enin20255sk_ch2

Embed Size (px)

DESCRIPTION

enin20255sk_ch2

Citation preview

  • 8

    2

    (Value Stream Analysis; VCA) (Value Stream Mapping ; VSM) IDEF0 (Integration Definition for Function Modeling) (Logistics Cost Analysis) ABC (Activity Based Costing) 2.1

    2.1.1 (Supply Chain Management) (Supply Chain)

    (Supply Chain Management; SCM) (Supply) (Demand) ( , 2546)

    (Integration)

  • 8

    (Upstream Source) (Downstream Customers) Council of Supply Chain Management Professional (2006) (Supply Chain Management)

    (Logistics Management) (Supply Chain Management)

  • 9

    (Cycle time) (Process) (End Customer Service)

    ( , 2550) 2-1

    - (Suppliers)

    - (Manufacturers)

    - (Distribution Centers)

  • 10

    - (Retailers or Customers)

    2-1

    - (Procurement):

    - (Transportation):

    - (Warehousing):

    - (Distribution): ( , 2548 )

    2.1.2 (Lean Concept) Lean Taiichi

    Ohno Toyota Production System TPS

  • 11

    4 Just In Time Autonomation Jidoka Flexible Workforce Creativity ( , 2552)

    Waste

    Waste

    2-2

    2-2

    95% 5 % Toyota (Non-Value Added) 7 (Liker et al., 2008)

    1. (Overproduction) 2. (Waiting-time on Hand) 3. (Unnecessary Transport or Conveyance) 4. (Over processing or

    Incorrect Processing) 5. (Excess inventory)

  • 12

    6. (Unnecessary Movement) 7. (Defects)

    5 ( ) (Cell manufacturing) (One-piece flow) (Total Productive Maintenance) (Just in Time) (Value Steam Mapping)

    (Lean Logistics)

    1. (Speed Delivery) 2. (Physical Flow) 3. (Information Flow) 4. (Value Added) 5.

    (Cargoes Handling & Carriage Cost) 6. (Core Competitiveness)

    2.1.3 (Value Stream Mapping; VSM)

    (Value Stream Analysis) (Lean Thinking)

    (Lean Manufacturing Strategy) (Story board)

  • 13

    (Visual Management) (Best Practice) (Tapping et al., 2007) (Value Stream Thinking) (Overall Process) VSM (Current State) (Future State) 3

    1. (Non Value Added; NVA) /

    2. (Necessary but Non Value Added; NNVA) , /

    3. (Value Added; VA)

    Value Stream Mapping (VSM) VSM

    VSM

  • 14

    (Work In Process; WIP)

    (Implementation)

    (Focus on Customer Needs) (Holistic Approach) ( , 2548) 3

    1. :

    2. :

    3. 2:

    2-3 2-1

  • 15

    2-1

    (Manual)

    ( )

    WIP (First-In, First-Out: FIFO)

    (: Don Tapping, 2007)

  • 16

    2-3 2.1.4 (Business Process Mapping)

    IDEF0 (Integration Definition for Function Modeling) IDEF0 (Activity Modeling)

  • 17

    IDEF0 2-4

    1. (Activity)

    2. (Input)

    3. (Control) Output

    4. (Mechanism)

    5. (Output)

    2-4 IDEF0

    IDEF0

  • 18

    2.1.5 (Logistics Cost Analysis)

    (Activity Based Costing ; ABC) ABC 2-5

    ABC

    /

    /

    2-5 ABC

    (: , 2553)

  • 19

    (Activity-Based Costing) ABC (Value-Based Management) (Cross-Functional) (Integrated View) ABC (Cost Behavior) (Cost Driver) ABC 6

    1.

    2. (Input)

    3. 2

    4. 5.

    6.

    ( , 2550)

  • 20

    2.1.6 SWOT TOWS Matrix SWOT Analysis

    SWOT

    1. Strengths - 2. Weaknesses - 3. Opportunities - 4. Threats -

    2-2 SWOT

    SWOT

    (Strengths)

    (Weaknesses)

    (Opportunities)

    (Threats)

    SWOT 2

    SWOT (Situation Analysis) - 2-2

  • 21

    TOWS Matrix TOWS Matrix 2-3

    2-3 TOWS Matrix

    / S W

    O SO

    WO

    T ST

    WT

    4 1. (SO Strategy) 2. (ST Strategy)

    3. (WO Strategy)

  • 22

    4. (WT Strategy) 2.2 5 2.2.1 (Hydroponics)

    (Hydroponics) (Soilless Culture) 100% ( , 2549)

    5

  • 23

    ( , 2542)

    (2547) (2549) (Logistics Cost Analysis)

    2.2.2 20

    (2551) 4 (Inbound Logistics) (Operations) (Outbound Logistics ) (Supporting) (Best Practice) (2549) (VSM) (2546) (SCOR Model) () (IDEF0)

  • 24

    Arouma (2005) 3 (Food Supply Chain and World Trade Organization; WTO) (Sanitary and Phytosanitary Agreements; SPS) (Hazard Analysis at Critical Control Point; HACCP)

    1. (Food Supply Chain ) (WTO) WTO

    (Progressive Liberalization) WTO (Special and Differential Treatment ; S&D) WTO WTO (Rights and Obligations) WTO WTO

    (WTO) - - - - - -

    WTO WTO WTO

  • 25

    2. (SPS)

    SPS (WTO) SPS 3 Codex IPPC OIE

    Codex (WTO) (Agreement on Technical Barrier to Trade; TBT) (Agreement on the Application of Sanitary and Phytosanitary Measure; SPS)

    GMP HACCP 2-6

    2-6

    (: , 2546)

  • 26

    3. (HACCP) HACCP 7 HACCP

    7 HACCP (WTO) Codex HACCP HACCP (Benefit) (Burden)

    (Performance Measurement) 75% (Palevich,1999)

    Lankford (2004) 3

    1. (Efficiency) (Minimize Cost) (Inventory Cost)

    2. (Responsiveness)

  • 27

    3. (Effectiveness) (Value Chain)

    Zhang, et al.(2009) 3

    1. (Financial Performance) (Total cost) (Distribution Cost) (Manufacturing Cost) (Inventory Cost) (Return On Investment) (Total Revenue) (Profit)

    2. (Operational Performance) (Customer Response Time) (Manufacturing Lead Time) (Product Quality) (Product Availability)

    3. (Overall Supply Chain Performance) (Customer Satisfaction) (Supply Chain Flexibility)

    J.G.A.J. Van Der Vorst, et al. (1998) (Key Performance Indicator) 3

    1. (Supply Chain Network)

    2. (Organization)

  • 28

    3. (Process)

    (Cost) Lusine, et al.(2006) KPI 4

    1. (Efficiency) (Cost) (Profit) (Return On Investment, ROI) (Inventory)

    2. (Flexibility)

    3. (Responsiveness) (Fill Rate) (Product Lateness)

    4. (Food Quality) (Product Quality) (Process Quality)

    2.2.3 (Value Stream Analysis)

    (Value Stream Mapping; VSM) Yingling et al. (2000) 5

  • 29

    1. (Value Definition) 2. (Value Stream Analysis) 3. (Flow) 4. (Pull/JIT) 5. (Perfection)

    (Standard Work)

    (Flexible Workforce) (TPM) (Lean Manufacturing) (Lean Enterprise) Value Stream Mapping (Harris, et al.,2006) VSM (Lean Manufacturing Strategy) (Waste) (Melton, 2005) VSM (Rother and Shook, 1999) (NVA) (Whicker, 2006) Arbulu et al. (2003) Seth and Gupta (2005) Taylor (2009)

  • 30

    Lehtinen and Torkko (2005) Taylor (2005) 30 %

    (2549) (VA) (NNVA) (NVA) (Process Activity Mapping) (VA) 62.71% 37.29% (NNVA)

    - 1.

    2. 3. 4. 5.

    2.2.4 IDEF0

    IDEF0 (Integration Definition for Function Modeling)

  • 31

    IDEF0 2-7

    IDEF0 (Supply Chain Operation Reference Model ; SCOR Model) (2546) IDEF0 (Flow Process Chart) IDEF0 (2548) IDEF0 IDEF0

    2-7 IDEF0 (: 2549)

  • 32

    2.2.5

    Andrade (1999) (Activity Based Costing; ABC) (Whicker, 2006)

    Kee (2008) ABC ABC (Non Value Added : NVA) ABC (Demeere et al.,2009) ABC ABC (Lusine,2006)

    (Activity Based Costing) (2548) (2550) (2552)

  • 33

    5 (Food Supply Chain) (Hydroponics) (Value Stream Analysis) IDEF0 (Logistics Cost Analysis)

    2-8

  • 34

    Value

    Strea

    m An

    alysis

    Lo

    gistic

    s Cos

    t Ana

    lysis

    ABC

    IDEF

    0

    2-8

  • 35

    1.

    2.

    3.

    4.

    5. (As-Is) (To-Be)

    2 3