I595 Express Corridor Improvements Project Kelley Hall, PE | FDOT May 10, 2013

2.3 i 595 improvements

Embed Size (px)

Citation preview

Page 1: 2.3 i 595 improvements

I‐595 Express Corridor Improvements Project

Kelley Hall, PE | FDOTMay 10, 2013

Page 2: 2.3 i 595 improvements

TYPICAL SECTIONS

Page 3: 2.3 i 595 improvements

PROJECT COMPONENTS

• Reversible Express Lanes• Direct Connect to 

Florida’s Turnpike• Open Road Tolling

• SR 84 Continuous Connection• Florida’s Turnpike Interchange

• Broward County Greenway• Ramp Improvements

• Auxiliary Lanes• Braided Ramps• Bypass Bridges

• Sound Barrier Walls

Page 4: 2.3 i 595 improvements

Concessionaire

Counsel

Concession Agreement

DB Contract

Technical and

 Legal Advice

Financing Agreements

Technical Advisor

Design‐Build Contractor

Design Subcontractor

CEI O&M 

LendersLenders

Design‐Build Contractor

Design ManagementConstruction/Operations 

Management

I‐595 TEAM ORGANIZATION

Bank Syndicate/TIFIA

Page 5: 2.3 i 595 improvements

INNOVATIONS

• 1st DBFOM P3 in Florida• 1st Availability Payment P3 in the US• Reversible Toll Lanes (six lanes for the price of three)• Congestion Pricing• State of the Art Emergency Access and Infrastructure

Fire suppression system  Emergency access gates

• 35‐year Operations and Maintenance (O&M)• Direct Connections to Florida’s Turnpike• Oversight CEI• Shared‐use Drainage  

Page 6: 2.3 i 595 improvements

INNOVATIONS ‐ CONTRACTING

Why a Public Private Partnership (P3) was considered for the I‐595 Corridor:• Accelerated the schedule

Advanced noise wall construction Provided capacity improvements a minimum of 15 years sooner than the 

Initial (conventional) plan• Provided financial mechanism for funding shortfall• Potential to deliver long‐term cost savings and higher levels of service• Industry Innovation

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A

Projects 1 thru 10A

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A

CONSTRUCTION YEARS

PROJECTS 1 THRU 10ACURRENT ANTICIPATED PLAN

Projects 1 thru 10APROJECTS 1 THRU 10APUBLIC – PRIVATEPARTNERSHIP (P3)

Page 7: 2.3 i 595 improvements

INNOVATIONS ‐ CONTRACTING

$0

$50

$100

$150

$200

$250

$300

2014 2015 2016 2017 2018 2019 2020 2044

20

6650

124

7195

123

217

4

Paym

ents (M

illions)

Year

I‐595 Express Payment Structure  

Final

Maximum Milestones Payment

Availability

ScheduledConstructionCompletionJuly 2014

Design & Construction March 2009

2009

Page 8: 2.3 i 595 improvements

INNOVATIONS – EXPRESS LANES

Morning Movement ‐ Eastbound Access Open 

N

Page 9: 2.3 i 595 improvements

INNOVATIONS – EXPRESS LANES

Afternoon Movement – Westbound Access Open

N

Page 10: 2.3 i 595 improvements

INNOVATIONS ‐ SAFETY

Emergency Access Gates

Warning GatesLONGITUDINAL SLIDING GATE BY ENERGY ABSORPTION

• 42 FT WIDE OPENING• REMOTE CONTROL OPENING

Fire Suppression System

Page 11: 2.3 i 595 improvements

INNOVATIONS – PROJECT COST

Summer 2009 Summer 2010

• Right of Way Acquisition• Shared‐Use Drainage

Page 12: 2.3 i 595 improvements

ToNaples

University

 Driv

e

Pine

 Island

 Roa

d

Nob

 Hill Roa

d

Hiatus R

oad

Flam

ingo

 Roa

d

Davie Roa

d

Broward Boulevard

Sunrise Boulevard

Peters Road

Griffin Road

To Miami

To West Palm Beach

To Miami

SW 136

 Avenu

e

Port Everglades

FLLAirport

Segment CBegan February 2010

82% Complete

Segment EBegan April 201170% Complete

Project Limits

I‐595 from I‐75/Sawgrass Expressway Interchange to west of the I‐95 Interchangeand Florida’s Turnpike from Griffin Road to Peters Road

Segment DBegan June 201078% Complete

Segment A/BBegan November 2010

78% Complete

CONSTRUCTION PROGRESS

Page 13: 2.3 i 595 improvements

I‐595 PROJECT HIGHLIGHTS

• Total Construction Completed: $633.4M‒ Construction Completed in March 2013: $21.1M‒ 1 remaining Milestone is on schedule ‒ 100% of customer requests in March were responded to by 

FDOT/OCEI team within 24hrs • Road Ranger Services: 100% customer satisfaction rating for Q4 of 2012• Severe Incident Response Vehicle (SIRV) and Rapid Incident Scene 

Clearance (RISC) Operations• Traffic Management Center Operations: 24/7 – 365• Scheduled Completion Date: Spring 2014

Page 14: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 15: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 16: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 17: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 18: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 19: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 20: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 21: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 22: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 23: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 24: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 25: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 26: 2.3 i 595 improvements

UNIVERSITY DRIVE FLYOVER RECONSTRUCTION

Page 27: 2.3 i 595 improvements

I‐595 Express Corridor Improvements Project

THANK YOU!

For additional project information, please visit:

www.i‐595.com