    DATE SUBMITTED: 10/01/12

    DESCRIPTION OF DOCUMENT: (previous secio! i"e# !u$%er &!' '&e

    0) )0 00 C&s*I!*P"&ce Co!cree (0)*11

    C+AN,ES MADE:

    Modifications include updating references, and the following:

    Clarified testing for trial concrete mix by contractor

    Revised requirements for moisture vapor emissions to allow alternatives to the moisture

    vapor emissions sealer, and added moisture testing.Revised fly ash testing submittal requirements.

  • 8/11/2019 033000

    2/37

    10-01-12

    SECTION 03 30 00

    CAST-IN-PLACE CONCRETE

    SPEC !"#E! $O#E% Delete et'een (( -- ((

    if not applicale to pro)ect* Also +elete

    an, oter item or paragrap not applicale

    in te section an+ renumer te

    paragraps*

    PART - !ENERAL

    " #ESCRIPTION$

    #is section specifies cast-in-place structural concrete an+ materials

    an+ mi.es for oter concrete*

    "% RELATE# &OR'$

    A* Materials testing an+ inspection +uring construction% Section 01 / 2

    #ES#"$3 4A5O!A#O!6 SE!V"CES*

    5* Concrete roa+s 'al7s an+ similar e.terior site 'or7% Section 82 0 28

    CEME$# A$D CO$C!E#E FO! E9#E!"O! "MP!OVEME$#S*

    "3 TESTIN! A!ENC( )OR CONCRETE MI* #ESI!N$

    A* #esting agenc, for te trial concrete mi. +esign retaine+ an+ reimurse+

    , te Contractor an+ appro:e+ , !esi+ent Engineer* For all oter

    testing refer to Section 01 / 2 #esting 4aorator, Ser:ices*

    5* #esting agenc, maintaining acti:e participation in Program of Cement an+

    Concrete !eference 4aorator, ;CC!4< of $ational "nstitute of Stan+ar+s

    an+ #ecnolog,* (( Accompan, re=uest for appro:al of testing agenc, 'it

    a cop, of !eport of 4atest "nspection of 4aorator, Facilities ,

    CC!4*((

    C* #esting agenc, sall furnis e=uipment an+ =ualifie+ tecnicians to

    estalis proportions of ingre+ients for concrete mi.es*

    "+ TOLERANCES$

    A* Form'or7% AC" 11> e.cept te ele:ation tolerance of forme+ surfaces

    efore remo:al of sores is ?0 mm ;?0 inc< an+ -20 mm ;-8(/ inc< use+ as column ties or

    stirrups is ?0 mm ;?0 inc< an+ -18 mm ;-1(2 inc< 'ere gross ar

    lengt is less tan 800 mm ;12 feet

  • 8/11/2019 033000

    3/37

    10-01-12

    #olerance of tic7ness of eams more tan 800 mm ;12 inc< ut less tan

    00 mm ;8 feet< is ?20 mm ;?8(/ inc< an+ -10 mm ;-8(B inc

  • 8/11/2019 033000

    4/37

    10-01-12

    participation in program of Cement an+ Concrete !eference 4aorator,

    ;CC!4< of $ational "nstitute of Stan+ar+s an+ #ecnolog, (( an+ cop, of

    report of latest CC!4 "nspection of 4aorator,* ((

    F* #est !eport for Concrete Mi. Designs% #rial mi.es inclu+ing 'ater-cement

    (( fl, as (( ratio cur:es concrete mi. ingre+ients an+ a+mi.tures*

    3* Soring an+ !esoring Se=uence% Sumit for appro:al a soring an+

    resoring se=uence for flat sla(flat plate portions prepare+ , a

    registere+ Professional Engineer* As a minimum inclu+e timing of form

    stripping resoring numer of floors to e re-sore+ an+ timing of re-

    sore remo:al to ser:e as an initial outline of proce+ures su)ect to

    mo+ification as construction progresses* Sumit re:isions to se=uence

    'eter initiate+ , !esi+ent Engineer ;see FO!MO!G< or Contractor*

    SPEC !"#E! $O#E% Delete splitting tensile

    strengt test of ligt'eigt concrete if

    no ligt'eigt concrete or if onl, use+on metal +ec7 slas*

    * #est reports on splitting tensile strengt ;Fct< of ligt'eigt

    concrete*

    "1 #ELI2ER( STORA!E AN# 4AN#LIN!$

    A* Conform to AC" 80/* Store aggregate separatel, for eac 7in+ or gra+e

    to pre:ent segregation of si@es an+ a:oi+ inclusion of +irt an+ oter

    materials*

    5* Deli:er cement in original seale+ containers earing name of ran+ an+

    manufacturer an+ mar7e+ 'it net 'eigt of contents* Store in suitale

    'atertigt uil+ing in 'ic floor is raise+ at least 800 mm ;1 foot IStan+ar+ Specification for

    Cast-"n-Place Arcitectural ConcreteJ to

    te Applicale Pulications section*

    "6 MOC'-P$

    A* "n a++ition to te oter specifie+ samples an+ tests construct a moc7-

    up using te materials reinforcing forming s,stem an+ construction

    meto+s propose+ for use in e.pose+ arcitectural concrete*

    5* Construct te moc7-up 'it at least a 2* m , 2* m ;B feet , B feet>(A>>M-0***********Stan+ar+ Specification for Kinc Coate+

    ;3al:ani@e+< Steel 5ars for Concrete!einforcement

    A>>(A>>M-0>***********Stan+ar+ Specification for Epo., Coate+

    !einforcing Steel 5ars

    AB20-11*****************Stan+ar+ Specification for Steel Fiers for

    Fier !einforce+ Concrete

    A(AM-0***********Stan+ar+ Specification for !ail Steel an+ A.le

    Steel Deforme+ 5ars for Concrete !einforcement

    C81(C81M-10*************Stan+ar+ Practice for Ma7ing an+ Curing Concrete

    #est Specimens in te fiel+

    C88(C88M-11A************Stan+ar+ Specification for Concrete Aggregates

    C8(C8M-12*************Stan+ar+ #est Meto+ for Compressi:e Strengt of

    C,lin+rical Concrete Specimens

    C/(C/M-12*************Stan+ar+ Specification for !ea+, Mi.e+ Concrete

    C1/8(C1/8M-10***********Stan+ar+ #est Meto+ for Slump of ,+raulic

    Cement Concrete

    C10-11*****************Stan+ar+ Specification for Portlan+ Cement

    C1>1-0>*****************Stan+ar+ Specification for Seet Materials for

    Curing Concrete

    C1>2-10*****************Stan+ar+ Practice for Sampling Fresl, Mi.e+

    Concrete

    C1>8-10*****************Stan+ar+ #est Meto+ for Air Content of Fresl,

    Mi.e+ Concrete , te Volumetric Meto+

    08 80 00 - >

  • 8/11/2019 033000

    8/37

    10-01-12

    C12(C12M-0>***********Stan+ar+ Practice for Ma7ing an+ Curing Concrete

    #est Specimens in te 4aorator,

    C281-10*****************Stan+ar+ #est Meto+ for Air Content of Fresl,

    Mi.e+ Concrete , te Pressure Meto+

    C20-10*****************Stan+ar+ Specification for Air Entraining

    A+mi.tures for Concrete

    C80-11*****************Stan+ar+ Specification for 4i=ui+ Memrane

    Forming Compoun+s for Curing Concrete

    C880-0*****************Stan+ar+ Specification for 4igt'eigt

    Aggregates for Structural Concrete

    C//(C//M-11***********Stan+ar+ Specification for Cemical A+mi.tures

    for Concrete

    C1B-12*****************Stan+ar+ Specification for Coal Fl, As an+ !a'

    or Calcine+ $atural Po@@olan for se in ConcreteC(CM-08;!200B

  • 8/11/2019 033000

    9/37

    10-01-12

    D/8>-10****************Stan+ar+ Specification for Pol,et,lene Seeting

    for Construction "n+ustrial an+ Agricultural

    Applications

    E11-;!200B

  • 8/11/2019 033000

    10/37

    10-01-12

    lose more tan 1 percent of teir original strengt after eing

    completel, sumerge+ in 'ater for 2/ ours an+ ten air +rie+*

    F* Form 4ining%

    1* ar+oar+% A$S"(AA A18*/ Class 2 'it one ;S1S< smoot si+e*

    8* Ma.imum si@e of coarse aggregates not more tan one-fift of

    narro'est +imension et'een si+es of forms one-tir+ of +ept of

    slas nor tree-fourt of minimum clear spacing et'een reinforcing

    ars*

    D* 4igt'eigt Aggregates for Structural Concrete% AS#M C880 #ale 1*

    Ma.imum si@e of aggregate not larger tan one-fift of narro'est

    +imension et'een forms nor tree-fourt of minimum clear +istance

    et'een reinforcing ars* Contractor to furnis certifie+ report to

    :erif, tat aggregate is soun+ an+ +urale an+ as a +urailit, factor

    of not less tan B0 ase+ on 800 c,cles of free@ing an+ ta'ing 'en

    teste+ in accor+ance 'it AS#M C*

    08 80 00 - 10

  • 8/11/2019 033000

    11/37

    10-01-12

    E* Fine Aggregate% AS#M C88* Fine aggregate for applie+ concrete floor

    topping sall pass a /*> mm ;$o* /< sie:e 10 percent ma.imum sall

    pass a 10 Nm ;$o* 100< sie:e*

    F* Mi.ing ater% Fres clean an+ potale*

    3* A+mi.tures%

    1* ater !e+ucing A+mi.ture% AS#M C// #,pe A an+ not contain more

    clori+e ions tan are present in municipal +rin7ing 'ater*

    2* ater !e+ucing !etar+ing A+mi.ture% AS#M C// #,pe D an+ not

    contain more clori+e ions tan are present in municipal +rin7ing

    'ater*

    8* ig-!ange ater-!e+ucing A+mi.ture ;Superplastici@er

  • 8/11/2019 033000

    12/37

    10-01-12

    ;0*8Bmm< 1mil :apor arrier for a++e+

    moisture protection*

    * Vapor 5arrier% AS#M D/8> ((0*2 mm ;10 mil0 controls te amountof caron an+ oter elements in or+er to

    minimi@e rittle failures +ue to

    cr,stalli@ation of te ase metal*

    G* !einforcing 5ars to e el+e+% AS#M A>0*

    4* 3al:ani@e+ !einforcing 5ars% AS#M A>>*

    M* Epo., Coate+ !einforcing 5ars% AS#M A>>*

    SPEC !"#E! $O#E% AB2 is use+ for spiral

    ties in columns particularl, in seismic

    regions*

    $* Col+ Dra'n Steel ire% AS#M AB2*

    ((O* !einforcement for Concrete Fireproofing% 100 mm . 100 mm . 8*/ mm

    +iameter ;/ . /-1*/ . 1*/< 'el+e+ 'ire faric secure+ in place to

    ol+ mes 20 mm ;8(/ inc< a'a, from steel* Mes at steel columns sall

    e 'ire+ to $o* 10 ;$o* 8< :ertical corner steel ars* ((

    P* !einforcement for Metal Pan Stair Fill% 0 mm ;2 inc< 'ire mes eiter

    e.agonal mes at *BGg(m2 ;1* poun+s per s=uare ,ar+ poun+s per s=uare ,ar+

  • 8/11/2019 033000

    13/37

    10-01-12

    V* 4i=ui+ ar+ener an+ Dustproofer% Fluosilicate solution of magnesium

    fluosilicate or @inc fluosilicate* Magnesium an+ @inc ma, e use+

    separatel, or in comination as recommen+e+ , manufacturer* se onl, on

    e.pose+ sla* Do not use 'ere floor is co:ere+ 'it resilient

    flooring paint or oter finis coating*

    * Moisture Vapor Emissions & Al7alinit, Control Sealer% 100 acti:e

    colorless a=ueous siliconate solution concrete surface*

    1* AS#M C181 #,pe 1 Class A an+ AS#M C80 #,pe 1 Class A penetrating

    pro+uct to a:e no less tan 8/ soli+ content lea:ing no seen

    :olatile organic compoun+ ;VOC< content rating as re=uire+ to suite

    regulator, re=uirements* #e pro+uct sall a:e at least a fi:e ; +a,s

    after placing e.cept 'et curing perio+ for ig-earl,-strengt concrete

    sall e not less tan 8 +a,s* Geep 'oo+ forms continuousl, 'et to

    pre:ent moisture loss until forms are remo:e+* Cure e.pose+ concrete

    surfaces as +escrie+ elo'* Oter curing meto+s ma, e use+ if

    appro:e+ , !esi+ent Engineer*

    1* 4i=ui+ curing an+ sealing compoun+s% Appl, , po'er-+ri:en spra, or

    roller in accor+ance 'it te manufacturerQs instructions* Appl,

    imme+iatel, after finising* Ma.imum co:erage 10m2(4 ;/00 s=uare feet

    per gallon< on steel tro'ele+ surfaces an+ >*m2(4 ;800 s=uare feet

    per gallon< on floate+ or roome+ surfaces for te curing(sealing

    compoun+*

    2* Plastic seets% Appl, as soon as concrete as ar+ene+ sufficientl,

    to pre:ent surface +amage* tili@e 'i+est practical 'i+t seet an+

    08 80 00 - 2

  • 8/11/2019 033000

    30/37

    10-01-12

    o:erlap a+)acent seets 0 mm ;2 inces at no

    a++itional cost to te 3o:ernment*

    3"% CONCRETE SR)ACE PREPARATION$

    A* Metal !emo:al% nnecessar, metal items cut ac7 flus 'it face of

    concrete memers*

    08 80 00 - 80

  • 8/11/2019 033000

    31/37

    10-01-12

    5* Patcing% Maintain curing an+ start patcing as soon as forms are

    remo:e+* Do not appl, curing compoun+s to concrete surfaces re=uiring

    patcing until patcing is complete+* se cement mortar for patcing of

    same composition as tat use+ in concrete* se 'ite or gra, Portlan+

    cement as necessar, to otain finis color matcing surroun+ing

    concrete* #orougl, clean areas to e patce+* Cut out one,come+ or

    oter'ise +efecti:e areas to soli+ concrete to a +ept of not less tan

    2 mm ;1 inc

  • 8/11/2019 033000

    32/37

    10-01-12

    means appro:e+ , !esi+ent Engineer an+ , ruing ligtl, 'it a

    fine arasi:e stone or one* se ample 'ater +uring ruing 'itout

    'or7ing up a later of mortar or canging te.ture of concrete*

    8* "nterior an+ e.terior e.pose+ areas finise+% 3i:e a grout finis of

    uniform color an+ smoot finis treate+ as follo's%

    a* After concrete as ar+ene+ an+ laitance fins an+ urrs remo:e+

    scru concrete 'it 'ire ruses* Clean staine+ concrete surfaces

    , use of a one stone*

    * Appl, grout compose+ of one part of Portlan+ cement one part fine

    san+ smaller tan a 00 Nm ;$o* 80< sie:e* or7 grout into

    surface of concrete 'it cor7 floats or fier ruses until all

    pits an+ one,coms are fille+*

    c* After grout as ar+ene+ sligtl, ut 'ile still plastic scrape

    grout off 'it a sponge ruer float an+ aout 1 our later ruconcrete :igorousl, 'it urlap to remo:e an, e.cess grout

    remaining on surfaces*

    +* "n ot +r, 'eater use a fog spra, to 7eep grout 'et +uring

    setting perio+* Complete finis of area in same +a,* Ma7e limits

    of finise+ areas at natural rea7s in 'all surface* 4ea:e no

    grout on concrete surface o:ernigt*

    /* #e.ture+% Finis as specifie+* Ma.imum =uantit, of patce+ area 0*2

    m2 ;2 s=uare feet< in eac 8 m2;1000 s=uare feet< of te.ture+

    surface*

    SPEC !"#E! $O#E% 5e sure tat sla finis

    re=uirements are so'n on te +ra'ings*

    5* Sla Finises%

    1* Monitoring an+ A+)ustment% Pro:i+e continuous c,cle of placement

    measurement e:aluation an+ a+)ustment of proce+ures to pro+uce slas

    'itin specifie+ tolerances* Monitor ele:ations of structural steel

    in 7e, locations efore an+ after concrete placement to estalis

    t,pical +eflection patterns for te structural steel* Determine

    ele:ations of cast-in-place sla soffits prior to remo:al of sores*

    Pro:i+e information to !esi+ent Engineer an+ floor consultant for

    e:aluation an+ recommen+ations for suse=uent placements*

    2* Set perimeter forms to ser:e as scree+ using eiter optical or laser

    instruments* For slas on gra+e 'et scree+s ma, e use+ to estalis

    initial gra+e +uring stri7e-off unless !esi+ent Engineer +etermines

    08 80 00 - 82

  • 8/11/2019 033000

    33/37

    10-01-12

    tat te meto+ is pro:ing insufficient to meet re=uire+ finis

    tolerances an+ +irects use of rigi+ scree+ gui+es* ere 'et scree+s

    are allo'e+ te, sall e place+ using gra+e sta7es set , optical

    or laser instruments* se rigi+ scree+ gui+es as oppose+ to 'et

    scree+s to control stri7e-off ele:ation for all t,pes of ele:ate+

    ;non sla-on-gra+e< slas* Di:i+e a,s into al:es or tir+s , ar+

    scree+s* A+)ust as necessar, 'ere monitoring of pre:ious placements

    in+icates unsore+ structural steel +eflections to oter tan a le:el

    profile*

    8* Place slas monoliticall,* Once sla placement commences complete

    finising operations 'itin same +a,* Slope finise+ sla to floor

    +rains 'ere te, occur 'eter so'n or not*

    /* se straigte+ges specificall, ma+e for scree+ing suc as ollo'

    magnesium straigte+ges or po'er stri7e-offs* Do not use pieces of+imensione+ lumer* Stri7e off an+ scree+ sla to a true surface at

    re=uire+ ele:ations* se optical or laser instruments to cec7

    concrete finise+ surface gra+e after stri7e-off* !epeat stri7e-off

    as necessar,* Complete scree+ing efore an, e.cess moisture or

    lee+ing 'ater is present on surface* Do not sprin7le +r, cement on

    te surface*

    * "mme+iatel, follo'ing scree+ing an+ efore an, lee+ 'ater appears

    use a 8000 mm ;10 foot< 'i+e ig'a, straigte+ge in a cutting an+

    filling operation to acie:e surface flatness* Do not use ull floats

    or +ar,s e.cept tat +ar,ing ma, e allo'e+ for narro' slas an+

    restricte+ spaces*

    * ait until 'ater seen +isappears an+ surface stiffens efore

    procee+ing furter* Do not perform suse=uent operations until

    concrete 'ill sustain foot pressure 'it ma.imum of mm ;1(/ inc* Scratc Finis% Finis ase sla to recei:e a on+e+ applie+

    cementitious application as in+icate+ ao:e e.cept tat ull floats

    an+ +ar,s ma, e use+* #orougl, coarse 'ire room 'itin t'o ours

    after placing to rougen sla surface to insure a permanent on+

    et'een ase sla an+ applie+ materials*

    B* Float Finis% Slas to recei:e unon+e+ toppings steel tro'el

    finis fill mortar setting e+s or a uilt-up roof an+ ramps

    stair trea+s platforms ;interior an+ e.terior

  • 8/11/2019 033000

    34/37

  • 8/11/2019 033000

    35/37

    10-01-12

    * Areas tat 'ill e e.pose+ recei:e tin-set tile or resilient

    flooring or roof areas +esigne+ as future floors%

    1< Sla on gra+e%

    a< Specifie+ o:erall :alue FF 8(F4 20

    < Minimum local :alue FF 2/(F4 1

    2< 4e:el suspen+e+ slas ;sore+ until after testing< an+ topping

    slas

    a< Specifie+ o:erall :alue FF 80(F4 20

    < Minimum local :alue FF 2/(F4 1

    8< nsore+ suspen+e+ slas%

    a< Specifie+ o:erall :alue FF 80

    < Minimum local :alue FF 2/

    /< 4e:el tolerance suc tat B0 percent of all points fall 'itin

    a 20 mm ;8(/ inc< en:elope ?10 mm -10 mm ;?8(B inc -8(Binc< from te +esign ele:ation*

    c* RSpecifie+ o:erall :alueR is ase+ on te composite of all

    measure+ :alues in a placement +eri:e+ in accor+ance 'it AS#M

    E11*

    +* RMinimum local :alueR ;M4V< +escries te flatness or le:elness

    elo' 'ic repair or replacement is re=uire+* M4V is ase+ on te

    results of an in+i:i+ual placement an+ applies to a minimum local

    area* Minimum local area oun+aries ma, not cross a construction

    )oint or e.pansion )oint* A minimum local area 'ill e oun+e+ ,

    construction an+(or control )oints or , column lines an+(or

    alf-column lines 'ice:er is smaller*

    12* Measurements

    a* Department of Veterans Affairs retaine+ testing laorator, 'ill

    ta7e measurements as +irecte+ , !esi+ent Engineer to :erif,

    compliance 'it FF F4 an+ oter finis re=uirements*

    Measurements 'ill occur 'itin >2 ours after completion of

    concrete placement ;'ee7en+s an+ oli+a,s e.clu+e+

  • 8/11/2019 033000

    36/37

  • 8/11/2019 033000

    37/37

    10-01-12

    3", APPLIE# TOPPIN!$

    A* Separate concrete topping on floor ase sla of tic7ness an+ strengt

    so'n* #opping mi. sall a:e a ma.imum slump of 200 mm ;B inces< for

    concrete containing a ig-range 'ater-re+ucing a+mi.ture

    ;superplastici@er< an+ 100 mm ;/ inces< for con:entional mi.* $eatl,

    e:el or slope at +oor openings an+ at slas a+)oining spaces not

    recei:ing an applie+ finis*

    5* Placing% Place continuousl, until entire section is complete struc7 off

    'it straigte+ge le:ele+ 'it a ig'a, straigte+ge or ig'a, ull

    float floate+ an+ tro'ele+ , macine to a ar+ +ense finis* Slope to

    floor +rains as re=uire+* Do not start floating until free 'ater as

    +isappeare+ an+ no 'ater seen is :isile* Allo' +r,ing of surface

    moisture naturall,* Do not asten , R+ustingR 'it cement or san+*

    3" RESR)ACIN! )LOORS$!emo:e e.isting flooring areas to recei:e resurfacing to e.pose e.isting

    structural sla an+ e.ten+ not less tan 2 mm ;1 inc< elo' ne'

    finise+ floor le:el* Prepare e.pose+ structural sla surface ,

    rougening room cleaning an+ +ampening* Appl, specifie+ on+ing

    grout* Place topping 'ile te on+ing grout is still tac7,*

    SPEC !"#E! $O#E% Cec7 4an+scape

    Arcitectural Di:ision to +etermine if

    retaining 'alls are to e specifie+ in

    Site or7 Concrete*

    3"1 RETAININ! &ALLS$

    A* se air-entraine+ concrete*

    5* E.pansion an+ contraction )oints 'aterstops 'eep oles reinforcement

    an+ railing slee:es installe+ an+ constructe+ as so'n*

    C* E.pose+ surfaces finise+ to matc a+)acent concrete surfaces ne' or

    e.isting*

    D* Place porous ac7fill as so'n*

    3"5 PRECAST CONCRETE ITEMS$

    Precast concrete items not specifie+ else'ere* Cast using 2 MPa ;8000

    psi< air-entraine+ concrete to sapes an+ +imensions so'n* Finis to

    matc correspon+ing a+)acent concrete surfaces* !einforce 'it steel for

    safe an+ling an+ erection*

    - - - E $ D - - -