第四届全国公路科技创新高层论坛. 2008 年 5 月 17 日. 昂船洲大桥 - 营运安全 和 养护策略. 许志豪 香港特区政府路政署总工程师. 八号干线的路线 ( 全长28.3公里 ). 深 圳 SHENZHEN. 元朗 Yuen Long. 屯門 Tuen Mun. 沙田 Sha Tin. 青衣 Tsing Yi. 9. 西部通道. 昂船洲大桥. 现有的一段八号干线 从机场到青马大桥. 3. 8. 施工中的八号干线 – 青衣至沙田段 ( 全长 13.5 公里 ). 昂船洲大桥 - 整体结构布局. 18m. - PowerPoint PPT Presentation

Citation preview

  • 2008517

  • 13.5 ). )893

  • +175 mPD+298 mPD-

  • = 540m -

  • ?

  • 1:20?

  • !

  • 3064/20o

  • 900100/20o

  • 112m 540m 115mm 192mm7mmWire 163 ~ 499 52 ~ 157 Kg/m 0.22~0.48Hz

  • 1:1

  • 298mTMD

  • TMD

  • TMD

  • 120

  • (PFA) (Silica Fume)

  • (strength) 60 Mpa(cover) 60mm(crack width) 0.25mm+ (w/c ratio) 0.35(cement) 490 kg/m3(PFA) 35% (Silica Fume) 6%

  • 20mm Duplex Grade800mm ()

  • (HDPE)

    (socket)

  • 60%

  • :

    , (Preventive Maintenance) (Predictive Maintenance) , (Condition-based Maintenance)

  • : 100 Lux

  • 5%10%100%50%100%

  • 8024

  • 700Kg

  • 150Kg

  • 5 x 18

  • Bridge Name ():Silver Bridge()Location ():West Virginia, USA ()Bridge Completion () :1928 (1928)Collapse Date ():December 1967 (196712)Cause of Collapse():Failure of Structural Steel due to Corrosion()

  • Bridge Name (): I-35W Mississippi River Bridge (I-35W)Location ():Minnesota, USA ()Bridge Completion ():November 1967 (196711)Collapse Date ():1 August 2007 (200781)Cause of Collapse ():Investigation underway (concern had been emphasized on possible flaw at truss girders)()

  • WIMWIM

  • :

  • 1 (Normal)Derived< 0.75SLS2 (Critical)0.75SLS 1.0 SLS (Operation Strategies)

  • ()ULS Displacement = 4.35 mSLS Displacement = 2.90 mHourly Mean Wind Speed at Deck Level (m/sec)Lateral Displacement at Mid-Span (metre)

  • Note : Each set of Suspender is composed of 4 Nos. 75 mm dia. Hanger Strands.ULS Material Strength= 617 tonsSLS Material Strength= 448 tonsULS Design Load= 500 tonsTension Load during Erection Stage()()SLS Design Load= 435 tons

  • (Fatigue Monitoring)Ma Wan TowerMa Wan AbutmentTsing Yi TowerTsing Yi AbutmentCHAINAGE 23623.0Partial Elevation View at Chainage 23623.00Sectional View at Chainage 23623.00NorthSouthCHAINAGE 23623.00

  • >> ,Fatigue stress concentration factor 1.4BS-5400: Part 10 r N Curves Class FHalf-Cycles CountsSTRESS (N/mm2)

  • 15.2.2006

  • 100% 100% 281m 246m 23/65 29/224 30.4.2008

  • 2008

  • 2008

  • 2009

    35****The truck for the testing is a 1994 ERF multi-axle rigid tipper lorry.MassCGRigid, 8 wheel trucks with twin steerThe CG is estimated by assessing the masses and CG heights of major vehicle components and taking moments about ground level.

    The critical issue here is about vortex shedding. When wind blows at a certain speed, along the bridge axis, the tower will vibrate in the across wind direction as a result of vortex shedding.

    The picture shows the model set up in the Velux tunnel in Denmark. As the tower is about 300m high, a 1:100 geometric scale will lead to a 3m high model.

    3535This shows the inner components of a heavy composite option. The outer structural steel skin which is 20mm thick. The inner reinforced concrete wall which is 800mm thick. These two components will be connected by shear connectors. The steel anchor box for stay cables will also be connected to the concrete wall by shear connectors.In order to enhance durability of the metallic finishes of the skin, it has been decided to use stainless steel shell instead of ordinary steel. A 1:1 prototype was fabricated to demonstrate the achievability of a good finish of the prefabricated steel units***********

    *

    *