2
cases. Now Ministry of Finance have asked to furnish list of cases of post audit, giving details so that a
decision on these cases may be taken.
c) All PCsDA / CsDA dealing with post-audit cases may, therefore, furnish the details to
this office latest by 10-6-2009 in the following format with copy sent on e-mail as well:
Sl.No. Name of thePAO and
address
PAO Code PAO RegnNo. with
NSDL
No.ofsubscribers
under post audit
as on 31-3-2009
Averagedelay in
number of
days (averagetime between
upload of data
and the monthit pertains to)
For CDA (AF), New Delhi / PCDA (AF) Dehradun only:Since ACAS ACCTS Air HQrs New Delhi has taken over responsibility of uploading of SCF in respect of
Defence civilians of Air Force, above information in respect of Def Civilians of Air Force need not be furnished
by them.
3. Registration of PAOs left over:
i) Instructions were issued vide Para 2.1 and 2.2 of this HQrs circular dated 17-7-2008 that
PAOs registration form N2 should be submitted in physical form by 10th
Aug 2008 to NSDL so thatregistration of PAOs could be completed. Registration of AAO GEs as PAOs was excepted at that
time.
ii) It has now been observed that some Pr.AOs had not completed registration of all PAOsunder their organization and the N2 forms of some PAOs have been forwarded to NSDL for
registration only now. NSDL has in turn requested this HQrs for advice whether to go ahead with the
registration of the same.
iii) In this connection it is directed that,
a. All Pr.AOs (PCDA / CDA) may identify left over PAOs including those not having anysubscribers to NPS and furnish their details i.e. PAO Code, PAO office name and address, e-
mail id etc., to this HQrs office for updation of PAO list in this HQrs and onward transmissionto NSDL.
b. On receipt of confirmation from this HQrs office the form N2 may be got filled by the PAOsand be sent to NSDL for registration by the Pr.AO. The N2 form, procedure and instructionfor filling N2 form are contained in the SOP prepared by NSDL which may be downloaded
from NSDL website.
4. Report on strength of NPS Subscribers:
8/13/2019 nps_ins_8
3/19
3
Monthly reports regarding recovery and remittance of subscriptions to NPS have already been
prescribed vide this HQrs office Instruction No.3/2009 dated 5-2-2009. A monthly report on strengthof subscribers to NPS is now being introduced in the format given in Annexure-A, the Part-A and Part-
B of the same may be sent to this HQrs office on regular basis. Part C of the Annexure-A may be
prepared and maintained by PAO and Pr.AO offices which should not be sent to this HQrs office.
5. Posting of Accumulated balance in Individual Retirement Accounts (IRAs) from 1stTranche
Data by NSDL:
5.1 Based on the confirmation of amounts of First Tranche Legacy Data received from NodalOffices in the Certificate in Annexure-A to this HQrs office circular of even No dated 19-02-
2009 (renumbered as Instruction No.6/2009), the Nodal Office-wise amounts were intimated to
the NSDL for posting in the Individual Retirement Accounts (IRAs) vide this HQrs office
letters of even No dated 13-03-2009 and 1-04-2009 (copies enclosed). NSDL has raised
observations on the legacy data received by them from Nodal Offices and amounts
intimated vide this HQrs letter dated 13-03-09 and suggested the related action pointswhich are given in Annexure B to this Circular.
5.2.1 As this HQrs Office has given concurrence to NSDL to go ahead and start processing data as per
Action Points mentioned in Anenxure-B, Nodal offices are requested to ensure that the processis followed properly and necessary action taken under intimation to this HQrs office. Timeline
for completing this exercise has been laid down in para 7 below.
6. Rendition of 2nd
tranche data to NSDL:
6.1 It has been observed that rendition of data in respect of 2nd
Tranche is very slow. However inVideo-conferencing it was confirmed by majority of the offices that 2nd tranche data duly
reconciled is ready. All Pr.AOs are requested that the complete 2nd
Tranche data duly
reconciled with amounts remitted should be sent to NSDL latest by 15-6-2009 on a CD asalready prescribed.
6.2 Wherever the 2nd
Tranche funds have been deposited by a PAO, the Pr.AO concerned
should do the final reconciliation of funds remitted and data submitted. NSDL has been
advised to accept clarifications on any mismatch in respect of 2nd
Tranche data only from
Pr.AO.
7. Time Line for transferring 1stand 2
ndTranche Legacy Data:
7.1 The final date for transferring the rectified 1stand 2
ndtranche legacy data has been set as
15th
JUNE 2009 and action are to be taken accordingly. It may please be noted that no
further extension of time will be allowed.
7.2 Data should be sent as per instructions issued vide this HQrs office important circular
No. 4/2009 and 6/2009. Nodal offices will furnish weekly progress report on 29th
May
8/13/2019 nps_ins_8
4/19
4
2009, 5th
, 12th
June 2009 and completion report on 15th
June 2009 through e-mail on the
address given in Para 1 above.
8. Match Pending Status of SCF upload with Funds Remitted to Trustee Bank:
8.1 NSDL have intimated that 45 % of the SCFs are in match pending status for followingreasons.
(a) The SCFs are not matched because either the accredited Bank of the PAO is not forwarding therequired details to the Trustee Bank as part of the electronic transfers or there is mismatch in
funds remitted and the amount uploaded in the SCF.
(b) Funds remitted to Trustee Bank include contribution of the employees for whom PRAN has notbeen generated.
(c) As SCFs uploaded by the PAOs have not been matched in the CRA system, the underlyingIRAs have not been credited with the contribution. The latest status of all pending files isavailable at the CRA website which can be accessed by Pr.AOs / PAOs as well as on NPS Cellhome page on WAN.
8.2 Pr.AOs , as oversight mechanism, may look into all match pending cases in respect of SCFsuploaded by the PAOs under their jurisdiction and resolve all such cases before 15
thJune
2009.
9. A detailed list of Name Mismatch cases, Multiple PRAN requests and List of PAOs who havenot uploaded a single file till date, received from NSDL has been provided at the NPS WAN
(URL provided in para 1 above):
i) All Pr.AOs are advised to examine and take corrective actions in respect of PAOs undertheir jurisdiction.
ii) In case of multiple PRAN requests for a single PPAN some PAOs have taken thestand that data provided by them is correct but has not been confirmed by the other
PAO and this is creating an impasse. This requires immediate intervention by Pr.AOs.
iii) In case of PAOs who are yet to upload a single file Pr.AOs may confirm to this officethrough e-mail whether non upload is due to oversight or due to absence of any
subscriber.
10. Filling of physical application form for registration of subscribers of legacy period:
a) Instructions have already been issued vide para 3 of NPS Circular No.7/2009, dt.17-3-2009,
that all new entrants to NPS who join service on or after 1stApril, 2009 will have to fill the paper
application form for allotment of Permanent Retirement Account Number (PRAN) and submit thesame to DDO who would further forward it to NSDL through PAO for generation and allotment
of PRAN and dispatch of PRAN kit. NSDL has intimated that the physical form of such
8/13/2019 nps_ins_8
5/19
5
subscribers, properly filled by the subscriber and duly authorized by the concerned DDO and the
PAO should be submitted to the nearest CRA facilitation centre.The list of Facilitation centers located at various places may be down loaded from the
website of NSDL. For any further assistance or clarification, Pr.AO / PAO offices may contact NSDL
(Mr.Janardan Shukla (Tel.022-24994567, email id [email protected]) or Mr.Prasenjit Mukherjee
(Tel-022-24994565, email id- [email protected]).
b) Ministry of Finance, Dept of Expenditure EV Branch, New Delhi, vide their OM
No.1(2)/EV/2008, dt.29thApril, 2009,(copy enclosed) have directed that all subscribers who were
registered through the legacy data must fill up the application for registration and the same must beforwarded to NSDL by the PAO concerned. The exercise in respect of subscribers who were
registered through legacy data must be completed by 31st July, 2009. Pr.AOs are requested to
issue necessary instructions to the PAOs under their jurisdiction for completion of the above
exercise by the due date given by the Finance Ministry.
11. Clarification on issues referred to this HQrs office by Pr.AOs:
Pr.AOs have referred to this HQrs office various problems , points and issues for clarificationwhich are indicated in Annexure-C to this circular. Though the issues have been raised by some
Pr.AOs , clarification on the issues is applicable across all the Pr.AOs.
(Pushkal Upadhyay)
Dy.CGDA(AT-I)Ph No. 011-26711745, Fax-26104462
To
All PCsDA/CsDA/PC of F&A(Fys)/Cs of F&A(Fys), ACAS (Air HQrs), New Delhi.
Pr.AO (NPS).
8/13/2019 nps_ins_8
6/19
6
Copy to:-
1. Shri Manoj Sahay,Director (Admn)
Deptt of Expenditure (Min of Finance)
Room N-76, North Block New Delhi
For information
2. Shri Siddharth Sharma,Sr. General ManagerPFRDA,
1stFloor, ICADR Building
Plot No-6 Vasant Kunj InstitutionalArea
Phase-II, New Delhi-110070
For information.
3. Shri Amit SinhaVice President NSDL
4th
Floor, A Wing Trade WorldKamala Mills Compound
Senapati Bapat Marg, Lower Parel
Mumbai-400013
1. It is requested to go ahead with theproposed Action Points (a) , (b) and (c)
of your office e- mail letter Ref No-AS/PM/2009/1964 dated 24-03-09.
2. The PAOs ,as requested by the twoPr.AOs as mentioned in your e-maildated 1-04-2009 on the subject-
registration of ( Additional) PAOs ,
may be registered. The updated PAO
list will be forwarded afterwards.
3.
Reports/status from your office mayalso be sent on the e-mail ID given in
para 1 of this circular letter.
4. Shri Anand AgrawalDy.CGDA (EDPS)
EDP Centre ( Local)
For information and with a request to postthis circular on website and CGDA WAN
Dy.CGDA( AT-I)
8/13/2019 nps_ins_8
7/19
7
ANNEXURE-
PART-A
Monthly Report on strength of subscribers to NPS.
Name of the Pr.AO:___________________________ Report for the month
Type of
Subscribers
Op.Bala
nce as
on 1stof
the
month*
ADDITIONS DELETIONS
New
Recruits
during
the
month
Transfer
in cases
Misc Total
(2+3+4)
Death Resignation T/Out M
1 2 3 4 5 6 7 8 9
(a)DefCivilians
(b)DAD
Employees
Total (a) +(b)
Note: 1. Report may be rendered from the month of April, 2009 taking into account the strength as on 31
The opening balance as on 1-04-2009 is the number of all the subscribers under NPS from
excluding cases of death, resignation, technical resignation during the period 1-01-04 to 31-02. Report may be rendered by 10
thof the following month through e-mail / FAX / SPEED POST.
the month of April 2009 may be furnished by 10-06-2009.3. Strength report should indicate actual strength of the month. This report should therefore not b
subscribers in the SCFs uploaded during the month.
8/13/2019 nps_ins_8
8/19
8
4. Addition (Misc) under column 4 above are cases such as (1). subscribers already covered under NPS
Ministries / Deptts to MOD and (2) subscribers to NPS whose recovery of subscriptions was suspended ddesertion etc and the subscribers have resumed duty during the month of report.
5. Deletions (Misc) under column 9 above are cases 1. technical resignation ,2. desertion, absence on E
recovery of NPS subscription is suspended.6. In Ty / Duty involving change of DDO/PAO of the subscriber., such cases may be treated as transfer
report.
8/13/2019 nps_ins_8
9/19
9
PART-B
Monthly Report Showing Progressive Total of Subscribers For the Month of_____
Name- Pr.AO:______________________________________
Type of
Subscribers
ADDITIONS DELETIONS
New
Entrants
Transfer
in cases
Misc Death Resignation T/Out
1 2 3 4 5 6
(a)Def Civilians
(b)DAD
Employees
Total (a) +(b)
Note 1. The columns 1,2 and 3 under Additions should show the number of subscribers for the monthreport. This is base for arriving progressive total under these columns for succeeding months rep
2. In the case of death and resignation under column 4 and 5 ( Deletion) following procedure may
(a) Find out all cases of death and resignations during the period 1-01-2004 to 31-03-2009, an
be taken as opening balance as on 1-04-2009. In the first report opening balance may be shown separatel
(b) Add the number of cases of death and resignations reported during 4/09 to the opening bala
above to arrive at the progressive for the month of 4/09.
3. The progressive under column 6 and 7 i.e. Transfer out and Misc under Deletion may be womentioned in Note 1 above.
8/13/2019 nps_ins_8
10/19
10
PART-C
Details of Death Cases in support of Column 4 of Part-B
( This Part-C of Annexure-A may be retained by PAO and Pr.AO offices, and should not b
Name of PAO:_________________________________________
Sl No PPAN PRAN Name of Subscribers Date of Death Name of Office/Uni
Note 1. PRAN only of the deceased subscriber may be mentioned . PRAN was not allotted in r
between 1-01-2004 to 31-03-2008 as their data was not sent to NSDL. In such cases PPA
PRAN column may be kept as blank.
2. Similar details of resignation cases in support of Column 5 of Part B may be prepared in
above format.
3. Details of Misc cases in support of Column 7 of Part-B may also be prepared in respect o
2009 only in above format .
8/13/2019 nps_ins_8
11/19
11
ANNEXURE-B
Sl.No. Observation raised by NSDL Proposed Action to be taken by Pr.AO(Nodal Office).
1 Fund details have been matched, but
Pr.AO (Nodal offices) havesubmitted additional/revised data.
PCDA(SC) Pune, CDA,Bangalore,
CDA Secunderabad have furnishedrevised data.
CRA shall send a CD to the Pr.AO (Nodal Office)
providing the Table-I and take a confirmation. Onceconfirmation is received, CRA shall post the
accumulated balance in the IRAs. Further, the Pr.AO
(Nodal Officer) will submit additional details asmentioned in para 3 below.
Action by- PCDA(WC) Chandigarh, PCDA(R&D)
New Delhi, CDA Guwahati, CDA(AF) New Delhi,
PCDA(SWC) Jaipur, PCDA(SC) Pune, CDA,
Bangalore, CDA, Secunderabad
2 Pr.AO (Nodal Office) who have
provided excess funds than what isindicated in this HQrs letter dt.13-3-2009
CRA may go ahead and credit the IRAs of the respective
Pr.AOs (Nodal Offices) in case there is no change in theindividual subscriber accumulated balance. CRA shallsend a CD to the Pr.AO (Nodal office) providing the
Table-I & take confirmation from the concerned Pr.AO
(Nodal Office). The balance shall be adjusted with 2nd
Tranche.
Action By PCDA(Navy) Mumbai, CDA(CSD)
Mumbai, CDA(PD) Meerut, CDA Patna, CDA(O)
Pune
3 Pr.AOs (Nodal Offices) in whose
case fund details are not matched
with Table-I data
The Pr.AO shall provide the following with a covering
letter:
One file which will contain Table-I(pertaining toTranche 1) all PPANs for which PRAN has already beengenerated by CRA and another file PPANs (pertaining to
Tranche I only) for which no PRAN has been generated
till now. Data of subscribers who are not part of thelegacy data (as on 31-3-2008) should not be sent
alongwith this data.
Action By- PCDA New Delhi, CDA(BR) New Delhi,
CDA(Army) Meerut, CDA Chennai, CDA Jabalpur.
4. Table-I with contribution notreceived form CDA(Army) Meerut,
CDA Chennai, CDA Jabalpur,PCA(Fys) Kolkata, PCDA(CC)Lucknow
Action by- CDA(Army) Meerut, CDA Chennai, CDA
Jabalpur, PCA(Fys) Kolkata, PCDA(CC) Lucknow
8/13/2019 nps_ins_8
12/19
12
ANNEXURE-C
Sl.No. Query Clarification
1 i) Whether the PPAN will continue tobe allotted by Pr CDA/CDA to the
appointees appointed on or after 1-10-2008 or their respective PAO s will
allot the PPAN & transmit the legacy
data to NSDL, based on which PRAN
will be generated by NSDL, so as toenable the PAO to upload the
subscriber contribution to NPSCAN
System & simultaneously remit theamount to the trustee.
(Referemce: CDA (Army) Meerut,letterNo.PAY/I/9823/NPS/REGS/Vol-II,
dt.9-3-2009)
ii) Whether allotment of PPANs to thenew comers will continue to be done
as before or after the month of Nov
08, it is not necessary for allottingtheir PPANs or will be done by the
new PAOs.
(Reference: Jt.CDA (AF), New Delhi,letter No.DCA/F-II/NPS/Vol-VI,
dt.2/4/2009)
It is clarified that PPAN will be allotted by the
PAO of the legacy period and data will be sentto NSDL in Table-I format for generation of
PRANs up to 31-3-2009. Thereafter new
entrants to NPS will have to fill the paper
application form for allotment of PRAN asintimated vide Para 3 of HQrs Office
Instruction No.7, dt.17-3-2009.
2 Effective date of clarification whetherall cases of EOL, HPL, Suspension in
past will be regulated afresh as per the
clarification issued by the Ministry of
Finance or the cases will be regulatedfrom the date of issue of the
clarification by the Ministry ofFinance i.e. wef 19 Jan 2009.(Ref: PCDA (AF) Dehradun letter
No.P/I/1270/NPS/Vol-III, dt.16-4-
2009)
In this connection it is stated that clarificationon legacy issues received from Ministry of
Finance OM NO.1(2)/EV/2008, dt.19th
January, 2009 were circulated to all Pr.AOs
vide this HQrs NPS instruction No.5/2009,dt.11-2-2009. The clarifications issued vide
above OM are effective from 1-1-2004 andpast cases, if any, would be regulatedaccordingly.
3 Since majority of the sub-offices
under PCDA (NC) are in far flungareas and are not possessing
As per the existing instructions on the matter,
uploading of SCF need to be done latest by5.30 PM on the 1stday of the following month
8/13/2019 nps_ins_8
13/19
13
uploading facilities, the NPS data is
centrally processed and uploaded
from Main Office. It has been ourexperience that the data from the sub-
offices takes some time to reach this
office and uploading of data may bepossible by the 15th
of the followingmonth to which the data pertains.
(Reference: PCDA (NC) Jammu,
letter No.PAY/I/84/NPS/Vol-III, dt.3-4-2009)
in pre-audit cases as per para 5 (i) (a) of this
HQrs office Instruction No.6/2009, dt.19-2-
2009. Efforts should, therefore, be made toadhere to the above timeline.
8/13/2019 nps_ins_8
14/19
14
No.1(2)/EV/2008
Ministry of FinanceDepartment of Expenditure
E.V. Branch
***
New Delhi, the 29th
April, 2009.
OFFICE MEMORANDUM
Subject: Implementation of New Pension Scheme issue of instructions regarding.***
Attention is invited to this office O.M. of even number dated 16th
February, 2009. It isreiterated that all new entrants who join service on or after 1 st April, 2009 may be registered
directly with NSDL through the form prescribed by NSDL. Their SCF upload would commence
thereafter.
2. Further, all the subscribers who were registered through the legacy data must fill up the
application for registration and the same must be forwarded to NSDL by the PAO/CDDOs
concerned. The exercise in respect of subscribers who were registered through legacy data mustbe completed by 31stJuly, 2009.
3. Necessary action may kindly be taken to ensure the above.
Sd/-(Manoj Sahay)
Director
To
1. Mr. C.R. Sundaramurti, CGA2. Ms Bulbul Ghosh, CGDA3. Ms Sowmya Raghavan, Financial Commissioner, Railways.4. Ms. Soma Roy Burman, CC (Pensions)5. Mr. S.K. Mishra, Dy.Director General (PAF)6. PFRDA/NSDL
8/13/2019 nps_ins_8
15/19
15
SPEED POST / FAX
No.5189/AT-I/NPS/ Vol-XV
Office of the CGDA
West Block-V, R.K PuramNew Delhi-110066
Dt. 13-3-2009.
To
Shri Amit SinhaExecutive Vice-President,NSDL
4th
Floor, A Wing
Trade WorldKamala Mills Compound,
Senapati Bapat Marg, Lower Parel
Mumbai-400013
Sub: Posting of accumulated balances for the 1sttranche in the Individual
Retirement Accounts (IRAs).
Ref: Your e-mail dt.3-2-2009 and this HQrs Office letter of even No.,
dt. 11-2-2009.
***
This HQrs Office agrees to the methodology as proposed vide Para 1.(b) of your e-mail
letter dt.3-2-2009 mentioned above for posting accumulated balances in the IRAs. The amountof 1stTranche legacy data for posting in IRAs has been shown in Annexure A (enclosed) against
the respective Nodal Offices. The IRAs in respect of subscribers of the respective Nodal Officesas shown may accordingly be posted upto the amount indicated in Annexure-A. Any excess orless amount may be intimated to respective Nodal Offices for adjustment immediately. The
amount of the remaining 4 Nodal offices will be intimated to your office shortly.
2. A copy of this letter is being endorsed to PFRDA and JS (Pers), Min of Fin as requestedby your Office.
Sd/-
Dy.CGDA (AT-I)
Encls:AA
(contd.)
8/13/2019 nps_ins_8
16/19
16
Copy to:
1. Shri Manoj Sahay, For information andDirector necessary action as requested vide
Dept of Expenditure NSDL e-mail dt.3-2-2009 (copy
Min of Finance enclosed) mentioned underNorth Block reference. A copy of this HQrs
New Delhi Office letter of even No., Dated 11-2-2009
is also enclosed for reference.
2. Shri Siddharth Sharma,General Manager,
Pension Fund Regulatory &Development Authority,1stFloor, ICADR Buidling
Plot No.6, Vasant Kunj
Institutional Area, Phase-II
New Delhi -110070.
Sd/-
Dy.CGDA (AT-I)
8/13/2019 nps_ins_8
17/19
17
ANNEXURE-A
AMOUNT OF 1ST TRANCHE LEGACY DATA FOR POSTING IN I.R.As
SL.NO. NAME OF NODAL OFFICE AMOUNT IN RUPEES
1 PCDA (SC) Pune 98742524
2 CDA. GUWAHATI 23915398
3 PCDA (N) MUMBAI 141792028
4 CDA., BANGALORE 26972401
5 PCDA (R&D) NEW DELHI 281121049
6 CDA (ARMY) MEERUT 48557750
7 CDA (BR), NEWDELHI 59975117
8 CDA (AF), NEW DELHI 65995514
9 CDA, SECUNDERABAD 16088902
10 CDA.CHENNAI 16458022
11 CDA (CSD). MUMBAI 2797323
12 PCDA, NEW DELHI 23885802
13 CDA (O), PUNE 5689931
14 PCDA (WC), CHANDIGARH 82278949
15 CDA, JABALPUR 33371348
16 CDA(PD), MEERUT 497556
17 PCDA (SWC) JAIPUR 36051568
18 CDA, PATNA 41686782
TOTAL 1005877964
8/13/2019 nps_ins_8
18/19
18
No.5189/AT-I/NPS/XVOffice of the CGDA
West Block-V, R.K. Puram,
New Delhi.
Dated 1-4-2009.To
Shri Amit Sinha
Executive Vice-President, NSDL
4th
Floor, A wingTrade World
Kamala Mills Compound,
Senapati Bapat Marg, Lower Parel,
Mumbai-400013.
Sub: New Pension Scheme : Posting of accumulated balances for the 1
st
tranche in theIndividual Retirement Accounts (IRAs).
Ref: This HQrs office letter of even No dated 13-3-2009 on above subject.
***
This is in continuation of this HQrs office letter mentioned under reference. The amount
for posting in the IRAs of subscribers in respect of following three Nodal offices is indicated
against the Nodal offices and the gross amount intimated for posting so far.
Sl.No. Name of Nodal Office Amount in Rupees
1 PCDA (NC) Jammu 45466175
2 PCDA (P) Allahabad 18806363 PCDA (CC) Lucknow 32860220
4 Total 80207031
5 Total amount already intimated for posting in
respect of 16 Nodal offices vide Annexure-A to this
HQrs letter dated 13-3-2009
1005877964
6 Gross Amount (4+5) 1086084995
The amount for posting in respect of PCA (Fys) Kolkata only is still awaited which will
be intimated to your office after receipt of the same from the Nodal Office.
Sd/-Dy. CGDA (AT-I)
Copy to:
8/13/2019 nps_ins_8
19/19
19
1. Shri Manoj Sahay, For information andDirector necessary action. This is in continuation of
North Block this HQrs letter mentioned under reference.
New Delhi
2. Shri Siddharth Sharma,
General Manager,Pension Fund Regulatory &
Development Authority,
1stFloor, ICADR Buidling
Plot No.6, Vasant Kunj
Institutional Area, Phase-II
New Delhi -110070.
Sd/-
Dy.CGDA (AT-I)