25
Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy, Water and Communications Malaysia OUTLINE Overview of the Malaysian Electricity Supply Industry Coal Resources in Malaysia Coal Demand in Malaysia Issues & Challenges Conclusion Coal Supply and Demand in Malaysia Noor Afifah Abdul Razak Ministry of Energy, Water and Communications Malaysia Sept.5, 2007 Tokyo, Japan

L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Embed Size (px)

Citation preview

Page 1: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-1

COAL SUPPLY AND DEMAND IN MALAYSIA

Noor Afifah Abdul Razak Ministry of Energy, Water and Communications

Malaysia

OUTLINE

• Overview of the Malaysian Electricity Supply Industry

• Coal Resources in Malaysia

• Coal Demand in Malaysia

• Issues & Challenges

• Conclusion

Coal Supply and Demand in Malaysia

Noor Afifah Abdul RazakMinistry of Energy, Water and Communications

Malaysia

Sept.5, 2007Tokyo, Japan

Page 2: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-2

NATIONAL ENERGY POLICY (1979)

Supply Objective: Ensure the provision of adequate, secure and cost-effectiveenergy supply.

Utilization Objective: Promote efficient utilization of energy and eliminate wasteful and non-productive patterns of energy consumption

Environmental Objective : Minimize negative impacts of energy production, transportation, conversion, utilization and consumption on the environment.

Page 3: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-3

ELECTRICITY DEMAND FORECAST (2006-2020)

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

2005 2006 2007 2008 2009 2010 2011 2012 2013

SalesGenerationPeak Demand

4.02010-20204.92006-2010

Growth Rate (%)Period

STATISTICS OF THE MALAYSIAN ELECTRICITY SUPPLY INDUSTRY (2006)

Reserve Margin (%)

Peak Demand

(MW)

Accumulated Installed Capacity

(MW)

Generation By System

3514,32919,352Total18755895Total

410IPP18755485SESCOSarawak43584835Total

444IPP43584391SESBSabah3512,99017,622Total

6,787IPP3512,99010,835TNBPeninsular

Malaysia

Page 4: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-4

100,000

120,000

140,000

160,000

180,000

200,000

220,000

240,000

260,000

RM Million(at 1987 prices)

15,000

25,000

35,000

45,000

55,000

65,000

75,000

GWh

GDP (RM Million) 111,06 120,60130,01140,86 153,88 166,62183,29197,12 182,23 192,42210,55211,22 220,42 232,35248,95261,39

Electricity Consumption (GWh) 19,932 22,373 25,778 28,474 34,076 39,225 43,897 50,955 53,187 53,187 60,299 63,043 66,991 70,846 77,258 80,705

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

TRENDS IN GDP AND ELECTRICITY CONSUMPTION

ELECTRICITY USE BY SECTOR (2006)

Domestic18.73%

Commercial30.87%

Industrial49.23%

Public Lighting & Mining1.17%

Total Electricity Consumption : 75,446 GWh- growth of 3.8% compared to 5.4% in 2005

Page 5: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-5

COAL FOR POWER GENERATION

Coal forms part of Malaysia’s fuel mix with the introduction of the Four Fuel/Fuel Diversification Policy in 1981

Aimed at diversifying fuel mix in order to ensure reliability and security of supply

Reduce the country’s over-dependence on oil as energy source and aims for optimum mix of oil, gas, hydro and coal in the supply of electricity

MALAYSIA’S FUEL MIX TO MEET INCREASING ELECTRICITY DEMAND

4.2

70.2

55.9

13.8

17.85.5 5.6

11

41.9

0.22.2

67.826.2

77.0

8.8

36.5

21.89.7

11.3 10.0

0.3 0.3 1.80.00.2

0%

20%

40%

60%

80%

100%

1990 1995 2000 2005 2010

Year

Perc

enta

ge (%

)

Oil Gas Coal Hydro Others

Page 6: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-6

WORLD COAL RESERVE

Asia Pacific56.1%

Malaysia0.2%

North America20.9%

S & CentAmerica

0.7%

Africa3.4%

Europe &Eurasia18.3%

ConsumptionConsumption

Total : 2.9BtoeTotal : 2.9BtoeReserveReserve

TotalTotal :: 426.5Btoe426.5Btoe

Source – BP Statistical Review of World Energy 2006

Ministry of Energy, Water and Communications, Malaysia

MALAYSIA COAL RESOURCESProduction and Reserves of Coal as of 31st December 2005

782,1071,483.06Total

-238.00Sub-bituminous, BituminousSabah

782,1071,228.06

Coking coal, Semi-anthracite, Anthracite, Sub-bituminous, Bituminous & Lignite

Sarawak

-17.00Sub-bituminousPeninsular Malaysia

Type

Production(metric tonnes)

Reserves(million tonnes)

Source: Department of Mineral & Geosciences Malaysia

Ministry of Energy, Water and Communications, Malaysia

Page 7: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-7

COAL UTILISATION IN MALAYSIA

Coal Consumption (1980 – 2005)

Source : National Energy Balance 2005

0

1000

2000

3000

4000

5000

6000

Industrial 53 362 513 712 727 740 767 608 991 977 1,086 1,212 1,305 1348

Power Stations 0 0 813 957 950 882 964 1,332 1,495 1,994 2,556 4,104 5,327 5541

1980 1985 1990 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

TNB Janamanjung Power Station – 2100MW

Sultan Salahuddin Power Station – 2x500MWPhase III

Sultan Salahuddin Power Station Phase II – 2x300MW

Ministry of Energy, Water and Communications, Malaysia

COAL UTILISATION IN MALAYSIA

Energy Input in Power Stations

Source : National Energy Balance (1998 and 2005)

1998

Natural Gas67%

Coal7%

Diesel Oil 2%

Fuel Oil16%

Hydro8%

2004

Natural Gas59%

Coal30%

Fuel Oil2%

Diesel Oil 2%

Hydro7%

20051998

Ministry of Energy, Water and Communications, Malaysia

Page 8: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-8

COAL UTILISATION IN MALAYSIA

Existing and Planned Coal Fired Power Plant (2000-2010)

Source : Tenaga Nasional Berhad

Ministry of Energy, Water and Communications, Malaysia

MALAYSIA’S ENERGY REQUIREMENT

0

10

20

30

40

50

Oil & Pet. Products Natural Gas Coal & Coke Hydro

Perc

enta

ge

2000

2005

2010

The Share of Primary Commercial Energy Supply by Source

Trend of energy supply mix in Malaysia indicated

continuous decrease in the percentage of oil and petroleum product share

steady increase in coal and coke demand

Source : Ninth Malaysia Plan (2000 – 2010)

Ministry of Energy, Water and Communications, Malaysia

Page 9: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-9

PROJECTED FUEL MIX UNTIL 2010

Source : Economic Planning Unit

0%

20%

40%

60%

80%

100%

2000 2005 2010

OthersHydroGasCoalOil

Ministry of Energy, Water and Communications, Malaysia

COAL UTILISATION IN MALAYSIA

Coal Demand Projection (2010 – 2030)

Source : Pusat Tenaga Malaysia

0

5000

10000

15000

20000

25000

1980 1985 1990 1995 2000 2005 2010 2020 2030

ktoe

IndustrialPower StationsProjection (power)Projection (non-power)

More Coal Power Stations?

Jimah Power Station – 1400MW

Tg. Bin Power Station – 2100MW

TNB Janamanjung – 2100MW

Sultan Salahuddin Phase III 2x500MW

Sultan Salahuddin Phase II 2x300MW

Ministry of Energy, Water and Communications, Malaysia

Page 10: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-10

ISSUES AND CHALLENGES- Environmental Impact

• Prime environmental consideration of coal utilisationis climate change

• Environmental impacts of coal from – consumption of coal– discharge of pollutants or disposal of ash

• CCT is given emphasis in Malaysian coal plants to offer substantial improvement in environmental performance and efficiency

Ministry of Energy, Water and Communications, Malaysia

ISSUES AND CHALLENGES- Increasing Coal Price

• The increasing price of fossil fuels i.e. oil, natural gas and coal will pose a serious challenge to the electricity utility companies, not only in Malaysia but also to the rest of the world

• Energy Information Agency (EIA) projection - coal price could be at USD35 per tonne in year 2010 but recently, USD70 per tonne

• Malaysia would have to spend nearly RM2.4 billion on coal import in year 2010 alone

Ministry of Energy, Water and Communications, Malaysia

Page 11: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-11

CONCLUSION

• Coal will remain in the long-term as a low cost energy source

• Development costs, technology, environmental impact and security of supply are major factors in considering the utilisation of coal for power generation

Ministry of Energy, Water and Communications, Malaysia

COMPARISON OF EMISSION STANDARDS

500-650615-16407209406506501700(AW)2000(OI)

NOx

400980-14801430850-17007507503500(AW)

200(OI)SOx

100401004005050400Particulates

Typical European

Typical North American

Typical Asian

Typical Bank

World Bank

JanaManjungDOE MalaysiaEmission

Notes:

*All units are in mg/Nm3

Ministry of Energy, Water and Communications, Malaysia

Page 12: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-12

CONCLUSION

• Adoption of CCT needs to be facilitated through cooperation from countries with coal utilisation expertise

• Malaysia will continue to support the ASEAN Plan of Action for Energy Cooperation which promotes Sustainable Utilisation of Coal

Ministry of Energy, Water and Communications, Malaysia

Page 13: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-13

マレーシアにおける石炭の需要と供給

Noor Afifah Abdul Razak

エネルギー・水資源・通信省 マレーシア

概要

• マレーシア電力供給産業の概観

• マレーシアの石炭資源

• マレーシアの石炭需要

• 問題点と課題

• 結論

マレーシアにおける石炭の需要と供給

Noor Afifah Abdul Razakエネルギー・水資源・通信省

マレーシア

2007年9月5日東京

Page 14: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-14

国家エネルギー政策 (1979年)

供給目標: 適切、安全で、費用効果の高いエネルギー供給を確保する.

利用目標: エネルギーの効率的な利用を促進し、非生産的で無駄なエネルギー消費パターンを排除する.

環境目標 : エネルギーの生産、輸送、転換、利用、消費による環境への悪影響 を最小限にする.

Page 15: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-15

電力需要予測 (2006-2020年)

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

2005 2006 2007 2008 2009 2010 2011 2012 2013

販売

発電

最大需要

4.02010-20204.92006-2010

伸び率 (%)期間

マレーシア電力供給産業の詳細 (2006年)

予備率

(%)ピーク需要

(MW)総発電能力 (MW)発電系統

3514,32919,352合計

18755895合計

410IPP18755485SESCOサラワク州

43584835合計

444IPP43584391SESBサバ州

3512,99017,622合計

6,787IPP3512,99010,835TNBマレーシア

半島部

Page 16: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-16

GDPと電力消費の動向

100,000

120,000

140,000

160,000

180,000

200,000

220,000

240,000

260,000

百万RM(1987年価格)

15,000

25,000

35,000

45,000

55,000

65,000

75,000

GWh

GDP (百万RM) 111,061120,609130,012140,864153,881166,625183,292197,120182,237192,422210,557211,227220,422232,359 248,954261,395電力消費 (GWh) 19,932 22,373 25,778 28,474 34,076 39,225 43,897 50,955 53,187 53,187 60,299 63,043 66,991 70,846 77,258 80,705

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

部門別電力消費 (2006年)

民生用家庭18.73%

商業部門30.87%

産業部門49.23%

公共照明と鉱業1.17%

総電力消費量 : 75,446 GWh- 2005年の5.4%と比べて3.8%の伸び

Page 17: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-17

発電における石炭

1981年の4種燃料/燃料多様化政策の導入に伴い、石炭はマレーシアにおける燃料構成の一部を担っている

供給の信頼性と安全性を確保するため燃料構成の多様化が目論まれた

エネルギー源としての石油への依存過剰を低減し、 電力供給における石油、ガス、水力、石炭の最適構成比を目指す

電力需要の増加に伴う

マレーシアの燃料比率の変化

4.2

70.2

55.9

13.8

17.85.5 5.6

2.2 0.2

41.9

11

77.0

26.267.8

9.7 21.8

36.5

8.810.011.3

0.2 0.0 1.80.30.3

0%

20%

40%

60%

80%

100%

1990 1995 2000 2005 2010

比率

(%)

石油 ガス 石炭 水力 他

Page 18: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-18

マレーシアの石炭埋蔵量2005年12月31日時点の石炭の生産量と埋蔵量

782,1071,483.0

6合計

-238.00亜瀝青炭、瀝青炭サバ州

782,1071,228.06原料炭、半無煙炭、無煙炭、亜瀝青炭、瀝青炭、亜炭

サラワク州

-17.00

亜瀝青炭マレーシア半島部

種類

生産量(メトリック

トン)

埋蔵量(百万トン)

出所:マレーシア地質研究所

マレーシア エネルギー・水資源・通信省

世界の石炭埋蔵量

出典 – BP 世界エネルギー統計 2006年

マレーシア エネルギー・水資源・通信省

アジア太平洋圏

56.1%

マレーシア

0.2%

北米

20.9%

中南米

0.7%

アフリカ

3.4%

欧州とユーラシア

18.3%

埋蔵量埋蔵量

合計合計 :: 426.5Btoe426.5Btoe

消費量消費量

合計合計 : 2.9Btoe: 2.9Btoe

Page 19: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-19

マレーシアにおける石炭利用

石炭消費 (1980 – 2005)

出典: 国家エネルギーバランス 2005年

0

1000

2000

3000

4000

5000

6000

éYã² 53 362 513 712 727 740 767 608 991 977 1,086 1,212 1,305 1348

î°ìdèä 0 0 813 957 950 882 964 1,332 1,495 1,994 2,556 4,104 5,327 5541

1980 1985 1990 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

TNB Janamanjung発電所– 2100MW

Sultan Salahuddin発電所– 2x500MWPhase 3

Sultan Salahuddin発電所Phase 2 – 2x300MW

マレーシア エネルギー・水資源・通信省

マレーシアにおける石炭利用

発電所のエネルギー源

出所: 国家エネルギーバランス (1998年と2005年)

1998

Natural Gas67%

Coal7%

Diesel Oil 2%

Fuel Oil16%

Hydro8%

2004

Natural Gas59%

Coal30%

Fuel Oil2%

Diesel Oil 2%

Hydro7%

20051998

マレーシア エネルギー・水資源・通信省

Page 20: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-20

マレーシアにおける石炭利用

既存および計画中の石炭火力発電所 (2000-2010年)

出典:テナガ・ナショナル社

マレーシア エネルギー・水資源・通信省

マレーシアのエネルギー必要量

0

10

20

30

40

50

Oil & Pet. Products Natural Gas Coal & Coke Hydro

Perc

enta

ge

2000

2005

2010

燃料別の一次商業エネルギー供給比率

マレーシアのエネルギー供給構成の動向は以下を示唆する;

石油製品が占める比率の継続的な低下

石炭とコークスの安定した増加

出典:第9次マレーシア計画(2000 – 2010年)

マレーシア エネルギー・水資源・通信省

Page 21: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-21

2010年までの燃料構成比予想

出典:マレーシア経済企画庁

マレーシア エネルギー・水資源・通信省

0%

20%

40%

60%

80%

100%

2000 2005 2010

その他

水力

ガス

石炭

石油

マレーシアにおける石炭利用

石油需要予測 (2010 – 2030年)

出典:マレーシアエネルギーセンター

0

5000

10000

15000

20000

25000

1980 1985 1990 1995 2000 2005 2010 2020 2030

ktoe

IndustrialPower StationsProjection (power)Projection (non-power)

石炭火力発電所の増加?

Jimah発電所– 1400MW

Tg. Bin発電所– 2100MW

TNB Janamanjung – 2100MW

Sultan Salahuddin Phase 3 2x500MW

Sultan Salahuddin Phase 2 2x300MW

マレーシア エネルギー・水資源・通信省

石炭需要予測(2010-2030年)

Page 22: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-22

問題点と課題- 環境への影響

• 石炭利用にあたり最も環境に配慮すべき事は気候変動である

• 石炭の環境影響は以下に起因する– 石炭の消費– 汚染物質の排出または灰の処分

• 環境パフォーマンスと効率性を大きく向上させるため、マレーシアの石炭火力発電所ではCCTを重視している

マレーシア エネルギー・水資源・通信省

問題点と課題- 上昇する石炭価格

• 化石燃料、即ち石油、天然ガス、石炭の価格上昇は、マレーシアだけでなく世界の他の国々においても、電力を使用する企業にとって重大な課題になるだろう

• エネルギー情報局 (EIA) 予測 - 石炭価格は2010年には35米ドル/トンになる可能性があるが、最近では70米ドル/トンになり得ると予測されている

• マレーシアは2010年だけでも石炭の輸入に24億リンギット近く費やさなくてはならないことになる

マレーシア エネルギー・水資源・通信省

Page 23: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-23

結論

• 石炭は低コストのエネルギー源として長期間使用され続けるであろう

• 石炭の発電への利用を考える上で、開発コスト、技術、環境に対する影響、供給確保が大きな要因である

マレーシア エネルギー・水資源・通信省

排出物基準の比較

500-650615-16407209406506501700(AW)2000(OI)

NOx

400980-14801430850-17007507503500(AW)

200(OI)SOx

100401004005050400粒子状物質

欧州標準

北米標準

アジア標準

Typical Bank世界銀行

JanaManjungマレーシアDOE排出物

Notes:

*単位はすべて mg/Nm3

マレーシア エネルギー・水資源・通信省

Page 24: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-24

結論

• 石炭利用の専門知識を有する諸国からの協力によりCCTの導入を円滑化する必要がある

• マレーシアは石炭の持続可能な利用を促進するASEANエネルギー協力行動計画を支援し続ける

マレーシア エネルギー・水資源・通信省

Page 25: L3 CCD2007Symposium Razak MYS - JCOAL 一般財団法人 石 … · Clean Coal Day in Japan 2007 L-3-1 COAL SUPPLY AND DEMAND IN MALAYSIA Noor Afifah Abdul Razak Ministry of Energy,

Clean Coal Day in Japan 2007

L-3-25

氏名 : Noor Afifah Abdul Razak Position: Principal Assistant Secretary,

Energy Division, Ministry of Energy, Water and Communications, Malaysia

Career: 1994–1995: Anti Corruption Agency, Malaysia

(Assistant Director, Administrative and Finance Division) 1995-1996: National Institute of Public Administration

(Diploma In Public Administration) 1996-1997: Public Service Department

(Assistant Director, Training Division) 1997–2003: Implementation Coordination Unit, Prime Minister’s Department

(Assistant Director (Development)) 2003–now: Ministry of Energy, Water and Communications

(Principal Assistant Secretary, Energy Division)

Education:

BSc. in Chemistry, University of Picardie Jules Verne, Amiens, France Msc. in Chemistry, University of Picardie Jules Verne, Amiens, France

現職: マレーシア国エネルギー・水資源・通信省 エネルギー部門主幹研究員 職歴: 1994-1995: マレーシア国収賄防止局(総務管理部副部長)

1995-1996: 国立行政研究所(行政士での学士号取得) 1996-1997: 行政部(人材育成部副部長) 1997-2003: 首相府行政局(開発担当副部長) 2003-現在: エネルギー・水資源・通信省(エネルギー部門主幹研究員)

学歴: フランス国アミアン市ピカデリー・ジュレ・ヴェルネ大学卒(専攻:化学)

フランス国アミアン市ピカデリー・ジュレ・ヴェルネ大学院卒(専攻:化学)