Proyecto #REF! Costo de Inversion a precios de mercado Alternativa II Item Descripción Und. Metrado Precio S/. Parcial S/. 01 OBRAS PROVISIONALES 29,669.16 01.01 CARTEL DE OBRA 29,669.16 01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 m und 1.00 1,225.56 1,225.56 01.01.02 CAMPAMENTO, DEPOSITO : MADERA Y CALAMINA m2 360.00 79.01 28,443.60 02 TOMA LATERAL C/POZA DE CAPTACIÓN (10 UND) 14,439.61 02.01 TRABAJOS PRELIMINARES 61.88 02.01.01 LIMPIEZA Y DEFORESTACION MANUAL m2 22.50 1.26 28.35 02.01.02 TRAZO Y REPLANTEO m2 22.50 1.49 33.53 02.02 MOVIMIENTO DE TIERRAS 707.18 02.02.01 EXCAVACION MANUAL EN ESTRUCTURAS m3 32.25 16.80 541.80 02.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 67.50 2.45 165.38 02.03 OBRAS DE CONCRETO SIMPLE 5,368.46 02.03.01 CONCRETO F'C = 100 KG/CM2 m3 1.23 262.19 322.49 02.03.02 CONCRETO F'C=175 KG/CM2 m3 8.12 352.12 2,859.21 02.03.03 ENCOFRADO Y DESENCOFRADO m2 77.08 28.37 2,186.76 02.04 REVOQUES Y ENLUCIDOS 1,521.57 02.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 34.20 23.07 788.99 02.04.02 TARRAJEO (MORTERO 1:5) m2 41.60 17.61 732.58 02.05 SUMINISTRO E INSTALACION DE ACCESORIOS 5,637.20 02.05.01 SUM. E INST. DE COMPUERTA METALICA C/IZAJE 0.30Mx0.70M, E=1/4" und 10.00 301.86 3,018.60 02.05.02 SUM. E INST. DE COMPUERTA METALICA TIPO TARJETA 0.80Mx0.70M, E=1/4 und 10.00 261.86 2,618.60 02.06 VARIOS 1,143.32 02.06.01 JUNTA ASFALTICA E=1" m 34.00 9.53 324.02 02.06.02 TUBERIA PVC SAL Ø 160MM S-25 m 30.00 27.31 819.30 03 CÁMARA DE CARGA (10 UND) 58,969.05 03.01 TRABAJOS PRELIMINARES 346.50 03.01.01 LIMPIEZA Y DEFORESTACION MANUAL m2 126.00 1.26 158.76 03.01.02 TRAZO Y REPLANTEO m2 126.00 1.49 187.74 03.02 MOVIMIENTO DE TIERRAS 2,735.12 03.02.01 EXCAVACION MANUAL EN ESTRUCTURAS m3 154.58 16.80 2,596.94 03.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 56.40 2.45 138.18 03.03 OBRAS DE CONCRETO ARMADO 31,787.39 03.03.01 CONCRETO F'C=175 KG/CM2 m3 30.89 352.12 10,876.99 03.03.02 ENCOFRADO Y DESENCOFRADO m2 328.80 28.37 9,328.06 03.03.03 ACERO F'Y=4200 KG/CM2 kg 1,504.20 7.70 11,582.34 03.04 REVOQUES Y ENLUCIDOS 6,927.74 03.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 123.20 23.07 2,842.22 03.04.02 TARRAJEO (MORTERO 1:5) m2 232.00 17.61 4,085.52 03.05 SUMINISTRO E INSTALACION DE ACCESORIOS 13,384.90 03.05.01 SUMINISTRO E INST. ACCESORIOS EN LA CAMARA DE CARGA und 10.00 603.67 6,036.70 03.05.02 SUMINISTRO E INST. ACCESORIOS EN CAJA DE VALVULAS DE CAMARA DE CAR und 10.00 734.82 7,348.20 03.06 TAPA METALICA 3,787.40 03.06.01 TAPA METALICA 0.70x0.70 m, e=1/8" und 10.00 169.37 1,693.70 03.06.02 TAPA METALICA 0.80x0.80 m, e=1/8" und 10.00 209.37 2,093.70 04 LÍNEA DE DISTRIBUCIÓN DE LA RED DE RIEGO (90,230.40 ML) ### 04.01 TRABAJOS PRELIMINARES 239,110.56 04.01.01 LIMPIEZA Y DEFORESTACION MANUAL m2 90,230.40 1.26 113,690.30 04.01.02 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m 90,230.40 1.39 125,420.26 04.02 MOVIMIENTO DE TIERRAS ### 04.02.01 EXCAVACION MANUAL DE ZANJAS EN MATERIAL COMUN m3 32,482.94 16.80 545,713.39 04.02.02 EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA m3 21,655.30 20.16 436,570.85 04.02.03 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m 90,230.40 1.42 128,127.17 04.02.04 CAMA DE APOYO PARA TUB. AGUA e=10 cm (PREPARACION Y COLOCACION) m 90,230.40 2.27 204,823.01 04.02.05 RELLENO DE ZANJAS CON MATERIAL DE PRESTAMO m3 32,125.75 7.90 253,793.43 04.02.06 RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO m3 20,301.84 6.35 128,916.68 04.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 60,360.41 8.40 507,027.44 04.03 SUMINISTRO E INSTALACION DE TUBERIAS 823,994.91 04.03.01 TUBERIA PVC SAP 110mm C-5 m 2,302.80 24.39 56,165.29 04.03.02 TUBERIA PVC SAP 90mm C-7.5 m 3,482.40 18.03 62,787.67 04.03.03 TUBERIA PVC SAP 90mm C-5 m 9,668.40 13.05 126,172.62 04.03.04 TUBERIA PVC SAP 75mm C-10 m 603.60 14.45 8,722.02 04.03.05 TUBERIA PVC SAP 75mm C-7.5 m 4,620.00 12.88 59,505.60 04.03.06 TUBERIA PVC SAP 75mm C-5 m 5,017.20 10.46 52,479.91 04.03.07 TUBERIA PVC SAP 63mm C-10 m 2,380.80 9.83 23,403.26 04.03.08 TUBERIA PVC SAP 63mm C-7.5 m 5,541.60 8.20 45,441.12 04.03.09 TUBERIA PVC SAP 63mm C-5 m 5,168.40 7.45 38,504.58 04.03.10 TUBERIA PVC SAP 1 1/2" C-10 m 20,778.00 5.90 122,590.20 04.03.11 TUBERIA PVC SAP 1 1/2" C-7.5 m 20,922.00 4.75 99,379.50 04.03.12 TUBERIA PVC SAP 1" C-10 m 9,745.20 4.24 41,319.65 04.03.13 PRUEBA HIDRAULICA DE TUBERIAS m 90,230.40 0.97 87,523.49 04.04 SUMINISTRO E INSTALACION DE ACCESORIOS 11,607.16 04.04.01 ACCESORIOS PARA TUBERIA PVC SAP und 1.00 11,607.16 11,607.16 04.05 OBRAS DE CONCRETO SIMPLE 3,904.64 04.05.01 CONCRETO F'C=140 KG/CM2 m3 12.30 317.45 3,904.64 05 CÁMARA ROMPE PRESIÓN TIPO 6 (32 UND) 104,207.42 05.01 TRABAJOS PRELIMINARES 288.51 05.01.01 LIMPIEZA Y DEFORESTACION MANUAL m2 112.80 1.26 142.13

Cronograma de Proyecto de tesis

Embed Size (px)

DESCRIPTION

JOS

Citation preview

PPTO ALT2

ProyectoERROR:#REF!

Costo de Inversion a precios de mercado Alternativa IIItemDescripcinUnd.MetradoPrecio S/.Parcial S/.01OBRAS PROVISIONALES29,669.1601.01 CARTEL DE OBRA29,669.1601.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 mund1.001,225.561,225.5601.01.02 CAMPAMENTO, DEPOSITO : MADERA Y CALAMINAm2360.0079.0128,443.6002TOMA LATERAL C/POZA DE CAPTACIN (10 UND)14,439.6102.01 TRABAJOS PRELIMINARES61.8802.01.01 LIMPIEZA Y DEFORESTACION MANUALm222.501.2628.3502.01.02 TRAZO Y REPLANTEOm222.501.4933.5302.02 MOVIMIENTO DE TIERRAS707.1802.02.01 EXCAVACION MANUAL EN ESTRUCTURASm332.2516.80541.8002.02.02 REFINE Y NIVELACION EN TERRENO NORMALm267.502.45165.3802.03 OBRAS DE CONCRETO SIMPLE5,368.4602.03.01 CONCRETO F'C = 100 KG/CM2m31.23262.19322.4902.03.02 CONCRETO F'C=175 KG/CM2m38.12352.122,859.2102.03.03 ENCOFRADO Y DESENCOFRADOm277.0828.372,186.7602.04 REVOQUES Y ENLUCIDOS1,521.5702.04.01 TARRAJEO CON IMPERMEABILIZANTEm234.2023.07788.9902.04.02 TARRAJEO (MORTERO 1:5)m241.6017.61732.5802.05 SUMINISTRO E INSTALACION DE ACCESORIOS5,637.2002.05.01 SUM. E INST. DE COMPUERTA METALICA C/IZAJE 0.30Mx0.70M, E=1/4"und10.00301.863,018.6002.05.02 SUM. E INST. DE COMPUERTA METALICA TIPO TARJETA 0.80Mx0.70M, E=1/4"und10.00261.862,618.6002.06 VARIOS1,143.3202.06.01 JUNTA ASFALTICA E=1"m34.009.53324.0202.06.02 TUBERIA PVC SAL 160MM S-25m30.0027.31819.3003CMARA DE CARGA (10 UND)58,969.0503.01 TRABAJOS PRELIMINARES346.5003.01.01 LIMPIEZA Y DEFORESTACION MANUALm2126.001.26158.7603.01.02 TRAZO Y REPLANTEOm2126.001.49187.7403.02 MOVIMIENTO DE TIERRAS2,735.1203.02.01 EXCAVACION MANUAL EN ESTRUCTURASm3154.5816.802,596.9403.02.02 REFINE Y NIVELACION EN TERRENO NORMALm256.402.45138.1803.03 OBRAS DE CONCRETO ARMADO31,787.3903.03.01 CONCRETO F'C=175 KG/CM2m330.89352.1210,876.9903.03.02 ENCOFRADO Y DESENCOFRADOm2328.8028.379,328.0603.03.03 ACERO F'Y=4200 KG/CM2kg1,504.207.7011,582.3403.04 REVOQUES Y ENLUCIDOS6,927.7403.04.01 TARRAJEO CON IMPERMEABILIZANTEm2123.2023.072,842.2203.04.02 TARRAJEO (MORTERO 1:5)m2232.0017.614,085.5203.05 SUMINISTRO E INSTALACION DE ACCESORIOS13,384.9003.05.01 SUMINISTRO E INST. ACCESORIOS EN LA CAMARA DE CARGAund10.00603.676,036.7003.05.02 SUMINISTRO E INST. ACCESORIOS EN CAJA DE VALVULAS DE CAMARA DE CARGAund10.00734.827,348.2003.06 TAPA METALICA3,787.4003.06.01 TAPA METALICA 0.70x0.70 m, e=1/8"und10.00169.371,693.7003.06.02 TAPA METALICA 0.80x0.80 m, e=1/8"und10.00209.372,093.7004LNEA DE DISTRIBUCIN DE LA RED DE RIEGO (90,230.40 ML)3,283,589.2404.01 TRABAJOS PRELIMINARES239,110.5604.01.01 LIMPIEZA Y DEFORESTACION MANUALm290,230.401.26113,690.3004.01.02 TRAZO NIVELACION Y REPLANTEO DE ZANJASm90,230.401.39125,420.2604.02 MOVIMIENTO DE TIERRAS2,204,971.9704.02.01 EXCAVACION MANUAL DE ZANJAS EN MATERIAL COMUNm332,482.9416.80545,713.3904.02.02 EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTAm321,655.3020.16436,570.8504.02.03 REFINE Y NIVELACION DE ZANJA PARA TUBERIASm90,230.401.42128,127.1704.02.04 CAMA DE APOYO PARA TUB. AGUA e=10 cm (PREPARACION Y COLOCACION)m90,230.402.27204,823.0104.02.05 RELLENO DE ZANJAS CON MATERIAL DE PRESTAMOm332,125.757.90253,793.4304.02.06 RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADOm320,301.846.35128,916.6804.02.07 ELIMINACION DE MATERIAL EXCEDENTEm360,360.418.40507,027.4404.03 SUMINISTRO E INSTALACION DE TUBERIAS823,994.9104.03.01 TUBERIA PVC SAP 110mm C-5m2,302.8024.3956,165.2904.03.02 TUBERIA PVC SAP 90mm C-7.5m3,482.4018.0362,787.6704.03.03 TUBERIA PVC SAP 90mm C-5m9,668.4013.05126,172.6204.03.04 TUBERIA PVC SAP 75mm C-10m603.6014.458,722.0204.03.05 TUBERIA PVC SAP 75mm C-7.5m4,620.0012.8859,505.6004.03.06 TUBERIA PVC SAP 75mm C-5m5,017.2010.4652,479.9104.03.07 TUBERIA PVC SAP 63mm C-10m2,380.809.8323,403.2604.03.08 TUBERIA PVC SAP 63mm C-7.5m5,541.608.2045,441.1204.03.09 TUBERIA PVC SAP 63mm C-5m5,168.407.4538,504.5804.03.10 TUBERIA PVC SAP 1 1/2" C-10m20,778.005.90122,590.2004.03.11 TUBERIA PVC SAP 1 1/2" C-7.5m20,922.004.7599,379.5004.03.12 TUBERIA PVC SAP 1" C-10m9,745.204.2441,319.6504.03.13 PRUEBA HIDRAULICA DE TUBERIASm90,230.400.9787,523.4904.04 SUMINISTRO E INSTALACION DE ACCESORIOS11,607.1604.04.01 ACCESORIOS PARA TUBERIA PVC SAPund1.0011,607.1611,607.1604.05 OBRAS DE CONCRETO SIMPLE3,904.6404.05.01 CONCRETO F'C=140 KG/CM2m312.30317.453,904.6405CMARA ROMPE PRESIN TIPO 6 (32 UND)104,207.4205.01 TRABAJOS PRELIMINARES288.5105.01.01 LIMPIEZA Y DEFORESTACION MANUALm2112.801.26142.1305.01.02 TRAZO Y REPLANTEOm298.241.49146.3805.02 MOVIMIENTO DE TIERRAS4,947.5605.02.01 EXCAVACION MANUAL EN ESTRUCTURASm3150.5914.402,168.5005.02.02 REFINE Y NIVELACION EN TERRENO NORMALm2116.482.45285.3805.02.03 RELLENO COMPACTADO MANUAL MATERIAL PROPIOm369.6013.11912.4605.02.04 ELIMINACION DE MATERIAL EXCEDENTEm3188.248.401,581.2205.03 OBRAS DE CONCRETO SIMPLE3,003.2405.03.01 CONCRETO F'C=175 KG/CM2m35.10352.121,795.8105.03.02 ENCOFRADO Y DESENCOFRADOm242.5628.371,207.4305.04 OBRAS DE CONCRETO ARMADO50,769.2805.04.01 CONCRETO f'c=210 kg/cm2m348.83361.5317,653.5105.04.02 ENCOFRADO Y DESENCOFRADO NORMALm2481.6029.0413,985.6605.04.03 ACERO F'Y=4200 KG/CM2kg2,484.437.7019,130.1105.05 REVOQUES Y ENLUCIDOS9,753.1405.05.01 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 ; E=1.0 Cmm2214.4025.625,492.9305.05.02 TARRAJEO (MORTERO 1:5)m2241.9217.614,260.2105.06 SUMINISTRO E INSTALACION DE ACCESORIOS23,660.1605.06.01 SUMINISTRO E INST. ACCESORIOS EN CAMARA ROMPE PRESION T-06und32.00739.3823,660.1605.07 TAPA METALICA9,879.6805.07.01 TAPA METALICA 0.70x0.70 m, e=1/8"und32.00169.375,419.8405.07.02 TAPA METALICA 0.50x0.50 m, e=1/8"und32.00139.374,459.8405.08 VARIOS1,905.8505.08.01 PINTURA EN EXTERIOR m2226.088.431,905.8506CAJA HIDRANTE DE UN LATERAL (1445 UND)881,861.5406.01 TRABAJOS PRELIMINARES2,543.2006.01.01 LIMPIEZA Y DEFORESTACION MANUALm2924.801.261,165.2506.01.02 TRAZO Y REPLANTEOm2924.801.491,377.9506.02 MOVIMIENTO DE TIERRAS25,522.1706.02.01 EXCAVACION MANUAL EN ESTRUCTURASm3878.5616.8014,759.8106.02.02 REFINE Y NIVELACION EN TERRENO NORMALm24,392.802.4510,762.3606.03 OBRAS DE CONCRETO SIMPLE377,371.0006.03.01 CONCRETO F'C=140 KG/CM2m3589.56317.45187,155.8206.03.02 ENCOFRADO Y DESENCOFRADOm26,704.8028.37190,215.1806.04 REVOQUES Y ENLUCIDOS40,714.3206.04.01 TARRAJEO (MORTERO 1:5)m22,312.0017.6140,714.3206.05 SUMINISTRO E INSTALACION DE ACCESORIOS234,321.2006.05.01 SUMINISTRO E INST. ACCESORIOS EN HIDRANTE DE UN LATERALglb1,445.00162.16234,321.2006.06 TAPA METALICA201,389.6506.06.01 TAPA METALICA 0.50x0.50 m, e=1/8"und1,445.00139.37201,389.6507CAJA DE VLVULA DE CONTROL (245 UND)196,380.5407.01 TRABAJOS PRELIMINARES330.1307.01.01 LIMPIEZA Y DEFORESTACION MANUALm2120.051.26151.2607.01.02 TRAZO Y REPLANTEOm2120.051.49178.8707.02 MOVIMIENTO DE TIERRAS2,321.5107.02.01 EXCAVACION MANUAL EN ESTRUCTURASm378.1616.801,313.0907.02.02 REFINE Y NIVELACION EN TERRENO NORMALm2411.602.451,008.4207.03 OBRAS DE CONCRETO SIMPLE31,827.1407.03.01 CONCRETO F'C=140 KG/CM2m335.28317.4511,199.6407.03.02 FONDO DE PISO (GRAVA MX. 3/4")m36.1399.45609.6307.03.03 ENCOFRADO Y DESENCOFRADOm2705.6028.3720,017.8707.04 REVOQUES Y ENLUCIDOS5,177.3407.04.01 TARRAJEO (MORTERO 1:5)m2294.0017.615,177.3407.05 SUMINISTRO E INSTALACION DE ACCESORIOS122,578.7707.05.01 SUMINISTRO E INST. VALVULA DE CONTROL Y ACCESORIOS 4"und13.00798.1610,376.0807.05.02 SUMINISTRO E INST. VALVULA DE CONTROL Y ACCESORIOS 3"und115.00639.8373,580.4507.05.03 SUMINISTRO E INST. VALVULA DE CONTROL Y ACCESORIOS 2 1/2"und52.00413.5221,503.0407.05.04 SUMINISTRO E INST. VALVULA DE CONTROL Y ACCESORIOS 2"und37.00304.0811,250.9607.05.05 SUMINISTRO E INST. VALVULA DE CONTROL Y ACCESORIOS 1 1/2"und28.00209.585,868.2407.06 TAPA METALICA34,145.6507.06.01 TAPA METALICA 0.50x0.50 m, e=1/8"und245.00139.3734,145.6508CAJA DE VLVULA DE PURGA (165 UND)79,234.3708.01 TRABAJOS PRELIMINARES222.3408.01.01 LIMPIEZA Y DEFORESTACION MANUALm280.851.26101.8708.01.02 TRAZO Y REPLANTEOm280.851.49120.4708.02 MOVIMIENTO DE TIERRAS1,563.4908.02.01 EXCAVACION MANUAL EN ESTRUCTURASm352.6416.80884.3508.02.02 REFINE Y NIVELACION EN TERRENO NORMALm2277.202.45679.1408.03 OBRAS DE CONCRETO SIMPLE21,434.7608.03.01 CONCRETO F'C=140 KG/CM2m323.76317.457,542.6108.03.02 FONDO DE PISO (GRAVA MX. 3/4")m34.1399.45410.7308.03.03 ENCOFRADO Y DESENCOFRADOm2475.2028.3713,481.4208.04 REVOQUES Y ENLUCIDOS3,486.7808.04.01 TARRAJEO (MORTERO 1:5)m2198.0017.613,486.7808.05 SUMINISTRO E INSTALACION DE ACCESORIOS29,530.9508.05.01 SUMINISTRO E INST. VALVULA DE PURGA Y ACCESORIOS 1 1/2"und98.00209.4320,524.1408.05.02 SUMINISTRO E INST. VALVULA DE PURGA Y ACCESORIOS 1"und67.00134.439,006.8108.06 TAPA METALICA22,996.0508.06.01 TAPA METALICA 0.50x0.50 m, e=1/8"und165.00139.3722,996.0509CAJA DE VLVULA DE AIRE (114 UND)91,171.3809.01 TRABAJOS PRELIMINARES200.6409.01.01 LIMPIEZA Y DEFORESTACION MANUALm272.961.2691.9309.01.02 TRAZO Y REPLANTEOm272.961.49108.7109.02 MOVIMIENTO DE TIERRAS2,013.4809.02.01 EXCAVACION MANUAL EN ESTRUCTURASm369.3116.801,164.4109.02.02 REFINE Y NIVELACION EN TERRENO NORMALm2346.562.45849.0709.03 OBRAS DE CONCRETO SIMPLE29,771.2009.03.01 CONCRETO F'C=140 KG/CM2m346.51317.4514,764.6009.03.02 ENCOFRADO Y DESENCOFRADOm2528.9628.3715,006.6009.04 REVOQUES Y ENLUCIDOS3,212.0609.04.01 TARRAJEO (MORTERO 1:5)m2182.4017.613,212.0609.05 SUMINISTRO E INSTALACION DE ACCESORIOS40,085.8209.05.01 SUMINISTRO E INST. VALVULA DE AIRE Y ACCESORIOS 2"glb114.00351.6340,085.8209.06 TAPA METALICA15,888.1809.06.01 TAPA METALICA 0.50x0.50 m, e=1/8"und114.00139.3715,888.1810CRUCE AREO L=15M C/CABLE (10 UND)71,279.3110.01 TRABAJOS PRELIMINARES449.0510.01.01 LIMPIEZA Y DEFORESTACION MANUALm2136.201.26171.6110.01.02 TRAZO Y REPLANTEOm2186.201.49277.4410.02 MOVIMIENTO DE TIERRAS1,580.7110.02.01 EXCAVACION MANUAL EN ESTRUCTURASm353.0616.80891.4110.02.02 NIVELACION Y COMPACTACION MANUALm236.203.65132.1310.02.03 ELIMINACION DE MATERIAL EXCEDENTEm366.338.40557.1710.03 OBRAS DE CONCRETO SIMPLE3,621.2910.03.01 CONCRETO 1:10 PARA SOLADOS Y/O SUB BASESm31.81244.83443.1410.03.02 CONCRETO FC = 175 Kg/Cm2 + 30% PM S/Mm311.34280.263,178.1510.04 OBRAS DE CONCRETO ARMADO18,104.0910.04.01 CONCRETO f'c=210 kg/cm2m319.25361.536,959.4510.04.02 ENCOFRADO Y DESENCOFRADO NORMALm2166.4029.044,832.2610.04.03 ACERO F'Y=4200 KG/CM2kg819.797.706,312.3810.05 SUMINISTRO E INSTALACION DE TUBERIAS5,725.6010.05.01 TUBERIA DE F GALVANIZADO 2"m170.0033.685,725.6010.06 CABLES Y FIERROS4,469.8710.06.01 CABLE DE ACERO TIPO BOA 3/8" (C. PRINCIPAL)m245.0014.493,550.0510.06.02 FIERRO LISO 1/4" (PENDOLAS)m123.307.46919.8210.07 SUMINISTRO E INSTALACION DE ACCESORIOS37,328.7010.07.01 ACCESORIOS PARA TUBERIA DE FG 2"glb10.00287.822,878.2010.07.02 ABRAZADERAS DE ACERO 2"und150.0088.6613,299.0010.07.03 ABRAZADERAS DE ACERO 3/8"und150.0045.166,774.0010.07.04 TEMPLADOR DE ACERO 3/8"und20.00220.774,415.4010.07.05 APOYO MOVIL DE FIERRO EN COLUMNA L=0.25Mund20.00376.667,533.2010.07.06 ACCESORIOS VARIOS EN CRUCE L=15Mglb10.00242.892,428.9011LATERAL DE RIEGO51,544.5011.01 LINEA DE RIEGO MOVIL51,544.5011.01.01 MODULO DE EQUIPO DE RIEGO MOVIL DE 02 ASPERSORES DE 3/4"und75.00687.2651,544.5012RESERVORIO DE 580 M3 (EXISTENTE)1,185.6912.01 OBRAS DE CONCRETO SIMPLE176.0612.01.01 CONCRETO F'C=175 KG/CM2m30.50352.12176.0612.02 SUMINISTRO E INSTALACION DE ACCESORIOS785.5712.02.01 SUMINISTRO E INST. ACCESORIOS EN CASETA DE VALVULASund1.00433.91433.9112.02.02 SUMINISTRO E INST. CANASTILLA DE PVC 6" A 4"und1.00351.66351.6612.03 TAPA METALICA224.0612.03.01 TAPA METALICA 1.00x1.00 m, e=1/8"und1.00224.06224.0613PRUEBAS DE LABORATORIO1,665.0013.01 PRUEBA DE CALIDAD DEL CONCRETO615.0013.01.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)und30.0020.50615.0013.02 PRUEBA DE COMPACTACION1,050.0013.02.01 PRUEBA DE COMPACTACION DEL SUELO (PRUEBA PROCTOR MODIFICADO)und30.0035.001,050.0014FLETE45,000.0014.01 FLETE45,000.0014.01.01 FLETE TERRESTREglb1.0030,000.0030,000.0014.01.02 FLETE RURALglb1.0015,000.0015,000.00|15CAPACITACION 40,000.0015.01 CAPACITACION SISTEMA DE RIEGO40,000.0015.01.01 CAPAC. OPERACION Y MANTENIMIENTO DEL SISTEMA DE RIEGO POR ASPERSIONglb20.001,000.0020,000.0015.01.02 CAPAC. MANEJO DE EQUIPOS DE RIEGO MOVILglb20.001,000.0020,000.0016IMPACTO AMBIENTAL50,000.0016.01 MITIGACION DE IMPACTO AMBIENTAL50,000.0016.01.01 MITIGACION DE IMPACTO AMBIENTALglb5.0010,000.0050,000.00COSTO DIRECTO5,000,196.81GASTOS GENERALES500,019.68Gastos GeneralesGLB1.00500,019.68500,019.68SUPERVISIN TCNICA 250,009.84Supervisin tcnica GLB1.00250,009.84250,009.84ESTUDIO DEFINITIVO100,003.94Expediente TcnicoGLB1.00100,003.94100,003.94COSTO TOTAL DE INVERSION5,850,230.27Gasto en Gestin del Programa a precios de mercado Alternativa IItemDescripcinUnd.MetradoPrecio S/.Parcial S/.GESTIN DEL PROGRAMA25,000.00Gastos de gestinGLB1.0022,000.0022,000.00Evaluacin expostGLB1.003,000.003,000.00

cronog. de acciones

CRONOGRAMA DE PROYECTOPROYECTO : ENERGA SOLAR EN EL TRATAMIENTO TRMICO DE SUELOS DE INVERNADERO-HUAMANGA-AYACUCHO, 2015UBICACIN: AYACUCHO - HUAMANGA, INIA

itemACTIVIDADESMESESAGOS.SET.OCT.NOV.DIC.ENER.FEBR.MARZ.ABR.MAYOJUN.JUL1.0ACTIVIDADES PRELIMINARES1.1REVISION BIBLIOGRAFICA1.20CONTACTO CON LA INSTITUCION INIA2.0TRABAJO DE CAMPO2.1SALIDA A CAMPO2.2DIAGNOSTICO DE LA ZONA DE TRABAJO2.3EVALUACION DE ZONA2.4LEVANTAMIENTO TOPOGRAFICO2.5MUESTREO DE SUELOS3.0TRABAJO DE GABINETE3.1ELABORACION DE PLANOS3.2ESTUDIO EN LABORATORIO3.3EVALUACION DE SUELOS (RESULTADOS)3.4VISITA CON EL TUTOR3.5ELABORACION DEL ROYECTO3.6BUSQUEDA DE PRESUPUESTO3.7PRESENTACION DEL PROYECTO

Hoja2

CRONOGRAMA DE PROYECTOPROYECTO : ENERGA SOLAR EN EL TRATAMIENTO TRMICO DE SUELOS DE INVERNADERO-HUAMANGA-AYACUCHO, 2015UBICACIN: AYACUCHO - HUAMANGA, INIA

itemACTIVIDADESUNIDCANTIDACOSTO UNITARIOPARCIALTOTALSET.OCT.NOV.1.0ACTIVIDADES PRELIMINARES2101.1REVISION BIBLIOGRAFICAGlb11501501.2CONTACTO CON LA INSTITUCION INIAGlb160602.0TRABAJO DE CAMPO15602.1SALIDA A CAMPOunid1501.42102.4LEVANTAMIENTO TOPOGRAFICOGlb12002002.5ALQUILER DE EQUIPOS TOPOGRAFICOSGlb15503502.6MUESTREO DE SUELOSunid5904502.7VIATICOSGlb13003002.8TOPICOGlb150503.0TRABAJO DE GABINETE11503.1ELABORACION DE PLANOSGlb15003003.3EVALUACION DE SUELOS (RESULTADOS)Glb16002003.5ELABORACION MURO TROMBEGlb13003003.7VISITA CON EL TUTORGlb150503.9ELABORACION DEL ROYECTOGlb12002003.10UTILES DE ESCRITORIOGlb1100100PRESUPUESTO TOTAL2920

Hoja1

ENERGA SOLAR EN EL TRATAMIENTO TRMICO DE SUELOS DE INVERNADERO-HUAMANGA-AYACUCHO, 2015PROBLEMASOBJETIVOSHIPOTESISVARIABLES1. PROBLEMA PRINCIPAL1. OBJETIVO GENERAL1. HIPOTESIS GENERAL1. VARIABLE INDEPENDIENTECunto influye la energa solar en la mejora de los suelos de invernadero en Huamanga-Ayacucho?Utilizar la influencia de la energa solar en la mejora de los suelos de invernadero en Huamanga-Ayacucho. La energa solar influye en la mejora de los suelos de invernadero Huamanga-Ayacucho, 2015Variable Independiente: X: Energa solar Indicadores:X 1: Temperatura (C)X2: Radiacin solar (W/m2)

2. PROBLEMAS SECUNDARIOS2. OBJETIVOS ESPECIFICOS2. HIPOTESIS ESPECIFICOS2. VARIABLE DEPENDIENTECunto influye la energa solar en eliminar los microorganismos patgenos de suelos de invernadero en Huamanga-Ayacucho?Evaluar la influencia de la energa solar en la eliminacin de los organismos patgenos en los suelos de invernadero en Huamanga-AyacuchoLa energa solar influye en la eliminacin de microorganismos patgenos de los suelos de invernaderos Huamanga-Ayacucho,2015Variable dependiente: Y: Caractersticas de suelo en invernadero Indicadores:Y1: TexturaY2: densidad Aparente (gr/cm3)Y3: calor especifico (J/g C)Y4: Humedad (%)Y5: cantidad de organismos patgenos (nmero)

Cunto influye el uso de energa solar en la conservacin de suelos de invernadero en Huamanga-Ayacucho?Determinar la influencia del uso de la energa solar en la conservacin de los suelos de invernadero Huamanga-Ayacucho.El uso de energa solar en la conservacin de suelos de invernadero Huamanga-Ayacucho, 2015.Cunto influye el uso de energa solar en la disminucin de contaminacin de agua y aire en invernaderos en Huamanga-Ayacucho?Sealar la influencia del uso de la energa solar en la disminucin de contaminacin de agua-aire en invernaderos de Huamanga-Ayacucho.El uso de la energa solar influye en la disminucin de contaminantes de agua y aire de invernaderos Huamanga-Ayacucho, 2015.