12C30 - C02 O/H # 1
ORGANIZE DUTIES OFMEDIUM GIRDER BRIDGE
ASSEMBLY CREWS
7/27/2019 C02mgb
2/9
12C30 - C02 O/H # 2
Action: Organize duties of medium girder bridge assembly
crews.
Conditions: In a classroom or at fixed bridge training site,
with a wet or dry gap, given bridge design, and personnel.
Standard: Organized duties of medium girder bridge
assembly crews by the type of bridge to be constructed. Selectwork parties, designate the number of personnel required per
crew and brief work party tasks to be performed.
Safety: There are no safety considerations for organizing
assembly crews.
Environmental: No major environmental consideration.
Risk Assessment: Low
7/27/2019 C02mgb
3/9
12C30 - C02 O/H # 3
*
SSB Span Work Party Work Party Tasks
Up to 32 feet 1 NCO Supervision
8 soldiers
1*, 2, 3, 4 Left hand panels andlaunching nose
5*, 6, 7, 8 Right hand panels and
roller beam
* Party leaders responsible for inserting pins and locking rollers.
WORK CREWS, (b) SINGLE STORY (MGB)
7/27/2019 C02mgb
4/9
12C30 - C02 O/H # 4
*
SSB Span Work Party Work Party Tasks
38 to 50 feet 1 NCO Supervision
16 soldiers
1*, 2, 3, 4 Left hand panels,
launching nose and
bankseat beams5*, 6, 7, 8 Right hand panels and
roller beam
9*, 10, 11, 12 Left hand panels
13*, 14, 15, 16 Right hand panels
* Party leaders responsible for inserting pins and locking rollers.
WORK CREWS (c), SINGLE STORY (MGB)
7/27/2019 C02mgb
5/9
12C30 - C02 O/H # 5
*
SSB Span Work Party Work Party Tasks
56 to 74 feet 1 NCO Supervision
16 soldiers
1*, 2, 3, 4 LH panels, launching
nose and bankseat
beam5*, 6, 7, 8 RH panels, roller beam
and bankseat beam
9*, 10, 11, 12 Left hand panels
13*, 14, 15, 16 Right hand panels
* Party leaders responsible for inserting pins and locking rollers.
LH=left hand/ Rh=right hand
WORK CREWS (d), SINGLE STORY (MGB)
7/27/2019 C02mgb
6/9
12C30 - C02 O/H # 6
DSB Span Work Party Work Party Tasks
36 to 102 feet 1 NCO Supervision
24 soldiers
1,2,3,4 LH bottom panel crew5,6,7,8 LH top panel crew9*,10,11,12,13,14 Center bridge crew,
launching nose, sway
braces, roller locks15* LH party leader, pin &
jack man16* RH party leader, pin &
jack man17,18,19,20 RH bottom panel crew21,22,23,24 RH top panel crew
* Party leaders insert pins/ LH=left hand/ RH=right hand
(a) (b) (c) (d)
Double story Single Span
Working party
Time by day (hours)
Time by night (hours)
1 + 24 1 + 24 1 + 24
1-4 Bays 5-8 Bays 9-12 Bays
3/4 1 1 1/2
1 1/4 1 1/2 2
2E+1through12 bays
without link
WORK CREWS, (b) DOUBLE STORY (MGB)
*
7/27/2019 C02mgb
7/9
12C30 - C02 O/H # 7
DSB Span Work Party Work Party Tasks
108 to 162 feet 1 NCO Supervision24 soldiers1,2,3,4 LH bottom panel crew5,6,7,8 LH top panel crew9*,10,11,12,13,14 Center bridge crew,
launching nose, sway
braces, roller locks
15* LH party leader, pin &
jack man16* RH party leader, pin &
jack man17,18,19,20 RH bottom panel crew
21,22,23,24 RH top panel crew
* Party leaders insert pins/ LH=left hand/ RH=right hand
(a) (b) (c) (d)
Double story Single Span
Working party
Time by day (hours)
Time by night (hours)
1 + 24 1 + 24 1 + 24
13 Bays 14-18 Bays 19-22 Bays
1 1/2 1 3/4 2
2 2 3/4 3
2E+13through22 bays
without link
WORK CREWS, (c) DOUBLE STORY (MGB)
*
7/27/2019 C02mgb
8/9
12C30 - C02 O/H # 8
DSB Span Work Party Work Party Tasks
108 to 162 feet 2 NCOs Supervision
32 soldiers1,2,3,4 LH bottom panel crew
5,6,7,8 LH top panel crew
9*,10,11,12,13,14 Center bridge crew,
launching nose, sway
braces, roller locks
15* LH party leader, pin &
jack man16* RH party leader, pin &
jack man
17,18,19,20 RH bottom panel crew
21,22,23,24 RH top panel crew
link reinforced 25*,26,27,28 LH reinforcement crewparty 29*,30,31,32 RH reinforcement crew
* party leaders insert pins/ LH=left hand/ RH=right hand
(a) (b) (c) (d)
Double story Single Span
Working party
Time by day (hours)
Time by night (hours)
2 + 32 2 + 32 2 + 32
13 Bays 14-18 Bays 19-22 Bays
2 2 3/4 3
3 4 4 1/2
2E+13 through 22 bays
with link set
WORK CREWS, (d) DOUBLE STORY (MGB)
*
7/27/2019 C02mgb
9/9
12C30 - C02 O/H # 9* These parts are carried in the basket
MANPOWER REQUIREMENTS