Modifications/Changes
in this updateDepartment of Veterans Affairs Office of Construction &
Facilities Management
DATE SUBMITTED: 10/01/12
DESCRIPTION OF DOCUMENT: (previous secio! i"e# !u$%er &!' '&e
0) )0 00 C&s*I!*P"&ce Co!cree (0)*11
C+AN,ES MADE:
Modifications include updating references, and the following:
Clarified testing for trial concrete mix by contractor
Revised requirements for moisture vapor emissions to allow alternatives to the moisture
vapor emissions sealer, and added moisture testing.Revised fly ash testing submittal requirements.
8/11/2019 033000
2/37
10-01-12
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
SPEC !"#E! $O#E% Delete et'een (( -- ((
if not applicale to pro)ect* Also +elete
an, oter item or paragrap not applicale
in te section an+ renumer te
paragraps*
PART - !ENERAL
" #ESCRIPTION$
#is section specifies cast-in-place structural concrete an+ materials
an+ mi.es for oter concrete*
"% RELATE# &OR'$
A* Materials testing an+ inspection +uring construction% Section 01 / 2
#ES#"$3 4A5O!A#O!6 SE!V"CES*
5* Concrete roa+s 'al7s an+ similar e.terior site 'or7% Section 82 0 28
CEME$# A$D CO$C!E#E FO! E9#E!"O! "MP!OVEME$#S*
"3 TESTIN! A!ENC( )OR CONCRETE MI* #ESI!N$
A* #esting agenc, for te trial concrete mi. +esign retaine+ an+ reimurse+
, te Contractor an+ appro:e+ , !esi+ent Engineer* For all oter
testing refer to Section 01 / 2 #esting 4aorator, Ser:ices*
5* #esting agenc, maintaining acti:e participation in Program of Cement an+
Concrete !eference 4aorator, ;CC!4< of $ational "nstitute of Stan+ar+s
an+ #ecnolog,* (( Accompan, re=uest for appro:al of testing agenc, 'it
a cop, of !eport of 4atest "nspection of 4aorator, Facilities ,
CC!4*((
C* #esting agenc, sall furnis e=uipment an+ =ualifie+ tecnicians to
estalis proportions of ingre+ients for concrete mi.es*
"+ TOLERANCES$
A* Form'or7% AC" 11> e.cept te ele:ation tolerance of forme+ surfaces
efore remo:al of sores is ?0 mm ;?0 inc< an+ -20 mm ;-8(/ inc< use+ as column ties or
stirrups is ?0 mm ;?0 inc< an+ -18 mm ;-1(2 inc< 'ere gross ar
lengt is less tan 800 mm ;12 feet
8/11/2019 033000
3/37
10-01-12
#olerance of tic7ness of eams more tan 800 mm ;12 inc< ut less tan
00 mm ;8 feet< is ?20 mm ;?8(/ inc< an+ -10 mm ;-8(B inc
8/11/2019 033000
4/37
10-01-12
participation in program of Cement an+ Concrete !eference 4aorator,
;CC!4< of $ational "nstitute of Stan+ar+s an+ #ecnolog, (( an+ cop, of
report of latest CC!4 "nspection of 4aorator,* ((
F* #est !eport for Concrete Mi. Designs% #rial mi.es inclu+ing 'ater-cement
(( fl, as (( ratio cur:es concrete mi. ingre+ients an+ a+mi.tures*
3* Soring an+ !esoring Se=uence% Sumit for appro:al a soring an+
resoring se=uence for flat sla(flat plate portions prepare+ , a
registere+ Professional Engineer* As a minimum inclu+e timing of form
stripping resoring numer of floors to e re-sore+ an+ timing of re-
sore remo:al to ser:e as an initial outline of proce+ures su)ect to
mo+ification as construction progresses* Sumit re:isions to se=uence
'eter initiate+ , !esi+ent Engineer ;see FO!MO!G< or Contractor*
SPEC !"#E! $O#E% Delete splitting tensile
strengt test of ligt'eigt concrete if
no ligt'eigt concrete or if onl, use+on metal +ec7 slas*
* #est reports on splitting tensile strengt ;Fct< of ligt'eigt
concrete*
"1 #ELI2ER( STORA!E AN# 4AN#LIN!$
A* Conform to AC" 80/* Store aggregate separatel, for eac 7in+ or gra+e
to pre:ent segregation of si@es an+ a:oi+ inclusion of +irt an+ oter
materials*
5* Deli:er cement in original seale+ containers earing name of ran+ an+
manufacturer an+ mar7e+ 'it net 'eigt of contents* Store in suitale
'atertigt uil+ing in 'ic floor is raise+ at least 800 mm ;1 foot IStan+ar+ Specification for
Cast-"n-Place Arcitectural ConcreteJ to
te Applicale Pulications section*
"6 MOC'-P$
A* "n a++ition to te oter specifie+ samples an+ tests construct a moc7-
up using te materials reinforcing forming s,stem an+ construction
meto+s propose+ for use in e.pose+ arcitectural concrete*
5* Construct te moc7-up 'it at least a 2* m , 2* m ;B feet , B feet>(A>>M-0***********Stan+ar+ Specification for Kinc Coate+
;3al:ani@e+< Steel 5ars for Concrete!einforcement
A>>(A>>M-0>***********Stan+ar+ Specification for Epo., Coate+
!einforcing Steel 5ars
AB20-11*****************Stan+ar+ Specification for Steel Fiers for
Fier !einforce+ Concrete
A(AM-0***********Stan+ar+ Specification for !ail Steel an+ A.le
Steel Deforme+ 5ars for Concrete !einforcement
C81(C81M-10*************Stan+ar+ Practice for Ma7ing an+ Curing Concrete
#est Specimens in te fiel+
C88(C88M-11A************Stan+ar+ Specification for Concrete Aggregates
C8(C8M-12*************Stan+ar+ #est Meto+ for Compressi:e Strengt of
C,lin+rical Concrete Specimens
C/(C/M-12*************Stan+ar+ Specification for !ea+, Mi.e+ Concrete
C1/8(C1/8M-10***********Stan+ar+ #est Meto+ for Slump of ,+raulic
Cement Concrete
C10-11*****************Stan+ar+ Specification for Portlan+ Cement
C1>1-0>*****************Stan+ar+ Specification for Seet Materials for
Curing Concrete
C1>2-10*****************Stan+ar+ Practice for Sampling Fresl, Mi.e+
Concrete
C1>8-10*****************Stan+ar+ #est Meto+ for Air Content of Fresl,
Mi.e+ Concrete , te Volumetric Meto+
08 80 00 - >
8/11/2019 033000
8/37
10-01-12
C12(C12M-0>***********Stan+ar+ Practice for Ma7ing an+ Curing Concrete
#est Specimens in te 4aorator,
C281-10*****************Stan+ar+ #est Meto+ for Air Content of Fresl,
Mi.e+ Concrete , te Pressure Meto+
C20-10*****************Stan+ar+ Specification for Air Entraining
A+mi.tures for Concrete
C80-11*****************Stan+ar+ Specification for 4i=ui+ Memrane
Forming Compoun+s for Curing Concrete
C880-0*****************Stan+ar+ Specification for 4igt'eigt
Aggregates for Structural Concrete
C//(C//M-11***********Stan+ar+ Specification for Cemical A+mi.tures
for Concrete
C1B-12*****************Stan+ar+ Specification for Coal Fl, As an+ !a'
or Calcine+ $atural Po@@olan for se in ConcreteC(CM-08;!200B
8/11/2019 033000
9/37
10-01-12
D/8>-10****************Stan+ar+ Specification for Pol,et,lene Seeting
for Construction "n+ustrial an+ Agricultural
Applications
E11-;!200B
8/11/2019 033000
10/37
10-01-12
lose more tan 1 percent of teir original strengt after eing
completel, sumerge+ in 'ater for 2/ ours an+ ten air +rie+*
F* Form 4ining%
1* ar+oar+% A$S"(AA A18*/ Class 2 'it one ;S1S< smoot si+e*
8* Ma.imum si@e of coarse aggregates not more tan one-fift of
narro'est +imension et'een si+es of forms one-tir+ of +ept of
slas nor tree-fourt of minimum clear spacing et'een reinforcing
ars*
D* 4igt'eigt Aggregates for Structural Concrete% AS#M C880 #ale 1*
Ma.imum si@e of aggregate not larger tan one-fift of narro'est
+imension et'een forms nor tree-fourt of minimum clear +istance
et'een reinforcing ars* Contractor to furnis certifie+ report to
:erif, tat aggregate is soun+ an+ +urale an+ as a +urailit, factor
of not less tan B0 ase+ on 800 c,cles of free@ing an+ ta'ing 'en
teste+ in accor+ance 'it AS#M C*
08 80 00 - 10
8/11/2019 033000
11/37
10-01-12
E* Fine Aggregate% AS#M C88* Fine aggregate for applie+ concrete floor
topping sall pass a /*> mm ;$o* /< sie:e 10 percent ma.imum sall
pass a 10 Nm ;$o* 100< sie:e*
F* Mi.ing ater% Fres clean an+ potale*
3* A+mi.tures%
1* ater !e+ucing A+mi.ture% AS#M C// #,pe A an+ not contain more
clori+e ions tan are present in municipal +rin7ing 'ater*
2* ater !e+ucing !etar+ing A+mi.ture% AS#M C// #,pe D an+ not
contain more clori+e ions tan are present in municipal +rin7ing
'ater*
8* ig-!ange ater-!e+ucing A+mi.ture ;Superplastici@er
8/11/2019 033000
12/37
10-01-12
;0*8Bmm< 1mil :apor arrier for a++e+
moisture protection*
* Vapor 5arrier% AS#M D/8> ((0*2 mm ;10 mil0 controls te amountof caron an+ oter elements in or+er to
minimi@e rittle failures +ue to
cr,stalli@ation of te ase metal*
G* !einforcing 5ars to e el+e+% AS#M A>0*
4* 3al:ani@e+ !einforcing 5ars% AS#M A>>*
M* Epo., Coate+ !einforcing 5ars% AS#M A>>*
SPEC !"#E! $O#E% AB2 is use+ for spiral
ties in columns particularl, in seismic
regions*
$* Col+ Dra'n Steel ire% AS#M AB2*
((O* !einforcement for Concrete Fireproofing% 100 mm . 100 mm . 8*/ mm
+iameter ;/ . /-1*/ . 1*/< 'el+e+ 'ire faric secure+ in place to
ol+ mes 20 mm ;8(/ inc< a'a, from steel* Mes at steel columns sall
e 'ire+ to $o* 10 ;$o* 8< :ertical corner steel ars* ((
P* !einforcement for Metal Pan Stair Fill% 0 mm ;2 inc< 'ire mes eiter
e.agonal mes at *BGg(m2 ;1* poun+s per s=uare ,ar+ poun+s per s=uare ,ar+
8/11/2019 033000
13/37
10-01-12
V* 4i=ui+ ar+ener an+ Dustproofer% Fluosilicate solution of magnesium
fluosilicate or @inc fluosilicate* Magnesium an+ @inc ma, e use+
separatel, or in comination as recommen+e+ , manufacturer* se onl, on
e.pose+ sla* Do not use 'ere floor is co:ere+ 'it resilient
flooring paint or oter finis coating*
* Moisture Vapor Emissions & Al7alinit, Control Sealer% 100 acti:e
colorless a=ueous siliconate solution concrete surface*
1* AS#M C181 #,pe 1 Class A an+ AS#M C80 #,pe 1 Class A penetrating
pro+uct to a:e no less tan 8/ soli+ content lea:ing no seen
:olatile organic compoun+ ;VOC< content rating as re=uire+ to suite
regulator, re=uirements* #e pro+uct sall a:e at least a fi:e ; +a,s
after placing e.cept 'et curing perio+ for ig-earl,-strengt concrete
sall e not less tan 8 +a,s* Geep 'oo+ forms continuousl, 'et to
pre:ent moisture loss until forms are remo:e+* Cure e.pose+ concrete
surfaces as +escrie+ elo'* Oter curing meto+s ma, e use+ if
appro:e+ , !esi+ent Engineer*
1* 4i=ui+ curing an+ sealing compoun+s% Appl, , po'er-+ri:en spra, or
roller in accor+ance 'it te manufacturerQs instructions* Appl,
imme+iatel, after finising* Ma.imum co:erage 10m2(4 ;/00 s=uare feet
per gallon< on steel tro'ele+ surfaces an+ >*m2(4 ;800 s=uare feet
per gallon< on floate+ or roome+ surfaces for te curing(sealing
compoun+*
2* Plastic seets% Appl, as soon as concrete as ar+ene+ sufficientl,
to pre:ent surface +amage* tili@e 'i+est practical 'i+t seet an+
08 80 00 - 2
8/11/2019 033000
30/37
10-01-12
o:erlap a+)acent seets 0 mm ;2 inces at no
a++itional cost to te 3o:ernment*
3"% CONCRETE SR)ACE PREPARATION$
A* Metal !emo:al% nnecessar, metal items cut ac7 flus 'it face of
concrete memers*
08 80 00 - 80
8/11/2019 033000
31/37
10-01-12
5* Patcing% Maintain curing an+ start patcing as soon as forms are
remo:e+* Do not appl, curing compoun+s to concrete surfaces re=uiring
patcing until patcing is complete+* se cement mortar for patcing of
same composition as tat use+ in concrete* se 'ite or gra, Portlan+
cement as necessar, to otain finis color matcing surroun+ing
concrete* #orougl, clean areas to e patce+* Cut out one,come+ or
oter'ise +efecti:e areas to soli+ concrete to a +ept of not less tan
2 mm ;1 inc
8/11/2019 033000
32/37
10-01-12
means appro:e+ , !esi+ent Engineer an+ , ruing ligtl, 'it a
fine arasi:e stone or one* se ample 'ater +uring ruing 'itout
'or7ing up a later of mortar or canging te.ture of concrete*
8* "nterior an+ e.terior e.pose+ areas finise+% 3i:e a grout finis of
uniform color an+ smoot finis treate+ as follo's%
a* After concrete as ar+ene+ an+ laitance fins an+ urrs remo:e+
scru concrete 'it 'ire ruses* Clean staine+ concrete surfaces
, use of a one stone*
* Appl, grout compose+ of one part of Portlan+ cement one part fine
san+ smaller tan a 00 Nm ;$o* 80< sie:e* or7 grout into
surface of concrete 'it cor7 floats or fier ruses until all
pits an+ one,coms are fille+*
c* After grout as ar+ene+ sligtl, ut 'ile still plastic scrape
grout off 'it a sponge ruer float an+ aout 1 our later ruconcrete :igorousl, 'it urlap to remo:e an, e.cess grout
remaining on surfaces*
+* "n ot +r, 'eater use a fog spra, to 7eep grout 'et +uring
setting perio+* Complete finis of area in same +a,* Ma7e limits
of finise+ areas at natural rea7s in 'all surface* 4ea:e no
grout on concrete surface o:ernigt*
/* #e.ture+% Finis as specifie+* Ma.imum =uantit, of patce+ area 0*2
m2 ;2 s=uare feet< in eac 8 m2;1000 s=uare feet< of te.ture+
surface*
SPEC !"#E! $O#E% 5e sure tat sla finis
re=uirements are so'n on te +ra'ings*
5* Sla Finises%
1* Monitoring an+ A+)ustment% Pro:i+e continuous c,cle of placement
measurement e:aluation an+ a+)ustment of proce+ures to pro+uce slas
'itin specifie+ tolerances* Monitor ele:ations of structural steel
in 7e, locations efore an+ after concrete placement to estalis
t,pical +eflection patterns for te structural steel* Determine
ele:ations of cast-in-place sla soffits prior to remo:al of sores*
Pro:i+e information to !esi+ent Engineer an+ floor consultant for
e:aluation an+ recommen+ations for suse=uent placements*
2* Set perimeter forms to ser:e as scree+ using eiter optical or laser
instruments* For slas on gra+e 'et scree+s ma, e use+ to estalis
initial gra+e +uring stri7e-off unless !esi+ent Engineer +etermines
08 80 00 - 82
8/11/2019 033000
33/37
10-01-12
tat te meto+ is pro:ing insufficient to meet re=uire+ finis
tolerances an+ +irects use of rigi+ scree+ gui+es* ere 'et scree+s
are allo'e+ te, sall e place+ using gra+e sta7es set , optical
or laser instruments* se rigi+ scree+ gui+es as oppose+ to 'et
scree+s to control stri7e-off ele:ation for all t,pes of ele:ate+
;non sla-on-gra+e< slas* Di:i+e a,s into al:es or tir+s , ar+
scree+s* A+)ust as necessar, 'ere monitoring of pre:ious placements
in+icates unsore+ structural steel +eflections to oter tan a le:el
profile*
8* Place slas monoliticall,* Once sla placement commences complete
finising operations 'itin same +a,* Slope finise+ sla to floor
+rains 'ere te, occur 'eter so'n or not*
/* se straigte+ges specificall, ma+e for scree+ing suc as ollo'
magnesium straigte+ges or po'er stri7e-offs* Do not use pieces of+imensione+ lumer* Stri7e off an+ scree+ sla to a true surface at
re=uire+ ele:ations* se optical or laser instruments to cec7
concrete finise+ surface gra+e after stri7e-off* !epeat stri7e-off
as necessar,* Complete scree+ing efore an, e.cess moisture or
lee+ing 'ater is present on surface* Do not sprin7le +r, cement on
te surface*
* "mme+iatel, follo'ing scree+ing an+ efore an, lee+ 'ater appears
use a 8000 mm ;10 foot< 'i+e ig'a, straigte+ge in a cutting an+
filling operation to acie:e surface flatness* Do not use ull floats
or +ar,s e.cept tat +ar,ing ma, e allo'e+ for narro' slas an+
restricte+ spaces*
* ait until 'ater seen +isappears an+ surface stiffens efore
procee+ing furter* Do not perform suse=uent operations until
concrete 'ill sustain foot pressure 'it ma.imum of mm ;1(/ inc* Scratc Finis% Finis ase sla to recei:e a on+e+ applie+
cementitious application as in+icate+ ao:e e.cept tat ull floats
an+ +ar,s ma, e use+* #orougl, coarse 'ire room 'itin t'o ours
after placing to rougen sla surface to insure a permanent on+
et'een ase sla an+ applie+ materials*
B* Float Finis% Slas to recei:e unon+e+ toppings steel tro'el
finis fill mortar setting e+s or a uilt-up roof an+ ramps
stair trea+s platforms ;interior an+ e.terior
8/11/2019 033000
34/37
8/11/2019 033000
35/37
10-01-12
* Areas tat 'ill e e.pose+ recei:e tin-set tile or resilient
flooring or roof areas +esigne+ as future floors%
1< Sla on gra+e%
a< Specifie+ o:erall :alue FF 8(F4 20
< Minimum local :alue FF 2/(F4 1
2< 4e:el suspen+e+ slas ;sore+ until after testing< an+ topping
slas
a< Specifie+ o:erall :alue FF 80(F4 20
< Minimum local :alue FF 2/(F4 1
8< nsore+ suspen+e+ slas%
a< Specifie+ o:erall :alue FF 80
< Minimum local :alue FF 2/
/< 4e:el tolerance suc tat B0 percent of all points fall 'itin
a 20 mm ;8(/ inc< en:elope ?10 mm -10 mm ;?8(B inc -8(Binc< from te +esign ele:ation*
c* RSpecifie+ o:erall :alueR is ase+ on te composite of all
measure+ :alues in a placement +eri:e+ in accor+ance 'it AS#M
E11*
+* RMinimum local :alueR ;M4V< +escries te flatness or le:elness
elo' 'ic repair or replacement is re=uire+* M4V is ase+ on te
results of an in+i:i+ual placement an+ applies to a minimum local
area* Minimum local area oun+aries ma, not cross a construction
)oint or e.pansion )oint* A minimum local area 'ill e oun+e+ ,
construction an+(or control )oints or , column lines an+(or
alf-column lines 'ice:er is smaller*
12* Measurements
a* Department of Veterans Affairs retaine+ testing laorator, 'ill
ta7e measurements as +irecte+ , !esi+ent Engineer to :erif,
compliance 'it FF F4 an+ oter finis re=uirements*
Measurements 'ill occur 'itin >2 ours after completion of
concrete placement ;'ee7en+s an+ oli+a,s e.clu+e+
8/11/2019 033000
36/37
8/11/2019 033000
37/37
10-01-12
3", APPLIE# TOPPIN!$
A* Separate concrete topping on floor ase sla of tic7ness an+ strengt
so'n* #opping mi. sall a:e a ma.imum slump of 200 mm ;B inces< for
concrete containing a ig-range 'ater-re+ucing a+mi.ture
;superplastici@er< an+ 100 mm ;/ inces< for con:entional mi.* $eatl,
e:el or slope at +oor openings an+ at slas a+)oining spaces not
recei:ing an applie+ finis*
5* Placing% Place continuousl, until entire section is complete struc7 off
'it straigte+ge le:ele+ 'it a ig'a, straigte+ge or ig'a, ull
float floate+ an+ tro'ele+ , macine to a ar+ +ense finis* Slope to
floor +rains as re=uire+* Do not start floating until free 'ater as
+isappeare+ an+ no 'ater seen is :isile* Allo' +r,ing of surface
moisture naturall,* Do not asten , R+ustingR 'it cement or san+*
3" RESR)ACIN! )LOORS$!emo:e e.isting flooring areas to recei:e resurfacing to e.pose e.isting
structural sla an+ e.ten+ not less tan 2 mm ;1 inc< elo' ne'
finise+ floor le:el* Prepare e.pose+ structural sla surface ,
rougening room cleaning an+ +ampening* Appl, specifie+ on+ing
grout* Place topping 'ile te on+ing grout is still tac7,*
SPEC !"#E! $O#E% Cec7 4an+scape
Arcitectural Di:ision to +etermine if
retaining 'alls are to e specifie+ in
Site or7 Concrete*
3"1 RETAININ! &ALLS$
A* se air-entraine+ concrete*
5* E.pansion an+ contraction )oints 'aterstops 'eep oles reinforcement
an+ railing slee:es installe+ an+ constructe+ as so'n*
C* E.pose+ surfaces finise+ to matc a+)acent concrete surfaces ne' or
e.isting*
D* Place porous ac7fill as so'n*
3"5 PRECAST CONCRETE ITEMS$
Precast concrete items not specifie+ else'ere* Cast using 2 MPa ;8000
psi< air-entraine+ concrete to sapes an+ +imensions so'n* Finis to
matc correspon+ing a+)acent concrete surfaces* !einforce 'it steel for
safe an+ling an+ erection*
- - - E $ D - - -