Kop Tugas Ptm

Embed Size (px)

Citation preview

  • 8/17/2019 Kop Tugas Ptm

    1/1

     

    PEMINDAHAN TANAH MEKANIS

    PERHITUNGAN WAKTU PRODUKTIFITAS ALAT DAN

    PERENCANAAN PONDASI ALAT

    TOWER CRANE

    OLEH :

    KELOMPOK III

    IDA BAGUS DWIJA PUTRA ARYANA 1361.121.012

    I PUTU GEDE RESTU ADI PAMUJI 1361.121.015

    I GEDE SUSILA INDRAYANA 1361.121.016

    NI LUH MADE DIAN APRILISTYA PUTRI 1361.121.018

    JURUSAN TEKNIK SIPIL

    FAKULTAS TEKNIK

    UNIVERSITAS WARMADEWA

    DENPASAR