48
IHC Hydrohammer® Tim van Erkel Area Sales Manager Renewables

IHC Offshore Wind Presentation

Embed Size (px)

DESCRIPTION

IHC Offshore Wind Presentation

Citation preview

Page 1: IHC Offshore Wind Presentation

IHC Hydrohammer®

Tim van Erkel �– Area Sales Manager Renewables

Page 2: IHC Offshore Wind Presentation

If it is innovative technology, we build it

Facts IHC MERWEDEFinancial turnover for 2010 EUR 1,1 billion

Staff 3000 + 1500

5 ship yards in The Netherlands, 1 ship yard in China

World wide Service & Manufacturing locations

4 5% of annual is dedicated to R&D

Page 3: IHC Offshore Wind Presentation

3

IHC Merwede : Typical products

Page 4: IHC Offshore Wind Presentation

IHC Merwede: Organisation

Page 5: IHC Offshore Wind Presentation

5

IHC Offshore Wind

IHC Offshore Wind

Page 6: IHC Offshore Wind Presentation

6

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Marine operations & Vessel design

Page 7: IHC Offshore Wind Presentation

Offshore handling systems, Subsea trenching tools, Control systems

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 8: IHC Offshore Wind Presentation

8

Engineering: Concept, Basic & DetailProduction: Project Management, Procurement, FabricationIntegration & Installation systems on vesselsCommissioning & Testing

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 9: IHC Offshore Wind Presentation

9

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 10: IHC Offshore Wind Presentation

10

IHC Offshore WindInstallation & Handling

IHC Handling Systems B.V.

Monopile sealing plug

Page 11: IHC Offshore Wind Presentation

11

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 12: IHC Offshore Wind Presentation

12

IHC Offshore WindConcept development

A number of developed concepts by IHC BU’s:• Fully assembled turbines on a jack-up vessel• Jacket installation system• Blade installation tool – 3 blades• Monopile installation• Floating vessel - fully assembled turbine installation

Patent pending

Concepts to be further developedin cooperation with the industry

Page 13: IHC Offshore Wind Presentation

IHC Hydrohammer B.V.�• Established in 1984�• 75 employees ( 2010)�• Locations;

�• The Netherlands, Main office and workshop�• Singapore, Office and workshop�• USA Office�• China & Dubai Dealers and service points

�• Hammer S 30 �– S 2300 KJ�• Sales and Rental projects�• Financial turnover EUR 53 million

Page 14: IHC Offshore Wind Presentation

Onshore

sheets profiles cast in situ concrete

Page 15: IHC Offshore Wind Presentation

Civil Works

Harbour works Bridges Jetties

Page 16: IHC Offshore Wind Presentation

Oil & Gas • Oil & Gas related• Mostly offshore• Deepwater

conductors jackets anchors/templates

Page 17: IHC Offshore Wind Presentation

Special application products

Rock breaking Pile Toe Drive Horizontal driving

Page 18: IHC Offshore Wind Presentation

Piling

The beginning�…�…�…�…�…..

Page 19: IHC Offshore Wind Presentation

RAM

ANVIL

PILE

S - 30S - 40S - 70S - 90S - 120S - 150S - 200S - 280S - 500S - 600S - 800S - 1200 S - 1400S - 1800S - 2000S - 2300

Piling

S-30: 30kJ = 1,5 t (ram) = 3,8 t (weight)S-2300: 2300kJ = 115 t (ram) = 240 t (weight)

Page 20: IHC Offshore Wind Presentation

Cross Section IHC Hydrohammer

Ram

Sleeve

Anvil

Pile

Page 21: IHC Offshore Wind Presentation

Some facts on sizes / forces / speedS 1200 Hydrohammer driving a steel pile:

�• Ram m= 60 tons

�• Ram is lifted up in 1s over 1m drop height

�• Ram accelerates at 2g down in 0,5 s to max speed

�• Ram speed at anvil v = 6,33 m/s = 22,8 km/h

�• Energy E = ½ m*v2 = 1200 kNm

�• Cycle rate is 40 blows/min at full energy

�• Contact time (energy transfer) of ram and anvil ป 4,5 ms�• Speed of shock wave in pile = 5200 m/s or 18720 km/h

Page 22: IHC Offshore Wind Presentation

IHC HYDROHAMMER

�• RATED = KINETIC

�• 100% ENERGY AT ANY BATTER

�• ONE PIECE RAM

�• FORGED STEEL RAM & ANVIL

�• STEEL TO STEEL TRANSFER

�• SHORT STROKE

�• PISTON ACCUMULATERS

�• ACCELERATION 100%

�• CLOSED HAMMER HOUSING

SINGLE ACTING

HYDRAULIC HAMMER

�• RATED = POTENTIAL

�• REDUCED ENERGY ON BATTER PILES

�• MULTIPLE PIECE RAM

�• CAST STEEL PRODUCTS

�• HAMMER CUSHION TRANSFER

�• LONG STROKE

�• BLADDER ACCUMULATERS

�• ACCELERATION 0 20%

�• OPEN HAMMER HOUSING

Main Differences Hydraulic Hammers

Page 23: IHC Offshore Wind Presentation

Renewable energies

• Oil & Gas related• Mostly offshore• Deepwater

mono piles jackets/tripods anchors

Page 24: IHC Offshore Wind Presentation

Piling options Foundations types

Page 25: IHC Offshore Wind Presentation
Page 26: IHC Offshore Wind Presentation

Mono-piles: installed piles incl. metmasts 2000-2009

269

719IHC Hydrohammer

Mono piles Track Record

Mono-piles: installed MW's 2000-2009

667

2148

IHC Hydrohammer

Page 27: IHC Offshore Wind Presentation

Renewables�• IHC Hydrohammer installed 70% of driven piles in Europe

�• IHC Hydrohammer will supply piling equipment to all Chinese Offshore Projects:BIN HAI, SHE YANG, DONG TAI and DA FENG

�• IHC Hydrohammer has the largest Hammer in the rental fleet and world andworking on the WALNEY 2 OWF project. Hammer size 2000 KJ

�• IHC Hydrohammer has the largest Sleeve in the rental fleet and world andworking on the WALNEY 2 OWF project. Diameter 5,5 meter

�• IHC Hydrohammer supplied piling equipment to the largest OWF project underconstruction:GREATER GABBARD (140 Mono Piles) last yearLONDON ARRAY 177 (Mono Piles) this year

�• IHC Hydrohammer works close together withother IHC business units in the OWF marketto provide a wide range of services

Page 28: IHC Offshore Wind Presentation

�• S 1200 Hammer

�• Piles: 7x 5100

�• Contractor: GE Wind Energy

�• Owner/Developer: Airtricity & GE Wind Energy

�• Area: Ireland (East Coast)

�• Installation Vessel: Jumping Jack

�• Turbine: GE 3.6 MW

�• Water Depth: 2 5 meter

ARKLOW BANKS 2003

Page 29: IHC Offshore Wind Presentation

BARROW 2005�• S 1200 Hammer

�• Piles: 30x 4750

�• Contractor: MPI

�• Owner/Developer: Dong Energy

�• Area: United Kingdom (West Coast)

�• Installation Vessel: Resolution

�• Turbine: Vestas V90 (3 MW)

�• Water Depth: 15 meter

Page 30: IHC Offshore Wind Presentation

BELWIND 2009�• S 1200 Hammer

�• Piles: 56x 4072

�• Contractor: Van Oord

�• Owner/Developer: Belwind

�• Area: Belgium

�• Installation Vessel: Svanen

�• Turbine: Vestas V90 (3 MW)

�• Water Depth: 15 37 meter

Page 31: IHC Offshore Wind Presentation

�• S 1200 & S 1800 Hammer

�• Piles: 140x 5100

�• Contractor: Seaway Heavy Lifting

�• Owner/Developer: NPower

�• Area: United Kingdom (East Coast)

�• Installation Vessel: HLV Stanislav Yudin

�• Turbine: Siemens 3,6 MW

�• Water Depth: 4 37 meter

GREATER GABBARD �– 2009/2010

Page 32: IHC Offshore Wind Presentation

Mono Piles�• S 1400 Hammer�• Piles: 50x 4700�• Contractor: GeoSea N/V�• Owner/Developer: Dong Energy�• Area: United Kingdom (West Coast)�• Installation Vessel: Goliath�• Turbine: Siemens 3,6 MW�• Water Depth: 19 23 meter

Substation Jacket�• S 500�• Contractor: VSF

WALNEY I 2010

Page 33: IHC Offshore Wind Presentation

Jiangsu Rudong 2010�• S 800 Hammer

�• Equipment prepared for 5100 mmMono Piles

�• Joint Venture between:

�• Project: September/October 2010

�• ZPMC manufactured Mono Piles and TransitionPieces for Greater Gabberd in Europe

Page 34: IHC Offshore Wind Presentation

Jiangsu Rudong 2010

Page 35: IHC Offshore Wind Presentation

Sleeve:Anvil 4300

Sleeve:Anvil 4300

+ Anvil Ring

Sleeve:Anvil 5500

+ Anvil Ring

Sleeve:Anvil 5500 +

Cone shaped follower

Sleeve:Synchronical

pile driving

Pile diameter: <4300m

Pile diameter: Up to 5200mm

Pile diameter: Up to 6500mm

Pile diameter: 6500-7500mm

Pile diameter: >7500mm

Hydrohammer:S-800 / S-1400

Hydrohammer:S-800 / S-2000

Hydrohammer:S-1400 / S-2000

Hydrohammer:S-2000 or bigger

Hydrohammer:S-2000 or bigger

Page 36: IHC Offshore Wind Presentation

M1

M2

M3

Ratio [M2 / M1]

=0

=0

=0

=0=0

=0=0

Before After

[M2 / M1] << 1 [M2 / M1] ~ 1 [M2 / M1] >> 1

Before After

Before After

INFLUENCE OF SIZE OF ANVIL

Page 37: IHC Offshore Wind Presentation

SINGLE SOLID ANVIL

�“UFO�” Design to reduce weight

High energy transfer efficiency

STANDARD FLAT NEW UFO

ENERGY TRANSFER

Page 38: IHC Offshore Wind Presentation

Solid forged anvil/ram

Page 39: IHC Offshore Wind Presentation

noise in air = noise under water ?

Page 40: IHC Offshore Wind Presentation

18 dB(A) reduction can bring us to acceptable levels

Noise reduction:

Page 41: IHC Offshore Wind Presentation

Forward actions underwater sound mitigation methods

1 Scale testing in IHC basin, double walled vacuum shell Completed at IHC yard October 2009, noise reduction 20-40dB

2 Open water test with live hammerCompleted March 2010

3 Full size shellFEED started January 2010Design drawings completed April 2010.

Page 42: IHC Offshore Wind Presentation

NRS around the pile, water depth 6m

Page 43: IHC Offshore Wind Presentation

60

80

100

120

140

160

180

31,5 12

5500

2000

8000

Frequency [Hz]

dB(lin)

1µP

zonder bescherming = 163.6dB(lin)

reductie scherm = 140.5dB(lin)

reductie bellen binnen = 137.5dB(lin)

achtergrond =124.4dB(lin)

Open water test: Noise Reduction Screen

Page 44: IHC Offshore Wind Presentation

Forward actions underwater sound mitigation methods

1 Scale testing in IHC basin, double walled vacuum shell Completed at IHC yard October 2009, noise reduction 20dB

2 Open water test with live hammerDouble wall air bubbles March 2010 27 dB(lin)Single wall air bubbles July 2010 20 dB(lin)

3 Full size shellFull sized NRS Started January 2010Design drawings completed April 2010.

4 Upcoming projectsRunder Tisch August 2011Flow RWE September 2011

5 Handling NMSHandling Concepts NMS Joined forces IHC Merwede

Page 45: IHC Offshore Wind Presentation

Handling Concepts NMS Joined forces IHC Merwede

Page 46: IHC Offshore Wind Presentation

NMS Pre-piling Frame

Page 47: IHC Offshore Wind Presentation

Our market position

well founded !

Page 48: IHC Offshore Wind Presentation

www.ihchydrohammer.com

Thank you for your attention