Upload
truongdiep
View
223
Download
0
Embed Size (px)
Citation preview
1
Subandono-DKP
Oleh:Dr,Ir. Subandono Diposatono, MEng
KEPALA SUBDIT MITIGASI BENCANA DAN PENCEMARAN [email protected] Hp. 081585659073
Subandono-DKP
TSUNAMI
Tsunami adalah gelombang laut denganperiode panjang yang ditimbulkangangguan impulsif yang terjadi padamedium laut. Gangguan impulsif itubisa berupa gempa bumi tektonik, erupsi vulkanik, atau longsoran (land-slide).
2
Subandono-DKP
TATANAN TEKTONIK WILAYAH INDONESIA
LEMPENG SAMUDERA HINDIA LEMPENG INDO AUSTRALIALEMPENG INDO AUSTRALIA
LEMPENG EURASIALEMPENG EURASIA
LEM
PENG
PAS
IFIK
LEM
PENG
PAS
IFIK
Subandono-DKP
TEKTONIK DI DAERAH INDONESIA
LempengAustralia
JawaPapua
Kalimantan
Lempeng Indo-Autralia
LempengPhilippine Sea
LempengPasifik
LempengEurasia Molucca
Sulawesi
Bali
Asia
Subduksi Sunda
Banda Arc
90 E
15 N
Sesar Sumatra
Sumatra
RAWAN GEMPA, TSUNAMI DAN GUNUNG MELETUS
Sesar flores
Sesar Palu-Koro
3
Subandono-DKP
PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004)
LEMPENG EURASIA
LEMPENG INDO-AUSTRALIA 6 cm/tahun
LEMPENG PHILIPPINE8 cm/tahun
LEMPENG PASIFIK12 cm/tahun
< 50 Km50–100 Km100-200 Km
200-300 Km>300 Km
Kedalaman :
Subandono-DKP
Normal Fault/Sesar turun Reverse Fault/Sesar Naik Sesar Horisontal
TSUNAMI AKAN TERJADI BILA :• >6,5 SR• Pusat Gempa <60 km dari dasar laut• Gempa dengan patahan vertikal dan deformasi vertikal dasar laut relatifbesar
JENIS PATAHAN
4
Subandono-DKPMEKANISME TERJADINYA TSUNAMI
Lempeng benuaEurasia
Lempeng samuderaIndo-Australia
• Lempeng Samudra Indo Australia bergeak terus menerus menghunjam ke lepeng benua Eurasia.• Bagian ujung lempeng benua Eurasia tertarik turun secara berangsur-angsur sehingga terjadi akumulasi tegangan..
• Ketika tegangan itu mencapai batas maksimum maka ujung lempeng samudra melenting ke atas dan mengakibatkan terjadinya gempa.
Pertemuan Lempeng
Laut Laut
Tsunami
Subandono-DKP
DISTRIBUSI GUNUNG BERAPI DI INDONESIA DISTRIBUSI GUNUNG BERAPI DI INDONESIA
DIREKTORAT JENDERAL GEOLOGI DAN SUMBERDAYA MINERALDEPARTEMEN ENERGI DAN SUMBER DAYA MINERAL
5
Subandono-DKP
TSUNAMI KARENA VULCANIC
9%
Subandono-DKP
PETA LOKASI GEMPA BUMI YANG MENGAKIBATKAN TSUNAMI DI INDONESIA (1600-2006)
43
21
Intesitas Tsunami:
Vulcanic TsunamiLandslide TsunamiEarthquake Tsunami
90.5%
8.5% 1%
108 tsunami
197719942006
1907
2004
1921
?
LEMPENG EURASIA
1833
LEMPENG INDO-AUSTRALIA
2005
?
? ?
LEMPENG PASIFIK
1992
19961968
1996
200035
32
18
11
93
6
Subandono-DKP
TSUNAMI DI INDONESIA (1960-2006)No. TAHUN PUSAT GEMPA RUN-UP
MAKSIMUM (m)JUMLAHKORBAN(meninggal/luka)
DAERAH BENCANA
1. 1961 8,2 LS; 122BT Tidak ada data 2/6 NTT, Flores Tengah
2. 1964 5,8 LU; 95,6 BT Tidak ada data 110/479 Sumatra
3. 1965 2,4 LS; 126 BT Tidak ada Data 71 meninggal Maluku, Seram, Sanana
4. 1967 3,7 LS; 119,3 BT Tidak ada Data 58/100 Tinambung Sulsel
5. 1968 0,7 LU; 119,7 BT 8 - 10 392 meninggal Tambo Sulteng
6. 1969 3,1 LS; 118,8 BT 10 64/97 Majene Sulsel
7. 1977 11,1 LS; 118,5 BT Tidak ada data 316 meninggal NTB, Pulau Sumbawa
8. 1977 8 LS; 125,3 BT Tidak ada data 2/25 NTT, Flores, P. Atauro
9. 1979 8,4 LS; 115,9 BT Tidak ada data 27/200 NTB,Sumbawa,Bali,Lombok
10. 1982 8,4 LS; 123 BT Tidak ada data 13/400 NTT,Larantuka
11. 1987 8,4 LS; 124,3 BT Tidak ada data 83/108 NTT, Flores Timur, P. Pantar
12. 1989 8,1 LS; 125,1 BT Tidak ada data 7 meninggal NTT, P. Alor
13 1992 8,5 LS; 121,9 BT 11,2 – 26,2 1952/2126 NTT,Flores, P. Babi
14. 1994 10,7 LS; 113,1 BT 19,1 38/400 Banyuwangi Jatim
15. 1996 1,1 LS; 118,8 BT Tidak ada data 3/63 Palu Sulteng
16. 1996 0,5 LS; 136 BT 13,7 107 meninggal P. Biak, Irian Jaya
17. 1998 2,02 LS; 124,87 BT 2,75 34 meninggal Tabuna Maliabu Maluku
18 2000 0,6 LU; 119,92 BT 3,0 2 Banggai
19 2004 3,298 LU; 95,6 BT 34.5 >300.000 NAD, Sumut,
20 2005 2,065 LU; 97,01 BT 3.5 Tidak ada data Nias
21 2006 9,4 LS; 107,2 7,6 >668 Jabar, Jateng, DIY
Subandono-DKP
Fault
Trench
Pesisir rawan tsunami
Daerah Rawan Tsunami di Indonesia
7
Subandono-DKP
PANTAI DENGAN BENTUK MENYERUPAI GIGI GERGAJI (SAWTOOTH)DENGAN BENTUK “V” (“V’ SHAPE)
NAD
Subandono-DKPGREEN LAW
8
Subandono-DKP
headlandbay
Contour line of sea depth
Wave ray
bay
refraction
reflection
Subandono-DKP
BANGUNAN DENGAN BANYAK PINTU DAN JENDELA RELATIF AMAN TERHADAP TSUNAMI
Mosque at Ujung Pancu
Mosque at Lampeuk, Lhok Nga
Mosque still withstood
Other Mosque
Direct tsunami impact
9
Subandono-DKP
GREENBELT DAPAT MEREDAM TSUNAMI
KERRY SHIEH©2005
Of Dec.26 2004 Earthquake & Tsunami
Subandono-DKP
Arah aliran
Rumah Panggung Aman terhadap GempuranTsunami
10
Subandono-DKP
Bangunan dengan Posisi Tegak lurus GarisPantai relatif aman terhadap tsunami
Cilacap Windarapayung Wetan
Garis pantaiDarat
Laut TSUNAMI TSUNAMI
Stream line
WC Komunal
Bangunan sejajar pantaiBangunan tegak lurus pantai
Subandono-DKP
Sand dunes (gumuk pasir) efektif meredam tsunami
11
Subandono-DKP
BUKIT TEMPAT YANG BAIK UNTUK EVAKUASI
Banyak orangmeyelamatkan diridengan mobilmeninggal.
Sedangkan yang naik kebukit selamat
Subandono-DKP
UPAYA MITIGASI BENCANA SECARA MENYELURUHUPAYA MITIGASI BENCANA SECARA MENYELURUH
UPAYA STRUKTUR (Fisik)METODE PERLINDUNGAN ALAMI
(Mangrove, sand dune, terumbu karang,Hutan (penghijauan)).
METODE PERLINDUNGAN BUATAN• breakwater, tembok laut, tanggul,
konstruksi pelindung, Bangunanpengendali, rumah panggung, Instalasi
pengolah limbah• Terumbu buatan• struktur tahan bencana:
- sisi panjang dari struktur sedapatmungkin diarahkan sejajar denganantisipasi arah penjalaran gelombang.
- Shear wall dan lateral bracingditempatkan searah dengan penjalarangelombang
- lantai terbawah dari bangunan dibuatterbuka
UPAYA STRUKTUR (Fisik)METODE PERLINDUNGAN ALAMI
(Mangrove, sand dune, terumbu karang,Hutan (penghijauan)).
METODE PERLINDUNGAN BUATAN• breakwater, tembok laut, tanggul,
konstruksi pelindung, Bangunanpengendali, rumah panggung, Instalasi
pengolah limbah• Terumbu buatan• struktur tahan bencana:
- sisi panjang dari struktur sedapatmungkin diarahkan sejajar denganantisipasi arah penjalaran gelombang.
- Shear wall dan lateral bracingditempatkan searah dengan penjalarangelombang
- lantai terbawah dari bangunan dibuatterbuka
UPAYA NONSTRUKTUR (Non Fisik), a.l:• PEMBUATAN PETA RAWAN BENCANA• PERATURAN PERUNDANGAN* SISTEM PERINGATAN DINI * PEMINDAHAN/RELOKASI* TATA RUANG, TATA GUNA LAHAN, ZONASI * PENETAPAN SEMPADAN PANTAI dansungai* INFORMASI PUBLIK & PENYULUHAN• PENEGAKAN HUKUM,• PELATIHAN DAN SIMULASI MITIGASI BENCANA,• AMDAL• Integrated Coastal and Ocean Management• Pengentasan Kemiskinan
UPAYA NONSTRUKTUR (Non Fisik), a.l:• PEMBUATAN PETA RAWAN BENCANA• PERATURAN PERUNDANGAN* SISTEM PERINGATAN DINI * PEMINDAHAN/RELOKASI* TATA RUANG, TATA GUNA LAHAN, ZONASI * PENETAPAN SEMPADAN PANTAI dansungai* INFORMASI PUBLIK & PENYULUHAN• PENEGAKAN HUKUM,• PELATIHAN DAN SIMULASI MITIGASI BENCANA,• AMDAL• Integrated Coastal and Ocean Management• Pengentasan Kemiskinan
MENGURANGI BESARNYA KERUGIAN AKIBAT BENCANA TERKAIT DENGAN LAUT
MENGURANGI BESARNYA KERUGIAN AKIBAT BENCANA TERKAIT DENGAN LAUT
12
Subandono-DKP
PEMETAAN DAERAH RAWAN BENCANA
Subandono-DKP
RISK =(RESIKO)
HAZZARD (BAHAYA) X VULNERABILITY (KERENTANANAN)
• CATATAN SEJARAH • SURAT KABAR (BERITA)• TIDE GAUGE, AWLR• TINGGI GELOMBANG DLL• RUN-UP• STATISTIK
• LINGKUNGAN• INFRASTUKTUR• BANGUNAN• TOPOGRAFI• HIDROGRAFI• MORFOLOGI• SOSIAL, DEMOGRAFI, EKONOMI
• KATALOG• SUMBER PEMBANGKIT • PETA WAKTU TIBA
• PENANGGULANGAN BENCANA (DISASTER MANAGEMENT)
• EMERGENCY MANAGEMENT• LOCAL RESPONSE
RISK ASSESSMENT – ZONATION MAP
MITIGATION
PENDEKATAN DALAM PENGKAJIAN RESIKO BENCANA
13
Subandono-DKP
Studi Literatur danInventarisasi Data
Data Meteorologi :Data AnginCurah Hujan
Historikal Data :Tsunami, Banjir
Peta TematikSosial, Demografi
EkonomiLingkungan,
morfologi
Data TopografiData Oseanografi :BatimetriPasang SurutData PengamatanGelombang
Digitasi Peta danPenyusunan Basis
Data DaerahRawan Bencana
Data Geologi :Hidrologi
Peta DasarPeta Tematik
Survei Lapangan
Model Numerik :Tsunami, Banjir, SLR, Gelombang Pasang
Sistem Informasi Geografis dan Basis Data Daerah Rawan Bencana
Mitigasi Bencana
Peta LingkunganRawan Bencana
BAGAN ALIR
Subandono-DKPCONTOH PEMETAAN TSUNAMI
14
Subandono-DKP
CARA UNTUK MELAKUKAN PRAKIRAAN GENANGAN TSUNAMI
防波堤、防潮堤、陸閘、水門等の効果を評価できる。
2~3m1~2m0~1m
地点ごとの水位が計算され、浸水深データが得られる。
全地点が同水位と仮定。(レベル湛水)
建物等による低減効果は反映されない。
青破線:数値シミュレーションによる浸水域
防潮堤、陸閘、水門等は水位と天端高の大小として評価。
防波堤による低減効果は反映されない。
水の勢いによる浸水域の拡大は反映されない。
越波、越流量と湛水量が等しくなる等高線までを浸水域として設定
SimulasiModel Run-up
Pendekatansamaelevasi air
Data historisberdasarkancatatan
○○地震津波以降に整備された防波堤、防潮堤、陸閘、水門等の効果は反映されない。
当時1階の屋根まで浸水
既往地震津波が最悪最大の浸水域・浸水深(外力レベル3)とは限らない。
青破線:数値シミュレーションによる浸水域
○○地震津波(xxxx年)の推定浸水域
浸水深は当時の記録がある場所のみ。
現在の地形形状が反映されていない。
Subandono-DKP
15
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai NTT akibat tsunami gempa bumi Jawa Timur tahun 1994
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai selatan Jawa Timur karenatsunami gempa bumi Jawa Timur tahun 1994
16
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai selatan Bali karenatsunami gempa bumi Jawa Timur tahun 1994
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai Banggai karena tsunami gempa bumi Flores tahun 1992
17
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai Sulawesi Tengah karenatsunami gempa bumi Sulawesi Tengah tahun 1996
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai Biak karena tsunami gempa bumi Biak 1996
18
Subandono-DKP
Pengamatan tinggi run-up tsunami di pantai Banda Aceh dan AcehBesar karena tsunami gempa bumi Sumatera 2004
Subandono-DKP
19
Subandono-DKP
0
1
2
3
4
5
6
7
8
107.6 107.8 108 108.2 108.4 108.6 108.8 109 109.2 109.4
Tsun
ami H
eigh
t & G
roun
d El
evat
ion
(m)
*1Garut, *2Cipatatujah, *3Cikalong, *4Cimerak, *5Parigi, *6Pangangaran, *7Cilacap, *8Kesugihan, *9Binangun, *10Jetis
2*1
Biru: Tinggi Tsunami, Oranye: Elevasi Tanah, Angka Merah: Korban Jiwa
7*2 49*3 87*4
31*5
137*6 15*72*8
61*9
Gambar Ketinggian Tanah dan Tsunami diukur dari Muka Air Laut saat Sebelum Tsunami
Ting
gi T
suna
mi d
an T
ingg
iPer
muk
aan
Tana
h(m
)
1*10
DKP-PARI-JSCE
TINGGI RUN-UP TSUNAMI JAWA BARAT 2006
Subandono-DKP
20
Subandono-DKP
Subandono-DKPDanny, 2002
Peta Daerah Rawan Bencana Tsunami Kota Padang
Peta Daerah Rawan Bencana Tsunami Kota Padang
Catatan Historis Kejadian Tsunami di SekitarSumatera
21
Subandono-DKP
SOURCE MODEL Fault Parameter : Sumatera Tsunami 1833
Pembangkitan Tsunami : Masinha, L and Smylie, D.E, 1971Penjalaran Tsunami : TUNAMI N1, N2, Tohoku University Numerical Analysis for TsunamiInundasi Tsunami : Pendekatan kesamaan level air di bibir pantai
INUNDATIONNON LINEAR MODEL
LINEAR MODEL
Daerah PerairanDangkal Laut dalam
MORE THAN 50 M
No SimulationFault
Length(m)
FaultWidth (m)
DipDirection
(o)
DipAngle
(o)
Slip Angle
(o)
Dislocation(m)
Depth (m)
A Tsunami 1833 420x 103 135 x 103 150 60 99 8 103
Subandono-DKP
Tinggi Tsunami (meter)
MENIT KE 0
Sumatera
Tsunami SUMATERA 1833
ANIMASI
22
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 5
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 10
23
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 15
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 20
24
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 25
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 30Padang
25
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 35Padang
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 40Padang
Padang
26
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 45Padang
Padang
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 50Padang
Padang
27
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 55Padang
Padang
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 60Padang
Padang
28
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 65Padang
Padang
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 70Padang
Padang
29
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 75Padang
Padang
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 80Padang
Padang
30
Subandono-DKPSum
atera
Elevasi (meter)
Menit ke 85Padang
Padang
Subandono-DKP
Sumatera
Elevasi (meter)
Menit ke 90Padang
Padang
31
Subandono-DKP
Hasil
• Tsunami sampai Kota Padang 35 – 40 minutes
• Sebelum mencapai Kota Padang teredamoleh Pulau Mentawai
• Maximum Run-up : 5.2 meter
Subandono-DKP
Inundadted by 5m tsunami:-80 km road-34 government office-2410 houses-13 hospital and clinic-60 school-Paddy field
Tsunami Hazard Map in Padang City, West S t
same level approximation H=5m
32
Subandono-DKP
FrameworkDistance from coastline
Distance from river
Topography/elevation
Total population
Female population
Dependent group
Physical vulnerability
Fishermen population
Poor people population
Social vulnerability
Economic vulnerability
Inundation Map
5 m height scenario
Elevation Data
Elevation DataSRTM
Contour Map
Place Vulnerability
Inundation Depth/Hazard
Tsunami Risk
Analysis of Risk
Special sites and lifelines
Hospital, PrisonKindergarten SchoolBasic schoolVillage with disable population
Economic variable in risk
Traditional marketBusiness centerCompaniesEconomic sector
Social variable in risk
Number of populationFemale populationDependent group
Building and Infrastructure in Risk
BuildingsRoads, bridgeHospitalSchoolsOffices
Hazard Analysis
AreaAdministration
You can add :-Building condition-Coastal protection--other communities
Numerical Simulation
Subandono-DKP
Hazard (Inundated) Delineation
9
;
Z
INDIAN OCEAN
µ0 1 20.5
Kilometers
Legendvery high inundated area (5 - 3 m)
High inundanted area (3 - 1 m)
Low inundated area (1 - 0 m)
Not inundated
6 sub districts
34 villages
4,835 ha
33
Subandono-DKP
Subandono-DKP
VULNERABILITY
Physic
9
;
Z
INDIAN OCEAN
0 1 20.5Kilometers
µ
LegendRiver
Z Airport
; City_hall
9 Governor
LOWER
HIGHER
• most of the city are below 5 m
• elevation and distance from coastline are main factors
34
Subandono-DKP
VULNERABILITY…cont
Social Economy
9
;
Z
INDIAN OCEAN
µ0 1 20.5
Kilometers
LegendZ Airport
; City_hall
9 Governor
LOWER
HIGHER
9
;
Z
INDIAN OCEAN
µ0 1 20.5
Kilometers
LegendZ Airport
; City_hall
9 Governor
LOWER
HIGHER
Pasir Nan Tigo
ParupukTabing
21423
Population
10796
Female
4570
Dependent
554
Poor Family
640
Fishermen
Subandono-DKP
RISK DISTRIBUTION
9
;
Z
Koto Tangah
Kuranji
Nanggalo
Padang Timur
Padang Utara
Lbk Begalung
Pauh
Pdg Selatan
Padang Barat
INDIAN OCEAN
µ0 1 20.5
Kilometers
LegendRiver
Z Airport
; City_hall
9 Governor
LOWER
HIGHER
Subdistrict Boundary
Areas with very high and high risk cover 6 sub districts and 20 villages
Social Variables at Risk
0
10000
20000
30000
40000
50000
60000
70000
KotoTangah
Nanggalo PadangBarat
PadangTimur
PadangUtara
PdgSelatan
PopulationFemaleDependent
Economic Variables at Risk
0
500
1000
1500
2000
2500
3000
3500
KotoTangah
Nanggalo PadangBarat
PadangTimur
PadangUtara
PdgSelatan
Poor FamilyFishermen
35
Subandono-DKP
0%10%20%30%40%50%60%70%80%90%
100%
Ulak Karang Selat
an
Kurao Pagang
Surau Gad
ang
Lubuk Buay
a
Padang Sarai
Pasir N
an Tigo
Sawahan
Batang Arau
Kampung P
ondok
Parupuk Tabin
g
Gunung Pangilun
PhysicEconomySocial
PROPORTION of RISK
Subandono-DKP
LegendMain_Road
River
Pipeline
Railway
Z Airport
; City_hall
9 Governor
^ Electrical_station
# Bridges
Area beyond inundation
Inundated area with elevation 0 - 5 m
Infrastructure at Risk
9
;
Z
^
^
^^
^
^
^^
^
^ ^^
#
#
#
##
#
#
#
# #
##
# #
#
#
###
#
#
#
# #
#
INDIAN OCEAN
0 1 20.5Kilometers
µ0 5 10 15 20 25 30
Fishing Harbour
Fishery facility
Industry/Company
Business Center
Bank
Hotel
inundated not inundated
0
50
100
150
200
250
300
Railway(km)
Pipeline(km)
Road(km)
Bridge (n) ElectricStation
(n)
num
ber/k
m
inundated not inundated
36
Subandono-DKP
9
;
Z
8
^
^
^^
^
^
^^
^
^ ^^
KK
K KK
K
K
KK K
K
#
#
#
##
#
#
#
# #
##
# #
#
#
###
##
#
# #
#
INDIAN OCEAN
0 1 20.5Kilometers
µ
Special Sites
Kindergarten school
LegendZ Airport
; City_hall
9 Governor
8 Prison
^ Electrical_station
K Hospital
# Bridges
0 - 5
6 - 15
16 - 42
0 - 2
3 - 5
6 - 9
Disable people
Inundation boundary
Water pipeline
Subandono-DKP
DISCUSSION
• The framework is potential to be used for other coastal cities
37
Subandono-DKP
DISCUSSION
• The framework is potential to be used for other coastal cities
Subandono-DKP
DISCUSSION
• The framework is potential to be used for other coastal cities
• The model for tsunami run up calculation is reliable and has been used in different areas (Aegean Sea, Tagus Estuary Lisbon, and Flores Island)
38
Subandono-DKP
DISCUSSION
• The framework is potential to be used for other coastal cities
• The model for tsunami run up calculation is reliable and have been used in different areas (Aegean Sea, Tagus Estuary Lisbon, and Flores Island)
• hazard delineation needs ground checking
Subandono-DKP
DISCUSSION
• The framework is potential to be used for other coastal cities
• The model for tsunami run up calculation is reliable and have been used in different areas (Aegean Sea, Tagus Estuary Lisbon, and Flores Island)
• Hazard delineation needs ground checking
• The result can be used as a guidance on mitigation program and action to be implemented
39
Subandono-DKP
CONCLUSION
• Padang City is vulnerable to tsunami because it is located in very active plate margin.
Subandono-DKP
CONCLUSION
• Padang City is vulnerable to tsunami because it is located in very active plate margin.
• Distribution of vulnerability and risk are not same for all sub districts and villages that imply the different mitigation action.
40
Subandono-DKP
CONCLUSION
• Padang City is vulnerable to tsunami because it is located in very active plate margin.
• Distribution of vulnerability and risk are not same for all sub districts and villages that imply the different mitigation action.
• High risk areas are characterized by its short distance from coastline, low elevation, high number of population, female, children, elderly, and disable people, fishermen and low income group.
Subandono-DKP
RECOMMENDATION
a. incorporate tsunami risk information in all aspects
41
Subandono-DKP
RECOMMENDATION..cont
a. incorporate tsunami risk information in all aspects
b.address high risk population, social and economic infrastructure and critical facilities through special tsunami mitigation programs.
Subandono-DKP
RECOMMENDATION..cont
a. incorporate tsunami risk information in all aspects
b.address high risk population, social and economic infrastructure and critical facilities through special tsunami mitigation programs.
c. conduct regular and systematic awareness and education about tsunami hazard for community with high social vulnerability.
42
Subandono-DKP
SOME EXAMPLES OF EXISTING CONDITIONS
Subandono-DKP
EXISTING PLAN (PADANG SPATIAL PLANNING 2004 -2013)
• Water front city vision
• Service and trading development for central of the city
• Settlement and industry development for north area
Center for public service, administration, offices, tourism, business
North area
Center area
East area
Central business district (CBD)
Transportation and economic activities
Transportation, social and cultural activities
Indian Ocean
43
Subandono-DKP
WHAT IS WRONG WITH THE PLAN?
• Most of development areas are in flooding boundary
• the plan is still on going and not yet revised or adjusted
Indian Ocean
Subandono-DKP
• New Airport
• 30 km from city
• Very close to the sea
• Highly vulnerable for tsunami
EXISTING DEVELOPMENT
44
Subandono-DKP
For Risk Analysis
Vulnerability information
Determine priority for physical construction, shelter distribution, awareness campaign, etc
Hazard distribution
Information about the most risky areas, population, building, etc
Subandono-DKP
PENDIDIKAN DAN PENYADARAN OLEH DKPPENDIDIKAN DAN PENYADARAN OLEH DKP
Tabligh Akbar.
WORKHOP/BIMBINGAN TEKNIS dang dut
45
Subandono-DKP
Beberapa Contoh Peta dan Petunjuk Jalur Evakuasi serta ZonaRelokasiyang dipasang di berbagai lokasi di Kota Padang
XXX M DPL
KEMAMPUAN TAMPUNGXXXX ORANG
KETINGGIAN XXX M DPL
Subandono-DKP
INFORMASI UNTUK EVAKUASI
46
Subandono-DKP
PAPAN INFORMASI DI TEMPAT-TEMPAT RAWAN TSUNAMI
Daerah rawantsunami
MenujuTempatamanTsunami
MenujuGedungbertingkat
MenujuBukit
Subandono-DKP
PAPAN INFORMASI
47
Subandono-DKPPENGATURAN BANGUNAN PADA KAWASAN PESISIR PENGATURAN BANGUNAN PADA KAWASAN PESISIR
Subandono-DKP
48
Subandono-DKP
Subandono-DKP
RELOKASI PEMUKIMAN DI PANTAI SIDEM, TULUNG AGUNG
49
Subandono-DKP
CONTOH SISTEM PERINGATAN DINI GEMPA DAN TSUNAMI
Subandono-DKP
MITIGASI STRUKTURAL/FISIK
50
Subandono-DKP
MITIGASI STRUKTURAL
Subandono-DKP
Rute evakuasi
Tanda daerah yang aman
51
Subandono-DKP
Subandono-DKP
BUKIT BUATAN/ARTIFICIAL HILLATAU MASJID YANG KOKOH
52
Subandono-DKP
KONSEP BUKIT BUATAN
Subandono-DKP
KOMBINASI TEMBOK LAUT, GREENBELT DAN RUMAH PANGGUNG SANGAT EFEKTIF MEREDAM TSUNAMI
50 - 100m
Tsunami yang telahteredam energinyaHWL
MWLLWL
21 3
(1b) Tembok laut, sewall dll
Hutan Pantai(casuarina etc.)
Rumah Panggung
Alternatively: innovative damping structures (Norderney Type further developed for tsunami )
53
Subandono-DKP
PENANAMAN MANGROVE DI DUSUN MOROSARI, DESA BEDONO (MONITORING APRIL 2005) oleh DKP
Penanaman tahun 2003
Penanaman tahun 2004
Subandono-DKP
Penanaman Vegetasi Pantai oleh DKP diPangandaran
• Cemara Laut.• Waru Laut• Ketapang• 3 x3 m2
54
Subandono-DKPSALAH SATU HUTAN DI BANYUWANGI DAPAT DIPAKAI SBG PEREDAM TSUNAMI
Subandono-DKP
PENENTUAN TEBAL JALUR HIJAU MANGROVE
B?PerikananPenyerap LimbahTsunamiErosi
55
Subandono-DKP
PERBANDINGAN KETEBALAN GREENBELT
GREENBELTGREENBELT KEUNTUNGANKEUNTUNGAN KERUGIANKERUGIAN CATATANCATATAN
TEBALTEBALCOCOK UNTUK COCOK UNTUK PROTEKSI TSUNAMIPROTEKSI TSUNAMI
LAHAN LAHAN BUDIDAYA BUDIDAYA MENJADI SEMPITMENJADI SEMPIT
I D E A LI D E A L M I N I M U MM I N I M U MO P T I M U MO P T I M U MPEDOMAN PEDOMAN
PENELITIANPENELITIAN
TIPISTIPIS
DAERAH UNTK DAERAH UNTK BUDIDAYA CUKUP BUDIDAYA CUKUP LUASLUAS
RENTAN RENTAN TERHADAP TERHADAP TSUNAMITSUNAMI
PERLU PERLU INFORMASI INFORMASI KETEBALAN KETEBALAN MAKSIMUMMAKSIMUM
PERLU PERLU INFORMASI INFORMASI TENTANG TENTANG KETEBALAN KETEBALAN MINIMUMMINIMUM
Subandono-DKP
MEKANISME REDUKSI KECEPATAN ALIRAN
ζB
ALIRAN
V = Cz ( R S )0,5
V zh
56
Subandono-DKP
Pengembangan Silvo-fishery (Wanamina) Empang (20%) dan Mangrove (80 %)
Zon
aP
enya
ngg
a
Sun
gai
Zona Penyangga
Laut
Mangrove
Man
grov
e
Mangrove
0,5
ha
tam
bak
0,5
ha
tam
bak
0,5
ha
tam
bak
Man
grov
e
Konservasi & RehabilitasiMangrove
Subandono-DKP
Pola Wanamina Empang Parit
Konservasi & RehabilitasiMangrove
57
Subandono-DKP
Pola Wanamina Empang Parit Yang Disempurnakan
Empang Tempat pememelihaan Ikan
Mangrove
Konservasi & RehabilitasiMangrove
Subandono-DKP
Pola Wanamina Komplangan
Konservasi & RehabilitasiMangrove
58
Subandono-DKP
L au t
Sung
ai
G R E E N B E L TM A N G R O V E
P eta kT a m b a k
P eta kT a m b a k
P eta kT a m b ak
P etakT a m b ak
P eta kT a m b a k
P eta kT a m b a k
P eta kT a m b a k
P eta kT a m b ak
P etakT a m b ak
P eta kT a m b a k
P eta kT a m b a k
P etakT a m b ak
P eta kT a m b ak
P eta kT a m b a k
P eta kT a m b a k
P eta kT a m b a k
P eta kT a m b ak
P etakT a m b ak
P eta kT a m b a k
P eta l P ercam p u ra nA ir A sin d a n T a w a r
P etakT a m b ak
P eta kT a m b ak
P eta kT am b a k
P eta kT am b a k
P eta kT am b a k
P eta kT am b a k
S alu ranA ir L au t
P eta kT am b a k
G R E E N B E L TM A N G R O V E
10 0 M
1 00 M
1 0 0 M
10 0 M
sem p ad ansu ng aino n -m ang rov e
sem p ad an su n gai m an grov e
300 m300 m 300 m
S a lu ran A ir T aw ar
V egeta si m an grove
Konservasi & RehabilitasiMangrove
Subandono-DKP
0.5
0.4
0.3
0.2
0.1
0.0
Dia
met
er(m
)
12 3 4 5 6 7 8
102 3 4 5 6 7 8
100Forest density( trees No./100m2)
Shuto(1985)Munakata(1991)Aburaya(2000)Original data
59
Subandono-DKP
Table. Peredaman Tsunami oleh Greenbelt
Tinggi Tsunami(m) 1 2 3
Hutan Pantai(Shuto, 1985)
Mitigasi kerusakan, Stop puing/perahuMengurangi energi tsunami
50m 0.98 0.86 0.81
100m 0.83 0.80 0.71
200m 0.79 0.71 0.64
400m 0.78 0.65 0.57
50 0.86 0.86 0.82
100 0.76 0.74 0.66
200 0.46 0.55 0.50
400 --- 0.11 0.18
50 0.71 0.58 0.54
100 0.57 0.47 0.44
200 0.56 0.39 0.34
400 --- 0.31 0.24
50 0.53 0.48 0.39
100 0.33 0.32 0.17
200 0.01 0.13 0.08
400 --- 0.02 0.01
Gaya hidrraulik Ketebalangreenbelt
Arus tsunami Ketebalangreenbelt
Kedalamangenangan
Ketebalangreenbelt
Jarak Run up Ketebalangreenbelt
Subandono-DKPPembangunan Rumah Ramah Bencana
Gempa dan Tsunami
60
Subandono-DKP
1. AKOMODASI/ADAPTASI DENGAN MEMBUAT RUMAH PANGGUNG
Subandono-DKP
Rumah Ramah Bencana Bencana Kabupaten Lombok Tengah(Retrofitting)
61
Subandono-DKP
RUMAH RAMAH BENCANA KABUPATEN PESISIR SELATAN (Retrofitting dan Relokasi)
Subandono-DKP
Rumah Ramah Bencana Kabupaten Pariaman (Retrofitting)
62
Subandono-DKP
GEDUNG TINKAT DENGAN LANTAI BAWAH TERBUKA
Subandono-DKP
SHELTER DI BANGLADESH
63
Subandono-DKPphoto by Okushiri-town
Subandono-DKPSHELTER DI AONAE OKUSHIRI
Nishiki Tower in Mie Prefecture, Japan