Upload
roberttrewartha
View
232
Download
0
Embed Size (px)
Citation preview
7/31/2019 Hurontario LRT
1/25
Preliminary Design/TPAP
HURONTARIO-MAIN LRT
PROJECTPreliminary Design/TPAP
Britannia Town Hall - Ward 5May 29, 2012
7/31/2019 Hurontario LRT
2/25
Preliminary Design/TPAP
Presentation Scope
1) Overview
2) What is LRT
3) Project Program
2
7/31/2019 Hurontario LRT
3/25
Preliminary Design/TPAP
7/31/2019 Hurontario LRT
4/25
Preliminary Design/TPAP
Metrolinx Big Move Transportation Plan
7/31/2019 Hurontario LRT
5/25
Preliminary Design/TPAP
Master Plan (Phase 1) Established corridor vision and recommended LRT technology Worked with Metrolinx on their Benefit Case Review (1.5) Completed in 2011 and received CIP Award for Planning Excellence
Municipal commitment Investing in completing Preliminary Design/TPAP
7/31/2019 Hurontario LRT
6/25
Preliminary Design/TPAP
Easy, reliable, frequent, comfortable and convenient light rail transit service
is provided throughout the Corridor, with effective connections to other linksin the inter-regional transit network
Hurontario/Main Street is a beautiful street, with attractive places along theCorridor featuring expanded mobility, vibrant economic activity, and liveable,connected, mixed-use neighbourhoods, integrated with the transportation
infrastructure
The Regional Urban System and the planned urban structure of each cityare recognized and reinforced, and accordingly, mixed use, compact,intensified Transit Oriented Development is present along the Corridor.
Master Plan
7/31/2019 Hurontario LRT
7/25
Preliminary Design/TPAP
PART 2 What is LRT
7
7/31/2019 Hurontario LRT
8/25
Preliminary Design/TPAP
Modern Light Rail Vehicles, Montpellier
82/22/2012
7/31/2019 Hurontario LRT
9/25
Preliminary Design/TPAP
Coupled LRVs, (90m platforms), Salt Lake City
9
7/31/2019 Hurontario LRT
10/25
Preliminary Design/TPAP
Maximum Segregation
10
7/31/2019 Hurontario LRT
11/25
Preliminary Design/TPAP
LRT- Segregated Right of Way, Paris
11
7/31/2019 Hurontario LRT
12/25
Preliminary Design/TPAP
Typical LRT Stop Layout
12
7/31/2019 Hurontario LRT
13/25
Preliminary Design/TPAP
LRT Stops
13
7/31/2019 Hurontario LRT
14/25
Preliminary Design/TPAP
Simple Stops, Easy to Integrate, Montpellier
14
7/31/2019 Hurontario LRT
15/25
Preliminary Design/TPAP
Planning for the Future billboard grocery stores
6/1/2012 15
http://www.theatlanticcities.com/commute/2012/02/grocery-store-future/1306/
7/31/2019 Hurontario LRT
16/25
Preliminary Design/TPAP
Low Floor Level Boarding- Access for All
16
7/31/2019 Hurontario LRT
17/25
Preliminary Design/TPAP
Easy Transit Transfer, Bordeaux
17
7/31/2019 Hurontario LRT
18/25
Preliminary Design/TPAP
New LRT and New TOD Development, Dublin
18
7/31/2019 Hurontario LRT
19/25
Preliminary Design/TPAP
A Complete Street Design Approach, Lyon
19
7/31/2019 Hurontario LRT
20/25
Preliminary Design/TPAP
LRT and Vibrant Street Space, Portland
20
7/31/2019 Hurontario LRT
21/25
Preliminary Design/TPAP
PART 3 PROJECT PROGRAM
21
7/31/2019 Hurontario LRT
22/25
Preliminary Design/TPAP
Project Outputs
Complete Preliminary Design
of Hurontario-Main LRT
Complete the Transit Project
Assessment Process (TPAP)
Project Business Case
Provide a complete package
to enable move to
implementation phase
22
7/31/2019 Hurontario LRT
23/25
Preliminary Design/TPAP
Overview of Program
23
Nov 2011 May 2012 Nov 2012 May 2013 Nov 2013
Review &Requirements
Concepts &
Criteria (Standards)
Conceptual
Design
Preliminary
Engineering
EnvironmentPre-Planning
TPAP
PIC's
Concept Alternatives Prefer red Concept Recommended Design(June 2012) (Nov 2012) (April 2013)
Main Documents
(Mar 30 2012) (Oct 2012) Final (Aug 2013)
Draft EPR (Apr il 2013)
Nov 2011 May 2012 Nov 2012 May 2013 Nov 2013
PHASE 1 - TPAP PRE-PLANNING PHASE 2 - TPAP
PIC1
WB1 WB2 WB3 EPR
DEPR
PIC2
PIC3
WB0
Soft
Launch
7/31/2019 Hurontario LRT
24/25
Preliminary Design/TPAP
7/31/2019 Hurontario LRT
25/25
Preliminary Design/TPAP
www.hurontario-main.ca