CURRICULUM VITAE SAI KIRAN MUTHYALA Electrical Co-Ordinator Email Id : [email protected] Skype id : kirangoud007 Mobile No: 00966531004469 Objective: To work challenging Dynamic environment these combines my engineering knowledge and managerial experience and contributes profitability to the organization and meaning to society. Professional synopsis: M. Tech with 8.7 years of experience in Project Planning, Construction, Maintenance, coordination and team management with well known organizations. Presently serving with AL-YAMAMA as a Project CO-Coordinator Electrical for Operation and Maintenance in Princess Nora Bint Abudul Rahman University in Riyadh, Saudi Arabia. Academic Credentials: M.Tech in High Voltage (Power systems) Engineering from Ramappa Engineering College, Warangal . B.Tech in Electrical and Electronics Engineering from Vidya Bharathi Institute of Technology, Jangaon. Diploma in Electrical and Electronics Engineering from Government Polytechnic Warangal .

CV coordinator

Embed Size (px)

Citation preview

Page 1: CV coordinator

CURRICULUM VITAE

SAI KIRAN MUTHYALA Electrical Co-Ordinator

Email Id : [email protected] Skype id : kirangoud007

Mobile No: 00966531004469

Objective: To work challenging Dynamic environment these combines my

engineering knowledge and managerial experience and contributes profitability to the

organization and meaning to society.

Professional synopsis:

M. Tech with 8.7 years of experience in Project Planning, Construction,

Maintenance, coordination and team management with well known organizations.

Presently serving with AL-YAMAMA as a Project CO-Coordinator

Electrical for Operation and Maintenance in Princess Nora Bint Abudul Rahman University in Riyadh, Saudi Arabia.

Academic Credentials:

M.Tech in High Voltage (Power systems) Engineering from Ramappa

Engineering College, Warangal.

B.Tech in Electrical and Electronics Engineering from Vidya Bharathi Institute of Technology, Jangaon.

Diploma in Electrical and Electronics Engineering from Government Polytechnic Warangal.

Page 2: CV coordinator

Skills:

MS office (word, excel, PowerPoint)

AutoCAD

Microsoft Visio

Maximo

Energy Saving Techniques

BMS & SCADA

Training Certificates:

OSHA (General Safety) training certified by California USA.

Project Management Professional training (Maintenance Planning Management &

work control) conducted by Arab Trainers at Saudi Arabia.

Training certificate on BTU Meters conducted by Johnson Controls & York at Riyadh in KSA.

Training Certificate on Energy management & Implementation techniques conducted by DAR AL- Hadassah (Shair and Partners) at Riyadh in KSA.

Training Certificate on BMS conducted by Johnson Controls & York at Riyadh in KSA

Certificate on High voltage Trends conducted by Ramappa engineering college at Warangal in India.

Training certificate on AutoCAD from cadpro institute from Hyderabad, India.

Attended SCADA trainings conducted by ABB, Riyadh, KSA.

Attended Safety trainings conducted by DAR AL HANDASA (Shair & Partners) Riyadh, KSA.

Training Certificate on Medium Voltage Switchgears Operation & Maintenance Techniques Conducted by SAUDI PARASONS LTD.

Training Certificate on 13.8KV, 5MVA X 8 Generators Operation & Maintenance conducted by SAUDI PARASONS LTD.

Present Employer: Al-Yamama Company, Riyadh Jan 2013 to till date:

Al-Yamama Company is one of the largest company in the KSA .It was established in 1954 as a trading and contracting firm, since then it has executed hundreds of projects in operating and maintenance, construction, landscaping and irrigation. Princess Nora

University Project, Operation and Maintenance.

Designation: Electrical CO-Ordinator

Work Responsibility:

Page 3: CV coordinator

Planning Schedules of regular preventive and break-down maintenance of all

equipments.

Preparation of daily and monthly energy audits.

Coordination with client and subcontractors. Moreover Fulfill the Consultant

requirements. Sending daily reports and major incident reports, Root cause reports to the client.

Coordination with Purchase Dept. for Material Issue

Coordination with Warehouse / Store dept. for tools / Spare-parts

Coordination with other Dept. like Mechanical, Civil, Low Current, IT etc.

Coordination with SEC (Saudi Electricity Company) for any Power Tripping /

Fluctuation / Shutdown Required

Preparation of Single Line diagrams

Coordination with the Manufacturer’s

Attend weekly meetings with client & explain all related works

Attend KPI Meetings

Arrange weekly meeting with all engineers & supervisors to determine the work status

Preparing Consumable & spare parts to maintain minimum stock in ware house

Preparing Jobplans & PM Schedules

Reply of All Official Letters received from Consultant / Other Departments.

Arrange Meetings with subcontractors

Site Inspections of MV, LV, UPS, Lightning & All utility areas and check engineer activities in site.

Arrange Meetings with technical staff & contractors for new installation. Then attend with client for final proposals.

Arrange Emergency plans to perform yearly ppms in holiday times.

Coordination with Logistics & Accounts Dept.

Everyday followup required material in site.

Testing’s: Megger Testing (Cable, Transformer, C.T and CB)

Earth Resistance Testing

Dielectric Testing (Transformer Oil)

Relay Testing

Hi pot Testing

Breaker Contact Resistance Testing

Cable Fault Locate test

Breaker time test

SACE (ABB)Breakers Testing

Previous Experience

1) Erection of 132kv and 33/11 KV Projects

Page 4: CV coordinator

Company : K. Ramchandra rao Transmission Project

Private Limited Duration : January 2012 TO December 2012

Designation : Electrical Engineer

Professional synopsis:

Keep in Planning & Coordination.

Strong Relationship management, Communication skills with the ability to network with project members, Consultants and Contractors with Consummate.

Extensive experience in substation project that is supply of material and erection

portion. Also managing different projects and maintenance.

Executed projects up to 220kv (i.e. 11kv, 33kv, 132kv, 220kv).

Site Management:

Handling all construction activities including providing technical inputs for methodologies of construction & coordination with site management activities.

Interacting with site purchasers and suppliers for achieving cost effective purchase of equipment accessories, material with timely delivery so as to

minimize project cost.

Coordinating with the main contractors, monitor the performance view of project schedule. Assist in settling all techno – commercial disputes / clarifications

during of execution project.

Implementing quality management principles and checks. Safety norms across

the entire course of project execution.

Project Planning & Management:

Managing detailed project reports and project execution plans after thorough

discussion with clients, Selection of sites, project evaluation in terms of outlays and profits attached.

Establishing time span of project execution as per client specifics.

Listing down the resource needs for projects, after considering the budgetary

parameters set.

Evaluating designs coordinate with consultants and subcontractors for change in

the same.

Carrying out advance planning for resource mobilization, manpower deployment

and rendering technical support, ensuring the execution of projects within time, cost & budgetary parameters.

Page 5: CV coordinator

Highlights in Project Planning and Management:

Excavation and foundation for all substation all structural equipments, earth met,

poles and towers.

Erection of structure and installation of power transformer, current transformer,

voltage transformer, SF6 circuit breakers, Post insulators and control panels.

Cable lying and termination, jump ring conductor for bus bar. Testing of P.T, C.T,

C.V.T, Isolators and Control Panel relays.

2) Operation and maintenance of 132/33kv substation

Organization : AP Transco Ltd.

Duration : April 2006 TO DEC2011

Designation : Shift Engineer

AP Transco (Govt.) AP Transco has ceased to do power trading and has retained with powers of controlling system operations of Power Transmission and Power supply in AP

Highlights in 132kv Substation Maintenance

Relay operations to withstand O/L & E/L trappings

Operation & Maintenance of Circuit Breaker, I have Working with all type of

Circuit Breakers (Vacuum, SF6 Gas etc.)

Operation & Maintenance of Power transformers up to 63MVA (132/33KV )

Tap Changing of Power Transformer at low, High Voltage Conditions.

Load Changing Process depends up on low voltage.

Maintained Line Clearance rules as per APTRANSCO

Capacitor bank operation at low voltage Conditions for improve the power factor.

AC & DC Panel Maintenance, Battery Charging, floating methods

Log book maintaining for every hour. Preparing Monthly report of substation

and also prepared Energy exports, imports details.

Monthly maintenance of all Switch Yard Equipments ( Bus bars, Breakers, CT,

PT, Isolator, Power transformers, Distribution Transformers).

Page 6: CV coordinator

PERSONAL DETAILS Father‘s Name : M.YADAGIRI Date of Birth : 07 May 1986. Nationality : Indian Religion : Hindu Passport No : H3559456 Valid Up to March 2019 Driving License : Gulf (Kingdom of Saudi Arabia) valid up to 2018 Status : Single Languages Known : English, Hindi, and Telugu Present CTC : Excepted CTC : Negotiable

Declaration:

I hear by solemnly declare that the above furnished details are true to the

best of my knowledge.

Place : Date : ` Saikiran Muthyala