    12C30 - C02 O/H # 1

    ORGANIZE DUTIES OFMEDIUM GIRDER BRIDGE

    ASSEMBLY CREWS

  • 7/27/2019 C02mgb

    2/9

    12C30 - C02 O/H # 2

    Action: Organize duties of medium girder bridge assembly

    crews.

    Conditions: In a classroom or at fixed bridge training site,

    with a wet or dry gap, given bridge design, and personnel.

    Standard: Organized duties of medium girder bridge

    assembly crews by the type of bridge to be constructed. Selectwork parties, designate the number of personnel required per

    crew and brief work party tasks to be performed.

    Safety: There are no safety considerations for organizing

    assembly crews.

    Environmental: No major environmental consideration.

    Risk Assessment: Low

  • 7/27/2019 C02mgb

    3/9

    12C30 - C02 O/H # 3

    *

    SSB Span Work Party Work Party Tasks

    Up to 32 feet 1 NCO Supervision

    8 soldiers

    1*, 2, 3, 4 Left hand panels andlaunching nose

    5*, 6, 7, 8 Right hand panels and

    roller beam

    * Party leaders responsible for inserting pins and locking rollers.

    WORK CREWS, (b) SINGLE STORY (MGB)

  • 7/27/2019 C02mgb

    4/9

    12C30 - C02 O/H # 4

    *

    SSB Span Work Party Work Party Tasks

    38 to 50 feet 1 NCO Supervision

    16 soldiers

    1*, 2, 3, 4 Left hand panels,

    launching nose and

    bankseat beams5*, 6, 7, 8 Right hand panels and

    roller beam

    9*, 10, 11, 12 Left hand panels

    13*, 14, 15, 16 Right hand panels

    * Party leaders responsible for inserting pins and locking rollers.

    WORK CREWS (c), SINGLE STORY (MGB)

  • 7/27/2019 C02mgb

    5/9

    12C30 - C02 O/H # 5

    *

    SSB Span Work Party Work Party Tasks

    56 to 74 feet 1 NCO Supervision

    16 soldiers

    1*, 2, 3, 4 LH panels, launching

    nose and bankseat

    beam5*, 6, 7, 8 RH panels, roller beam

    and bankseat beam

    9*, 10, 11, 12 Left hand panels

    13*, 14, 15, 16 Right hand panels

    * Party leaders responsible for inserting pins and locking rollers.

    LH=left hand/ Rh=right hand

    WORK CREWS (d), SINGLE STORY (MGB)

  • 7/27/2019 C02mgb

    6/9

    12C30 - C02 O/H # 6

    DSB Span Work Party Work Party Tasks

    36 to 102 feet 1 NCO Supervision

    24 soldiers

    1,2,3,4 LH bottom panel crew5,6,7,8 LH top panel crew9*,10,11,12,13,14 Center bridge crew,

    launching nose, sway

    braces, roller locks15* LH party leader, pin &

    jack man16* RH party leader, pin &

    jack man17,18,19,20 RH bottom panel crew21,22,23,24 RH top panel crew

    * Party leaders insert pins/ LH=left hand/ RH=right hand

    (a) (b) (c) (d)

    Double story Single Span

    Working party

    Time by day (hours)

    Time by night (hours)

    1 + 24 1 + 24 1 + 24

    1-4 Bays 5-8 Bays 9-12 Bays

    3/4 1 1 1/2

    1 1/4 1 1/2 2

    2E+1through12 bays

    without link

    WORK CREWS, (b) DOUBLE STORY (MGB)

    *

  • 7/27/2019 C02mgb

    7/9

    12C30 - C02 O/H # 7

    DSB Span Work Party Work Party Tasks

    108 to 162 feet 1 NCO Supervision24 soldiers1,2,3,4 LH bottom panel crew5,6,7,8 LH top panel crew9*,10,11,12,13,14 Center bridge crew,

    launching nose, sway

    braces, roller locks

    15* LH party leader, pin &

    jack man16* RH party leader, pin &

    jack man17,18,19,20 RH bottom panel crew

    21,22,23,24 RH top panel crew

    * Party leaders insert pins/ LH=left hand/ RH=right hand

    (a) (b) (c) (d)

    Double story Single Span

    Working party

    Time by day (hours)

    Time by night (hours)

    1 + 24 1 + 24 1 + 24

    13 Bays 14-18 Bays 19-22 Bays

    1 1/2 1 3/4 2

    2 2 3/4 3

    2E+13through22 bays

    without link

    WORK CREWS, (c) DOUBLE STORY (MGB)

    *

  • 7/27/2019 C02mgb

    8/9

    12C30 - C02 O/H # 8

    DSB Span Work Party Work Party Tasks

    108 to 162 feet 2 NCOs Supervision

    32 soldiers1,2,3,4 LH bottom panel crew

    5,6,7,8 LH top panel crew

    9*,10,11,12,13,14 Center bridge crew,

    launching nose, sway

    braces, roller locks

    15* LH party leader, pin &

    jack man16* RH party leader, pin &

    jack man

    17,18,19,20 RH bottom panel crew

    21,22,23,24 RH top panel crew

    link reinforced 25*,26,27,28 LH reinforcement crewparty 29*,30,31,32 RH reinforcement crew

    * party leaders insert pins/ LH=left hand/ RH=right hand

    (a) (b) (c) (d)

    Double story Single Span

    Working party

    Time by day (hours)

    Time by night (hours)

    2 + 32 2 + 32 2 + 32

    13 Bays 14-18 Bays 19-22 Bays

    2 2 3/4 3

    3 4 4 1/2

    2E+13 through 22 bays

    with link set

    WORK CREWS, (d) DOUBLE STORY (MGB)

    *

  • 7/27/2019 C02mgb

    9/9

    12C30 - C02 O/H # 9* These parts are carried in the basket

    MANPOWER REQUIREMENTS