Project Specific Plan Review
Project Name: _____________________________________ UM Project Manager: ________
Contractor Firm: ___________________________________
Item Meets Incomplete or
N/A Item Meets Incomplete or
N/A
Accountability Policy Fire Prevention and Protection
Accident/Incident Reporting Extinguishers (where, how many, type)
Audits/Inspections – Example format Inspection Policy
Weekly and Documented Hot Work Permit Process
Applicability to Subcontractors Flammable Liquid Storage
Cell Phone Usage Policy Forms (Accident Investigation, JSA, etc.)
Designated Areas for Usage Housekeeping
Communication No Walkway Storage
Daily Huddles/Safety Meetings Emergency Action Plan
How are they documented Evac. Plans for Site
Applicability to Subs. Emergency Numbers/Contact List
UM TIP Line Information Hospital/Clinic Location
Location of Job Safety Board UM Reporting Requirements
Orientation First Aid Kit Location
Review of Orientation Material Job Hazard Analysis – Example format
Process to Verify Workers Attend Policy for Communication
Visitor Policy PPE
Crane Safety and Rigging Hard Hat, Safety Glasses,
Annual Inspection Long Pants, Sleeved Shirt, Work Boots
CCO Operator Project Safety Personnel
Electrical Safety Safety Representatives (incl. subs)
GFCI usage 30 Hour Training Requirement
Extension Cord Policy 1st
Aid/CPR Training
LOTO Policy Protection of the Public
NFPA 70E Requirements Site Logistic Plan
Environmental Smoking Policy
Soil Erosion/Sediment Control Plan Substance Abuse Policy
Spill Response Plan 3rd
Party Administrator
Spill Kit Location 9 Panel Minimum
Chemical Storage and Disposal Verification of Worker Compliance
Asbestos/Lead Pass/Fail Criteria
Hazard Communication Policy Task Specific Elements:
Equipment Safety Concrete
Training verification – List Equipment Demolition
Inspection requirements/Tagging Roofing
Fall Protection Steel Erection
6 Foot Fall Policy Trenching
Roofing, Steel Erection & Scaffolding Temporary Elevator Operation
Comments:
Status of Plan: __________________________________________________________________________
_______________________________ Reviewed by U-M OSEH Date