231
Understandings API ICP653 Reading 8 - Q&A Practices API653 储罐认证, Q&A作业学习 28 th January 2016 Charlie Chong/ Fion Zhang

Understanding api icp653 reading 8 worksheet-03

Embed Size (px)

Citation preview

Page 1: Understanding api icp653 reading 8 worksheet-03

Understandings API ICP653 Reading 8 - Q&A Practices API653 储罐认证, Q&A作业学习28th January 2016

Charlie Chong/ Fion Zhang

Page 2: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 3: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 4: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 5: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 6: Understanding api icp653 reading 8 worksheet-03

Adobe Acrobat Reader HotkeysCtrl + G = find againCtrl + L = full screenCtrl + M = zoom toCtrl + N = go to page (insert number in box)Ctrl + Q = quit programCtrl + + = zoom inCtrl + - = zoom outCtrl + 0 = fit in windowCtrl + 1 = actual sizeCtrl + 2 = fit widthCtrl + 3 = fit visibleCtrl + 4 = reflowCtrl + Shift + A = deselect allCtrl + Shift + F = search queryCtrl + Shift + G = search resultsCtrl + Shift + J = cascade windowsCtrl + Shift + K = tile windows horizontallyCtrl + Shift + L = tile windows vertically

Charlie Chong/ Fion Zhang http://allhotkeys.com/adobe_acrobat_reader_hotkeys.html

Page 7: Understanding api icp653 reading 8 worksheet-03

Ctrl + Shift + S = save a copyCtrl + Shift + P = page setupCtrl + Shift + W = search word assistantCtrl + Shift + X = search select indexesCtrl + Shift + Page Up = first pageCtrl + Shift + Page Down = last pageCtrl + Shift + + = rotate clockwiseCtrl + Shift + - = rotate counterclockwiseCtrl + Alt + W = close allAlt + Left Arrow = go to previous viewAlt + Right Arrow = go to next viewAlt + Shift + Left Arrow = go to previous documentAlt + Shift + Right Arrow = go to next documentF4 = thumbnailsF5 = bookmarksF8 = hide toolbarsF9 = hide menu bar

http://en.wikipedia.org/wiki/Table_of_keyboard_shortcutshttp://help.adobe.com/en_US/acrobat/using/WS58a04a822e3e50102bd615109794195ff-7aed.w.htmlCharlie Chong/ Fion Zhang

Page 8: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 9: Understanding api icp653 reading 8 worksheet-03

API 653 Exam Administration -- Publications Effectivity Sheet FOR: November 2015, March 2016 and July 2016 Listed below are the effective editions of the publications required for this exam for the date(s) shown above. API Recommended Practice 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, Second Edition, April 2011

Charlie Chong/ Fion Zhang

Page 10: Understanding api icp653 reading 8 worksheet-03

API 653 Exam Administration -- Publications Effectivity Sheet FOR: November 2015, March 2016 and July 2016 Listed below are the effective editions of the publications required for this exam for the date(s) shown above. API Recommended Practice 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, Second Edition, April 2011

Charlie Chong/ Fion Zhang

Page 11: Understanding api icp653 reading 8 worksheet-03

ATTENTION: Only the following sections / mechanisms from RP 571 are included on the exam:

Section 3, Definitions Par. 4.2.7 Brittle Fracture 4.2.16 Mechanical Fatigue 4.3.2 Atmospheric Corrosion 4.3.3 Corrosion Under insulation (CUI) 4.3.8 Microbiologically Induced Corrosion (MIC) 4.3.9 Soil Corrosion 4.3.10 Caustic Corrosion 4.5.1 Chloride Stress Corrosion Cracking (Cl-SCC) 4.5.3 Caustic Stress Corrosion Cracking (Caustic Embrittlement) 5.1.1.10 Sour Water Corrosion (Acidic) 5.1.1.11 Sulfuric Acid Corrosion

Charlie Chong/ Fion Zhang

Page 12: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

• API Recommended Practice 575, Inspection of Atmospheric and Low-Pressure Storage Tanks, Third Edition, April 2014

• API Recommended Practice 577 – Welding Inspection and Metallurgy, Second Edition, December 2013

• API Standard 650, Welded Tanks for Oil Storage, Twelfth Edition, March 2013 with Addendum 1 (September 2014), Errata 1 (July 2013), andErrata 2 (December 2014).

• API Recommended Practice 651, Cathodic Protection of AbovegroundPetroleum Storage Tanks, Fourth Edition, September 2014.

• API Recommended Practice 652, Lining of Aboveground Petroleum Storage Tank Bottoms, Fourth Edition, September 2014

• API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction, Fifth Edition, November 2014.

Page 13: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

• American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code, 2013 Edition

i. ASME Section V, Nondestructive Examination, Articles 1, 2, 6, 7 and 23 (section SE-797 only)

ii. Section IX, Welding and Brazing Qualifications (Welding Only)

See end of this study note for API Official BOK

Page 14: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 15: Understanding api icp653 reading 8 worksheet-03

http://independent.academia.edu/CharlieChong1http://www.yumpu.com/zh/browse/user/charliechonghttp://issuu.com/charlieccchong

Charlie Chong/ Fion Zhang

Page 16: Understanding api icp653 reading 8 worksheet-03

http://greekhouseoffonts.com/Charlie Chong/ Fion Zhang

Page 17: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

The Magical Book of Tank Inspection ICP

Page 18: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 19: Understanding api icp653 reading 8 worksheet-03

闭门练功

Charlie Chong/ Fion Zhang

Page 20: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 21: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q1. __________ is a change from previous operating conditions involving different properties of the stored product such as specific gravity or corrosivity and / or different service conditions oftemperature and / or pressure"(a) Re-rating; (b) Change in service;(c) Repair; (d) ReconstructionREF : API-653, - 3.7ANS : (b)

Q2. A __________ is a device used to determine the image quality of a radiograph.(a) A step wedge comparison film; (b) A densitometer;(c) A penetramter (d) All of the above.REF : ASME Section V, T-233ANS : (c)

Page 22: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q3. A corroded roof plate is found to have an average thickness of 0.1" measured over an area of 100 sq. inches. This area shall be :-(a) Repaired or replaced; (b) Found to be acceptable;(c) Repair is prohibited; (d) Replacement is mandatedREF : API-653, 4.2.1.2ANS : (b)

Q4. A double-welded butt joint is defined as :-(a) A joint between two members that intersect at an angle between 0 degrees (a butt joint) and 90 degrees (a corner joint).(b) A joint between two abutting parts lying in approximately the same plane that is welded from both sides.(c) A joint whose size is equal to the thickness of the thinner jointed member.(d) A joint between two overlapping members in which the overlapped edge is welded.REF : API 650, 3.1.1.1ANS : (b)

Page 23: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q5. An external floating roof shall be provided with at least one manhole having a minimum inside diameter of __________ inches.(a) 18; (b) 15; (c) 24; (d) 30.REF : API 650, APP. C. 3.11ANS : (c)

Q6. A formal Visual External inspection by a qualified inspector shall be done atleast :-(a) Every 5 years of ¼ CR life whichever is less(b) Every 5 years of ½ CR life whichever is less(c) Every 2 years(d) Every 1- years or ¼ CR life whichever is greaterREF :API 653, 6.3.2.1ANS : (a)

Page 24: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API6536.3.2 External Inspection6.3.2.1 All tanks shall be given a visual external inspection by an authorized inspector. This inspection shall be called the external inspection and must be conducted at least every five years or RCA/4N years (where RCA is the difference between the measured shell thickness and the minimum required thickness in mils, and N is the shell corrosion rate in mils per year) whichever is less. Tanks may be in operation during this inspection.

Page 25: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q7. A full hydrostatic test (when required) shall be held for __________ hours :-(a) 24; (b) 8; (c) 18; (d) 12REF : API 653, 12.3.1.1ANS : (a)

Q8. A full-fillet weld is a weld that :-(a) not less than 1/3 the thinner plate;(b) the legs equal the thickness of the thinner plate;(c) the largest isosceles triangle that can be inscribed within the cross section of the weld(d) is at least the thickness of the thicker plateREF : API 650 3.1.1.7ANS : (b)

Page 26: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: 5.1.1.4 fillet weld A weld of approximately triangular cross-section that joins two surfaces at approximately right angles, as in a lap joint, tee joint, or corner joint.

Q8. A full-fillet weld is a weld that :-(a) not less than 1/3 the thinner plate;(b) the legs equal the thickness of the thinner plate;(c) the largest isosceles triangle that can be inscribed within the cross section of the weld(d) is at least the thickness of the thicker plateREF : API 650 3.1.1.7

Page 27: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q9. A hot tap in a 1.25" thick tank with a minimum metal temperature of 65⁰F at time of hot tap, without having material toughness data is :-(a) not permitted; (b) permitted;(?)(c) not enough information; (d) not addressed by the codeREF : API 653 – 9.13.4 & Fig. 9-5ANS : (a)

Q10. A hydrostatic test for a relocated tank :-(a) may be waived by the Owner / Operator; (b) is required;(c) may be waived by the Inspector; (d) is not necessaryREF : API 653, 12.3.1.1 (a)ANS : (b)

Page 28: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653: Figure 5.2—Exemption Curve for Tanks Constructed from Carbon Steel of Unknown Material Specification

Page 29: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q11. A liquid penetrant examiner must have vision to enable him to read Jagger Type 2 standard chart at a distance of not less than 12 inches and is capable of distinguishing and differentiating contrast between colours used. Examiners shall be checked __________ toensure that they meet these requirements :-(a) Quarterly; (b) Semi-Annually;(c) Annually; (d) Bi-Annually.REF : API 650, 6.4.3 (a)ANS : (c)

Q12. A procedure qualification record (PQR) shall address :-(a) non-essential variables;(b) essential variables;(c) supplemental essential variables (when required);(d) both (b) and (c)REF : ASME Sec IX, QW-200.2ANS : (d)

Page 30: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q13. A radiograph is made using an X-ray source and two films in each film holder. For composite viewing, each film of the composite shall have a minimum density of :-(a) 4.0; (b) 1.8; (c) 2.0; (d) 1.3REF : ASME Section V, T-282.1ANS : (d)

Q14. A reconstructed tank with a total height of 25' has been determined to have an out-of plumbness of 2 ¾". This is :-(a) acceptable; (b) unacceptable;(c) not covered by the code (d) corrected by eternal strengtheningREF : API-653, 10.5.2.1ANS : (a)

Page 31: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q15. A riveted tank shell with a butt joint has 3 rows. What is the joint efficiency ?(a) 0.75"; (b) 0.85"; (c) 0.90; (d) 0.91.REF : API-653, Table 4-2ANS : (b)

Q16. A SAW welding operator is attempting to quality by radiography on a 6 inch thick test coupon. Elongated slag inclusions are measured to be 0.2 inch long.(a) Must weld 2 additional coupons; (b) meets the requirements (passes)(c) slag must not exceed 0.5" (d) slag is not acceptable.REF : ASME Section IX, QW-191.2.2ANS : (b)

Page 32: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q17. A self-supporting cone roof :-(a) is formed approximately to the surface of a right cone;(b) both a and d(c) has columns and / or rafters on trusses(d) is supported at the periphery.REF : API 650 3.10.1 (a)ANS : (b)

Q18. A shell to bottom fillet weld for a Grade IV material shall be(a) made with atleast 2 passed; (b) may be made with 1 pass(c) shall be atleast 3/16" (d) both (a) and (c) aboveREF : API 650 3.1.5.7 cANS : (a)

Page 33: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q19. A single film technique was used to make a radiograph using a Cobalt-60 source. The minimum permitted density in the area of interest is :(a) 4.0; (b) 1.8; (c) 2.0; (d) 1.3.REF : ASME Section V, T-282ANS : (b)

Q20. A supported cone roof :-(a) is formed approximately to the surface of a right cone;(b) both (a) and (c);(c) has columns and / or rafters on trusses;(d) is supported at the peripheryREF : API 650 3.10.1 (a)ANS : (b)

Page 34: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

ASME V: T-282 Radiographic DensityT-282.1 Density Limitations. The transmitted film density through theradiographic image of the body of the appropriate hole IQI or adjacent to thedesignated wire of a wire IQI and the area of interest shall be 1.8 minimum forsingle film viewing for radiographs made with an X-ray source and 2.0minimum for radiographs made with a gamma ray source. For compositeviewing of multiple film exposures, each film of the composite set shall have aminimum density of 1.3. The maximum density shall be 4.0 for either single orcomposite viewing. A tolerance of 0.05 in density is allowed for variationsbetween densitometer readings.

Page 35: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q21. A tank bottom depression is 9.125" deep, radius of depression is 22.5 feet. What is the maximum depth of depression ?(a) 7.825"; (b) 8.062"; (c) 8.125"; (d) 8.325"REF : 653 APP. “B” B-6ANS : (d) BB = 0.37R

Q22. A tank bottom lining with a measured thickness of 15 mils should be tested with :-(a) A high voltage detector in accordance with NACE RP0188;(b) A low voltage (67.5 volts) wet sponge detector;(c) A calibrated Ultrasonic tester;(d) An Eddy Current lift-off detector;REF : API-652, 7.3.2ANS : (b) 3.26 thin-film liningA lining with a dry film thickness less than 20 mils (500 μm).

Page 36: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q23. A weld shall be unacceptable by Visal Inspection if the inspection shows which of the following ?(a)The weld has no crater cracks or other surface cracks.(b)Undercutting exceeds the limits given in 5.2.1.4 for vertical or horizontal

butt joints.(c) The frequency of surface porosity in the weld does not exceed one cluster

(one or more pores) in any four inches of length, and the diameter of each cluster does not exceed 3/32 inch.

(d)All of the above;REF : API 650 6.5.1ANS : (b)

Page 37: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Durian Avalanche: Durian Runtuh

Page 38: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Durian Avalanche: Durian Runtuh

Page 39: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q24. A weld with a nominal thickness of 1.5 inch is to be radiographed using a film side penetrameter, hole type. The penetrameter designation should be :-(a) 25; (b) 30; (c) 35; (d) Both (a) and (b) are responsible;REF : ASME Section V, T-276ANS : (a)

Q25. A welder may deviate from the parameters specified in WPS if they are nonessential variables :-(a) Provided authorization from inspection is documented;(b) Provided the welding supervisor approves;(c) No;(d) Nonessential variables only apply to PQRsREF : ASME Section IX, QW-200.1ANS : (c)

Page 40: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

ASME V: T276

Page 41: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q26. A welder qualifies in the 3G position on a plate coupon, he is then qualified to weld in the position(s) on NPS 6 pipe :-(a) F, V; (b) F only; (c) F, V, O; (d) ALLREF : ASME Sec IX, QW-461.9ANS : (b)

Q27. A welder who is qualified using a double-groove weld :-(a) is also qualified to make a single V-groove weld without backing;(b) is also qualified to make a single V-groove weld with backing;(c) may weld in the 6G position;(d) must requalify every 2 monthsREF : ASME Section IX, QW-402.2ANS : (b)

Page 42: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 43: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q28. A welder's ID must be placed at intervals not exceeding along completed welds :-(a) One foot; (b) One and a half feet;(c) Two feet; (d) Three feet.REF : API-653, 11.2.2ANS : (d)

Q29. A welding procedure qualified on ¼ inch thick plate can be used to weld groove welds in materials from to :-(a) 3/16 to 3/4; (b) 1/16 to 3/4;(c) 3/8 to 3/4; (d) 1/16 to 1/2.REF : ASME Sec IX, QW-451.1ANS : (d)

Page 44: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q30. A welding procedure qualified on 3/8" thick plate can be used to weld groove welds in materials :-(a) 3/16 to 3/4; (b) 1/16 to 3/4;(c) 3/8 to 3/4; (d) 1/16 to 3/8.REF : ASME Sec IX, QW-451.1ANS : (b)

Q31. A welding procedure qualified under the 1965 ASME Code Section IX :(a) Is obsolete;(b) Is still applicable;(c) Must be re-qualified every 3 years when code is re-issued;(d) is not addressed by the codeREF : ASME Section IX ForwardANS : (b)

Page 45: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q32. Above-ground storage tank is defined as a stationary container with a barrel capacity greater than :-(a) 2000 barrels; (b) 300 barrels;(c) 500 barrels; (d) 750 barrels.REF : API 651-1.2.1ANS : (c)

Q33. Acceptance standards for MT examination shall be per :-(a) AWS D-1.1;(b) SNT-TC-1A;(c) Appendix 6 of ASME Sect VII (VIII) , div. 1(d) Article 7 of ASME Sect VREF :API 650 6.2.4ANS : (c) 8.2.4 Acceptance standards and the removal and repair of defects shall be in accordance with Section VIII, Annex 6, Paragraphs 6-3, 6-4, and 6-5, of the ASME Code.

Page 46: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q34. All tanks shall be given a formal visual external inspection by an inspector at least :-(a) every 3 years or at quarter corrosion rate;(b) every 5 years or at quarter corrosion rate;(c) every 3 years or at half corrosion rate;(d) every 5 years or at half corrosion rate.REF : API-653-6.3.2.1ANS : (b)

Q35. inspection only when :-(a) operations dictate;(b) construction allows external access to the tank bottom to determine thickness;(c) all insulation is removed from the tank;(d) no alternate is allowed.REF : API 653 6.5ANS : (b)

Page 47: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q36. Anticipated minimum thickness of tank bottom where bottom / foundation design provides for leak detection and containment is :-(a) 0.10"; (b) 0.05"; (c) 0.09";(d) same as without leak detection and containment.REF : API 653 Table 6-1ANS : (b)

Q37. Radiographic location markers are to be placed(a) on the exposure holder / cassette; (b) on the part;(c) between the part and the film; (d) either (b) or (c) aboveREF :ASME Section V-T375ANS : (d)

Page 48: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

ASME V: T-275 Location MarkersLocation markers (see Fig. T-275), which are to appear as radiographicimages on the film, shall be placed on the part, not on the exposure holder/cassette. Their locations shall be permanently marked on the surface of thepart being radiographed when permitted, or on a map, in a manner permittingthe area of interest on a radiograph to be accurately traceable to its locationon the part, for the required retention period of the radiograph. Evidence shallalso be provided on the radiograph that the required coverage of the region being examined has been obtained. Location markers shall be placed as follows.

Page 49: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q38) At what design metal temperature must impact tests be made for all weld metal and procedures to be used ?(a) Below 32⁰F; (b) Below 20⁰F; (c) Below 15⁰F; (d) Below 10⁰F.REF : API 650-7.2.2.4ANS : (b)

Q39) At what level is the atmosphere considered oxygen-deficient ?(a) less than 19.5 %; (b) less than 21.9 %;(c) less than 24.9 %; (d) less than 16.0 %REF : API 2015 – 3.3ANS : (a)

Page 50: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

9.2.2.3 For all materials to be used at a design metal temperature below 10°C (50°F), the qualification of the welding procedure for vertical joints shall include impact tests of the weld metal. If vertical joints are to be made by a machine, automatic, or semiautomatic process, impact tests of the heat-affected zone shall also be made.9.2.2.4 When the design metal temperature is below -7°C (20°F), impact tests of the weld metal shall be made for all procedures used for welding the components listed in 4.2.10.1, for welding attachments to these components, and for fabricating shell nozzles and manholes from pipe and forgings listed in 4.5.9.2.2.5 Impact tests shall show minimum values for acceptance in accordance with 4.2.9.3 and the following:a)for P-No. 1, Group 1, materials— 20 J (15 ft-lbf), average of three specimens; b)for P-No. 1, Group 2, materials— 27 J (20 ft-lbf), average of three specimens; c)for P-No. 1, Group 3, materials— 34 J (25 ft-lbf), average of three specimens.

Page 51: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q40) Base metals are grouped into groupings according to their welding characteristics :-(a) F-number; (b) AWS;(c) A-number; (d) P-number.REF : ASME Sec IX, QW-421ANS : (d)

Q41) Based on a measured corrosion of 0.006" annually and using a corrosion allowance of 0.120", how long before the next UT thickness measurements are required ?(a) 10 years; (b) 36.5 years;(c) 20 years; (d) 15 years.REF : API-653 6.3.3.2ANS : (d) RCA/2N = 0.120/(2x 0.006)= 10 years

Page 52: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

6.3.3 Ultrasonic Thickness Inspection6.3.3.1 External, ultrasonic thickness measurements of the shell can be a means of determining a rate of uniform general corrosion while the tank is in service, and can provide an indication of the integrity of the shell. The extent of such measurements shall be determined by the owner/operator. 6.3.3.2 When used, the ultrasonic thickness measurements shall be made at

intervals not to exceed the following. a) When the corrosion rate is not known, the maximum interval shall be five

years. Corrosion rates may be estimated from tanks in similar service based on thickness measurements taken at an interval not exceeding five years.

b) When the corrosion rate is known, the maximum interval shall be the smaller of RCA/2N years (where RCA is the difference between themeasured shell thickness and the minimum required thickness in mils, and N is the shell corrosion rate in mils per year) or 15 years.

Page 53: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q42) Based on variable-design point method, calculate the first course thickness, exclusive of CA, for a 200 foot diameter tank, purchaser specified specific gravity of 1, 56 feet in height, using 96 inch (8’) courses with material stress of 23,000 psi. Design is based on test conditions :-(a) 0.853; (b) 0.934; (c) 1.239; (d) 1.220REF : API 650-3.6.4ANS : (c) t= 2.6(55)200/(23000)= 1.243”

Q43) Before elevating the operating temperature of a shell tank to atemperature above 200°F, what document must be considered ?(a) API RP 650, Welded Steel Tanks for Oil Storage;(b) API 650, Appendix M;(c) API RO 650, Lining of Aboveground Petroleum Tanks;(d) Publication 2207, Preparing Tank Bottoms for Work.REF : API-653, 4.2.4.4ANS : (b)

Page 54: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q44) Bimetallic corrosion can occur when :-(a) A bronze check valve is joined to steel piping;(b) Either stainless steel or copper is connected to a steel tank;(c) Neither (a) or (b);(d) Both (a) and (b).REF : API 651 2.2.2ANS : (d)

Q45) Bottom leak detection :-(a) can be detected by installation of cathodic protection;(b) can be detected by observation at a tell-tale hole;(c) is a hazard that can not be detected;(d) never happens when lining are properly installed.REF : API 651 2.2.2ANS : (b)

Page 55: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q46) Bottoms exceeding 100' diameter in tanks operating above 200⁰F shall have :-(a) butt-welded annular bottom plates;(b) be made of a Group IV, V or VI material;(c) have a modulus of elasticity of 30,000,000;(d) all of the above.REF : API 650 App M.4.1ANS : (a)

Q47) Hot work is defined as :-(a) Work than can lead to fever;(b) an operation that can produce a spark or flake hot enough to ignite flammable vapours;(c) an atmosphere between the LEL and UEL;(d) both (a) and (c) above.REF : API 2207, 1.1ANS : (b)

Page 56: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q48) Cathodic protection is achieved by directing the flow of current from :-(a) A cathode to an anode; (b) An anode to a cathode;(c) Both installations are unacceptable; (d) Neither (a) or (b).REF : API 651 5.2.1ANS : (b)

Q49) Concrete rings shall be inspected for :-(a) broken concrete, spalling, cracks; (b) vegetation against tank;(c) holidays in paint; (d) only (a) and (b).REF : API 653 Appendix C, C.1.1.1ANS : (d).

Page 57: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q50) Construction, inspection and repair records shall be maintained by the :-(a) Manufacturer; (b) Inspector;(c) Owner / Operator; (d) Jurisdiction.REF : API 653, 13.2.1ANS : (c)

Page 58: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 59: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q51) Describe how a liquid penetrant examination should be performed in order to detect discontinuities, which are open to the surface :-

(a)clean the part, apply the developer, apply the penetrant, remove excess penetrant, inspect the part, clean the part;

(b)clean the part, apply the penetrant, remove excess penetrant, apply the developer, inspect the part, clean the part;

(c) clean the part, apply the developer, apply the penetrant, inspect the part, remove excess penetrant, clean the part;

(d)clean the part, apply the developer, apply the penetrant, inspect the part, clean the part.

REF : ASME Section V-T620ANS : (b)

Page 60: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q52) Tank with 17 mils of the original 25 mils corrosion allowance still remaining after 15 years ?(a) 5 years; (b) 15 years; (c) 23.875 years; (d) 31.875 years.REF : API 653, 6.3.3.2 (c)ANS : (b)

Q53) Determine the maximum allowable height for a 90 foot diameter tank based on a maximum shell plate thickness of 0.5 inch and maximumallowable stress of 21,000 psi, with a jointefficiency of 0.85, and no corrosion allowance :-(a) 29.6; (b) 35.3; (c) 39.1; (d) 43.9REF : API 650-Table A-4ANS : (c) / SEt/(2.6x90) = H = 38.141’ used 35.3’

Page 61: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q54) Differential settlement leads to :-(a) potential floating roof hang up; (b) lack of circularity at the top;(c) oval shape at the top; (d) all of the above.REF : API 653 Appendix B.2.2.3ANS : (d)

Q55) Distorted anchor bolts may indicate :-(a) overpressure uplift condition; (b) foundation settlement;(c) both (a) and (b) above; (d) anchor bolts do not distort.REF : API 653, 4.5.3ANS : (c)

Page 62: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q56) During an inspection, you are required to calculate the retirement thickness for the bottom course of a tank. The information available is as follows :-Diameter = 150 feetHeight = 40 feetSpecific gravity of contents = 0.77Joint efficiency = 0.7Material tensile strength is unknownMaterial yirld strength is unknown;Material maximum allowable stress is unknown. S, used 23600psi

(a) 0.050; (b) 0.7141; (c) 0.500; (d) 0.5625REF : API 653, 4.3.3.1ANS : (c)t = 2.6HDG/SE = 0.727S used 23600psi

Page 63: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q58) E7018 electrodes are classified as F number :-(a) 1; (b) 2; (c) 4; (d) 5.REF : ASME Sec IX, QW-432ANS : (c)

Q59) Essential variable on a welding procedure specification :-(a) those in which a change, as described in the specific variables, is

considered to affect the mechanical properties of the weldment;(b)variable are listed in section IX of the ASME CODE;(c) both (a) and (b) above.(d)are the same for all procedures.REF : ASME Section IX, QW 251.2ANS : (c)

Page 64: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q60) Examiners who perform ultrasonic examinations under API-650 shall be qualified and certified by the manufacturers as meeting the requirements of certification as outlined in ?(a) ASME; (b) ASNT-TC-1A; (c) API-650; (d) API-653.REF : API 650, 6.3.3ANS : (b)

Q61) Except as modified in Section 6 of API-650, the radiographic method employed shall be in accordance with which Section and article of the ASME code ?(a) Section II, Article 2; (b) Section III, Article 1;(c) Section V, Article 2; (d) Section IX, Article 1.REF : API 650, 6.1.3.1ANS : (c)

Page 65: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q62) Exclusive of corrosion allowance, what is the minimum nominal thickness for all new construction bottom plates?

(a) 1/2 inch; (b) 1/4 inch; (c) 3/16 inch; (d) 5/8 inch.REF : API 650-3.4.1ANS : (b)

Q63) Existing shells shall be analyzed by experienced personnel for :-(a)Fluid static head, internal and external pressure, wind loads, settlement

and business needs;(b)Wind loads, settlement, fluid static head, internal and external pressure

and nozzle loads;(c) Internal and external pressure, wind loads, fluid static head, settlement

and if it convenient.(d)Only (a) and (b) above.REF : API 653, 4.3.1.2ANS : (b)

Page 66: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q64) External tank bottom inspection is permitted :-(a) when required by the inspector;(b) only when reassembly is being done.(c) where construction, size or other aspects allow;(d) is not permitted.REF : API-653, Table 6-1; 6.5ANS : (c)

Q65) Find the capacity of a small tank, with a joint efficiency of 0.85, specific gravity = 1.0, no corrosion allowance, diameter is 40 feet, height is 30 feet with 5 completed 72" courses.(a) 5,370; (b) 5,140; (c) 6,710; (d) 7,350.REF : API 650 – Appendix A.2.2 Table A-1ANS : (c)C = 0.14D2H = Barrels1 Fluid barrel =4.2109375 cubic feet

Page 67: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q66) Flaws such as cracks in the weld in shell-to-bottom of a tank are :-(a) not critical;(b) acceptable if length is less than twice the width;(c) to be removed and repaired;(d) welded over without needing to be removed.REF : API-653, 4.3.6ANS : (c)

Q67) Floating root anti-rotation devices shall be evaluated for :-(a) needed repairs; (b) replacement;(c) ultrasonically for flaws; (d) only (a) and (b) above.REF : API 653, 4.2.3.3ANS : (d)

Page 68: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q68) For a 30 inch shell manhole, 0.5 inches thick shell and reinforcing plate, what minimum neck thickness is required ?(a) 3/16; (b) 3/8; (c) 1/2; (d) 5/16.REF : API 650 – 3.7.5.1 (Table 3-5)ANS : (d)

Q69) For an existing 150 foot diameter storage tank, which has been in service for 28 years, known joint efficiency is 1.0, contents have been the same, with a specific gravity of 1.0, material yield of plate is 30,000 and tensile strength is 55,000, liquid fill level is 50 feet, calculate theminimum allowable thickness for the second course :-(a) 0.6789; (b) 0.7962; (c) 0.8056; (d) 0.8156.REF : API 653, 4.3.3.1ANS : (d) S = 23600psit = 2.6(42)150/(23600) =. 0694”

Page 69: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650:

Page 70: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q70) For butt-welded joints in which the thinner shell plate is 3/8 inch or less, how many spot radiographs shall be taken in the first 10 feet of completed vertical joint of each type and thickness welded by each welder or welding operator ?(a) One; (b) Two; (c) Three; (d) Four.REF : API 650 – 6.1.2.2ANS : (a)

Q71) For dome roofs that are flanged, the radius of curvature is limited by the depth of the roof, including the crown and knuckle depth. What is t he maximum roof depth for a shop assembled cone roof 10 feet in diameter?(a) 2.0"; (b) 3.5"; (c) 5.5"; (d) 8.0REF : API 650 – J.3.5.3 (Table J-1)ANS : (c)

Page 71: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API560: 8.1.2.2 The following requirements apply to vertical joints.a) For butt-welded joints in which the thinner shell plate is less than or equal

to 10 mm (3/8 in.) thick, one spot radiograph shall be taken in the first 3 m (10 ft) of completed vertical joint of each type and thickness welded by each welder or welding operator. The spot radiographs taken in the vertical joints of the lowest course may be used to meet the requirements of Note 3 in Figure 8.1 for individual joints. Thereafter, without regard to the number of welders or welding operators, one additional spot radiograph shall be taken in each additional 30 m (100 ft) (approximately) and any remaining major fraction of vertical joint of the same type and thickness. At least 25 % of the selected spots shall be at junctions of vertical and horizontal joints, with a minimum of two such intersections per tank. In addition to the foregoing requirements, one random spotradiograph shall be taken in each vertical joint in the lowest course (see the top panel of Figure 8.1).

Page 72: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: Table J.1b—Minimum Roof Depths for Shop-Assembled Dome-Roof Tanks (USC)

Page 73: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q72) For impact testing materials, what is the minimum transverse value of Group IV materials, 1.5" thick ?(a) 13 foot – pounds; (b) 15 foot – ponds;(c) 20 foot – pounds; (d) 25 foot – pounds;REF : API-650 Table 2-4ANS : (c)

Q73) For impact testing materials, what is the minimum longitudinal value for a 1.8" thick A-516-70as rolled material for a WPS ?(a) 50 foot – pounds;(b) 15 foot – pounds;(c) 42 foot – pounds;(d) 40 foot – pounds.REF : API 650, 7.2.2.5 or Table 2-3ANS : (c)

Page 74: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Table 4.5b—Minimum Impact Test Requirements for Plates (USC) (See Note)

Page 75: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q74) For new or repaired shell horizontal joints, how many radiographs shall be taken for each 50 feet of horizontal joint, not including those required at intersections of vertical and horizontal joints ?(a) 1; (b) 2; (c) 3; (d) 5.REF : API 653 – 12.2.1.2ANS : (a)2+1? 3 Radiographs?

API650: 8.1.2.3 One spot radiograph shall be taken in the first 3 m (10 ft) of completed horizontal butt joint of the same type and thickness (based on the thickness of the thinner plate at the joint) without regard to the number of welders or welding operators. Thereafter, one radiograph shall be taken in each additional 60 m (200 ft) (approximately) and any remaining major fraction of horizontal joint of the same type and thickness. These radiographs are in addition to the radiographs of junctions of vertical joints required by Item c of 8.1.2.2 (see Figure 8.1).

Page 76: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653: 12.2.1.2 For horizontal joints:a) new replacement shell plates to new shell plates, no additional

radiographs required, other than those required by API 650, Section 8.1.2.3 and Figure 8-11 for new construction;

b) new replacement shell plates to existing shell plates, one additional radiograph for each 50 ft of repaired horizontal weld;

c) repaired joints in existing shell plates shall have one additional radiograph taken for each 50 ft of repaired horizontal weld.

2+1? 3 Radiographs?

Page 77: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q75) For welds that attach nozzles, manholes, cleanout openings and permanent attachments, undercut shall not exceed ______ inch.(a) 3/32; (b) 1/8; (c) 3/16; (d) 1/64.REF : API 650, 6.5.1ANS : (d)

API650: 8.5.2 A weld shall be acceptable by visual examination if the inspection shows the following.

a) There are no crater cracks, other surface cracks or arc strikes in or adjacent to the welded joints.

b) Maximum permissible undercut is 0.4 mm (1/64 in.) in depth for vertical butt joints, vertically oriented permanent attachments, attachment welds for nozzles, manholes, flush-type openings, and the inside shell-to-bottom welds. For horizontal butt joints, horizontally oriented permanent attachments, and annular-ring butt joints, the maximum permissible undercut is 0.8 mm (1/32 in.) in depth.

Page 78: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q76) Foundations of relocated tanks specified as true to horizontal plane without ring walls shall be true :-(a) ± 1/8" in any 30' and ± 1/4" in the total circumference;(b) ± 1/8" in any 30' and ± 1/2" in the total circumference;(c) ± 1/8" in any 10' and ± 1/2" in the total circumference;(d) ± 1.4" in any 30' and ± 1/2" in the total circumference.REF : API 653, 10.5.6.2 bANS : (c)

Q77) From what type of material should shims be fabricated when they are to be used to radiograph welds ?(a) Malleable materials capable of being drilled;(b) From the same heat number as the material being inspected;(c) Fabricated of radiographically similar material to the object to be inspected;(d) All of the above.REF : ASME Section V, T277.3ANS : (c)

Page 79: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653: 10.5.6.2 Where foundations true to a horizontal plane are specified, tolerances shall be as follows:

a) where concrete ringwalls are provided under the shell, the top of the ringwall shall be level within ±1/8 inches in any 30 ft of the circumference and within ±1/4 inches in the total circumference measured from the average elevation;

b) where concrete ringwalls are not provided, the foundation under the shell shall be level within ±1/8 in. in any 10 ft of circumference and within ±1/2 in. in the total circumference measured from the average elevation.

Page 80: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q78) Generally, tank bottom linings cover the entire tank bottom and extend ____ inches up the shell of the tank :-(a) 10 – 15 inches; (b) 12 - 18 inches;(c) 18 – 24 inches; (d) 24 – 30 inches.REF : API 652 4.4ANS : (c)

Q79) Hot taps are not permitted :-(a) on the roof of a tank or within the gas / vapour space of a tank;(b) where heat of welding may cause environmental cracking;(c) both (a) and (b);(d) (a) only.REF : API 653 – 9.13ANS : (c)

Page 81: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q80) Safe entry administrative controls include :-(a) an emergency plan;(b) atmospheric testing;(c) ventilation procedures;(d) all of the above.REF : API 2015, 2.1ANS : (d)

Page 82: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q81) How does the calculation of minimum thickness for a riveted tank shell differ from that of a welded tank shell :-

(a)The formula for the calculation of minimum thickness of a riveted tank shell is the same as for a welded tank shell except that the maximum allowable stress (S) is 21,000 lbs / sq. inch and the efficiency equals 1 for the shell plate 6 inches away from rivets;

(b)The formula for the calculation of minimum thickness of a riveted tank shell is exactly the same for a welded tank;

(c) The formula for the calculation of minimum thickness of a riveted tank shell is the same as for a welded tank shell except the minimum allowable stress (S) is 21,000 lbs /s q. inch and the efficiency equals 0.85 for the shell plate 6 inches away from the rivets.

(d)API does not set minimum thickness.REF : API-653, 4.3.4.1ANS : (a)

Page 83: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q82) How many equally spaced measurement are required for the thickness averaging technique ?(a) 2; (b) 5; (c) 4; (d) 3.REF : API 653, 4.3.2.1ANS : (b)

Q83) How many impact specimens must be broken for an average value for P1, Group 1, 2, 3 material?(a) 2; (b) 3; (c) 4; (d) 6.REF : API-650, 2.2.8.3ANS : (b)

Page 84: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q84) How many inches must project beyond the outside edge of the weld attaching the bottom sketchplate to the shell plate ?(a) At least 1/2 inch; (b) at least 2 inches;(c) A tleast 9/16 inch; (d) at least 1.0 inchREF : API 650 – 3.4.2ANS : (d)

Q85) How many settlement measurement points are required for a tank that measures 200 ft. in diameter ?(a) 30; (b) 8; (c) 21; (d) 10.REF : API 653, APP. “B” B-2ANS : (c)Internal = D/10+1 = 21External = D/10, even number

Page 85: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q86) How many specimens and impact tests must be performed from a single test coupon or test location ?(a) 1; (b) 2; (c) 3; (d) 4.REF : API 650 2.2.8.3ANS : (c)

Q87) How many specimens must be broken for an average value for P1, Group 1, 2, 3 material ?(a) 2; (b) 3; (c) 4; (d) 6.REF : API 650, 2.2.8.3ANS : (b)

Page 86: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q88) Hydrochloric acid may be formed by :-(a) Sodium and potassium; (b) Magnesium and calcium chlorides;(c) Calcium chlorides and sodium; (d) Potassium and Magnesium.REF : API Chapter II, 202.022ANS : (b)

Q89) Hydrostatic tests shall be held for ____ hours :-(a) 2; (b) 8; (c) 24; (d) 72.REF : API 653, 12.3.1.1ANS : (c)

Page 87: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q90) If penetrameters are not placed adjacent to the welds, what rules apply ?(a)The penetrameter should be placed on the source side of the material

being radiographed.(b)The penetrameter may be placed on the film side of the material being

radiographed.(c) Lead letter "F" at least as high as the identification number is placed

adjacent to the film side penetrameter;(d) All of the above.REF : ASME Section V, T277ANS : (d)

Q91) In a radiographic film of a weld, how is film sensitivity or quality measured?(a) by use of a penetrameter;(b) by film density;(c) comparing to known defects;(d) all of the above.REF : ASME Section V, T282, T283ANS : (a)

Page 88: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q92) In a riveted tank shell, a butt joint has 3 rows. What is the joint efficiency ?(a) 0.75; (b) 0.85; (c) 0.90; (d) 0.91.REF : API 653, Table 4-1ANS : (b)

Q93) In accordance with ASME Section V, intensifying screens :-(a) Can always be used;(b) Can be used unless restricted by the referencing Code;(c) Can never be used;(d) Can be used only with Type 1 film.REF : ASME Section V T-232ANS : (b)

Page 89: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q94) In general, if shell thickness does not exceed ____ inch, it does not require further assessment for brittle fracture :-(a) 0.25; (b) 0.75; (c) 1.00; (d) 0.50REF : 653, Notes for FIG. 5-1ANS : (d)

Q95) In tank floors, the maximum depth of bulge or edge settlement is dependent upon :-(a) Floor thickness; (b) The radius of an inscribed circle in the area;(c) tank diameter; (d) Tank height.REF : API 653 APP. “B”ANS : (b)

Page 90: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q96) Information needed when determining the rate of corrosion :-(a) Original thickness or last inspection thickness;(b) Current thickness;(c) Length of time in service;(d) All of the above.REF : API 653,ANS : (d)

Q97) Inspection history as required in the tank records is :-(a)all measurements taken, condition of all parts inspected and a record of all

tests and examinations;(b)personnel certification;(c) training records;(d) the as built record from the erector.REF : API 653, 6.8.3ANS : (a)

Page 91: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q98) _____ inspection may be substituted for a program of external UR thickness measurements:-

(a) Hydrostatic;(b) External;(c) Acoustic;(d) Internal.REF : API 653, 6.3.3.3ANS : (d)

Q99) Inspection of emergency P/V hatches includes :-(a)Servicing;(b)Removing oil from seals;(c) Action to prevent chattering;(d)Only (a) and (c) above.REF : API 653, appendix C.2.7.4ANS : (d)

Page 92: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q100) Inspection of insulation :-(a) is not required;(b) is done in routine in-service inspections;(c) requires material traceability records;(d) only (b) and (c) above.REF : API 653, 6.3.1.3ANS : (b)

Q101) Insulated tanks shall have their insulation removed :-(a) completely prior to inspection;(b) yearly;(c) from welded joints only;(d) to extent necessary to determine the external condition.REF : API 653, 6.3.2.2ANS : (d)

Page 93: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

20160129- 迎头赶上

Page 94: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

20160129- 迎头赶上

Page 95: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 96: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q102) Interference current problems in cathodic protection are can beapproached by :-(a) drainage of collected current to sacrificial anodes;(b) design to mimnimise exposure;(c) provide metallic return of collected current to a foreign structured;(d) all of the above.REF : API 651, 8.4.1ANS : (d)

Q103) Internal inspection intervals are determined by corrosion rates. Normally, the corrosion rates govern :-(a) roof;(b) upper shell;(c) bottom;(d) lower shell.REF : API 653 6.4.2.1ANS : (c)

Page 97: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q104) Internal inspection intervals normally :-(a) are controlled by bottom corrosion rates;(b) shall not exceed 20 years;(c) owner / user is free to set any convenient material;(d) both (a) and (b) above.REF : API 653 6.4.2.1ANS : (d)

Q105) Internal inspection is primarily to :-(a) all of the below;(b) Ensure that the bottom is not corroded and leaking;(c) Gather data for assessment;(d) Identify and evaluate bottom settlement.REF : API – 653, 6.4.1ANS : (a)

Page 98: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q106) Intervals between internal inspections shall be determined by the corrosion rate. Normally, bottom corrosion rates control the inspection interval. However, in no case shall the intervalinspection interval exceed ____ years :-(a) 10; (b) 15; (c) 20; (d) 25.REF : API 653 – 6.4.2.1ANS : (c)

Q107) Letters and numerals on nameplates shall not be less than inch high.(a) 5/32; (b) 5/16; (c) 3/16; (d) 1/8.REF : API 650 8.1.1ANS : (a)

Page 99: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

5/32 (3.8mm)

Page 100: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q108) Liquid penetrant examiners shall be qualified in accordance with _:-(a) ASME Section VIII, div. 1 Appendix 8.(b) API 650;(c) ASNT proc. SNT-TC-1A(d) ASME SECTION V, Art 6.REF : API 650, 6.4.3ANS : (b)

Q109) Magnetic particle examination shall be performed in accordance with a written procedure that is in compliance with the requirements of :-(a) ASME Section V, Art. 7; (b) ASME Sectin IX, Art. 2;(c) SNT-TC-1A; (d) Appendix C, API 653.REF : API 650, 6.2.1ANS : (a)

Page 101: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

8.4 Liquid Penetrant Examination 8.4.1 When liquid penetrant examination is specified, the method of examination shall be in accordance with Section V, Article 6, of the ASME Code. 8.4.2 Liquid penetrant examination shall be performed in accordance with a written procedure that is certified by the Manufacturer to be in compliance with the applicable requirements of Section V of the ASME Code.8.4.3 The Manufacturer shall determine and certify that each liquid penetrant examiner meets the following requirements. a) Has vision (with correction, if necessary) to enable him to read a Jaeger Type 2 standard chart at a distance of not less than 300 mm (12 in.) and is capable of distinguishing and differentiating contrast between the colors used. Examiners shall be checked annually to ensure that they meet these requirements. b) Is competent in the technique of the liquid penetrant examination method for which he is certified, including making the examination and interpreting and evaluating the results; however, where the examination method consists of more than one operation, the examiner may be certified as being qualified for one or more of the operations. 8.4.4 Acceptance standards and the removal and repair of defects shall be in accordance with Section VIII, Annex 8, Paragraphs 8-3, 8-4, and 8-5, of the ASME Code.

Page 102: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

NDT Personnel Qualifications RT: SNT-TC-1A UT: SNT-TC-1A MT: API650 PT: API650 VT: API650

Page 103: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q110) Measurement of film thickness of tank bottom linings are taken :-(a) only when the film has completely dried;(b) both before and after the film has dried;(c) in accordance with ASNT;(d) only if there is reason to believe it is thin.REF : API-652, 7.3.2.2ANS : (b).

Q111) Minimum spacing between toes of welds for a radius (R) on a penetration and other welds of 1.25" plate must be :-(a) 6"; (b) 7.5"; (c) 3"; (d) 1.25"REF : API 653 Figure 9-1ANS : (b)

Page 104: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Figure 9.1—Acceptable Details for Replacement of Shell Plate Material

Page 105: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q112) Minimum thickness calculation for shells of tanks 200 ft. or less in diameter shall be done using ____ :-(a) the variable design point method fo API 650;(b) ASME section VII, div. 1;(c) the formula given in API 653;(d) either (a) or (c) may be used.REF : API 653, 4.3.3.2ANS : (d)

Q113) Acceptance criteria for NDT of reconstructed tanks are to be inaccordance with :-(a) ASME Section VIII; (b) ASME Section V;(c) API 653; (d) API 650.REF : API 650, 6.1.5, 6.2.4, 6.3.4ANS : (d)

Page 106: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q114) Of the following welding processes, which one is not permitted for welding on above ground storage tanks :-(a) SMAW; (b) GMAW; (c) OFW; (d) SAW.REF : API 650, 5.2.1.1ANS : (c)

Q115) On plates more than 3/16 inch thick, the fillet weld thickness shall not be less than 1/3 the thickness of the thinner plat at the joint and shall be at least :-(a) 1/2 inch; (b) 1/4 inch; (c) 3/16 inch; (d) 9/32 inch.REF : API 650 – 3.1.3.3ANS : (c)3/16 = 4.6mm

Page 107: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

■ ωσμ∙Ωπ∆∇ º≠δ≤>ηθφФρ|β≠Ɛ∠ ʋ λ α ρτ√ ≠≥ѵФε ≠≥ѵФdsssa→

Page 108: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q116) On the drawing that the manufacturer shall furnish the purchase, you would expect to see which of the following information :-(a)The required shell thickness for both the design condition (including

corrosion allowance) and the hydrostatic test condition;(b)The nominal thickness used;(c) The material specification and allowable stresses;(d)All the above.REF : API 650, 3.6.1.8ANS : (d)

Q117) Opening in tank shells larger than required to accommodate a _____ inch standard-weight coupling shall be reinforced :-(a) 1.0 inch; (b) 1.5 inch; (c) 2.0 inch; (d) 2.5 inch.REF : API 650 – 3.7.2.1ANS : (c)

Page 109: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q118) Pan-type, pontoon-type and double-deck-type are examples of :-(a) internal roofs;(b) external roofs;(c) both internal and external roofs;(d) roofs on tanks < 200' in dia.REF : API 650 appendixes C & HANS : (c)

Q119) Per API 650, calculation of shell thickness by the 1-foot method cannot be used for tanks :-(a) under 200 ft. in diameter; (b) over 200 ft. in diameter;(c) under 150 ft. in diameter. (d) of any size.REF : 650 3.6.3.1ANS : (b)

Page 110: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q120) Pinhole leaks or porosity in tank bottom joints may be repaired by :-(a) grinding and out area; (b) penning over affected area;(c) applying additional weld bead over area; (d) mechanical caulking.REF : API 650 – 5.4.2ANS : (c)

Q121) Piping connections such as nozzles shall be inspected for :-(a) structural adequacy; (b) thickness of component;(c) reinforcement; (d) all of the above.REF : API 653, 4.3.9ANS : (d)

Page 111: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q122) Plate material thicker than ____ inches shall be normalised or quench tempered, killed, made to fine grain practice and impact tested :-(a) 2.00; (b) 1.75; (c) 1.50; (d) 1.00REF : API 650, 2.2.1.4ANS : (c)

Q123) Plates found to be thinner than those in the course above it are :-(a) not allowed;(b) permitted;(c) permitted provided they were so designed;(d) need to be calculated for suitability for service.REF : API 650, 3.6.1.5ANS : (a)

http://www.thefabricator.com/article/tubepipefabrication/quenching-and-tempering-of-welded-carbon-steel-tubulars

Page 112: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

客家酿豆腐http://www.nipic.com/show/1/55/7e100f3d34463cdb.html

Page 113: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

124) Procedure qualification for welding on a tank of unknown or obsolete material shall be done using test coupons of :-a) any P-1 material;b) any similar type material;c) material from the same P number grouping;d) actual material from the tank.REF : API 653, 11.1.2ANS : (d)

125) Procedure requirements for ultrasonic examination of welds :-(a) shall be performed to a written procedure; (b) approved by ASNT;(c) proven to the satisfaction of the inspector; (d) both (a) and (c) above.REF : ASME Section V, T150 cANS : (d)

Page 114: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

ASME V T 150c(c) When an examination to the requirements of this Section of the Code is required by other Sections of the Code, it shall be the responsibility of the Manufacturer, fabricator, or installer to establish nondestructive examination procedures and personnel certification procedures conforming to the referencing Code requirements.

Page 115: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q126) Pure hydrocarbon fluids :-(a) usually cause corrosion;(b) require special corrosion control;(c) both (a) and (b);(d) are usually not corrosive.REF : API-651, 1.1.3ANS : (d)

Q127) Radiographic acceptance standards are found in :-(a) ASME Section VIII, div. 1, para UW-51;(b) ASME Section V, Article 2;(c) API 650, Section 3;(d) API 653, Appendix D.REF : API 650 6.1.5ANS : (a)

Page 116: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q128) Reinforcement pads shall be tested by applying pressure between the tank shell and reinforcement plate using the telltale hole. How much pressure is used to perform thisinspection:-(a) 15 psig hydrostatic pressure; (b) 15 psig pneumatic pressure;(c) 5 psig hydrostatic pressure; (d) 5 psig pneumatic pressure.REF : API 650 – 5.3.5ANS : (b)

Q129) Repairs of cracks in the shell-to-bottom :-(a) are only necessary if they exceed 0.25" in length;(b) are performed on an individual basis, according to extent of damage;(c) may be welded over and left as is without reinspection;(d) both (b) and (c) above.REF : API-653, 4.3.6ANS : (b)

Page 117: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q130) Resistivity of surrounding soil may be used to determine the probability of corrosion on tank bottoms. Which of the following resistivity ranges is considered to be very corosive :-(a) < 500; (b) 500 – 1000; (c) 1000 – 2000; (d) < 10,000REF : API 651 – 3.3.1.3 (Table – 1)ANS : (a)

Q131) Rewelding vertical joints requires cutting horizontal welds back from the joint a minimum of ____ inches :-(a) 1/2; (b) 1; (c) 2; (d) 12.REF : API 653 Figure 9-1ANS : (d)

Page 118: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q132) Flame arresters are to be inspected :-(a) semi-annually;(b) annually;(c) at intervals determined by experience locally;(d) every 5 years.REF : API Chapter XIII 13.4.2.11ANS : (c)

Q133) Routine visual inspection by Owner / Operator personnel shall be done at least :-(a) annually; (b) bi-monthly; (c) monthly; (d) semi-annually.REF : API 653, 6.3.1.2ANS : (c)

Page 119: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q134) With a vertical sweep board 36 inches long, banding on reconstructed tanks shall not exceed ____ inch(s) :-(a) 1/2";(b) 3/4";(c) 1";(d) 1 ½".REF : API-653, 10.5.5ANS : (c)

Q135) Scheduled external inspections shall be performed at least :-(a) the lesser of every 5 years of 1/2 corrosion rate of the shell life;(b) the lesser of every 5 years or 1/4 corrosion rate of the shell life;(c) the lesser of every 10 years or 1/2 corrosion rate of the shell life;(d) the lesser of every 10 years or 1/4 corrosion rate of the shell life.REF : API 653, 6.3.2.1ANS : (c)

Page 120: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API65310.5.4 PeakingWith a horizontal sweep board 36-in. long, peaking shall not exceed ½ in. The sweep board shall be made to the true outside radius of the tank.10.5.5 BandingWith a vertical sweep board 36-in. long, banding shall not exceed 1 in.

Page 121: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653: 6.3.2 External Inspection6.3.2.1 All tanks shall be given a visual external inspection by an authorized inspector. This inspection shall be called the external inspection and must be conducted at least every five years or RCA/4N years (where RCA is thedifference between the measured shell thickness and the minimum required thickness in mils, and N is the shell corrosion rate in mils per year) whichever is less. Tanks may be in operation during this inspection.6.3.2.2 Insulated tanks need to have insulation removed only to the extent necessary to determine the condition of the exterior wall of the tank or the roof.6.3.2.3 Tank grounding system components such as shunts or mechanical connections of cables shall be visually checked. Recommended practices dealing with the prevention of hydrocarbon ignition are covered by API 2003.

Page 122: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q136) Seal material shall be placed :-(a) between the outer periphery of the roof and the tank shell;(b) around columns, ladders and gauge pipes that penetrate the deck;(c) the seal shall be flexible;(d) all of the above.REF : API 650 Appendix H.3.5ANS : (d)

Q137) Shell penetrations experiencing corrosion must be assessed and :-(a) tank rerated;(b) repair procedures established;(c) tank removed from service;(d) both (a) and (b) above.REF : API 653, 4.3.9ANS : (d)

Page 123: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q138) Small punctures in floating roof systems :-(a) may be ignored if they have been determined to be non-critical;(b) shall be repaired;(c) shall be replaced;(d) either (b) or (c) above.REF : API-653, 4.2.3.1ANS : (d)

Q139) Tack welds shall be made using a procedure qualified in accordance with ASME Section IX :-(a) Fillet weld; (b) Groove or fillet weld;(c) Special; (d) Butt weld.REF : API 650, 5.2.1.8ANS : (b)

Page 124: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q140) Tank grounding shunts shall be inspected :-(a) visually; (b) infrared camera;(c) by a certified electrician; (d) need no inspection.REF : API 653, 6.3.2.4ANS : (a)

Q141) Tanks reconstructed in accordance to API-653 shall be identified with a corrosion-resistant metal nameplate with letters not less than ____" high :-(a) 5/32; (b) 7/32; (c) 9/32; (d) 3/32.REF :- API 653, 13.1.1ANS : (a)

Page 125: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q144) The "L" in actual thickness determination for each shell course :(a) may be greater than 40";(b) is valid only when corroded area is less than 40";(c) applies even if corroded area is greater than L;(d) requires converting "D" from feet to inches.REF : API 653, 4.3.2.1 See NoteANS : (c) L=3.7√(Dt2)

Q145) The 6 G position for welding is a :-(a) Qualification position;(b) Production welding position;(c) Rod position;(d) Rank position.REF : ASME Sec IX QW-120ANS : (a)

Page 126: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q146) The API 653 standard covers the maintenance inspection, repairs, alteration, relocation and reconstruction of tanks constructed to which one of the following standards :-(a) ASME; (b) API 651; (c) API 65; (d) API 650.REF : API 653, 3.1.1ANS : (d)

Q147) The assessment period for inspection of tank bottom integrity is :-(a) is always 5 years;(b) is fixed by corrosion rate;(c) less than or equal to the appropriate internal inspection interval given in API-653 6.4.2(d) determined by the designer.REF : API-653, 4.4.1ANS : (c)

Page 127: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q148) The complete or partial removal and replacement of more than 12inches of a vertical weld joining shell plates is considered a :-(a) minor alteration; (b) minor repair;(c) major alteration; (d) major repair.REF : API 653, 12.3.1.2 (c)ANS : (d)

Q149) The definition of a confined space is :-a) large enough to enter;b) restricted means of entry;c) not designed for continuous occupancy;d) all of the above are required.REF : API 2015 1.4ANS : (d)

Page 128: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q150) The determining factor for intervals between internal and external inspections :-(a) Change of service to a higher specific gravity;(b) Tank service history provided earlier inspection is not required by specialreasons;(c) Corrosion activity either known or suspected.(d) Governmental regulationsREF : API 653, 6.4.2.1ANS : (b)

Page 129: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q151) The difference between peaking and banding is :-(a) peaking pertains to the roof;(b) banding is external to the tank;(c) peaking pertains to vertical weld seams, banding pertains to horizontal weld seams;(d) peaking pertains to horizontal weld seams, banding pertains to vertical weld seams.REF : General KnowledgeANS : (c)

Page 130: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API65310.5.4 PeakingWith a horizontal sweep board 36-in. long, peaking shall not exceed ½ in. The sweep board shall be made to the true outside radius of the tank.10.5.5 BandingWith a vertical sweep board 36-in. long, banding shall not exceed 1 in.

Page 131: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q152) The first checks for tanks out-of-service are :-(a) (b) and (d) below;(b) cleaned, gas freed and safe for entry;(c) hammer test the roof;(d) complete isolation.REF : API 653 Table C-2.1 a & bANS : (a)

Q153) The flammable range is when a vapour exists :-(a) above the ambient temperature;(b) between the lower flammable limit and the upper flammable limit;(c) between the extremes of the lower flammable limit;(d) between the extremes of the upper flammable limit;REF : API 20151.3.10ANS : (b)

Page 132: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q154) The formula for maximum bulge or depression of a tank bottom is :-(a) B = 0.37 R, gives an Answer in feet;(b) B = 0.37 R gives an Answer in inches;(c) B + 0.37" is the minimum;(d) B = 0.37 + RREF : API 653, B.3.3ANS : (d)

Q155) The general shape of gas cavities on a radiograph :(a) appear darker in contrast with areas of defect-free material;(b) are generally round in shape;(c) are acceptable;(d) both a and b.REF : General KnowledgeANS : (d)

Page 133: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q156) The Heat Affected Zone is :-(a) that portion of the base metal which has not been melted;(b) whose mechanical properties or micro structures have been altered by the heat of welding;(c) is least likely to contain discontinuities;(d) both (a) and (b) above.REF : ASME Section IX, QW-492ANS : (d)

Q157) The inspection interval for a tank is determined by :-(a) size; (b) service history; (b) the manufacturer; (d) type of tank.REF : API 653, 6.2.2ANS : (b)

Page 134: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q158) The lower flammable limit (LFL) is the _____ concentration of a glammable vapour in air that will ignite :-(a) approximate; (b) maximum; (c) average; (d) minimum.REF : 2015 1.3.1ANS : (d)

Q159) The maximum acceptable undercutting for base metal in repaired or altered horizontal welds is :-(a) 1/64"; (b) 1/32"; (c) 1/16"; (d) 1/8"REF : API-653, 10.4.2.5ANS : (b)

Page 135: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: 8.5.2 A weld shall be acceptable by visual examination if the inspection shows the following. a) There are no crater cracks, other surface cracks or arc strikes in or adjacent to the welded joints. b) Maximum permissible undercut is 0.4 mm (1/64 in.) in depth for vertical butt joints, vertically oriented permanent attachments, attachment welds for nozzles, manholes, flush-type openings, and the inside shell-to-bottom welds. For horizontal butt joints, horizontally oriented permanent attachments, and annular-ring butt joints, the maximum permissible undercut is 0.8 mm (1/32 in.) in depth.

Page 136: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q160) The maximum acceptable undercutting for base metal in vertical welds is :-(a) 1/64"; (b) 1/32"; (c) 1/16"; (d) 1/8,REF : API-653, 10.4.2.5ANS : (a)

Q161) The maximum interval between internal inspections shall not exceed ____ years :-(a) 10; (b) 20; (c) 5; (d) 15.REF : API 653, 6.4.2.1ANS : (b)

Page 137: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q162) The maximum spacing between settlement measurement points shallbe :-(a) 30 ft.; (b) 20 ft.; (c) 40 ft.; (d) 25 ft.REF : API 653 APP. “B”ANS : (a)N= D/10 even number.

Q163) The minimum dimension for replacement shell plate is 12 times t or ____ inches :-(a) 8; (b) 18; (c) 6; (d) 12.REF : API 653, 9.2.2.1ANS : (d)

Page 138: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q164) The minimum interval for external inspection by a qualified inspector is ____ years or at thequarter corrosion-rate life of the shell, whichever is less :-(a) Twenty; (b) Five; (c) Ten; (d) Fifteen.REF : API-653, 6.3.2.1, 6.4.2.1ANS : (b)

Page 139: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q165) The minimum size of a fillet weld is which of the following :-(a) On plate 3/16 inch tick, the weld shall be a full-fillet weld, and on plates more than 3/16 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at the joint and shall be atleast 3/16 inch.(b) On plate 5/16 inch thick, the weld shall be a full-fillet weld, and on plates more than 5/16 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at hte joint and shall be atleast 3/16 inch.(c) On plate 3/16 inch thick, the weld shall be a full-fillet weld, and on plates more than 5/16 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at the joint and shall be atleast 5/16 inch.(d) On plate 1/4 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at the joint and shall be atleast 1/4 inch.REF : API-650 3.1.3.3ANS : (a)

Page 140: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q166) The minimum thickness of an annular plate ring is usually greater than :-(a) 0.10; (b) 0.25; (c) 0.0625; (d) 0.1875.REF : API 653 4.4.8.1ANS : (a)

Q167) The permissible exposure limit (PEL) is the maximum ____ time-weighed average of any airborne contaminant to which an employee may be exposed :-(a) 8 hour; (b) 24 hour; (c) 4 hour; (d) 1 hour.REF : 2015 1.3.8ANS : (a)

Page 141: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q168) The proper method for dismantling tank bottoms that are to be reused shall be cut by:-(a) deseaming of lapwelds;(b) cutting alongside remaining welds at a minimum of 2 inches from existing welds;(c) cutting alongside remaining welds at a minimum of 3 inches from existing welds;(d) Both (a) and (b) are acceptable.REF : API 653-10.3.2.1ANS : (d)

Page 142: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q169) The purchaser has not specified the use of 1-foot method for calculating thickness and L/H ≤ 2, therefore, what is the shell plate thickness for the first course for the following tank design?

Height = 40 feet Diameter = 260 feetStress @ test condition = 30,000 psiSpecific gravity = 1.0 Course Length = 8 feetCorrosion Allowance = 0 Joint Efficiency = .0

(a) 1.209"; (b) 1.171"; (c) 0.856"; (d) 1.038"REF : 650 3.6.4.3 Table K-2ANS : (c)

Page 143: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q170) The purpose of electrical grounding of A/C power connections is :-(a) protect against lightening; (b) corrosion control for tank bottoms;(c) personal safety; (d) corrosion control for tank shells;REF : API 651, 1.1.1ANS : (c)

Q171) The root opening for square grooves for butt-welded bottom plate shall not be less than :-(a) 1/2 inch; (b) 1/4 inch; (c) 3/16 inch; (d) 9/32 inch.REF : API 650 – 3.1.5.5ANS : (b)

Page 144: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q172) The sequence of welding of the shell-to-bottom :-(a) is the welder's option;(b) is not addressed;(c) is completed after the bottom joints are fully welded;(d) must be completed before the welding of bottom joints.REF : API-653, 10.4.3.2ANS : (d)

Q173) The shell plate formula tmin =(a) only (b) and (c) below; (b) is only valid if tmin is not les than 0.1";(c) applies only to tanks less than 200' in dia; (d) does not apply to riveted construction.REF : API 653 4.3.3.1ANS : (c)

Page 145: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q174) The tank shall be cleaned and ____ prior to commencement of dismantling :-(a) gas-freed; (b) inspected; (c) surveyed; (d) cleaned;REF : API-653, - 10.2ANS : (a)

Q175) The thickness to be used for each shell course when checking the tank design after reconstruction shall be based on measurements taken within ____ days prior to relocation :-(a) 45; (b) 90; (c) 180; (d) 360.REF : API-653, 8.4.1ANS : (c)

Page 146: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q176) The types of tanks covered by API 653 are :-(a) non-refrigerated;(b) vertical, cylindrical, above ground closed and open top;(c) built to API 650 and 12 C;(d) All of the above.REF : API 650-1.1.1 and 653-3.1.1ANS : (d)

Q177) The upper flammable limit (UFL) is the _____concentration of a flammable vapour in air that will ignite :-(a) approximate; (b) maximum; (c) average; (d) minimum.REF : 2015 1.3.2ANS : (b)

Page 147: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q178) The variable design point method shall be used for tanks greater than ____ in diameter :-(a) 50” (b) 200” (c) 150’ (d) 200'.REF : API-653, 2.3.3.3ANS : (d)

Q179) Thick-film internal linings :-(a) are frequently used as an alternative to replacing the steel bottom;(b) are prohibited from use as an alternative to replacing the steel bottom;(c) removes the need for external cathodic protection;(d) removes the need for external anodic protection.`REF : API 651 3.4.4ANS : (a)

Page 148: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q180) Thickness readings taken on a tank shell after 5 years of service show a minimum thickness of 0.420 inches. The data sheet shows the original thickness as 0.5 inches. What is the corrosion rate for the tank :-(a) 0.008; (b) 0.0016; (c) 0.016; (d) 0REF : API-653 6.3.3.22ANS : (c)

Q181) Three different methods of conducting "Visual Examinations" (VT) :-(a) Direct, indirect and previously recorded;(b) Translucent, direct and previously recorded;(c) Translucent, direct and indirect or (remote visual examination)(d) all of the above.REF : ASME Sec. V, T940, T941, T942, T943ANS : (c)

Page 149: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

ASME V: T-954 Translucent Visual ExaminationTranslucent visual examination is a supplement of directvisual examination. The method of translucent visual examination uses the aid of artificial lighting, which canbe contained in an illuminator that produces directionallighting. The illuminator shall provide light of an intensitythat will illuminate and diffuse the light evenly throughthe area or region under examination. The ambient lightingmust be so arranged that there are no surface glares orreflections from the surface under examination and shallbe less than the light applied through the area or regionunder examination. The artificial light source shall havesufficient intensity to permit “candling” any translucentlaminate thickness variations.

Page 150: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q182) Three types of external inspections are :-(a) scheduled, routine and liquid penetrant;(b) scheduled, routine and UT thickness;(c) scheduled out of service, routine and UT thickness;(d) unscheduled, routine and liquid penetrant.REF : API 653-6.3.1, 6.3.2 & 6.3.3ANS : (b)

Q183) To be an alteration a nozzle must be :-(a) 12" or greater NPS nozzles; (b) greater than 12" NPS nozzles;(c) greater than 2" NPS nozzles; (d) greater than 10" NPS nozzles.REF : API 653, 3.5.1 (a)ANS : (b)

Page 151: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q184) To be certified under the program which of the following educational and experience requirements must be met :-

(a)A degree in engineering plus 6 months of experience in inspection of tanks,pressure vessels, or piping;

(b)A two-year certificate in engineering or technical college and two years ofexperience in construction, repair, operation, or inspection of tanks, pressure vessels or piping;

(c) The equivalent of a high school education and three years of experience inconstruction, repair, operation or inspection of which one year must be ininspection of tanks, pressure vessels or piping;

(d)Four years of experience in the inspection of above ground storage tanks in petroleum / chemical industries.

REF : API 653, 6.10ANS : (c)

Page 152: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q185) To evaluate tank settlement, elevation measurements are performed and compared with measurements marked just after construction. Where are these measurements made ?(a) Tank circumference, tank height; (b) Tank diameter, tank height;(c) Tank height, tank base; (d) Tank circumference, tank diameter.REF : API-653, Appendix B.2.ANS : (d)

Q186) To qualify a GMAW, short circuit transfer, welding procedure :-(a) Radiography may be used;(b) Tension tests and transverse bend test are required;(c) May be omitted if another manufacturer has a qualified WPS;(d) Require bend tests only.REF : ASME Section IX, QW-202.1ANS : (b)

Page 153: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q187) Top decks of external floating roofs (double deck or pontoon type) which are designed with are designed with a permanent slope for drainage shall have a minimum slope of ____ inch in12 inches :-(a) 3/16; (b) 1/2; (c) 1/4; (d) 3/8.REF : API-650 APP-C C.3.3.4ANS : (a)

Q188) Under-run on plate not more than inch from the computed design thickness or minimum permitted thickness is acceptable :-(a) 0.01; (b) 0.02; (c) 0.03; (d) 0.04.REF : API 650, 2.2.1.2.3ANS : (a)0.01” = 0.254mm

Page 154: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q189) Unless otherwise agreed to by the purchaser, what is the minimum nominal width of a shell plate ?(a) 36 inches; (b) 48 inches; (c) 72 inches; (d) 96 inches.REF : 650 3.6.1.2ANS : (c)

Q190) UT examination methods shall be in acordance with :-(a) ASME Code Section V, Article 5;(b) ASME Code Section II, Article 5;(c) API 653;(d) ASME Code Section IX, Article 2.REF : API 650 6.3.1ANS : (a)

Page 155: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q191) Vertical welds must be fully radiographed if the shell thickness exceeds inches :-(a) ¾ ; (b) 1; (c) 1¼ ; (d) 1½ .REF : API-650 6.1.2.2 (C)ANS : (b)

Q192) Visual examination shall be done in accordance with :-(a) ASME Section V, Article 9;(b) API 650;(c) AWS Guidelines;(d) ASME B-31.1, Chapter VI.REF : API 650 5.2.1.8 & 6.5ANS : (b)

Page 156: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q193) Welded joints that have experienced metal loss due to corrosion :-(a) must be X-Rayed prior to further use;(b) may be repaired by welding;(c) may be repaired by grinding;(d) all of the above.REF : API 653, 9.5.3ANS : (b)

Q194) Welder identification is not required for :-(a) lap welds; (b) corner joints;(c) fillet welds around opening; (d) roof plate welds.REF : API 650 7.4ANS : (d)

Page 157: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q195) Welder or welding operator's identification marks shall be located adjacent to completed welds at intervals not exceeding :-(a) 9 feet;(b) 6 feet;(c) 3 feet;(d) As identified on the approved welding procedure specification.REF : API 653 – 11.2.1ANS : (c)

Q196) Welders qualifications shall expire as they do not weld :-(a) within a given process for a 6 month period;(b) using a given procedure for a 6 month period;(c) on a tank for 6 months;(d) for a 3 month period.REF : ASME Sec IX QW-322ANS : (a)

Page 158: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q197) Welding filler metals are grouped into groupings based on their AWS classification:-(a) P-numbers; (b) F-numbers;(c) Z-numbers; (d) ASTM spec.REF : ASME Sec IX QW-432ANS : (b)

Q198) Welding Procedure Specifications (WPS), and welders and weldingoperators must be qualified in accordance with ____ :-(a) API-653; (b) API-650;(c) Section V of the ASME; (d) Section IX of the ASMEREF : API-653, 11.1.1ANS : (d)

Page 159: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q199) Welding procedures are qualified in accordance with ____(a) ASME Section IX, Art. 3; (b) ASME Section V, Art. 2;(c) ASME Section IX, Art. 2; (d) AWS D-1.1REF : ASME IX Article 2ANS : (c)

Q200) Why are penetrameters used for? :-(a) A penetrameter is used for evaluating radiographic technique in that it serves as an image quality indicator;(b) It indicates the magnetic properties of the materials;(c) Is the same as penetration in Ultrasonic Inspection;(d) both (a) and (c) above.REF : ASME SECTION V, T233, T262ANS : (a)

Page 160: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Breaks

Page 161: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Breaks

Page 162: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q201) What are the two general approaches for determining minimum thicknesses of tank bottom plate and briefly describe their differences :-(a) Deterministic and Probabilistic;(b) Probabilistic and Actualistic;(c) Actualistic and Deterministic;(d) Variable design and Actual thickness determination.REF : API-653, 4.4.7ANS : (a)

Q202) What are the two methods of guided-bend tests permitted by ASME Section IX ?(a) Bottom ejection method and Wrap around method;(b) Top ejection method and Bottom ejection method;(c) Side ejection method and Wrap around method;(d) All to the above.REF : ASME Section IX, QW-162ANS : (a)

Page 163: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

QW-162 Guided-Bend Test ProcedureQW-162.1 Jigs. Guided-bend specimens shall be bentin test jigs that are in substantial accordance with QW-466.When using the jigs illustrated in figure QW-466.1 or figureQW-466.2, the side of the specimen turned toward the gapof the jig shall be the face for face-bend specimens, theroot for root-bend specimens, and the side with the greaterdiscontinuities, if any, for side-bend specimens. The specimenshall be forced into the die by applying load on theplunger until the curvature of the specimen is such that a1⁄8 in. (3 mm) diameter wire cannot be inserted betweenthe specimen and the die of figure QW-466.1, or the specimenis bottom ejected if the roller type of jig (figureQW-466.2) is used.

Page 164: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q203) What diameter bolt circle is required and how many bolts for a 24 inch roof manhole?(a) 26.0 inch diameter bolt circle and 18 bolts;(b) 25.5 inch diameter bolt circle and 20 bolts;(c) 27.5 inch diameter bolt circle and 16 bolts;(d) 27.5 inch diameter bolt circle and 20 bolts.REF : API 650 – 3.8.4ANS : (d)

Q204) What F number is E70T1 electrodes classified as :-(a) 1; (b) 2; (c) 4; (d) 6.REF : ASME Sec IX,QW-432ANS : (d)

Page 165: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650:

Page 166: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q205) What is calcination :-(a) An accumulation of a mineral coating on the lining of the tank;(b) Increase of water of hydration;(c) Loss of water of hydration;(d) Form of tank deterioration.REF : API-653, 4.5.1.2ANS : (c)

Q206) What is meant by "non destructive examination" of a welded joint ?(a) An examination of a welded joint that will disclose surface and sub-surfacediscontinuities without physical harm to the welded joint;(b) An examination of a bolted joint;(c) An examination of a welded joint that will disclose surface and sub-surfacediscontinuities that may cause physical harm to the welded joint.(d) An examination of a welded joint that will disclose only surface discontinuitieswithout physical harm to the welded joint.REF : ASME Section V, T110ANS : (a)

Page 167: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q207) What is MRT2 as used by the deterministic method ?(a) Minimum remaining thickness due to maximum internal pitting and average external pitting;(b) Maximum remaining thickness that can be used for calculations;(c) Maximum reported thickness minus all corrosion;(d) Min remaining thickness due to average internal pitting and max external pitting.REF : API 653, 4.4.7.1ANS : (a)

Q208) What is the 42 gallon barrel capacity of a tank 110 feet in diameter, 24 feet high, joint efficiency is 0.85, specific gravity = 1.0, corrosion allowance = 0.(a) 34,303; (b) 38,909; (c) 39,910; (d) 40,656.REF : API 650 – Appendix A Table A-1 C = 0.14D2HANS : (d) C = 0.14D2H

Page 168: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

4.4.5.1 An acceptable method for calculating the minimum acceptable bottom thickness for the entire bottom or portions thereof is as follows:

MRT = (Minimum of RTbc or RTip) – Or (StPr + UPr)

whereMRT is the minimum remaining thickness at the end of interval Or . This value must meet the requirements of Table 4.4 and 4.4.5.4 and 4.4.6;

RTbc is the minimum remaining thickness from bottom side corrosion after repairs;RTip is the minimum remaining thickness from internal corrosion after repairs;

Page 169: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q209) What is the allowable stress at root of anchor bolt threads for a tank with a design pressure up to 2.5 psig ? Uplift is based on tank design pressure and wind.(a) 15,000; (b) 20,000; (c) 25,000; (d) 30,000.REF : API 650 – F.7, Table F-1ANS : (b)

Q210) What is the capacity of a tank 110 feet in diameter, 24 feet high, joint efficiency is 0.85,specific gravity is 1.0, corrosion allowance = 0 ?(a) 34,303; (b) 38,909; (c) 39,910; (d) 40,656.REF : API 650 Table A-1ANS : (d) ANS : (d) C = 0.14D2H

Page 170: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q211) What is the distance from the centre pipe to shell for a 3 inch nominal pipe size, 36 diameter drawoff sump, which is 18 inched deep ?(a) 2.1875'; (b) 3.2343'; (c) 5.0000'; (d) 5.3780'REF : API 650 - 3.8.6ANS : (c)

Page 171: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650:

Page 172: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q212) What is the distance in inches, that both a roof plate or a shell bottom must be cut from the weld when dismantling a shell tank :-(a) One; (b) Two; (c) Four; (d) Six.REF : API-653, 10.3.2; API-653, 10.3.4.1ANS : (b)

Q213) What is the expected service life for a properly applied tank bottom lining ?(a) 5 – 10 years; (b) 10 – 15 years;(c) 10 – 20 years; (d) 20 – 30 years.REF : API 652 3.6 and 8.1ANS : (c)

Page 173: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q214) What is the flammable range for Methane ?(a) 1 – 5; (b) 2 – 8; (c) 2 – 9; (d) 5 – 15.REF : 2015 – 3.2 (Table – 1)ANS : (d)

Q215) What is the maximum acceptable undercutting of new constructed base metal for vertical butt joints?(a) 1/4 inch; (b) 1/8 inch; (c) 9/32 inch; (d) 1/64 inch.REF : API 650 - 5.2.1.4ANS : (d)

Page 174: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q216) What is the maximum acceptable undercutting of new constructionbase metal for horizontal joints ?(a) 1/4 inch; (b) 1/8 inch; (c) 1/32 inch; (d) 1/64 inch.REF : API 650 – 5.2.1.4ANS : (c)

Q217) What is the maximum depth of a depreciation, oval in shape, which measures 18 feet long by 11 feet wide?(a) 6.6"; (b) 24.42"; (c) 4.07"; (d) 2.035".REF : API 653 APP. “B” B-5ANS : (d)BB =0.37R = 2.035”Note: L = 3.7√(Dt2), but not more than 40 in.

Page 175: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q218) What is the maximum depth of edge settlement if the distance from the inside of the shell to the bend point of the depression is 7 feet ?(a) 2.59"; (b) 1.295"; (c) 5.18"; (d) 31.08".REF : API 653 APP. “B”ANS : (a)BB =0.37R = 1.295” for R=3.5’

Page 176: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653:

Page 177: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q219) What is the maximum interval between external UT thickness measurements for a tank, given the following information ? Remaining CA = 0.064", Corrosion rate is 0.008" per year.(a) 5 yrs; (b) 4 yrs; (c) 8 yrs; (d) 3 – 1/2 yrs.REF : API 653, 6.3.3.2ANS : (b)Lesser of 15 years or RCA/2N

Page 178: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q220) What is the maximum out-of-plumbness of a new tank from the top of shell relative to the bottom of the shell ?(a) 1/100 of the total tank height; (b) 1/50 of the total tank height;(c) 1/60 of the total tank height; (d) 1/200 of the total tank height.REF : API 650 – 5.5.2ANS : (d)

API653: 10.5.2 Plumbness10.5.2.1 The maximum out-of-plumbness of the top of the shell relative to the bottom of the shell shall not exceed 1/100 of the total tank height, with amaximum of 5 in. The 1/100 criteria, with a maximum of 5 in., shall also applyto fixed roof columns. For tanks with internal floating roofs, apply the criteriaof this section or API 650, Section 7.5.2 and Annex H, Section H.4.1.1,whichever is more stringent.10.5.2.2 The out-of-plumbness in one shell course shall not exceed the values specified for mill tolerances in ASTM A6 or ASTM A20, whichever is applicable.

Page 179: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650:7.5.2 Plumbness a) The maximum out-of-plumbness of the top of the shell relative to the

bottom of the shell shall not exceed 1/200 of the total tank height. The out-of-plumbness in one shell course shall not exceed the permissible variations for flatness and waviness as specified in ASTM A6M/A6, ASTM A20M/A20, or ASTM A480M/A480, whichever is applicable.

b) The maximum out-of-plumbness of roof columns, guide poles, or other vertical internal components shall not exceed 1/200 of the total height. The 1/200 criteria shall also apply to fixed roof columns. For tanks with internal floating roofs, apply the criteria of this section or Annex H, whichever is more stringent.

Page 180: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q221) What is the maximum reinforcement allowed on a 1/2" thick vertical butt weld made on a reconstructed tank ?(a) 3/16; (b) 3/32; (c) 1/8; (d) 1/4.REF : API-653, 10.4.2.6ANS : (b)

Q222) What is the maximum spacing between settlement measurement points?(a) 20 feet; (b) 30 feet; (c) 35 feet; (d) 50 feet.REF : API 653 – 12.5.1.2ANS : (b)

QQ223) What is the maximum thickness of weld reinforcement for a 0.5625 inch plate ?(a) 1/16; (b) 3/32; (c) 1/8; (d) 3/16.REF : API 650 – 6.1.3.4ANS : (b)

Page 181: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653: Table 10.1—Maximum Thicknesses on New Welds

Page 182: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: 8.1.3.4 The finished surface of the weld reinforcement at the location of the radiograph shall either be flush with the plate or have a reasonably uniform crown not to exceed the following values:

Page 183: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q224) What is the minimum acceptable shell plate thickness for a tank shell made of A 283 grade C material, 70 feet in diameter and 50 feet high ? Specific gravity of contents is 0.8. Original joint efficiency was 100 %.(a) 0.356; (b) 0.339; (c) 0.480; (d) 0.304.REF : API-653, 4.3.3.1ANS : (d) S=23600, t=2.6HDG/SE = 0.308”

Q225) What is the minimum allowable density through the image of the penetrameter for radiographs made with a 2000 kv tube ?(a) 1.8 – 4.0; (b) 1.3 – 2.8; (c) 2.0 – 4.0; (d) 1.3 – 1.8;REF : ASME Sec. V, T-282.1 ANS (a)

Page 184: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

T-282 Radiographic DensityT-282.1 Density Limitations. The transmitted filmdensity through the radiographic image of the body of theappropriate hole IQI or adjacent to the designated wire ofa wire IQI and the area of interest shall be 1.8 minimumfor single film viewing for radiographs made with an X-raysource and 2.0 minimum for radiographs made with agamma ray source. For composite viewing of multiple filmexposures, each film of the composite set shall have aminimum density of 1.3. The maximum density shall be4.0 for either single or composite viewing. A tolerance of0.05 in density is allowed for variations between densitometerreadings.

1.3/1.8/2.0/4.0

Page 185: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q226) Windgirders are evaluated for :-(a) Corrosion of structural elements; (b) attachment welds;(c) the same evaluation as for shell stiffeners; (d) all of the above.REF : API 653, 4.3.7ANS : (d)

Q227) What is the minimum nominal shell thickness required when the normal tank diameter is less than 50 feet?(a) 3/16; (b) 1/4; (c) 5/16; (d) 3/8.REF : API-650 3.6.1.1ANS : (a)

Page 186: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: 5.6.1.1 The required shell thickness shall be the greater of the design shell thickness, including any corrosion allowance, or the hydrostatic test shell thickness, but the shell thickness shall not be less than the following:

Page 187: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q228) What is the minimum nominal thickness for bottom plates, exclusive of any corrosion allowance?(a) 3/16 inch; (b) 1/4 inch; (c) 5/16 inch; (d) 7/16 inch.REF : API 650, 3.4.1ANS : (b) / ¼ = 6.35mm

Q229) What is the minimum number of settlement measurement points ?(a) 4; (b) 6; (b) 8; (d) 10.REF : API 653 – 12.5.1.2ANS : (c)

Page 188: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q230) What is the minimum permissible design metal temperature for a 280 foot diameter tank, 75 feet high, tank radius is 1,680 inches, plate material ordered is 1.125" (including corrosion allowance) A 516 – 555 as rolled, killed fine-grain practice without impact testing :-(a) + 8; (b) 0;(c) – 4; (d) All Material must be impact tested.REF :API 650 - 2.2.9.2 (Fig. 2-1)ANS : (c)

Q231) What it the minimum permitted density of radiographic film using an Iridium source ?(a) 2.0; (b) 1.8; (c) 1.3; (d) 4.0REF : ASME Sec V-T282.1ANS : (a)

Page 189: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q232) What is the minimum required number of settlement measurement points for a 200' diameter tank ?(a) 10; (b) 8; (c) 21; (d) 20.REF : API 653 – 12.5.1.2ANS : (c)

Q233) What is the minimum thickness of bolting flange and cover plate for a 24 × 24 size flush-type cleanout to be installed in a tank having maximum height of 53 feet :-(a) 1/16; (b) 1/8; (c) 3/16; (d) 9/16.REF : API 650 – 3.7.7 (Table 3-12)ANS : (d)

Page 190: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: Table 5.10b—Minimum Thickness of Cover Plate, Bolting Flange, and Bottom Reinforcing Plate for Flush- Type Cleanout Fittingsf (USC)

Page 191: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q234) What is the calculated minimum thickness of shell plates from the stress on vertical joints for a field-erected small capacity tank, which has a diameter of 30 feet, height of 36 feet, joint efficiency is 0.85, specific gravity is 1.0, with a corrosion allowance of 0.125 ?(a) t = 0.1529; (b) t = 0.1875;(c) t = 0.2779; (d) t = 0.3125.REF : API 650 – A.4 (See 3.6.1.1)ANS : (c) t =2.6HDG/SE = ?, for S=?

Q235) What is the minimum weld length that must be shown oneach radiograph ?(a) 2 inches; (b) 3 inches; (c) 4 inches; (d) 5 inches.REF : API 650 – 6.1.2.8ANS : (b)

Page 192: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q236) What is the most common protective cushion for aboveground storage tanks ?(a) Clean sand; (b) Clay; (c) Gravel; (d) Carbonaceous.REF : API – 651, Section 3ANS : (a)

Q237) What is the nominal shell thickness required when the nominal tank diameter is less than 50 feet ?(a) 3/16 inch; (b) 1/4 inch; (c) 5/16 inch; (d) 3/8 inch.REF : API 650 3.6.1.1ANS : (a)

Page 193: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q238) What is the radii tolerance measured at 1 foot above the shell to bottom for a reconstructed 125 foot diameter tank ?(a) +/- 1/2; (b) +/- 3/4; (c) +/- 1; (d) +/- 1 1/4.REF : API 653, 10.5.3ANS : (b)

Q239) What is the title of API Publication 2015A ?(a) "Guide for Controlling the Lead Hazard Associated with Tank Entry andCleaning."(b) "Cleaning Open-Top and Covered Floating-Roof Tanks"(c) "Guidelines for Confined Space Work in the Petroleum Industry"(d) "Welded Steel Tanks for Oil Storage"REF : API-653, 3.6ANS : (a)

Page 194: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q240) What must be done to the tank prior to dismantling to insure proper alignment after the tank is reconstructed ?

(a)At least four sets of matching centre punch marks should be placed at the top and bottom edges of each shell plate.

(b)At least two sets of matching centre punch marks shall be placed at the top and bottom edges of each shell plate.

(c) At least three alignment tabs shall be tack welded to the top and bottom edges of the each shell plate.

(d)At least two sets of matching centre punch marks may be placed at the top and side edges of each shell plate.

REF : API-653, 10.3.5.2ANS : (b)

Page 195: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q241) What are NDE methods and to what extent shall they be used for the examination of repairs to butt welds ?(a) MT and PT over full length; (b) MT and PT spot;(c) UT and RT over full length; (d) UT or RT over full length.REF : API 653 – 12.1.3.2ANS : (d)

Q242) What of the following are not principal causes of shell distortion :-(a) Thinning caused by corrosion; (b) Foundation settlement;(c) Over-or under-pressuring; (d) High wind.REF : API-653, 4.3.5ANS : (a)

Page 196: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q243) What percentage of selected spot radiography shall be at junctions of vertical and horizontal joints ?(a) 15 %; (b) 20 %; (c) 25 %; (d) 50 %.REF : API 650 – 6.1.2.2ANS : (c)

Q244) What size diameter cover plate is required for a 20 inch roof manhole ?(a) 22 inch; (b) 24 inch; (c) 26 inch; (d) 28 inch.REF : API 650 3.8.4ANS : (c)

Page 197: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q245) What size penetrameter is required for RT of a tank 0.75 inches thick ?(a) 17; (b) 20; (c) 25; (d) 1.REF : ASME Sec V Article 2ANS : (a)

Q246) What spacing must be used for a settlement survey of a 100’ diameter tank ?(a) 31.4’; (b) 30’; (c) 28.56’; (d) 31’4”.REF : API 653 4.3.3.1ANS : (c)

Page 198: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

ASME V:

Page 199: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q247) When a new nameplate is attached, the existing nameplate :-(a) is removed;(b) is covered by the new name plated;(c) is located next to the new name plate;(d) is left for the owner / user to keep on fileREF : API-653, 13.1.2ANS : (c)

Q248) When alternative inspection intervals are selected, the owner / user :-(a) shall document the procedure and make it part of the permanent record;(b) alternatives are not allowed;(c) alternative method shall include method for determining bottom plate thickness;(d) both (a) and (c) above.REF : API 653, 6.4.3ANS : (d)

Page 200: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q249) When calculating the maximum liquid level for reconstructed tanks, the required corrosion allowance shall be :-

(a)deducted from the actual thickness before calculating maximum liquid level;

(b)added to actual thickness before calculating maximum liquid level;(c) not be considered when calculating maximum liquid level;(d)deducted from the original design thickness.REF : API 653 – 8.4.4ANS : (a)

Q250) When changing a non-essential variable on a welding procedure, the procedure must be :-

(a) revised; (b) re-qualified;(c) no action required; (d) re-written as a new procedure.REF : ASME Sec IX QW-200.1ANS : (a)

Page 201: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q251) When concrete ring walls are provided under the shell, the top of the ring wall shall be level with ______ inch in the total circumference measured from the average elevation :-(a) 1/4; (b) 1/8; (c) 3/8; (d) 5/16.REF : API 650 – 5.5.5.2 aANS : (a)

Q252) When determining average thickness in a corroded area of a shell, a minimum of equally paced measurements shall be taken over a length of L.(a) 10; (b) 5; (c) 8; (d) 6.REF : API 653 4.3.2.1 (c)ANS : (b)

Page 202: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API653: 10.5.6.2 Where foundations true to a horizontal plane are specified, tolerances shall be as follows:

a) where concrete ringwalls are provided under the shell, the top of the ringwall shall be level within ±1/8 inches in any 30 ft of the circumference and within ±1/4 inches in the total circumference measured from the average elevation;

b) where concrete ringwalls are not provided, the foundation under the shell shall be level within ±1/8 in. in any 10 ft of circumference and within ±1/2 in. in the total circumference measured from the average elevation.

Page 203: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q253) When evaluating roof support systems, special attention should be paid to:(a) Rafters; (b) Prior repairs;(c) Distortions; (d) The possibility of severe internal corrosion of pipecolumns.REF : API – 653, 4.2.2ANS : (d)

Q254) When is pitting an important factor in determining tank shell acceptability ?(a) When pits are 1/4" in diameter;(b) When the pits are 1/8” in diameter.(c) When the pits are present in a severe form in close proximity.(d) Pitting always represents a significant threat.REF : API-653, 4.3.1.3; 4.3.2.2ANS : (c)

Page 204: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q255) When liquid penetrant is specified, the method of examination shall be in accordance with one of the following :-(a) ASME, Section V, Article 6; (b) API-650, Section 6;(c) API-653, Section 6; (d) ASME, Section 8, Article 6.REF : API 650 6.4.1ANS : (a)

Q256) When preparing the surface for lining, the abrasive blasting should not be performed if the temperature of the steel surface is less than ____ above the dew point or if the relative humidity is greater than ____ %.(a) 10 degrees, 75 %; (b) 5 degrees, 80 %;(c) 10 degrees, 80 %; (d) 5 degrees, 75 %.REF :API-652, 5.4ANS : (b)

Page 205: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

8.4 Liquid Penetrant Examination 8.4.1 When liquid penetrant examination is specified, the method of examination shall be in accordance with Section V, Article 6, of the ASME Code. 8.4.2 Liquid penetrant examination shall be performed in accordance with a written procedure that is certified by the Manufacturer to be in compliance with the applicable requirements of Section V of the ASME Code.8.4.3 The Manufacturer shall determine and certify that each liquid penetrant examiner meets the following requirements. a) Has vision (with correction, if necessary) to enable him to read a Jaeger Type 2 standard chart at a distance of not less than 300 mm (12 in.) and is capable of distinguishing and differentiating contrast between the colors used. Examiners shall be checked annually to ensure that they meet these requirements. b) Is competent in the technique of the liquid penetrant examination method for which he is certified, including making the examination and interpreting and evaluating the results; however, where the examination method consists of more than one operation, the examiner may be certified as being qualified for one or more of the operations. 8.4.4 Acceptance standards and the removal and repair of defects shall be in accordance with Section VIII, Annex 8, Paragraphs 8-3, 8-4, and 8-5, of the ASME Code.

Page 206: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q257) When replacing rim-mounted shoe seals on a floating roof, no more than ____ of the seal should be out of service at any one time.(a) 1/4; (b) 1/2; (c) 1/3; (d) 1/8.REF : API-653 9.12.1ANS : (a)

Q258) When required, a set of Charpay V-notch impact specimens shall be taken :-(a) Before heat treatment; (b) After heat treatment;(c) Either before or after; (d) Both before and after heat treatment.REF : API 650 2.2.8.1ANS : (b)

Page 207: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q259) When required, how long shall a full hydrostatic be held ?(a) 18 hours; (b) 24 hours; (c) 36 hours; (d) 38 hours.REF : API 653 – 12.3.1.1ANS : (b)

Q260) When reusing the entire bottom in the intact condition, the shell cut shall be a minimum of ____ inch(es) above the top of the bottom plate :-(a) 1/2; (b) 6 except where crossing existing welds;(c) 12; (d) 12 is the maximum.REF : API 653 10.3.2.2ANS : (c)

Page 208: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q261) When reviewing a radiograph, a dark image of the letter B can be seen on the film(a) This is cause for rejection;(b) This is not cause for rejection;(c) This is the same as a light letter B;(d) An unusual safety hazard existed during the exposure.REF : ASME Section V, T-284ANS : (b)

Q262) When the corrosion rate is not known or determinable from similar service experience, actual bottom plate thickness shall be determined by inspection within the next ____ years of operation :-(a) 10; (b) 7; (c) 5; (d) 3.REF : API 653 6.4.2.2ANS : (a)

Page 209: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 210: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q263) When the tank is out of service, additional bottom plate examination includes :-(a) All of the below; (b) ultrasonic;(c) hammer testing; (d) turning of coupons.REF : API 653 Appendix C, C.1.1.4ANS : (a)

Q264) When two (2) welders weld opposite sides of the same butt joint :-(a) 2 spot radiographs shall be taken;(b) heat generated by twin arc removes the need to radiograph;(c) shall be inspected by ultrasonics;(d) 1 spot radiograph shall be taken .REF : API 650 – 6.1.2.5ANS : (d)

Page 211: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

API650: 8.1.2.5 It is recognized that in many cases the same welder or welding operator does not weld both sides of a butt joint. If two welders or welding operators weld opposite sides of a butt joint it is permissible to examine their work with one spot radiograph. If the radiograph is rejected, additional spot radiographs shall be taken to determine whether one or both of the welders or welding operators are at fault.

Page 212: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q265) When two or more tanks are installed concurrently in the same location for the same purchase :-

(a)spot radiographs to be taken is based on each tanks footage of the welds;(b)spot radiographs may be omitted in tank # 2 if no defects were found in

tank # 1;(c) spot radiographs may be taken based on the aggregate footage of the

welds of the same type and thickness;(d)spot radiographs to be taken be based on the aggregate footage of the

welds regardless of weld type and thicknesss;REF : API 650 – 6.1.2.5ANS : (c)

Page 213: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q266) When ultrasonic thickness measurements are used to take in-service thickness measurements, what is the maximum interval for reinspection on a tank corroding at a rate of 1.13 mils per year and has a remaining corrosion allowance of 22 mils ?(a) 5 years; (b) 9 years; (c) 15 years; (d) 20 years.REF : API 653 – 6.3.3.2ANS : (b)

Q267) When used, in-service UT thickness measurements shall be taken :-(a) 10 years after commissioning;(b) 15 year intervals where corrosion rate is unknown;(c) the smaller of RCA/2N or 15 years;(d) all of the above.REF : API 653, 6.3.3.2ANS : (c)

Page 214: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q268) When vacuum testing is performed, a partial vacuum of at least psig should be used :-(a) 2; (b) 3; (c) 4; (d) 5.REF : 650 5.3.3.4ANS : (a)

API560: 8.6 Vacuum Testing8.6.3 A partial vacuum of 21 kPa (3 lbf/in.2, 6 in. Hg) to 35 kPa (5 lbf/in.2, 10 in Hg) gauge shall be used for the test. If specified by the Purchaser, a second partial vacuum test of 56 kPa (8 lbf/in.2, 16 in. Hg) to 70 kPa (10 lbf/in.2, 20 in. Hg) shall be performed for the detection of very small leaks.

lbf/in.2

Page 215: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

蛋炒饭

Page 216: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q269) Which below best describes how surfaces shall be prepared for Ultrasonic examination :-

(a)The finished contact surfaces shall be free from weld splatter and any roughness that would interfere with free movement of the search unit or impair the transmission of ultrasonic vibrations;

(b)The weld surfaces shall be finished so they cannot mask or be confused with reflections from defects, and should merge smoothly into the surfaces of the adjacent base materials;

(c) The volume of base material through which the sound will travel in angle beam examination shall be completely scanned with a straight beam search unit to detect reflectors which might affect interpretation of angle beam results;

(d)all of the above.REF : ASME Section V, T-542.7.1ANS : (d)

Page 217: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q270) Which below option Thin-Film lining system shall be used for the following service conditions; Temperature 200 degrees F, product contents are distillates,(a) Coal tar epoxy; (b) Epoxy amine;(c) Epoxy polyamide; (d) Epoxy PolyamidoamineREF : API 652 – 4.3, Table 1ANS : (b)

Q271) Which is not a factor in determining intervals between internal inspections for storage tanks:-(a) Measured during previous inspection;(b) Based on experience with similar tanks;(c) Anticipated corrosion rate;(d) Consistent with conditions at a particular site.REF : API-653, 6.4.2ANS : (d)

Page 218: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q272) Which item is not found on a gauge well?(a) hold-off distance; (b) marker vapour control float;(c) blow-down valve; (d) pipe seal system.REF : API 653, Appendix C.2.1.1.1ANS : (c)

Q273) Which of the following equations refer to an anodic reaction:-(a) O2 + 2 H2) + 4 e- > 4 OH-(b) Fe + 2 e- ____ Fe2(c) H2O2 + Fe > 2 e(d) Fe --> Fe-2 +2 e-REF : API-651, 2.1.1ANS : (d)

Page 219: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q274) Which of the following is a cause for tank bottom failure?(a) Erosion corrosion; (b) Concentration Cell corrosion;(c) Sulphate-reducing bacteria; (d) All are causes.REF : API-652, Section 2ANS : (d)

Q275) Which of the following is a factor in the effectiveness of cathodic protection :-(a) Concrete foundation;(b) An impervious lining between tank anode such as a secondary containmentsystem(c) High resistance soil or rock formations;(d) All are factors.REF : API-651 3.1.4ANS : (d)

Page 220: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q276) Which of the following is a principle cause of concrete foundation deterioration :-(a) Attack by frost; (b) Rusting; (c) Wind load; (d) Floods.REF : API-653, 4.5ANS : (a)

Q277) The difference between peaking and banding is :-(a) peaking pertains to the roof;(b) banding is external to the tank;(c) peaking pertains to vertical weld seams, banding pertains to horizontal weld seams(d) peaking pertains to horizontal weld seams, banding pertains to vertical weld seams.REF : General KnowledgeANS : (c)

Page 221: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q278) Which of the following is not a cause of bottom failure :-(a) Stresses placed on the bottom plates by roof support loads and shell settlement;(b) Inadequate drainage;(c) Rock or gravel foundation pads with inadequately filled-in surface voids;(d) Operating conditions.REF : API-653, 4.4.2ANS : (d)

Q279) Which of the following is not a factor in determining suitability for service of shell tanks :-(a) Internal corrosion due to the product or water bottoms;(b) Location relative to other tanks;(c) Chemical analysis and mechanical properties of the materials of construction;(d) Tank foundation, soil and settlement conditions.REF : API-653, 4.1.3ANS : (b)

Page 222: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q280) Which of the following is not a shell distortion ?(a) undersize weld; (b) out of roundness;(c) flat spots; (d) buckled areas.REF : API 653, 4.3.5.1ANS : (a)

Q281) Which of the following is not required information on a nameplate :-(a) Edition and revision number;(b) Shell material for shell course;(c) Nominal diameter;(d) Test Pressure.REF : API-653, 13.1.1ANS : (d)

Page 223: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q282) Which of the following is not true regarding dismantling of the shell :-(a) Temporary attachments welds must be ground flush;(b) Shell stiffener rings, including wind girders and top angles, may be removed;(c) Shell stiffener rings, including wind girders and top angles, may be leftattached;(d) Temporary attachments welds need not be ground flush.REF : API-653, 10.3.3.2ANS : (d)

Q283) Which of the following is not true regarding small punctures in a floating roof plate :-(a) May be ignored if they have been determined to be non-critical;(b) Shall be repaired;(c) Shall have affected sections replaced;(d) Is considered a change from the original condition.REF : API-653 4.2.3.1ANS : (a)

Page 224: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q284) Which of the following types of welds do not need welder identification ?(a) Shell vertical welds; (b) Roof Plate welds;(c) Flange-to-nozzle-neck welds; (d) Both (b) and (c)REF : API-653, 11.2.2ANS : (d)

Q285) Which thin-film lining system shall be used for the following service conditions : Temperature 200 degrees F, product contents are distillates :-(a) Coal tar epoxy; (b) Epoxy amine;(c) Epoxy polyamide; (d) Epoxy polyamidomine.REF : 652 6.3 Table 1ANS : (b)

Page 225: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q286) Which tool would least likely be used in an in-service inspection ?(a) UT thickness device; (b) X-ray equipment;(c) Steel rule; (d) paint or crayon.REF : API Chapter XIII 13.4.1ANS : (b)

Q287) Who is responsible for preparing the Welding Procedure Specification ?(a) Purchasing; (b) Erector / Manufacturer / Repairer;(c) Weld Testing Laboratory; (d) A qualified welderREF : ASME Sec IX QW-200.1ANS : (b)

Page 226: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q288) Who is responsible for qualifying the welders used to repair an above ground storage tank ?(a) The tank manufacturer; (b) The repair concern;(c) The inspector; (d) The test laboratory.REF : ASME Sec IX QW-103.1ANS : (b)

Q289) Who is responsible for stating the design metal temperature (based on ambient temperatures), the design specific gravity, the corrosion allowance (if any), and the design wind velocity ?(a) PURCHASER; (b) FABRICATOR;(c) INSPECTOR; (d) ERECTOR.REF : API 650 XIIIANS : (a)

Page 227: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Q290) Widely scattered pits may be ignored provided that the sum of their dimensions along any vertical line does not exceed 2 inch in an 8 inch length and no pit depth results in a shell thickness of less than of the minimum thickness exclusive of corrosion allowance :-(a) 5/8; (b) 3/4; (c) 1/2; (d) 2/3.REF : API-653 4.3.2.2ANS : (c)

Page 228: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Page 229: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion ZhangCharlie Chong/ Fion Zhang

Page 230: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Good Luck!

Page 231: Understanding api icp653 reading 8 worksheet-03

Charlie Chong/ Fion Zhang

Good Luck!