Asset integrity management system (AIMS) evaluation checklist
Overview
Documentation is… Y / N omments
Easy to read – format and layout clear
Quick to reference – check reference several aspects at random
Concise – clear and to the point
Minimal narrative – use of bullet points in checklists; use of tables andflowcharts in preference to wordy explanations
onsi!erations
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
% Document control an! #re&ace
1.1 ocument control re!ister
1." #able of document name$ document number$ edition$ version$ date issued
1.% istr ibution list
1.& 'evision procedure
' ontents
".1 (lan structure – dia!ram format
"." #able of contents
".% )ist of fi!ures$ charts and tables
Intro!uction
%.1 (urpose
%." *cope
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 1 of 10
8/17/2019 Checklist AIMS
2/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
%.".1 -nte!ration or relationship of plans
• corrosion mana!ement inspection and repair
• planned maintenance inspection
• risk2based inspection
• reliability2centred maintenance
%."." -nte!ration with other company plans
%.% 3b4ectives
%.& )ocation details
*eneral
&.1 #he +-M* addresses the followin! main elements as a minimum
• corrosion mana!ement inspection and repair ,e.!. vessels$
pipelines$ instrumentation• safety critical elements ,e.!. emer!ency shut down and
isolation e5uipment$ fire protection and detection for plant
and e5uipment
• instrumented protective functions
• planned maintenance inspection and repair$ and fitness2for2 purpose ,e.!. mobile
plant
• well head and subsurface well inte!rity
&." #he +-M* dele!ates duties$ responsibilities$ authorities and accountabilities withrespect to its development and implementation.
&.% #he +-M* demonstrates that any future development or activities can be addressed
&.& +ll relevant personnel have access to relevant +-M* documentation and records
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e " of 10
8/17/2019 Checklist AIMS
3/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
&.6 #he +-M* incorporates or links to a 5uality mana!ement system as a mechanism forassistin! in meetin! the +-M* performance standards or key performance indicators,7(-s. 7(-s should be readily available from the +-M*$ such as
•percenta!e of pro!ramme completed
• months of backlo!
• backlo! of critical items
• percenta!e emer!ency work
• weekly schedule compliance
7(-s are re!ularly reviewed by supervisors and mana!ers. 'eports of outstandin!critical maintenance and other exception reports are approved by the mana!erresponsible for facility inte!rity
+ ,acility or o#eration !escri#tion
6.1 8eneral
6.1.1 #he facility or operation is sufficiently described to allow a clearunderstandin! of the purpose of the asset and its activities and the controlsin place to ensure that risks are mana!ed to as low as reasonablypracticable
6.1." #he description includes as a minimum$ where applicable
• the physical controls in place to ensure that identified risks are
mana!ed to as low as reasonably practicable
• key parties and responsibilities
• the !eo!raphical location and a site location plan
• key crossin!s
• environment description ,e.!. oil$ !as$ sweet$ sour
• flora and fauna
• site meteorolo!ical conditions
• !eotechnical considerations
• interaction with existin! facilities
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e % of 10
8/17/2019 Checklist AIMS
4/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
6.1.% #here is an overview of key plant and utilities$ includin!
• li!htin!
• water
• fuel supply
• power
• communications
• fire protection$ suppression and detection
• office and control rooms
• processin!$ stora!e and handlin! areas
- .olicy lea!ershi# commitment an! strategy
9.1 8eneral
9.1.1 #here is a documented policy with strate!ic ob4ectives for mana!in! theinte!rity of the facility that
• is clear$ specific and useable by the workforce
• defines ob4ectives$ strate!ies$ plan$ performance standards$
performance indicators and continuous improvement strate!y
• clearly identifies systems$ assets and e5uipment to be monitored by
specific pro!rammes$ includin! on2line inspection
• clearly defines the process of validation and verification a!ainst
re!ulatory re5uirements
9.1." Mechanisms are in place to ensure the accountability of seniormana!ement for the achievement of asset inte!rity mana!ement$ such as
• facility inte!rity is part of operator:s overall business mana!ementsystem
• top mana!ement re!ularly reviews the technical health of the facility
and effectiveness of its monitorin!
• every level of workforce has access to relevant inte!rity information and
re!ular briefin!s by mana!ement
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e & of 10
8/17/2019 Checklist AIMS
5/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
9.1.% • -nte!rity assessment procedures and !uidelines are in place$ such as
pipeline inte!rity mana!ement system
• structural inte!rity mana!ement system
• technical chan!e mana!ement system
• maintenance mana!ement manual
• inspection and corrosion en!ineerin! manual
• small bore pipin! inte!rity manual
• safety critical function maintenance and testin! mana!ement system
• asset information system ,documented asset re!ister
• well head and subsurface well inte!rity mana!ement
9.1.& #here is a documented maintenance strate!y or plan that is derived fromthe policy for maintenance of systems and e5uipment$ and is clear andactionable and includes
• risk2based decision makin! to set appropriate maintenance options ,i.e.
preventive$ predictive and run to failure
• reliability2centred maintenance concept applied ,i.e. focus on systems
and e5uipment with safety conse5uences and fre5uent failure
• describes the resources provided to achieve the plan$ and how they are
provided
• describes how maintenance performance is monitored and measured
• describes how technical support is provided$ and from whom
• defines safety critical elements
• specifies the process for identifyin! safety critical elements and their
correspondin! performance standards in preventin! or miti!atin! theinitiation of a ma4or accident event
Note: Safety critical elements are any part of the facility, plant or computer programmes whose failure will either cause or contribute to a majoraccident, or the purpose of which is to prevent or limit the effect of a majoraccident
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 6 of 10
8/17/2019 Checklist AIMS
6/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
9.1.6 (eriodic review of the +-M* are scheduled to ensure its relevance and thatob4ectives are met
9." 3r!anisation and responsibility
9.".1 +ll personnel involved in the +-M* are informed of their roles$responsibilities and accountabilities such that
• the custodian of facility inte!rity is clearly identified$ with 4ob description
and authority
• the roles$ responsibilities and communication between the operations$
maintenance and technical inte!rity !roup are clear
• the roles and responsibilities of other personnel such as support staff$
contractors and specialists are unambi!uous
9."." 7ey personnel have si!ned off on their understandin! of their +-M* roles$responsibilities and accountabilities
9.".% 'esponsibilities and accountabilities under the +-M* are reviewed re!ularlyand when with or!anisational chan!es are made
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 9 of 10
8/17/2019 Checklist AIMS
7/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
9.".& #he +-M* responsibilities and accountabilities of all personnel ali!n withtheir skills and trainin!
• key personnel involved in safe!uardin! the facility inte!rity are
identified• there is a procedure for identifyin! the trainin! needs of these
personnel$ and a trainin! or skills matrix
• there are competency re5uirements for personnel responsible for
specific areas of inte!rity safe!uardin! such as corrosion or erosion$pressure system$ pipework and safety critical elements
• specific skills that are outsourced are identified$ and the work output
and performance monitorin! approach described
• external accreditation re5uired for specific skills of personnel ,own and
contractors is defined
• there is a competency assessment procedure
• personnel are trained in root cause analysis$ +
8/17/2019 Checklist AIMS
8/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
9.%." Maintenance issues are discussed between the site2based
technicians or supervisors and office2based support staff
#here is a daily communication protocol between site frontline staff and
office2based support staff#here is a mechanism for problems encountered on site by the techniciansto be discussed and resolved with office based support staff
Contact can be made
• daily for immediate issues
• monthly for plannin! purposes
• 5uarterly and annually for medium2 and lon!2term plannin!
0 .lanning1 res#onsi$ility ha2ar! i!enti&ication an! risk management
0.1 8eneral
0.1.1 (lans and procedures are in place to achieve the strate!ic ob4ectives ofsafe!uardin! the facility inte!rity$ such as
• clear identification of critical activities and threats to inte!rity
• inte!rity mana!ement manual
• plan and procedures for inspection$ audits and chan!e mana!ement
• methodolo!ies defined ,i.e. risk2based inspections$ reliability2centred
maintenance$ instrumented protective function
• clear process for definin! safety critical elements and their performance
standards$ plans and procedures for each type of asset$ e5uipment orsystem ,e.!. pipe work$ pressure system$ corrosion and erosion$structures
0.1." +ssumptions made within the +-M* are 4ustified and backed by relevantinformation
0.1.% 'isk assessments are based on$ and reference$ appropriate standards,e.!. risk2based inspection 2 +(- 6A1
Bote *ee (art % of this !uideline for simplified !uidance on fitness2for2purpose and risk2based inspection
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e A of 10
8/17/2019 Checklist AIMS
9/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
0." 3b4ectives$ plans and performance standards
0.".1 #he +-M* ob4ectives$ plans and standards are defined and verifiable$ suchas
• pipeline inte!rity mana!ement system
• structural inte!rity mana!ement system
• technical chan!e mana!ement system
• maintenance mana!ement manual
• inspection and corrosion en!ineerin! manual
• small bore pipin! inte!rity manual
• safety critical function maintenance and testin! mana!ement system
• asset information system
• well head and subsurface well inte!rity mana!ement
0."." #he +-M* ob4ectives$ plans and standards reflect the responsibilities$le!islative re5uirements and +-M* commitments
0.".% (lans are updated to reflect chan!es in performance standards$ oroutcomes of appraisals of the +-M* effectiveness
3 Sa&e o#erating #roce!ures
A.1 eferral of safety critical elements
A.1.1 #here are procedures or documentation describin! how deferrals areauthorised and 4ustified$ and ensurin!
• any deferrals of safety critical items follow the chan!e mana!ement
system of the *M*
• when a deferral is approved$ it is stipulated whether that work item is
still referenced as a backlo!
Note: All work requests that have not been completed are “backlog bydefinition
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e of 10
8/17/2019 Checklist AIMS
10/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
A.1." -f maintenance of a safety critical element is deferred$ the steps taken toidentify and implement additional measures to restore the inte!rity of thebarriers weakened by the deferral are described
A.1.% (rocedures and !uidelines are in place for temporary measures or repairs$and are sub4ect to an en!ineerin! assessment and !iven a =defined
life? prior to implementation
Dhen temporary measures are put in place$ they must be limited to aspecified time period and authorised in accordance with chan!emana!ement procedures$ includin! a risk assessment.
Note: Any change in the design of safety critical systems or equipmentmust be subject to change management system procedures andauthorisation levels
+ work order is !enerated on the maintenance schedulin! software torecord the defined life and to schedule when the temporary repair shouldbe inspected$ maintained and replaced with a conventional repair within the
defined life
A." Maintenance and repair
A.".1 + pro!ram has been developed and implemented on site for the routineinspection and maintenance of plant and e5uipment
A."." -nspection and maintenance schedules are in place and are in line withmanufacturers: and le!islative re5uirements$ work practices andrecommendations
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 1/ of 10
8/17/2019 Checklist AIMS
11/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
A.".% (lanned maintenance activities are conducted in line with procedurescontained within the +-M* and
• there is a mechanism to prioritise maintenance tasks$ and any
differences between the priorities for corrective maintenance and thosefor planned maintenance are identified
• work orders are screened for matters such as scope$ plannin! and
parts availability
• risk assessment methodolo!y is applied consistently to determine the
time frame within which safety critical work is to be completed
• safety critical work that is not completed by the nominated =re5uired by
date? is the sub4ect of an exception report re5uirin! mana!ementapproval
• priority is !iven to corrective maintenance that is necessary to avoid
serious safety conse5uences
A.".& + process is in place to ensure that safety critical elements are identifiedand maintenance scheduled accordin!ly$ and scheduled maintenance isprioritised with consideration for the safety and inte!rity impact ofe5uipment$ such as
• critical function tests based on a checklist with acceptance parameters
• safety critical element acceptance criteria laid out in written schemes of
examination ,D*E
• performance measures in inte!rity manuals for security critical
elements or critical function testin!
• performance standards definin! the minimum acceptable standards for
a safety critical element in terms of functionality$ reliability or availability$
and survivability• failed functions not immediately repaired bein! the sub4ect of a
mana!ement2of2chan!e report for si!n off by the operation:s person inchar!e$ with contin!ency measures in place for safe operation inclusiveof an appropriate risk assessment
• separate reports for the backlo! of safety critical elements and
e5uipment that is not safety critical
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 11 of 10
8/17/2019 Checklist AIMS
12/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
A.".6 (rocedures are in place for the periodic review of maintenance proceduresto ensure
• maintenance is bein! undertaken and e5uipment is safe and fit for
purpose before bein! returned to service• potential improvements to the maintenance process are identified
• work is undertaken in accordance with documented procedures
• safety critical procedures include a checklist to be filed on completion
• the +-M* maintenance system includes performance monitorin!
arran!ements with a!reed performance standards and performanceindicators
• office support staff analyse$ monitor and verify the maintenance
performance a!ainst appropriate key performance indicators$ and theseprompt 5ueries and discussion between site2 and office2based staff forcompliance and continuous improvement
A.".9 #he +-M* plant and e5uipment re!ister is used to record plant ande5uipment inspections$ maintenance$ repairs or modifications
A.".0 3perations vehicles and plant are inspected by operations2authoriseddrivers or operators$ and the results are recorded in a lo!book
A.".A (lant or e5uipment found to be defective or dan!erous is taken out ofservice and ta!!ed as =out of service? until such time as a 5ualifiedtechnician has made suitable repairs or the e5uipment is replaced
A.". +ppropriate procedures and trainin! are in place to ensure all maintenanceactivities and tasks are conducted in line with the +-M*
A.".1/ #here is a documented procedure to ensure that defective or dan!erous
plant and e5uipment is reported-f e5uipment is allowed to continue operatin! when it is known to bedefective ,e.!. a passin! valve$ there are procedures in place to identifywhat other barriers and defences need to be implemented to compensate.
Note: A risk assessment is required to arrive at mitigating measures forcontinued operation
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 1" of 10
8/17/2019 Checklist AIMS
13/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
A.% Employee selection competency and trainin!
A.%.1 + competency and skills matrix defines the competency criteria and safetyattributes of each position
A.%." Evidence of statutory competencies is re5uired for relevant positions andcopies of certificates are retained on site
A.%.% #here is a process to capture the review of position specifications
A.%.& +ll personnel are aware of their roles and responsibilities uponcommencement of employment
A.%.6 Employee competence is assessed as part of a periodic performancereview
A.%.9 #rainin! pro!rams are ade5uately funded and reviewed$ and reassessedperiodically to ensure effectiveness
A.& Dorkplace environment
A.&.1 #he pro4ect mana!ement team has developed the +-M* to ensure andpromote a safe workin! environment
4 Ins#ection testing monitoring an! re#orting
.1 8eneral
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 1% of 10
8/17/2019 Checklist AIMS
14/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
.1.1 #here are processes coverin! the inspection$ testin! and monitorin! of siteactivities$ plant and e5uipment for the operation$ includin!
• procedures for ensurin! plant is checked before use
• planned re!ime of workplace +-M* inspections
• work activity observations
• pre2operation inspections of vehicles and plant
• inspections and testin! of electrical e5uipment
• inspections and testin! of cranes and liftin! e5uipment
• inspections and testin! of pressure vessels and pressure testin!
e5uipment
• inspections and testin! of emer!ency$ first aid$ fire and spill control
e5uipment
• inspections and testin! of well inte!rity
.1." -nspections follow an a!reed format and are documented
.1.% + corrective action re!ister prioritises$ tracks and closes2out actions andimprovements
%5 Au!it veri&ication review an! im#rovement
1/.1 +sset inte!rity audit
1/.1.1 #he audit and review approach of the +-M* is demonstrated throu!h
• key performance indicators used in daily and monthly operations
reports
• monthly facility inte!rity reports
• monthly facility technical chan!e reports
• validation and verification schemes
• re!ular internal and external audits and reviews
1/.1." #he system and pro!ram of +-M* audits includes both internal andindependent audits
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 1& of 10
8/17/2019 Checklist AIMS
15/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
1/.1.% #he +-M* audits enable verification that the +-M* arran!ements meetspecified performance standards and allow opportunities for systemimprovement to be identified
1/.1.& #he methodolo!y for conductin! +-M* audits is described$ includin!• scope and ob4ectives
• criteria for selection of audit teams and leaders
• reportin! re5uirements
1/.1.6 #he +-M* audits are conducted by suitably competent personnel and the +-M* personnel are involved$ and
• there is a policy and procedure for facility inte!rity audit
• the plannin! for audits is described$ includin! whether they are based
on the status and importance of the activity
• the selection of personnel to conduct each audit is described
• independent competent persons are used for audits and verification
1/.1.9 Corrective actions are prioritised$ assi!ned responsibility$ and allocatedexpected completion dates
1/.1.0 #he +-M* audit findin!s are submitted in a formal report alon! with anycorrective action re5uests to appropriate pro4ect personnel
1/.1.A >ollow2up actions on audit findin!s are monitored for suitable resolutionand timely close2out
1/.1. #he +-M* audit reports are disseminated to involved stakeholders andauthorities
1/." 'eview and improvement
1/.".1 + process is in place to capture corrective actions and follow2upre5uirements resultin! from the audit or assessment$ and ensure close2outin a timely manner
1/."." #he +-M* performance is benchmarked a!ainst other or!anisational$operational and industry data
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 16 of 10
8/17/2019 Checklist AIMS
16/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
%% Document an! recor! control #roce!ures
11.1 -n !eneral$ the +-M* describes whether records are centrally kept and
• inte!rity records are maintained to demonstrate achievement of the performance
standards of the systems and e5uipment
• records are maintained for non2compliances$ deviations$ deferrals$ corrective
actions and remedial measures taken
• the validation and verification results of specialist contractors are recorded
• records accessible to relevant ,i.e. site and office personnel
• the form in which the records are kept and what the retention time is
11.1.1 #here is a document identification system that allows each document to beuni5uely identified
11.1." +ll documents developed utilise the document identification system
11.1.% +ll documents are developed in line with an a!reed format11.1.& +ll documents intended solely for the operation and developed by external
parties are reproduced ,with consent of the external party in line with thea!reed format and identification system
11.1.6 Dhere a document hierarchy exists$ this is detailed within the documentcontrol procedures
11.1.9 ocument development is undertaken by personnel who are suitably5ualified and competent
11.1.0 +ll documents are sub4ect to a defined review process that includes theparticipation of relevant personnel
11.1.A #he review of documents is recorded either on the document master draftsor by some other means ,e.!. document review re!ister
11.1. +ll documents are sub4ect to a defined authorisation process that includesthose peoples whose responsibility it falls under$ as per the or!anisationstructure
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 19 of 10
8/17/2019 Checklist AIMS
17/17
AIMS evaluation an! consi!erations Y/N omments
(N/A " not a##lica$le)
11.1.1/ #he authorisation of documents is recorded either on the document finaldraft or by some other means ,e.!. document authorisation re!ister
11.1.11 Dhere applicable$ documents include references to material !athered from
other documentation$ either internal or external to the operation:sor!anisation
11.1.1" +n effective document chan!e mana!ement process is in place to ensurethat
• chan!es to the operation ,any internal or external factors or references
are captured in the correspondin! documents
• dissemination of altered documentation is timely and effective
• relevant personnel are made aware of chan!es to documentation
• superseded or redundant documents are replaced at all locations on
site and within the or!anisation
11.1.1% #he document control process captures all correspondence that will$ or hasthe potential to influence the +-M* aspects of the operation
11.1.1& ocuments are marked as either controlled or uncontrolled as isapplicable$ and this process is mana!ed effectively
11.1.16 ocumentation is archived in accordance with statutory re5uirements
+sset inte!rity mana!ement system ,+-M* evaluation checklist – +u!ust "/1" (a!e 10 of 10