OFFSHORE INDEPENDENTS IS AN INDEPENDENT, PRIVATELY

OWNED COMPANY OFFERING A WIDE ARRAY OF PROJECT

SERVICES TO THE OFFSHORE OIL AND GAS INDUSTRY. OUR

CONSULTATION EXPERTISE COVERS EVERY IMAGINABLE

OFFSHORE INFRASTRUCTURE PROJECT — THROUGHOUT

ALL PHASES, FROM (PRE-)FEED UP TO ABANDONMENT. WE

HAVE A LOYAL AND VALUED CUSTOMER BASE CONSISTING

OF OPERATORS, CONTRACTORS, ENGINEERING COMPANIES,

ASSET OWNERS, LAW FIRMS, LENDERS AND UNDERWRITERS.

OUR VAST PRACTICAL BACKGROUND, COMBINED WITH A SOLID

THEORETICAL BASE AND THE NO-NONSENSE MENTALITY OF

OFFSHORE INDEPENDENTS’ HIGHLY QUALIFIED EXPERTS, GIVES

US A LEADING EDGE WHEN IT COMES TO UNDERSTANDING THE

COMPLEX REQUIREMENTS FOR CONDUCTING ANY TYPE OF

OFFSHORE INSTALLATION PROJECT — INVOLVING PIPELINES,

SURF, PLATFORMS OR SUBSEA STRUCTURES — AS WELL AS THE

EVENTUAL NEED FOR DECOMMISSIONING.

WITH OUR PRIMARY FOCUS ON COST REDUCTION WITHOUT

INCREASING RISK ON YOUR PROJECT, WE ARE RENOWNED FOR

OUR OFFSHORE CONSTRUCTION EXPERIENCE, RELIABILITY

AND INDEPENDENCE — AND WE DEMONSTRATE THESE

QUALITIES EVERY DAY.

PLEASE ALSO CHECK OUR WEBSITE

WWW.OFFSHOREINDEPENDENTS.COM

OUR SUCCESS IS ATTRIBUTABLE TO SEVERAL UNIQUE STRENGTHS: WE ARE FULLY INDEPENDENT, WHICH MEANS WE ARE NOT

AFFILIATED WITH OTHER ORGANIZATIONS WITH COMPETING INTERESTS. OUR PEOPLE HAVE THEIR ROOTS WITH INTERNATIONAL

MAIN INSTALLATION CONTRACTORS AND HAVE PRACTICAL KNOWLEDGE IN ALL AREAS OF THE BUSINESS — BE IT SHIPBUILDING,

DREDGING, CONTRACTING, OR THE USE OF SPECIALIZED MARINE EQUIPMENT. THESE SKILLS AND INSIGHTS ARE MADE AVAILABLE

TO THE ENTIRE MARKET BY VIRTUE OF OUR INDEPENDENCE. THANKS TO OUR BACKGROUND, WORKING ACROSS THE INDUSTRY

IN ALL CAPACITIES, WE KNOW JUST HOW CONTRACTORS THINK — AND THAT KNOWLEDGE IS THE UNDERLYING SOURCE OF OUR

RELIABLE AND TRUSTWORTHY ADVICE.

OFFSHORE INDEPENDENTS IN SHORT:

• INDEPENDENT, RELIABLE AND PASSIONATE ABOUT WHAT WE DO

• A HIGHLY QUALIFIED, MULTI-DISCIPLINARY, MOTIVATED AND DEDICATED TEAM

• MANY YEARS OF PRACTICAL EXPERIENCE AND A HANDS-ON MENTALITY

• SUCCESSFUL TRACK RECORD IN SOLVING DIVERSIFIED ENGINEERING AND OPERATIONAL CHALLENGES WORLDWIDE

PROFILE

WITH OUR EXTENSIVE BACKGROUND IN S-LAY, J-LAY, REEL

AND PULL/TOW METHODS, WE ARE ABLE TO DEFINE, REVIEW

AND ADVISE ON ALL OFFSHORE PIPELINE INSTALLATION

TECHNIQUES, AS WELL AS ON PROTECTION AND BURIAL

SYSTEMS. THESE CAPABILITIES APPLY TO RIGID OR FLEXIBLE

PIPES, PIPE-IN-PIPE OR INSULATED PIPE PRODUCTS, FIBER

OPTIC AND POWER CABLES, AND ASSOCIATED SERVICES

SUCH AS TRENCHING AND DIVING — AT ANY LOCATION, FROM

SHALLOW TO ULTRA-DEEP WATER. WHEN RECOGNIZED

METHODS ARE NOT APPROPRIATE, WE DEVELOP WORKABLE

ALTERNATIVES, EITHER BY MODIFYING EXISTING TECHNIQUES

OR BY INVENTING NEW ONES.

OFFSHORE INDEPENDENTS’ EXPERTISE IN SURF PROJECTS

INVOLVES ALL THE VARIOUS COMPONENTS BETWEEN THE

WELL ON THE SEA BOTTOM AND THE PLATFORM, CONSISTING

OF UMBILICALS FOR POWER AND DATA TRANSFER, RISERS

(RIGID RISER SYSTEMS, SCR (STEEL CATENARY RISER), DYNAMIC

AND HYBRID RISER SYSTEMS) TO TRANSPORT THE PRODUCT

TO THE SURFACE, AND FLOWLINES (UP TO 16”) TO TRANSPORT

THE UNPROCESSED PRODUCT BETWEEN WELLHEAD AND

MANIFOLD, OR TO A PROCESSING PLANT IN SHALLOW, DEEP

AND ULTRA-DEEP REGIONS.

WITH REGARD TO PLATFORMS (FIXED OR FLOATING— FROM

A REGULAR JACKET UP TO FPSO, GBS, SPAR OR TLP), WE ARE

CAPABLE OF IDENTIFYING THE AREAS WHERE POTENTIAL

SAVINGS CAN BE ACHIEVED THROUGHOUT ALL PROJECT

PHASES ON INSTALLATION, MODIFICATION AND OPEX

(OPERATIONAL EXPENDITURE) COSTS FULLY COMPLIANT WITH

ALL QHSE REQUIREMENTS. THIS COULD BE REALIZED VIA

PLATFORM INTEGRITY AND LIFETIME OPTIMIZATION.

OUR EXPERTISE IN SUBSEA STRUCTURES INVOLVES THE USE OF

A LARGE RANGE OF UNDERWATER STRUCTURES TO EXTRACT,

CONTROL AND TRANSPORT THE PRODUCT TO SURFACE

FACILITIES. THIS REQUIRES A WIDE VARIETY OF  ENGINEERED

SUBSEA ASSETS, SUCH  AS WELLHEADS, TREES, TEMPLATES,

MANIFOLDS, JUMPERS, SPOOL PIECES AND SUBSEA ISOLATION

VALVES, ALL DESIGNED TO ACHIEVE OPTIMAL WELL CONTROL

AND FLOW.

DECOMMISSIONING COULD BE DEFINED AS TOTAL OR

PARTIAL REMOVAL, REUSE OR LEAVING IN SITU. OFFSHORE

INDEPENDENTS PRIMARILY FOCUSES ON DEVELOPING

COST-SAVING INITIATIVES AND CONTINUAL COMPARISON

OF OPTIONS AND ALTERNATIVES, AS THESE ARE PRECISELY

THE ELEMENTS THAT CAN REPRESENT SUBSTANTIAL CAPEX

(CAPITAL EXPENDITURE) COST SAVINGS.

EXPERTISE

PIPELINES SURF PLATFORMS SUBSEA STRUCTURES DECOMMISSIONING

Page 3: OI BROCHURE_2016

ENGINEERING & DESIGN TENDER SUPPORT OPERATIONAL SUPPORT PROJECT MANAGEMENT BUSINESS SUPPORT

PIPELINES

O RIGID/FLEXIBLE, UMBILICALS, POWER AND FIBRE OPTIC CABLES (FOC)

O 3” - 72” ODO SHALLOW/ULTRA-DEEP WATERO S-LAY, J-LAY, REEL AND PULL/

TOW METHODS

FOR PIPELINE DESIGN:• MATERIAL SIZING (WT, CWC)• MATERIAL SPECIFICATIONS (PIPE,

COATINGS, ANODES ETC.)• CORROSION PROTECTION (AN-

ODES)• ON BOTTOM STABILITY• FATIGUE (VORTEX INDUCED VIBRA-

TIONS)• ALLOWABLE SPAN LENGTHS

FOR PIPELINE ROUTE DESIGN:• ROUTE OPTIMIZATION• FREESPAN ANALYSIS• BOTTOM ROUGHNESS ANALYSIS• CROSSINGS, SHORE APPROACH,

LANDFALLS

FOR PIPELINE INSTALLATION:• S-LAY, J-LAY OR REEL LAY INSTAL-

LATION METHOD• COMPLETE PROJECT INSTALLA-

TION SCOPE FROM START-UP TO LAY DOWN INCLUDING DYNAMIC ANALYSES

• SPECIAL OPERATIONS E.G. ABAN-DONMENT, RECOVERY, SHORE-PULL, HORIZONTAL DIRECTIONAL DRILLING (HDD), SURFACE TIE-INS, DEAD MAN ANCHOR (DMA) INSTAL-LATION

• RELATED OPERATIONS LIKE DREDGING, BACKFILLING, ROCK-DUMPING, PEAKSHEAVING, DIVING ETC.

• PRE-COMMISSIONING, E.G. COMPLETE PIGGING (FLOODING, CLEANING, GAUGING) AND TEST-ING AND COMMISSIONING SCOPE (HYDROTESTING, LEAKTESTING, DEWATERING, DRYING) INCLUDING EQUIPMENT SIZING

FOR UMBILICALS & FIBRE OPTIC CABLES:• REEL INSTALLATION METHOD• SPECIAL OPERATIONS E.G. J-TUBE

PULL-IN AND INSTALLATION OF THE FOLLOWING UMBILICAL OR FOC ITEMS VERTEBRAE BEND RESTRICTOR, CEM (CABLE END MODULE), SUTH (SUBSEA UMBIL-ICAL TERMINATION HEAD, TUTA (TOPSIDE UMBILICAL TERMINATION ASSEMBLY)

• RELATED OPERATIONS E.G. DIVING, VESSEL AND PLATFORM PREPARATIONS, MATTRESSES INSTALLATION ETC.

FOR CROSSINGS DESIGN:• CONCRETE MATTRESS CROSSING• SLEEPER CROSSING

• DEVELOPMENT OF ITT PACKAGES, INCL. TECHNICAL SPECIFICATIONS, SCOPE OF WORK DEFINITIONS, COMMERCIAL PACKAGES, TERMS AND CONDITIONS ETC.

• CONTRACTING AND PROCURE-MENT STRATEGIES (INCL. MATE-RIALS SELECTION STUDIES, LONG LEAD ITEMS LISTS & TAKE-OFFS)

• SUPPLIER’S CONSULTATIONS

• TENDER MANAGEMENT AND EVALUATIONS

• TENDER ENGINEERING/ COST ESTIMATING

• PACKAGE MANAGEMENT

• SERVICE SUPPORT AND PLANNING

• ENGINEERING MANAGEMENT

• INTERFACE MANAGEMENT

• DELIVERY MANAGEMENT INCLUDING INSPECTION & QA/QC SERVICES

• TECHNICAL WITNESSING

• WARRANTY SURVEY

• CLIENT REPRESENTATION

• MODIFICATIONS AND (EMERGENCY) REPAIRS

• FIELD ENGINEERING • LOGISTICS • PROCESS OPTIMIZATION • PROBLEM SOLVING • REPORTING • LIAISING WITH CLIENTS • SECURING PROCEDURES • PRE-COMMISSIONING SUPPORT

• PLANNING AND COST CONTROL

• DESIGN MANAGEMENT

• QHSE MANAGEMENT

• (SUB)-CONTRACT MANAGEMENT

• FIELD AND LOGISTICS SUPPORT

• FABRICATION, CONSTRUCTION AND VESSEL OPERATIONS MANAGEMENT

• INSPECTION SERVICES

LENDER’S ENGINEERING:• TECHNICAL AND COMMERCIAL

FEASIBILITY STUDIES• CAPABILITY ASSESSMENT OF THE

ENTITIES INVOLVED IN PROJECT EXECUTION

• VESSEL/EQUIPMENT ASSURANCE• RISK ASSESSMENT (CONTRACTUAL,

COMMERCIAL AND TECHNICAL)• MAXIMUM ESTIMATED LOSS

STUDIES• PROJECT MONITORING (PROG-

RESS, COST, QUALITY) INCL. REME-DIAL MEASURES ADVICE

• DISPUTE RESOLUTION• QUALITY CONTROL SERVICES

DUE DILIGENCE SUPPORT:• CAPABILITY ASSESSMENT OF THE

EQUIPMENT/ORGANIZATION• VESSEL/EQUIPMENT VALUATIONS• CUSTOMER PORTFOLIO AND

BACKLOG VALUATION• CAPITAL BUDGETS AND STRATEGIC

PLANS ASSESSMENTS• BUSINESS ENVIRONMENT ASSESS-

MENT (COMPETITION, MARKET ANALYSES, NEW TECHNOLOGY, LAW AND REGULATIONS, LOCAL CONTENT REQUIREMENTS)

• INTELLECTUAL PROPERTY VALUATIONS

• PROJECT RISK ASSESSMENTS (CONTRACTUAL, COMMERCIAL AND TECHNICAL)

MARKET STUDIES AND BUSINESS PLANS:• MARKET STUDIES, TAILORED TO

SPECIFIC CUSTOMER (EXISTING & FUTURE) CAPABILITIES

• BUSINESS PLANS• COMPETITION ANALYSES• SWOTS• RISK ASSESSMENT• MARKET VALUE, AND PROSPEC-

TIVE MARKET SHARE ASSESS-MENTS

• P&L FORECASTS• STRATEGIC ADVICE ON HARVEST-

ING OPPORTUNITIES AND ELIMI-NATING RISKS

• LOCAL CONSTRAINTS, CULTURAL/GEOPOLITICAL ISSUES

RISK ASSESSMENTS:• QUALITATIVE RISK ASSESSMENTS

– SECTOR, CORPORATE & PROJECT LEVEL

• QUANTITATIVE RISK ANALYSES - MONTE CARLO-BASED PREDICTIONS OF FAILURES, COST OVERRUNS AND SCHEDULE OVER-RUNS.

SURF

O UMBILICALS O FLEXIBLESO RIGID RISER SYSTEMSO SCR (STEEL CATENARY RISER)O DYNAMIC AND HYBRID RISER

SYSTEMS

FOR RISERS:• WALL THICKNESS SIZING• COATING DETERMINATION• CORROSION ASSESSMENT• WAVE INTERACTION• CLAMP DESIGN AND SPACING• PLATFORM INTERACTION• FATIGUE

FOR HYBRID RISERS INSTALLATION:• DEEPWATER INSTALLATION OF A

SLHR• INSTALLATION OF UPPER/LOWER

RISER ASSEMBLIES• BUOYANCY TANK CONNECTION• LOWERING AND STAB-IN ANALYSIS

FOR STEEL CATENARY RISERS INSTALLATION:• TYPICAL SCR INSTALLATION• DETERMINATION OF PRE-LAY SCR

CONFIGURATION• DETERMINATION OF MAXIMUM

STRESS/STRAIN TENSION AND CLEARANCE DURING INSTALLA-TION

• RECOVERY AND KEEL-HAUL ANALYSES INSTALLATION SEQUENCE DETERMINATION

• CLASH CHECK STUDIES

PLATFORMS

O FIXED OR FLOATING O FROM CONVENTIONAL JACKETS/

TOPSIDES TO GBS, SPAR AND TLP

FOR PLATFORMS INSTALLATION:• REVIEW STRUCTURAL DESIGN JACKET INSTALLATION• SPECIAL OPERATIONS LIKE THE HOOK-UP OF PRE-LAID MOORINGS LINES TO A HEAVY TRANSPORT VESSEL (HTV)

TO ENABLE A SAFE TRANSFER OF TOPSIDE TO A PRE-INSTALLED JACKET. INCLUDES PRE-LAY, TESTING AND HOOK-UP PROCEDURES OF THE PRE-LAID MOORING SPREAD AND UNMOORING AND RECOVERY PROCEDURES

SUBSEA STRUCTURES FOR STRUCTURES:• WELLHEADS• TREES• TEMPLATES• MANIFOLDS• JUMPERS• SPOOL PIECES• SUBSEA ISOLATION

VALVES

• PIPELINE HEADS • PROTECTION FRAMES• PLEMS • PLETS • ILTS• CROSSINGS • MATTRESSES

FOR SPOOL PIECES:• WALL THICKNESS SIZING• COATING DETERMINATION• FLANGE SIZING

FOR PROTECTION FRAMES:• STRUCTURAL DESIGN• PROTECTION FRAME DESIGN• GRAVITY-BASED OR PILED

DECOMMISSIONING (CONCEPTUAL) ENGINEERING & DESIGN FOR:• PREPARATORY AND REMOVAL WORKS• HEAVY LIFTING• TRANSPORT & LOAD-OUT• MARINE ACTIVITIES

DRAFTING AND ENGINEERING SOFTWARE INCLUDES – ORCAFLEX (FULLY 3D FINITE ELEMENT PROGRAM, STATIC AND DYNAMIC ANALYSES, WIDE RANGE OF OFFSHORE SYSTEMS, INCLUDING RISERS (RIGID AND FLEXIBLE), INSTALLATION SUBSEA EQUIPMENT AND MOORINGS), OFFPIPE (FULLY 2D FINITE ELEMENT PROGRAM, STATIC AND DYNAMIC PIPELAY ANALYSES, BROAD RANGE OF LAY BARGE AND STINGER CONFIGURATIONS, INCLUDING CONVENTIONAL PIPELAY AND J-LAY), FEM AND CAD (SOLID WORKS, AUTOCAD, ANSYS, MATHCAD)

SERVICES/DELIVERABLES

EXPERTISE

OVERVIEW & KEYWORD MATRIX OF EXPERTISE AND SERVICES

Page 4: OI BROCHURE_2016

SERVICES

OFFSHORE INDEPENDENTS IS RENOWNED FOR ITS OFFSHORE

CONSTRUCTION EXPERIENCE WHICH IS BEING APPLIED

THROUGHOUT THE FEASIBILITY, DEFINITION AND EXECUTION

PHASES OF PROJECT DEVELOPMENT AND, ONCE INSTALLED,

DURING OPERATIONS AND EVENTUAL ABANDONMENT.

OUR ENGINEERING SERVICES ENCOMPASS CONCEPT SELECTION

AND DESIGN, PROJECT DEVELOPMENT STUDIES, FEASIBILITY

STUDIES (COMMERCIAL AND TECHNICAL), (PRE-)FEED STUDIES,

INSTALLATION AND CONSTRUCTION STUDIES INCLUDING

INSTALLATION ANALYSES, METHOD STATEMENTS, PROCEDURES,

AND INSTALLATION ENGINEERING.

OUR TENDERING SUPPORT SERVICES ARE AIMED AT

OPTIMAL ALIGNMENT OF THE PROJECT EVENTS, MITIGATING

(INTERFACE) RISKS AND MANAGING CAPITAL EXPENDITURE.

WE DELIVER FUNCTIONAL ADVICE AND DOCUMENTATION THAT

COVER ALL TECHNICAL, COMMERCIAL AND ADMINISTRATIVE

REQUIREMENTS AS THE BASIS FOR AN EFFICIENT PROJECT

EXECUTION.

FOR OPERATIONAL SUPPORT, WE MOBILIZE OUR TEAMS

TO ASSIST IN DEVELOPING PRACTICAL, COMPREHENSIVE

PROCEDURES, WORK METHODS AND SCHEDULES, BUT ALSO

TO PROVIDE SUBCONTRACTOR LIAISON AND PROCUREMENT

SUPPORT, QHSE, QA/QC, TECHNICAL WITNESSING AND

WARRANTY SURVEY EXPERTISE.

PROJECT MANAGEMENT FOR US, IS DEFINED AS THE PLANNING,

ORGANIZING, SECURING, MANAGING AND CONTROLLING

OF RESOURCES TO ACHIEVE A SPECIFIC SET OF GOALS. THIS

APPLIES TO ANY TYPE OF ASSIGNMENT WITHIN OUR FIELDS

OF EXPERTISE, ENTAILING PLANNING, COST CONTROL, QHSE,

(SUB-) CONTRACTOR MANAGEMENT, INTERFACE MANAGEMENT

OR ANY OTHER RELEVANT DISCIPLINE.

OUR MAIN FOCUS FOR BUSINESS SUPPORT SERVICES IS

TO IDENTIFY AND MINIMIZE RISKS, WHILE OPTIMIZING THE

OPPORTUNITIES RELEVANT TO THE CLIENT´S VENTURE. WE DO

THIS BY PROVIDING LENDER’S ENGINEERING, (TECHNICAL) DUE

DILIGENCE SUPPORT, MARKET STUDIES AND BUSINESS PLANS,

EXPERT WITNESSING, AND QUANTITATIVE AND QUALITATIVE

RISK ASSESSMENTS.

VENEZUELA

PERLA PROJECT

WE PROVIDED ANALYSES, METHOD

STATEMENTS, PROCEDURES &

PROPOSAL OF EQUIPMENT FOR THE

INSTALLATION AND PULL-IN OF 3 FIBER

OPTIC CABLES AND AN UMBILICAL.

WORLDWIDE

UMBILICAL STUDY DCV AEGIR

WE PROVIDED AN UMBILICAL DATA

REPORT AND INSTALLATION STUDY TO

PROVE THE UMBILICAL INSTALLATION

CAPABILITIES FOR THE DCV AEGIR.

KOREA/TAIWAN

PIPELAY SUPPORT LB STINGRAY

WE PERFORMED PROJECT

MANAGEMENT AND PIPELAY

ENGINEERING SERVICES (E.G. PIPE HEAD

DESIGN), DRAFTING SUPPORT, PRE-

COMMISSIONING ENGINEERING AND

OPERATIONAL SUPPORT.

RUSSIA

TENDER SUPPORT FOR SSTTBV/

TURKSTREAM

OUR SCOPE OF WORK CONSISTED

OF VARIOUS ACTIVITIES, SUCH

AS: CONTRACT MANAGEMENT,

PROCUREMENT /TENDER SUPPORT,

CONTRACT NEGOTIATION, RISK

MANAGEMENT, QHSE SERVICES.

IRAQ

SUBSTRUCTURE IN-PLACE ANALYSIS

FOR PLATFORM

WE PERFORMED AN INDEPENDENT

DESIGN REVIEW, ANALYSIS REVIEW,

DOCUMENT CHECK AND ENDORSEMENT

OF THE DETAILED DESIGN OF THE

PLATFORM.

INTERNATIONAL

NORTH SEA

THE NETHERLANDS

FLEXIBLE INSTALLATION

WE PROVIDED INSTALLATION

ENGINEERING SUPPORT INCLUDING

INSTALLATION ANALYSIS, INSTALLATION

PROCEDURES AND INSTALLATION

DRAWINGS.

THE NETHERLANDS

MARKET STUDY

WE PERFORMED A MARKET ANALYSIS,

SWOT ANALYSIS AND A DUE DILIGENCE

ANALYSIS ON AN ASSET.

THE NETHERLANDS

EPRS ADVICE

WE STUDIED AND ADVISED THE BBL

COMPANY WHETHER THE EPRS WAS

SUFFICIENT IN ALL CIRCUMSTANCES.

THE STUDY WAS USED TO UPDATE THEIR

POLICIES & STRATEGIES.

UNITED KINGDOM

PROJECT MANAGEMENT

WE WERE CONTRACTED BY N-SEA

OFFSHORE TO PROVIDE OVERALL

PROJECT MANAGEMENT SUPPORT FOR

SUBSEA ASSETS IN THE UK NORTH SEA

SECTOR.

UNITED KINGDOM

ORCA D18 PIPELINE

WE PERFORMED THE STRESS ANALYSES

FOLLOWING NEN 3650 DURING THE

PICK-UP AND TRENCHING PROCESS OF

THE ORCA D18 PIPELINE.

PLEASE CHECK OUR WEBSITE FOR ALL OUR PROJECTS: WWW.OFFSHOREINDEPENDENTS.COM

ENGINEERING TENDER SUPPORT OPERATIONAL SUPPORT PROJECT MANAGEMENT BUSINESS SUPPORT

Page 5: OI BROCHURE_2016

“SEAWAY HEAVY LIFTING REQUESTED OFFSHORE

INDEPENDENTS TO ASSIST US ON ONE OF OUR RECENT

PROJECTS ON THE ENGINEERING REQUIRED FOR

THE CABLE INSTALLATION AND OFFSHORE SPOOL

PIECE FABRICATION SCOPE, BOTH OF WHICH ARE NOT

CONSIDERED TO BE SHL’S CORE BUSINESS.

OFFSHORE INDEPENDENTS SHOWED FLEXIBILITY AND

GOOD COOPERATION TO ASSIST SEAWAY ON A TIMELY

DELIVERY OF ENGINEERING DOCUMENTATION. THE

“GETTING THE JOB DONE” MENTALITY OF OFFSHORE

INDEPENDENTS MATCHES SHL’S APPROACH AND

RESULTED IN SUCCESSFUL PROJECT FOR SHL AND HER

CUSTOMER.”

HANS VAN MARIS - PROJECT DIRECTOR

SEAWAY HEAVY LIFTING

“FOR A FAST-TRACK TENDER PROCESS, DISA

INTERNATIONAL AND HER CONSORTIUM PARTNERS

RECENTLY ENGAGED OFFSHORE INDEPENDENTS

FOR ENGINEERING SUPPORT. THE KNOW-HOW,

PROFESSIONALISM AND ENTHUSIASM OF OFFSHORE

INDEPENDENTS HAVE MOST DEFINITELY CONTRIBUTED

TO THE TIMELY SUBMISSION OF A COMPREHENSIVE

TENDER PACKAGE.  IT HAS BEEN AN ABSOLUTE

PLEASURE TO COOPERATE WITH OFFSHORE

INDEPENDENTS AND WE LOOK FORWARD TO A

NEXT OCCASION TO MAKE USE OF THEIR EXCELLENT

SERVICES.”

HANS REINIGERT – MANAGING DIRECTOR

DISA INTERNATIONAL

TESTIMONIALS

A T

E

W

NOORDSINGEL 117 3035 EM ROTTERDAM THE NETHERLANDS

+31 (0) 10 737 09 38 [email protected] OFFSHOREINDEPENDENTS.COM