2
Circle Radio Network Utilizatio n (during BBH) [Erlang Carried/T otal Cap] in %] % Cells having utilization > = 90% (during BBH) % Cells having utilization <= 30% (during BBH) Network Availability (Switch - MSS/MSC) (during 24 hrs.) in % Network Availability (Radio) (during 24 hrs.) [Based on cumulative BTS down time] in % Call Setup Success Rate (24 hrs.) in % Call Setup Success Rate for Bottom 20 Cells in % Call Drop Rate in % Handover Success Rate in % Peak Gb Utilisation in % Least Gb Utilisation in % Peak IuPS utilization in % Least IuPS utilization in % % Cells having PDCH / Radio Bearer Utilization > = 90 (during BBH) % Cells having PDCH / Radio Bearer Utilization < = 30 (during BBH) Attach Success Rate excluding unregister ed subs 24 Hrs. in % PDP Context Activation Success Rate (Only NW Cause codes) in % Date of Report Date of Submissio n Name and Mob of the Officer submitting the Data UP West 48.06 9.64 18.34 100 98.64 98.24 54.12 1.29 91.52 50.13 21.15 16.92 3.41 1.19 38.76 96.05 95.05 31-Mar-14 1-Apr-14 Sk Jain/ 9412783040 KPI for CMTS QoS Dated 31-03-2014 NB: You are requested to submit the Data using the link Below or by sending a mail in this excel file to [email protected] https://docs.google.com/forms/d/1n2BZpquclyqyBmSH_zuqfeHBKndbl0ImAOhsgDj1FyU/viewform

QoS_Proforma_DirCM_1_12.05.2014

Embed Size (px)

Citation preview

Page 1: QoS_Proforma_DirCM_1_12.05.2014

Circle Radio

Network

Utilizatio

n (during

BBH)

[Erlang

Carried/T

otal Cap]

in %]

% Cells

having

utilization

> = 90%

(during

BBH)

% Cells

having

utilization

<= 30%

(during

BBH)

Network

Availability

(Switch -

MSS/MSC)

(during 24

hrs.) in %

Network

Availability

(Radio)

(during 24

hrs.)

[Based on

cumulative

BTS down

time] in %

Call Setup

Success

Rate (24

hrs.) in %

Call Setup

Success

Rate for

Bottom 20

Cells in %

Call Drop

Rate in %

Handover

Success

Rate in %

Peak Gb

Utilisation

in %

Least Gb

Utilisation

in %

Peak IuPS

utilization

in %

Least

IuPS

utilization

in %

% Cells

having

PDCH /

Radio

Bearer

Utilization

> = 90

(during

BBH)

% Cells

having

PDCH /

Radio

Bearer

Utilization

< = 30

(during

BBH)

Attach

Success

Rate

excluding

unregister

ed subs

24 Hrs. in

%

PDP

Context

Activation

Success

Rate

(Only NW

Cause

codes) in

%

Date of

Report

Date of

Submissio

n

Name and Mob of the

Officer submitting the

Data

UP West 48.06 9.64 18.34 100 98.64 98.24 54.12 1.29 91.52 50.13 21.15 16.92 3.41 1.19 38.76 96.05 95.05 31-Mar-14 1-Apr-14 Sk Jain/ 9412783040

KPI for CMTS QoS Dated 31-03-2014

NB: You are requested to submit the Data using the link Below or by sending a mail in this excel file to [email protected]

https://docs.google.com/forms/d/1n2BZpquclyqyBmSH_zuqfeHBKndbl0ImAOhsgDj1FyU/viewform

Page 2: QoS_Proforma_DirCM_1_12.05.2014

Circle Radio

Network

Utilization

(during

BBH)

[Erlang

Carried/T

otal Cap]

in %]

% Cells

having

utilization

> = 90%

(during

BBH)

% Cells

having

utilization

<= 30%

(during

BBH)

Network

Availability

(Switch -

MSS/MSC)

(during 24

hrs.) in %

Network

Availability

(Radio)

(during 24

hrs.)

[Based on

cumulative

BTS down

time] in %

Call Setup

Success

Rate (24

hrs.) in %

Call Setup

Success

Rate for

Bottom 20

Cells in %

Call Drop

Rate in %

Handover

Success

Rate in %

Throughp

ut of all

Gb Links

(in Gbps)

During

Peak

Time

Total

Capacity

of all Gb

Links (in

Gbps)

Throughpu

t of all

IuPS Links

(in Gbps)

During

Peak Time

Total

Capacity

of all IuPS

Links (in

Gbps

% Cells

having

PDCH /

Radio

Bearer

Utilization

> = 90

(during

BBH)

% Cells

having

PDCH /

Radio

Bearer

Utilization

< = 30

(during

BBH)

Attach

Success

Rate

excluding

unregister

ed subs

24 Hrs. in

%

PDP

Context

Activation

Success

Rate (Only

NW

Cause

codes) in

%

Date of

Report

Date of

Submissio

n

Name and Mob of the

Officer submitting the

Data

UP West 47.65 9.00 18.19 100 98.23 97.72 48.39 0.92 91.16 0.0967 0.2335 0.2782 1.21 1.28 39.93 98.83 95.81 5/11/2014 5/12/2014 Sk Jain/ 9412783040

UP West 45.15 9.58 17.23 100 98.83 95.18 49.44 1.2 92.34 0.0980 0.2335 0.2674 1.21 1.19 36.89 99.01 94.8 5/10/2014 5/11/2014 Sk Jain/ 9412783040

UP West 44.93 9.77 18.09 100 98.68 97.63 51.04 1.07 92.07 0.0976 0.2335 0.2536 1.21 1.24 35.96 98.84 95.31 5/9/2014 5/10/2014 Sk Jain/ 9412783040

UP West 47.02 8.78 17.46 100 98.20 95.37 51.67 1.03 92.11 0.0972 0.2335 0.2806 1.21 1.13 36.52 98.88 95.41 5/8/2014 5/9/2014 Sk Jain/ 9412783040

UP West 46.32 9.62 18.29 100 98.72 98.25 48.65 0.96 91.29 0.0959 0.2335 0.2723 1.21 1.29 38.2 98.80 94.72 5/7/2014 5/8/2014 Sk Jain/ 9412783040

UP West 46.98 9.23 17.75 100 98.27 98.23 51.46 0.96 92.36 0.1018 0.2335 0.3107 1.21 1.28 39.45 99.10 95.38 5/6/2014 5/7/2014 Sk Jain/ 9412783040

UP West 44.69 8.55 17.8 100 98.12 97.93 49.39 0.9 91.95 0.0951 0.2335 0.2847 1.21 1.29 36.33 98.90 94.96 5/5/2014 5/6/2014 Sk Jain/ 9412783040

KPI for CMTS QoS -April'14

NB: You are requested to submit the Data using the link Below or by sending a mail in this excel file to [email protected]

https://docs.google.com/forms/d/1n2BZpquclyqyBmSH_zuqfeHBKndbl0ImAOhsgDj1FyU/viewform