    METHOD STATEMENT FOR TESTING OF DRAINAGE PIPE WORK

    1. SCOPE OF WORK

    Drainage system will be tested as per specification 15410. Burried or concealed pipe work will be tested before any

    Permanent covering is applied.

    2. RESPONSIBILITY

    2.1 ake sure t!at all t!e related works" w!ic! may prevent t!e proper testing" are over.

    2.2 #nsure pipes are straig!t" correct slope $ no obstruction wit! ot!er services.

    2.3 %nc!ors $ fasteners will be capable of developing a restraining force commensurate wit! t!e loadof t!e water to be filled and will suited for use wit! t!e supporting structure.

    3 DESCRIPTION OF WORK

    WATER TEST

    &.1 '!e pipes will be leak tested after t!e installation.

    &.2 '!e pipe work will be prepared for testing by e(tending vertically two of t!e pipe ends $ inserting test plugsin all ot!er lower open ends.

    &.& '!e pipe ends to be e(tended will be c!osen so as to ensure air removal.

    &.4 )ater will be filled t!roug! one of t!e e(tended pipe to provide minimum 1.2 static !ead above t!e crown

    of t!e pipe but not more t!an * at t!e lower end.

    &.5 '!e test will be carried out for minimum of 4!ours and no loss of water s!all occur during t!e period.

    AIR TEST

    &.* '!e riser pipes will be air tested after t!e installation by using %ir 'est +it.

    &., '!e pipe work will be prepared for testing by plugging as before described.

    &.- %ir will be pumped in by a !and bellow until a pressure of 100mm of water is indicated in a glass" / 'ubeconnected to t!e system. '!e air pressure s!ould not fall to less t!an ,5mm during a period of 5 minuteswit!out furt!er pumping after allowing a suitable time for stabiliation of t!e air temperature.

    4. LABOUR, PLANT & MATERIAL REQUIREMENTS

    4.1 3abour will be as per t!e program and as reuired for t!e above said activity to finis! t!e ob on time.

    5. SUPERISION ARRANGEMENTS

    5.1 6ualified supervisors" foremen $ c!arge !ands will conduct supervision7 to ac!ieve a good uality ofwork as per t!e approved standard and approval to t!e satisfaction of t!e #ngineers.

    !. TEMPORARY WORKS TO BE DESIGNATED AND INSTALLED

    89%

    ". HEALTH AND SAFETY REQUIREMENTS

    7.1 )!en testing t!e :afety of t!e employees will be ensured.

    ,.2 %ir test kit will be operated by trained" competent $ ualif ied personal.

  • 8/11/2019 Mech-021

    2/2

    #. ENIRONMENTAL REQUIREMENT

    -.1 #nsure work place is clean and tidy.-.2 #nsure work place is !aard free.

    $. SECURITY ARRANGEMENTS

    89%

    1%. SPECIFIC CONTRACTUAL OBLIGATIONS

    89%

    11. REFERENCE DOCUMENTS

    11.1 ;elevant drawing issued for