ENVIRONMENTAL REPORT 2014-15
Message From Managing Director---------- 3 Summary of the Company’s Business ------------- 4 Environmental Policy ----------------------------------- 6 Environmental Management Systems ---------7 ~ 11 Environmental Objectives and Achievements ---12 Environmental Impacts and Reduction Measures ---13 ~ 16 Environmental Social Contribution Activities ------ 17 ~18 Period and Items Covered Period covered: Fiscal 2014 (April 2014 to March 2015) Coverage: Environmental aspects of SHARP INDIA LIMITED [SIL]
2
3
I thank you all for referring our Environmental Report for
the year 2014. Since the foundation of Sharp India Limited in the
year 1985 in Pune, India, the company adopted eco-friendly attitude and always tried to create an eco-friendly atmosphere around the factory and surrounding area. Last year we have successfully started manufacturing of Inverter Air Conditioners which are energy efficient & draw only 60-70% of the power as compared to conventional split Air Conditioners. During installation of the new set-up for manufacturing of the Air Conditioners we have taken maximum care to use energy efficient equipment / devices. We will further monitor the performance of the new set-up & continue to incorporate new measures to save the energy & reduce wastage.
During the last year 2014-15, Sharp India Ltd. had taken up various initiatives to reduce CO2 emission/unit, water saving, etc.
Summary of activities is as below – - Environment Day at Factory was celebrated by plantation of
30 nos. of trees in the factory premises. - Total CO2 emission increased due addition of new equipments
for AC ODU PWB manufacturing. - Reduction in Water usage & prevention of water leakages.
Tomio Isogai MANAGING DIRECTOR SHARP INDIA LIMITED
Company Name
SHARP INDIA LIMITED [SIL]
Address GAT NO. 686/4,KOREGAON BHIMA, TALUKA : SHIRUR DIST-PUNE-412216
Managing Director
Mr. Tomio Isogai
Founded JULY,1985 Operations MANUFACTURING OF LED
TV & AIR CONDITIONER Capital stock RUPEES -25,94,40,000/-
Number of Employees
144 AS ON 31-03-2015
4
5
1) Inverter Air Conditioners ( 13K BTU ~ 21.5K BTU ton range)
2) LCD Color Television
6
Sharp India Limited adopts following policy known as “3E " to expand contribution for
environment protection EPP: Eco-positive Product - Products having less usage of resources and are safe for use. EPO: Eco-positive Operation - Reduce adverse impact on environment during manufacturing processes. EPR: Eco-positive Relationship - Enhance corporate value during involvement of employees. Targets will be set up in each of above area and performance will be monitored. We will give consideration of expectations of interested parties and we are committed to comply with legal, regulatory and other requirements.
Mr. T. ISOGAI Managing Director Sharp India Limited
1. Status of ISO 14001 certification
SIL received certification for compliance to ISO14001:2004 7
2. Status of certification from Government Pollution Control board
SIL received consent from Government Pollution control board, to operate the factory for production of CTV, LCD TV & Air Conditioners.
8
Organization structure of Environmental Management System :
• SIL Environment Management System is carried out using top down Management System . • Managing Director is approving the Environment Policy and objectives of the organization. • Environmental Objectives are set and achieved by Quality Executive Team (QET) members guided by respective department Heads on the basic policy. • ISO 14001:2004 Standard followed and maintained by QET members. • There is separate Wastage Management committee for proper disposal of Waste • Legal and other requirement monitored by Management Representative and Secretarial Department in coordination with respective department .
9
Mr. T. Isogai - MD
Mr. Nakagawasai- FD Mr. Kashiwaya- VP Mr. Oka- VP
Mr. R. Gokhale - AVP
Mr. D. Nalawade- Safety
Mr. S.Sane- GM
Mr. S. Khedkar- Safety & Legal
Mr. V. Parekh-Environmental
performance & ISO 14001
Organization structure of Waste Management Committee :
CHAIRMAN Mr. N.S. Kale
GM, Design & Development
Mr. Kashiwaya Vice President
AV Division
Mr. Khedkar Manager
HR/Admin
Mr. Date Dy. Manager
Store
Mr. Sharma Manager Purchase
10
• SIL Waste material management committee taking care of waste disposal process as per regulation eg Waste disposal through Approved agency only
1) Total training programs conducted:- 03Nos. 2)Total participants:- 178Nos. 3) Major Topics covered are a) Safety of Environment, Human evacuation, etc b) Understand the requirements of ISO14001:2004 c) Understand & follow SIL Environmental Management System
Program Target Goal Number of participants
Fire Extinguisher & Fire Hydrant Operating System
Security Personnel (Aug-2014)
Keep Trained Man power for operating fire cease equipment during emergency
33 Nos.
Safety Mock Drill Training
SIL Employees (Sep-2014)
Keep practice of personnel evacuation during emergency situation
140Nos.
ISO14001:2004 standards awareness
New employees (Sep-2014)
Make new employees familiar with SIL Environmental Management System
05Nos.
3. Environmental Education
11
Objectives in Fiscal 2014
Achievements in Fiscal 2014
Result
Eco Positive operation 1) Waste Reduction per production unit by 5%
Waste generated per production unit for year 2013 : 2.11 Kg Target for year 2014 : 2.00 Kg Actual measured : 2.23 Kg COMMENT : Waste increased per production unit as compared with year 2013 because of waste material in rainy season & non moving material waste more
Target not achieved
2) Reduction per production unit on CO2 Emission by 5%
CO2 emission per production unit for the year 2013 : 3.95 Kg Target for year 2014 : 3.75 Kg Actual measured : 3.48 Kg COMMENT : CO2 Emission reduced per production unit as compared with year 2013 because of reduction in Electrically operated conveyors
Target achieved
3) Reduction in water consumption by 5%
Water consumption in year 2013 : 4124 m3
Target for year 2014 : 3918 m3
Actual measured : 3340 m3
COMMENT : Water consumption reduced as compared with year 2013 by replacing leak water taps & close unwanted toilets.
Target achieved
Eco positive Relationship SHARP Bio-diversity activities
Planted 30 nos. of Trees on world Environment day (5th June).
Target achieved
12
COMMENTS & OBSERVATIONS : CO2 emission per set is reduced as compare to previous year, but total
CO2 emission increased, since 1) Addition of new process ie AC ODU PWB in-house Production is
started 2) New equipments are installed eg Wave soldering machine, AI
machines 3) Production Qty. increased by 35.7% in 2014~15
Target not achieved
(Target : Reduce CO2 emission by 5%as
compare to last year)
1. Reduction of CO2 Emissions
13
44
4.1
51
0.3 60
6.3
200.0300.0400.0500.0600.0700.0
2012 2013 2014
Total CO2 emission (ton)
ACTUAL TARGET
Item 2013 2014
Qty. CO2 Qty. CO2
Electricity 503705 kWh
475.497 ton 597869 kWh
564.388
Light Oil 6420 liter 17.179 ton 8540 liter 22.853 ton
LPG 5468 kg 17.601 ton 5933 kg 19.099 ton
Total 510.277 ton
606.34 ton
COMMENTS & OBSERVATIONS : Waste generation increased in 2014 due to 1) Waste material wet in rainy season, since
waste material store in Open area 2) New equipments eg Wave soldering machine,
AI machines, etc packaging waste 3) AC ODU PWB raw material packaging waste
generation started from this year 4) Non moving, design samples waste 5) All waste sale to MPCB approved supplier for
reuse or recycle
Target not achieved (Target : Reduce waste
generation by 5% as compare to last year)
2. Minimization and Recycle of Waste
14
160.6
272.3
387.7
100.0
200.0
300.0
400.0
2012 2013 2014
Total Waste generation (Kg)
Actual Target
COMMENTS & OBSERVATIONS : Water consumption is reduced than last year by 1)Unwanted toilets use stopped 2)Stopping water leakages ie defective water taps
replaced
Target achieved (Target : > 5%)
3. Reduction of Water Usage
15
52404124 3340
2000
3000
4000
5000
6000
7000
2012 2013 2014
Water consumption comparison
Actual Target
4. Compliance with Environmental Regulations
Item Qty. Regulation level Measurement in Fiscal 2014
Diesel Generator Emission
3 nos. 150mg/m3 17mg/m3
Lead free wave solder m/c emission
1 no. 150mg/m3 12mg/m3
Atmosphere Emissions
Pollutant Loads of Public Water Areas: No discharge of treated water to any water stream/river By SIL.
Item Qty. Regulation level Measurement in Fiscal 2014
NA NA NA NA
Soil Pollution, Noise, Vibration, Offensive Odors etc. Item Qty. Regulation level Measurement in
Fiscal 2014
NOISE 75dB Within limit
16
17
Refer Next page for photographs of the above activities.
SHARP – Bio-diversity activities
Social activities
Tree plantation was done on World Environmental Day-30 Nos.
18 Tree Plantation In Factory Premises
SHARP INDIA LIMITED GAT NO. 686/4, KOREGAON BHIMA,TAL-SHIRUR,
DIST: PUNE: PIN 412 216 PHONE : (02137) 252417 EXT : 432
FAX : (02137) 252453 Mobile : + 91 9850166454
contact Email : [email protected] website: www.sharpindialimited.com
19
Thank you