FLNG Safe Tandem Offloading of LNG in Severe Offshore Environments Allen Liu, Caspar Heyl, Arun Duggal & L. Terry Boatman SOFEC, Inc. FLNG 2009, Seoul, South Korea September 24, 2009

FLNG Safe Tandem Offloading of LNG in Severe Offshore

Embed Size (px)

Citation preview

Page 1: FLNG Safe Tandem Offloading of LNG in Severe Offshore

FLNG Safe Tandem Offloading of LNG in Severe Offshore Environments

Allen Liu, Caspar Heyl, Arun Duggal & L. Terry BoatmanSOFEC, Inc.

FLNG 2009, Seoul, South Korea September 24, 2009

Page 2: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Outline

• Why Tandem Offloading for FLNG systems?• Design Requirements• Development of the SOFEC Yoke Mooring System• Equipment on the FLNG Vessel & LNG Carrier• Marine Operations• Summary

Page 3: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Offloading Oil from an F(P)SOTandem and Side-by-Side Gulf of Mexico

Page 4: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Typical Offload Operation Criteria

• Tandem offloading using Nylon Hawser from FPSO to Tanker:– Maximum Connect Hs = 2.5m– Maximum Offload Hs = 3.5m

• Tandem Offloading using DP Shuttle Tankers– Maximum Connect Hs = 4.5m– Maximum Offload Hs = 5.5m

• Side-by-Side Offloading from FPSOs to Oil Tankers:– Maximum Connect Hs ~ 1.5 to 2m– Maximum Offload Hs ~ 2.0 to 2.5m

Page 5: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Simulation Response in Hs 5.5m seas (Orcaflex™ )

Page 6: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Design Requirements

• Offloading from Floating LNG (FLNG) Vessels

• High Safety and Reliability Requirements

• Use Field Proven Technology• Severe Operational

Environmental Conditions:– Offload in Hs = 5.5m seas– Connect mooring and LNG transfer

system in Hs = 4.5m– No additional support vessels

• Offload Frequency ~ 2 offloads / week

Page 7: FLNG Safe Tandem Offloading of LNG in Severe Offshore

LNG Tandem Offloading System Development

SOFEC Duplex Yoke

Page 8: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Mooring System Equipment• Connection hardware on FLNG

– Mooring system– Mooring yoke [parked, floating,

and connected to LNGC]– Hawser winch, constant tension– Auxiliary winches– Lines– Yoke connector cone

• Connection hardware on LNG Carrier– Connection module– Hawser connector– Cone Connector assembly– Auxiliary deck winch

• LNG Transfer system options– FMC Loading Systems

pantograph pipe & swivels– Aerial cryogenic flexible hose

when proven & available

Page 9: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke in Parked Position

Two Winches 325mt capacity

Lift yokeEither will lift yoke

in emergency

Two Auxiliary Winches (225 mt)

Stabilize swayOn port & stbd side

Four part lines,Two part each winch

4” DyneemaSF=6

Hawser winch300 mt capacity

Render & Recover

Page 10: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Arrangement of Yoke Mooring System

Yoke, 42m wide at links• Yoke system steel weights – Tank 600 mt– Yoke 400 mt– Links 200 mt– Total 1200 mt– Water Ballast

adds 1410 tons

Page 11: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Tip Cone

Pivoting cone on two-axis gimbaled joint with internal vertical axis yaw bearing

Page 12: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Mooring Hook-UpProcedure Summary

Page 13: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Throw-line Zone for LNG Carrier Bow Position

Throw-line Gun PositionReq’d Range: 52m – 102 m

F.P. Position Zone

Page 14: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Lines Required for Hook-Up

• Hawser (Winch on FLNG)– 5” diameter x 400 meters– Dyneema SK-75 HMPE– 975 metric ton MBS– Winch on FLNG

• Floating Pick-Up Line– 2” Polypropylene– 21 mt MBS

• Throw Line– Coiled in pneumatic throw gun– 3/16” Dyneema x 300m – 2.2 mt MBS

• Recovery Line (on LNGC)– 1” diameter x 400m– Dyneema SK-75 HMPE– 44.5 mt MBS– Winch on LNGC

Recovery Line Winch

2” x 40m Poly

5” x 400m HMPE

Hawser Winch

Spooling Drumfor Pick-up line

LNG Carrier

3/16” x 300m HMPE

1” x 400m HMPE

Page 15: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke in Parked PositionReady for LNGC Arrival in Area

Slacken Lines onTwo Auxiliary

WinchesPort & Stbd

Pick-up Line

Final inspection of yoke before connection

Throw line gun ready

Release Hook

Page 16: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Connection Procedure Hawser pull continues

Page 17: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Connection Procedure Yoke lifts out of water as hawser is retrieved to FLNG

Page 18: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Connection Procedure Cone approaches receptacle

Page 19: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Connection Procedure Yoke connected, propulsion stopped

LNG Pantograph Hook-up sequence begins

Page 20: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Connection Simulation (Orcaflex™ )

Page 21: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Connection Procedure LNG Pantograph connected & offloading

Page 22: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Mooring Yoke DisconnectSummary

Page 23: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Disconnection Procedure Pantograph retracted

Page 24: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Disconnection Connection Procedure LNGC begins thrust astern to back away

Cone Connector releases, Yoke lowers on Hawser

Page 25: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Disconnection Procedure Hawser retrieved back to LNGC

Hawser End Fitting returns to Cone tip

Floating Pick-up Line

LNGC Departs

Page 26: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Yoke Disconnect Procedure Yoke in Parked Position, Ready for next LNGC Arrival

Unless required by weather, leave snubbing lines slack on Auxiliary

WinchesPort & Stbd

Inspect Yoke after disconnection

Inspect Pick-up Line

Throw line gun made ready

Page 27: FLNG Safe Tandem Offloading of LNG in Severe Offshore

Summary & Conclusions

• Robust tandem mooring system developed for FLNG Offloading in severe environments

• Can be used with existing LNG Transfer Systems• Also suitable for use with cryogenic hoses (under

qualification / not yet field proven)• System has been technically qualified by major

oil companies for mooring & LNG transfer• Marine procedures have been accepted by major

oil company mooring and marine operations officials