30

How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management
Page 2: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | 2

基于内存计算的自助服务大数据分析平台 钟振华 Aaron Zhong Oracle亚太区商务智能及工程系统架构首席顾问

Page 3: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Safe Harbor Statement

The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.

Safe Harbor Statement

The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.

Oracle Confidential – Internal/Restricted/Highly Restricted 3

Page 4: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

数据驱动的决策 #1 for execs1

分析 公司增长的关键, 竞争优势2

运营数据驱动决策的公司比不采用的公司运作的更好

1Gartner 2014 CEO Study, CIO Magazine Study 4

2MIT Study “Strength in Numbers”

Page 5: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | 5

4 个继续技术创新的关键

1 2 3 4

Page 6: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

6

1

• 不同业务部分,不同时期都有不同的分析需求

• 有的需求时效性要求很高,并需要合并多个数据源

• 需要满足个人,部分和企业多个层面的需求

挑战

Today 完全依赖IT

获取数据 创建/修改ETL 数据验证

加入新数据

需要修改现有的模型 需要充分理解业务 需要和之前的模型整合

IT新的模型

新的报告 新的业务/系统 重要的临时分析

业务新需求

Page 7: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

自助化信息探索

Oracle Confidential – Internal/Restricted/Highly Restricted 7

用户配置的数据和内容

加入新数据

直观分析可视化 详细记录特征 分享和协作

看见新图示

迅速组建探索应用程序 利用预先构建的导航 开箱即用的搜索

询问新问题

自助服务探索 IT 提供的探索

创新ETL

爬取非结构化数据

更高数据规模

加入新数据

创建先进的分析指标

优化和自定义文本浓缩

更高用户规模

看见新图示

实现深度探索应用程序 基于角色进行交互 高度调优搜索

询问新问题

形式化

发展

Page 8: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

业务用户能自助服务完成多数据源的联合分析

Oracle Confidential – Internal/Restricted/Highly Restricted 8

易于使用的wizards指导业务用户的数据上传过程

Oracle BI 服务器模型

云和社交服务

个人Excel文件

IT 提供的企业数据

更多数据源包括JDBC,

Oracle BI服务器,JSON,Hadoop,Hive

在几分钟内创建新探索应用程序

随时间逐步增加更多的数据来创建不同的混搭式应

用 自助服务数据聚合和探索仪表板

Page 9: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

9

• 自助化连接多数据源

• 无需模型设计

• 快速数据筛选和信息模式探索

方案

Tomorrow

Big Data Discovery

1

Page 10: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

10

2

• 同时支持封装的APP和能个性化定制的开发环境

• 支持任何装置,任何形式

• 集成移动设备管理平台

• 使空闲时间的生产与移动见解

移动互联网

Today

Page 11: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | 11

• 在每家商店提高库存可见性实现更高的利润

• 每一个商店经理都能移动接入

• Oracle商务智能基础,移动商业智能和商务智能云服务器

Page 12: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

12

2

• 大规模个性化

• 探索模板

• 内容具体的可视化

• 集成映射

• 语音识别和查询

方案

Tomorrow

Page 13: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

13

3

• Hadoop,NoSQL和已有数据仓库的集成结合

• 从掌握数据的领先者到使用数据的领袖者

• 保护现有投资,发挥更大价值

更多数据,更多信息

Today

Page 14: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Oracle Big Data SQL 一个能跨越Oracle数据库,Hadoop和NoSQL的统一查询

在RDBMS,

Hadoop 和 NoSQL中

查询数据

Oracle SQL

Oracle

NoSQL DB

HDFS

Data Node

Oracle

NoSQL DB

HDFS

Data Node

Oracle Database

Storage Server

Oracle Database

Storage Server

真正的大数据应用 大规模并行处理

存储索引

本地过滤

最小化数据移动

Oracle Confidential – Internal

Page 15: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | 15

• 顾客 + 会员 + 快速支付

• 电子价目

• 智能工牌

• 二维码查询

• 互动商品组合广告

Page 16: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

16

3

• Oracle Big Data Appliance

• Oracle Exadata

• Oracle Exalytics

更多数据,更多信息

Tomorrow

Page 17: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

17

4

• 第一个集成内存计算,并为分析应用优化的工程系统

• 快速部署,降低风险,易于扩展

• 拥有最好的总拥有成本

一体机

Today

Page 18: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Oracle 一体机引领IT技术高端方案

100%

Oracle一体机的每一款产品都有明确的应用场景定位,并且针对Oracle特定软件进行软硬件一体化的优化和集成

6年 2008年Oracle Exadata V1开始,Oracle一体机产品线已经持续发展了6年时间

18 Oracle Confidential – Internal/Restricted/Highly Restricted

Exadata 数据库一体机

Exalogic 中间件一体机

Big Data Appliance

大数据一体机

Exalytics 内存计算一体机

SuperCluster

超级集群

一体机

Oracle

Database

Appliance

入门数据机

Page 19: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Exalytics

Oracle Confidential – Internal/Restricted/Highly Restricted 19

X2-4

X3-4 X4-4

Upgrade Kit

1 TB RAM

4 Intel® Xeon® E7-4870

40 physical cores total

3.6 TBs of raw disk capacity

40 Gbps InfiniBand – 2 ports

10 Gbps Ethernet – 2 ports

1 Gbps Ethernet – 4 ports

2 TB RAM

4 Intel® Xeon® E7-4870

40 physical cores total

2.4TB PCI Flash

5.4 TBs of raw disk capacity

40 Gbps InfiniBand – 2 ports

10 Gbps Ethernet – 2 ports

1 Gbps Ethernet – 4 ports

2 TB DRAM

4 Intel® Xeon® E7-8895 v2

60 physical cores total

2.4TB PCI Flash

7.2 TBs of raw disk capacity

40 Gbps InfiniBand – 2 ports

10 Gbps Ethernet- 4 ports

Flash Upgrade kit

Memory and Flash

Upgrade kit

T5-8

+ 1TB RAM

+ 2.4 TB PCI Flash

+ bigger disks

+ Super-SKU CPU

+ even bigger disks

Page 20: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Exalytics X4-4 集成系统

硬件 • 内存

– 2 TB DRAM, upgradable to 3TB

• 处理器

– 4 Intel® Xeon® E7-8895 v2, 60 cores total

• 网络

– QDR 40 Gbps InfiniBand

– 10 Gbps Ethernet

• 存储

– 2.4TB PCI Flash, upgradable to 4.8TB

– 7.2 TBs of raw disk capacity

软件 Oracle BI Foundation Suite

Oracle EPM

Oracle Endeca Information Discovery

Exalytics 唯一的集成特性:

– OBIEE Accelerator

– Essbase Accelerator

– In-Memory Data Caching

– BI Publisher Accelerator

Page 21: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

独有的处理器: Intel® Xeon® E7-8895 v2 in Exalytics X4-4

Oracle Confidential – Internal/Restricted/Highly Restricted 21

挑战:

核数和主频的矛盾

方案:

“秘密武器” - 专门针对Oracle产品的工作量而设

计的处理器

方案:

主频灵活 2.8GHz to 3.6GHz

方案:

主频和核数可以为特定用例进行配置

Page 22: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

技术创新 – 内存引擎

Oracle Confidential – Internal/Restricted/Highly Restricted 22

Database In-Memory Option • 100%技术透明 • 热点数据自我识别

Essbase In-Memory Enhancements • 支持更复杂的分析 • 支持更多的用户并发 • 支持更快的交互访问

Page 23: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Database In-Memory Option Powering Business Analytics

Oracle Confidential – Internal/Restricted/Highly Restricted 23

• 全面内存计算 • 透明采用 • 满足任意数据量 • 最佳的成本效益 • 健壮,成熟,设计安全

Σ Data

Warehouse

100% Data In‐Memory

• 任意数据仓库

• 任意数据量

只有Exalytics能自动识别热点数据

• 更智能的可视化和使用体验 • 更佳支持移动访问 • 更快的决策 • 更多活跃用户 • 减少调优成本

Page 24: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Exalytics: Fast Path to In-Memory Business Analytics Powered by 12c DB In-Memory Option

• Adaptive In-Memory Cache

– Superfast Interactive exploration and visualization

– Data mart automation with Oracle Business Intelligence

• No change to existing systems of record In-Memory Data

Cache Design

Infrastructure Management

Business Analytics Integration

Data Synchronization

In-Memory Data Cache Design

Infrastructure Management

Business Analytics Integration

Data Synchronization

• Fast Path to realize the value of memory computing

• Less Risk to adapt new technology

Page 25: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

Essbase In-Memory Enhancements

Oracle Confidential – Internal/Restricted/Highly Restricted 25

Dilemma:

• More performance enhancement requirements for calculation in BI and planning

• Support More BI and planning users

• Consolidate Essbase with BI/planning appliction

Solution:

• Essbase becomes “Pure” in-memory engine as calculation will no longer wait for I/O (background write)

Solution:

• Improved Resource management and CPU utilization

– Thread management and thread based memory allocation

– Fundamental improvement to Essbase infrastructure, will impact resource consumption, stability and performance.

– Execute any FIX commands in parallel

Solution :

• BSO MDX Bottom up calculation by ASO like dynamic aggregation in BSO

• Leverage X4-4 capabilities by improving scalability

Page 26: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |

What’s Coming

Oracle Confidential – Internal/Restricted/Highly Restricted 26

Project Visual Analyzer

• In-memory data sub-setting

• MOLAP Acceleration

ASK/Mobile

• In-memory Indexing

• Better scaling for mobile

User Data Management

• In-memory personal data store

• In-memory execution for mashups

• Optimized BI Server internal execution

HFM Certification

• HFM on Linux is coming with EPM PS4

• Certified to run on Exalytics

• Both bare metal and OVM configurations

Page 27: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | 27

• 为企业和专业人士提供全球领先的智能信息源

• 为全球用户提供高度互动的仪表盘和可视化平台

• 采用Oracle Exalytics云服务器,性能提升90倍

Page 28: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

28

4

• Oracle数据库12C内存选件

• Essbase内存中查询增强

• 容量按需扩展

• Hyperion财务管理认证

• 商务智能云服务器

Exalytics

Tomorrow

Page 29: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management

Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | 29

创建新一代大数据分析平台

• 个性自助化

• 移动分析

• 大数据集成

• 内存计算

Page 30: How to Use the PowerPoint Template...engine as calculation will no longer wait for I/O (background write) Solution: • Improved Resource management and CPU utilization –Thread management