Upload
dewa-made-aditya
View
215
Download
0
Embed Size (px)
Citation preview
8/17/2019 Kop Tugas Ptm
1/1
PEMINDAHAN TANAH MEKANIS
PERHITUNGAN WAKTU PRODUKTIFITAS ALAT DAN
PERENCANAAN PONDASI ALAT
TOWER CRANE
OLEH :
KELOMPOK III
IDA BAGUS DWIJA PUTRA ARYANA 1361.121.012
I PUTU GEDE RESTU ADI PAMUJI 1361.121.015
I GEDE SUSILA INDRAYANA 1361.121.016
NI LUH MADE DIAN APRILISTYA PUTRI 1361.121.018
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS WARMADEWA
DENPASAR