63
Subandono-DKP Oleh: Dr,Ir. Subandono Diposatono, MEng KEPALA SUBDIT MITIGASI BENCANA DAN PENCEMARAN LINGKUNGAN [email protected] Hp. 081585659073 Subandono-DKP TSUNAMI Tsunami adalah gelombang laut dengan periode panjang yang ditimbulkan gangguan impulsif yang terjadi pada medium laut. Gangguan impulsif itu bisa berupa gempa bumi tektonik, erupsi vulkanik, atau longsoran (land- slide).

TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

Embed Size (px)

Citation preview

Page 1: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

1

Subandono-DKP

Oleh:Dr,Ir. Subandono Diposatono, MEng

KEPALA SUBDIT MITIGASI BENCANA DAN PENCEMARAN [email protected] Hp. 081585659073

Subandono-DKP

TSUNAMI

Tsunami adalah gelombang laut denganperiode panjang yang ditimbulkangangguan impulsif yang terjadi padamedium laut. Gangguan impulsif itubisa berupa gempa bumi tektonik, erupsi vulkanik, atau longsoran (land-slide).

Page 2: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

2

Subandono-DKP

TATANAN TEKTONIK WILAYAH INDONESIA

LEMPENG SAMUDERA HINDIA LEMPENG INDO AUSTRALIALEMPENG INDO AUSTRALIA

LEMPENG EURASIALEMPENG EURASIA

LEM

PENG

PAS

IFIK

LEM

PENG

PAS

IFIK

Subandono-DKP

TEKTONIK DI DAERAH INDONESIA

LempengAustralia

JawaPapua

Kalimantan

Lempeng Indo-Autralia

LempengPhilippine Sea

LempengPasifik

LempengEurasia Molucca

Sulawesi

Bali

Asia

Subduksi Sunda

Banda Arc

90 E

15 N

Sesar Sumatra

Sumatra

RAWAN GEMPA, TSUNAMI DAN GUNUNG MELETUS

Sesar flores

Sesar Palu-Koro

Page 3: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

3

Subandono-DKP

PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004)

LEMPENG EURASIA

LEMPENG INDO-AUSTRALIA 6 cm/tahun

LEMPENG PHILIPPINE8 cm/tahun

LEMPENG PASIFIK12 cm/tahun

< 50 Km50–100 Km100-200 Km

200-300 Km>300 Km

Kedalaman :

Subandono-DKP

Normal Fault/Sesar turun Reverse Fault/Sesar Naik Sesar Horisontal

TSUNAMI AKAN TERJADI BILA :• >6,5 SR• Pusat Gempa <60 km dari dasar laut• Gempa dengan patahan vertikal dan deformasi vertikal dasar laut relatifbesar

JENIS PATAHAN

Page 4: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

4

Subandono-DKPMEKANISME TERJADINYA TSUNAMI

Lempeng benuaEurasia

Lempeng samuderaIndo-Australia

• Lempeng Samudra Indo Australia bergeak terus menerus menghunjam ke lepeng benua Eurasia.• Bagian ujung lempeng benua Eurasia tertarik turun secara berangsur-angsur sehingga terjadi akumulasi tegangan..

• Ketika tegangan itu mencapai batas maksimum maka ujung lempeng samudra melenting ke atas dan mengakibatkan terjadinya gempa.

Pertemuan Lempeng

Laut Laut

Tsunami

Subandono-DKP

DISTRIBUSI GUNUNG BERAPI DI INDONESIA DISTRIBUSI GUNUNG BERAPI DI INDONESIA

DIREKTORAT JENDERAL GEOLOGI DAN SUMBERDAYA MINERALDEPARTEMEN ENERGI DAN SUMBER DAYA MINERAL

Page 5: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

5

Subandono-DKP

TSUNAMI KARENA VULCANIC

9%

Subandono-DKP

PETA LOKASI GEMPA BUMI YANG MENGAKIBATKAN TSUNAMI DI INDONESIA (1600-2006)

43

21

Intesitas Tsunami:

Vulcanic TsunamiLandslide TsunamiEarthquake Tsunami

90.5%

8.5% 1%

108 tsunami

197719942006

1907

2004

1921

?

LEMPENG EURASIA

1833

LEMPENG INDO-AUSTRALIA

2005

?

? ?

LEMPENG PASIFIK

1992

19961968

1996

200035

32

18

11

93

Page 6: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

6

Subandono-DKP

TSUNAMI DI INDONESIA (1960-2006)No. TAHUN PUSAT GEMPA RUN-UP

MAKSIMUM (m)JUMLAHKORBAN(meninggal/luka)

DAERAH BENCANA

1. 1961 8,2 LS; 122BT Tidak ada data 2/6 NTT, Flores Tengah

2. 1964 5,8 LU; 95,6 BT Tidak ada data 110/479 Sumatra

3. 1965 2,4 LS; 126 BT Tidak ada Data 71 meninggal Maluku, Seram, Sanana

4. 1967 3,7 LS; 119,3 BT Tidak ada Data 58/100 Tinambung Sulsel

5. 1968 0,7 LU; 119,7 BT 8 - 10 392 meninggal Tambo Sulteng

6. 1969 3,1 LS; 118,8 BT 10 64/97 Majene Sulsel

7. 1977 11,1 LS; 118,5 BT Tidak ada data 316 meninggal NTB, Pulau Sumbawa

8. 1977 8 LS; 125,3 BT Tidak ada data 2/25 NTT, Flores, P. Atauro

9. 1979 8,4 LS; 115,9 BT Tidak ada data 27/200 NTB,Sumbawa,Bali,Lombok

10. 1982 8,4 LS; 123 BT Tidak ada data 13/400 NTT,Larantuka

11. 1987 8,4 LS; 124,3 BT Tidak ada data 83/108 NTT, Flores Timur, P. Pantar

12. 1989 8,1 LS; 125,1 BT Tidak ada data 7 meninggal NTT, P. Alor

13 1992 8,5 LS; 121,9 BT 11,2 – 26,2 1952/2126 NTT,Flores, P. Babi

14. 1994 10,7 LS; 113,1 BT 19,1 38/400 Banyuwangi Jatim

15. 1996 1,1 LS; 118,8 BT Tidak ada data 3/63 Palu Sulteng

16. 1996 0,5 LS; 136 BT 13,7 107 meninggal P. Biak, Irian Jaya

17. 1998 2,02 LS; 124,87 BT 2,75 34 meninggal Tabuna Maliabu Maluku

18 2000 0,6 LU; 119,92 BT 3,0 2 Banggai

19 2004 3,298 LU; 95,6 BT 34.5 >300.000 NAD, Sumut,

20 2005 2,065 LU; 97,01 BT 3.5 Tidak ada data Nias

21 2006 9,4 LS; 107,2 7,6 >668 Jabar, Jateng, DIY

Subandono-DKP

Fault

Trench

Pesisir rawan tsunami

Daerah Rawan Tsunami di Indonesia

Page 7: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

7

Subandono-DKP

PANTAI DENGAN BENTUK MENYERUPAI GIGI GERGAJI (SAWTOOTH)DENGAN BENTUK “V” (“V’ SHAPE)

NAD

Subandono-DKPGREEN LAW

Page 8: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

8

Subandono-DKP

headlandbay

Contour line of sea depth

Wave ray

bay

refraction

reflection

Subandono-DKP

BANGUNAN DENGAN BANYAK PINTU DAN JENDELA RELATIF AMAN TERHADAP TSUNAMI

Mosque at Ujung Pancu

Mosque at Lampeuk, Lhok Nga

Mosque still withstood

Other Mosque

Direct tsunami impact

Page 9: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

9

Subandono-DKP

GREENBELT DAPAT MEREDAM TSUNAMI

KERRY SHIEH©2005

Of Dec.26 2004 Earthquake & Tsunami

Subandono-DKP

Arah aliran

Rumah Panggung Aman terhadap GempuranTsunami

Page 10: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

10

Subandono-DKP

Bangunan dengan Posisi Tegak lurus GarisPantai relatif aman terhadap tsunami

Cilacap Windarapayung Wetan

Garis pantaiDarat

Laut TSUNAMI TSUNAMI

Stream line

WC Komunal

Bangunan sejajar pantaiBangunan tegak lurus pantai

Subandono-DKP

Sand dunes (gumuk pasir) efektif meredam tsunami

Page 11: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

11

Subandono-DKP

BUKIT TEMPAT YANG BAIK UNTUK EVAKUASI

Banyak orangmeyelamatkan diridengan mobilmeninggal.

Sedangkan yang naik kebukit selamat

Subandono-DKP

UPAYA MITIGASI BENCANA SECARA MENYELURUHUPAYA MITIGASI BENCANA SECARA MENYELURUH

UPAYA STRUKTUR (Fisik)METODE PERLINDUNGAN ALAMI

(Mangrove, sand dune, terumbu karang,Hutan (penghijauan)).

METODE PERLINDUNGAN BUATAN• breakwater, tembok laut, tanggul,

konstruksi pelindung, Bangunanpengendali, rumah panggung, Instalasi

pengolah limbah• Terumbu buatan• struktur tahan bencana:

- sisi panjang dari struktur sedapatmungkin diarahkan sejajar denganantisipasi arah penjalaran gelombang.

- Shear wall dan lateral bracingditempatkan searah dengan penjalarangelombang

- lantai terbawah dari bangunan dibuatterbuka

UPAYA STRUKTUR (Fisik)METODE PERLINDUNGAN ALAMI

(Mangrove, sand dune, terumbu karang,Hutan (penghijauan)).

METODE PERLINDUNGAN BUATAN• breakwater, tembok laut, tanggul,

konstruksi pelindung, Bangunanpengendali, rumah panggung, Instalasi

pengolah limbah• Terumbu buatan• struktur tahan bencana:

- sisi panjang dari struktur sedapatmungkin diarahkan sejajar denganantisipasi arah penjalaran gelombang.

- Shear wall dan lateral bracingditempatkan searah dengan penjalarangelombang

- lantai terbawah dari bangunan dibuatterbuka

UPAYA NONSTRUKTUR (Non Fisik), a.l:• PEMBUATAN PETA RAWAN BENCANA• PERATURAN PERUNDANGAN* SISTEM PERINGATAN DINI * PEMINDAHAN/RELOKASI* TATA RUANG, TATA GUNA LAHAN, ZONASI * PENETAPAN SEMPADAN PANTAI dansungai* INFORMASI PUBLIK & PENYULUHAN• PENEGAKAN HUKUM,• PELATIHAN DAN SIMULASI MITIGASI BENCANA,• AMDAL• Integrated Coastal and Ocean Management• Pengentasan Kemiskinan

UPAYA NONSTRUKTUR (Non Fisik), a.l:• PEMBUATAN PETA RAWAN BENCANA• PERATURAN PERUNDANGAN* SISTEM PERINGATAN DINI * PEMINDAHAN/RELOKASI* TATA RUANG, TATA GUNA LAHAN, ZONASI * PENETAPAN SEMPADAN PANTAI dansungai* INFORMASI PUBLIK & PENYULUHAN• PENEGAKAN HUKUM,• PELATIHAN DAN SIMULASI MITIGASI BENCANA,• AMDAL• Integrated Coastal and Ocean Management• Pengentasan Kemiskinan

MENGURANGI BESARNYA KERUGIAN AKIBAT BENCANA TERKAIT DENGAN LAUT

MENGURANGI BESARNYA KERUGIAN AKIBAT BENCANA TERKAIT DENGAN LAUT

Page 12: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

12

Subandono-DKP

PEMETAAN DAERAH RAWAN BENCANA

Subandono-DKP

RISK =(RESIKO)

HAZZARD (BAHAYA) X VULNERABILITY (KERENTANANAN)

• CATATAN SEJARAH • SURAT KABAR (BERITA)• TIDE GAUGE, AWLR• TINGGI GELOMBANG DLL• RUN-UP• STATISTIK

• LINGKUNGAN• INFRASTUKTUR• BANGUNAN• TOPOGRAFI• HIDROGRAFI• MORFOLOGI• SOSIAL, DEMOGRAFI, EKONOMI

• KATALOG• SUMBER PEMBANGKIT • PETA WAKTU TIBA

• PENANGGULANGAN BENCANA (DISASTER MANAGEMENT)

• EMERGENCY MANAGEMENT• LOCAL RESPONSE

RISK ASSESSMENT – ZONATION MAP

MITIGATION

PENDEKATAN DALAM PENGKAJIAN RESIKO BENCANA

Page 13: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

13

Subandono-DKP

Studi Literatur danInventarisasi Data

Data Meteorologi :Data AnginCurah Hujan

Historikal Data :Tsunami, Banjir

Peta TematikSosial, Demografi

EkonomiLingkungan,

morfologi

Data TopografiData Oseanografi :BatimetriPasang SurutData PengamatanGelombang

Digitasi Peta danPenyusunan Basis

Data DaerahRawan Bencana

Data Geologi :Hidrologi

Peta DasarPeta Tematik

Survei Lapangan

Model Numerik :Tsunami, Banjir, SLR, Gelombang Pasang

Sistem Informasi Geografis dan Basis Data Daerah Rawan Bencana

Mitigasi Bencana

Peta LingkunganRawan Bencana

BAGAN ALIR

Subandono-DKPCONTOH PEMETAAN TSUNAMI

Page 14: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

14

Subandono-DKP

CARA UNTUK MELAKUKAN PRAKIRAAN GENANGAN TSUNAMI

防波堤、防潮堤、陸閘、水門等の効果を評価できる。

2~3m1~2m0~1m

地点ごとの水位が計算され、浸水深データが得られる。

全地点が同水位と仮定。(レベル湛水)

建物等による低減効果は反映されない。

青破線:数値シミュレーションによる浸水域

防潮堤、陸閘、水門等は水位と天端高の大小として評価。

防波堤による低減効果は反映されない。

水の勢いによる浸水域の拡大は反映されない。

越波、越流量と湛水量が等しくなる等高線までを浸水域として設定

SimulasiModel Run-up

Pendekatansamaelevasi air

Data historisberdasarkancatatan

○○地震津波以降に整備された防波堤、防潮堤、陸閘、水門等の効果は反映されない。

当時1階の屋根まで浸水

既往地震津波が最悪最大の浸水域・浸水深(外力レベル3)とは限らない。

青破線:数値シミュレーションによる浸水域

○○地震津波(xxxx年)の推定浸水域

浸水深は当時の記録がある場所のみ。

現在の地形形状が反映されていない。

Subandono-DKP

Page 15: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

15

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai NTT akibat tsunami gempa bumi Jawa Timur tahun 1994

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai selatan Jawa Timur karenatsunami gempa bumi Jawa Timur tahun 1994

Page 16: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

16

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai selatan Bali karenatsunami gempa bumi Jawa Timur tahun 1994

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai Banggai karena tsunami gempa bumi Flores tahun 1992

Page 17: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

17

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai Sulawesi Tengah karenatsunami gempa bumi Sulawesi Tengah tahun 1996

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai Biak karena tsunami gempa bumi Biak 1996

Page 18: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

18

Subandono-DKP

Pengamatan tinggi run-up tsunami di pantai Banda Aceh dan AcehBesar karena tsunami gempa bumi Sumatera 2004

Subandono-DKP

Page 19: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

19

Subandono-DKP

0

1

2

3

4

5

6

7

8

107.6 107.8 108 108.2 108.4 108.6 108.8 109 109.2 109.4

Tsun

ami H

eigh

t & G

roun

d El

evat

ion

(m)

*1Garut, *2Cipatatujah, *3Cikalong, *4Cimerak, *5Parigi, *6Pangangaran, *7Cilacap, *8Kesugihan, *9Binangun, *10Jetis

2*1

Biru: Tinggi Tsunami, Oranye: Elevasi Tanah, Angka Merah: Korban Jiwa

7*2 49*3 87*4

31*5

137*6 15*72*8

61*9

Gambar Ketinggian Tanah dan Tsunami diukur dari Muka Air Laut saat Sebelum Tsunami

Ting

gi T

suna

mi d

an T

ingg

iPer

muk

aan

Tana

h(m

)

1*10

DKP-PARI-JSCE

TINGGI RUN-UP TSUNAMI JAWA BARAT 2006

Subandono-DKP

Page 20: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

20

Subandono-DKP

Subandono-DKPDanny, 2002

Peta Daerah Rawan Bencana Tsunami Kota Padang

Peta Daerah Rawan Bencana Tsunami Kota Padang

Catatan Historis Kejadian Tsunami di SekitarSumatera

Page 21: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

21

Subandono-DKP

SOURCE MODEL Fault Parameter : Sumatera Tsunami 1833

Pembangkitan Tsunami : Masinha, L and Smylie, D.E, 1971Penjalaran Tsunami : TUNAMI N1, N2, Tohoku University Numerical Analysis for TsunamiInundasi Tsunami : Pendekatan kesamaan level air di bibir pantai

INUNDATIONNON LINEAR MODEL

LINEAR MODEL

Daerah PerairanDangkal Laut dalam

MORE THAN 50 M

No SimulationFault

Length(m)

FaultWidth (m)

DipDirection

(o)

DipAngle

(o)

Slip Angle

(o)

Dislocation(m)

Depth (m)

A Tsunami 1833 420x 103 135 x 103 150 60 99 8 103

Subandono-DKP

Tinggi Tsunami (meter)

MENIT KE 0

Sumatera

Tsunami SUMATERA 1833

ANIMASI

Page 22: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

22

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 5

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 10

Page 23: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

23

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 15

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 20

Page 24: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

24

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 25

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 30Padang

Page 25: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

25

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 35Padang

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 40Padang

Padang

Page 26: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

26

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 45Padang

Padang

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 50Padang

Padang

Page 27: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

27

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 55Padang

Padang

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 60Padang

Padang

Page 28: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

28

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 65Padang

Padang

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 70Padang

Padang

Page 29: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

29

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 75Padang

Padang

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 80Padang

Padang

Page 30: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

30

Subandono-DKPSum

atera

Elevasi (meter)

Menit ke 85Padang

Padang

Subandono-DKP

Sumatera

Elevasi (meter)

Menit ke 90Padang

Padang

Page 31: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

31

Subandono-DKP

Hasil

• Tsunami sampai Kota Padang 35 – 40 minutes

• Sebelum mencapai Kota Padang teredamoleh Pulau Mentawai

• Maximum Run-up : 5.2 meter

Subandono-DKP

Inundadted by 5m tsunami:-80 km road-34 government office-2410 houses-13 hospital and clinic-60 school-Paddy field

Tsunami Hazard Map in Padang City, West S t

same level approximation H=5m

Page 32: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

32

Subandono-DKP

FrameworkDistance from coastline

Distance from river

Topography/elevation

Total population

Female population

Dependent group

Physical vulnerability

Fishermen population

Poor people population

Social vulnerability

Economic vulnerability

Inundation Map

5 m height scenario

Elevation Data

Elevation DataSRTM

Contour Map

Place Vulnerability

Inundation Depth/Hazard

Tsunami Risk

Analysis of Risk

Special sites and lifelines

Hospital, PrisonKindergarten SchoolBasic schoolVillage with disable population

Economic variable in risk

Traditional marketBusiness centerCompaniesEconomic sector

Social variable in risk

Number of populationFemale populationDependent group

Building and Infrastructure in Risk

BuildingsRoads, bridgeHospitalSchoolsOffices

Hazard Analysis

AreaAdministration

You can add :-Building condition-Coastal protection--other communities

Numerical Simulation

Subandono-DKP

Hazard (Inundated) Delineation

9

;

Z

INDIAN OCEAN

µ0 1 20.5

Kilometers

Legendvery high inundated area (5 - 3 m)

High inundanted area (3 - 1 m)

Low inundated area (1 - 0 m)

Not inundated

6 sub districts

34 villages

4,835 ha

Page 33: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

33

Subandono-DKP

Subandono-DKP

VULNERABILITY

Physic

9

;

Z

INDIAN OCEAN

0 1 20.5Kilometers

µ

LegendRiver

Z Airport

; City_hall

9 Governor

LOWER

HIGHER

• most of the city are below 5 m

• elevation and distance from coastline are main factors

Page 34: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

34

Subandono-DKP

VULNERABILITY…cont

Social Economy

9

;

Z

INDIAN OCEAN

µ0 1 20.5

Kilometers

LegendZ Airport

; City_hall

9 Governor

LOWER

HIGHER

9

;

Z

INDIAN OCEAN

µ0 1 20.5

Kilometers

LegendZ Airport

; City_hall

9 Governor

LOWER

HIGHER

Pasir Nan Tigo

ParupukTabing

21423

Population

10796

Female

4570

Dependent

554

Poor Family

640

Fishermen

Subandono-DKP

RISK DISTRIBUTION

9

;

Z

Koto Tangah

Kuranji

Nanggalo

Padang Timur

Padang Utara

Lbk Begalung

Pauh

Pdg Selatan

Padang Barat

INDIAN OCEAN

µ0 1 20.5

Kilometers

LegendRiver

Z Airport

; City_hall

9 Governor

LOWER

HIGHER

Subdistrict Boundary

Areas with very high and high risk cover 6 sub districts and 20 villages

Social Variables at Risk

0

10000

20000

30000

40000

50000

60000

70000

KotoTangah

Nanggalo PadangBarat

PadangTimur

PadangUtara

PdgSelatan

PopulationFemaleDependent

Economic Variables at Risk

0

500

1000

1500

2000

2500

3000

3500

KotoTangah

Nanggalo PadangBarat

PadangTimur

PadangUtara

PdgSelatan

Poor FamilyFishermen

Page 35: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

35

Subandono-DKP

0%10%20%30%40%50%60%70%80%90%

100%

Ulak Karang Selat

an

Kurao Pagang

Surau Gad

ang

Lubuk Buay

a

Padang Sarai

Pasir N

an Tigo

Sawahan

Batang Arau

Kampung P

ondok

Parupuk Tabin

g

Gunung Pangilun

PhysicEconomySocial

PROPORTION of RISK

Subandono-DKP

LegendMain_Road

River

Pipeline

Railway

Z Airport

; City_hall

9 Governor

^ Electrical_station

# Bridges

Area beyond inundation

Inundated area with elevation 0 - 5 m

Infrastructure at Risk

9

;

Z

^

^

^^

^

^

^^

^

^ ^^

#

#

#

##

#

#

#

# #

##

# #

#

#

###

#

#

#

# #

#

INDIAN OCEAN

0 1 20.5Kilometers

µ0 5 10 15 20 25 30

Fishing Harbour

Fishery facility

Industry/Company

Business Center

Bank

Hotel

inundated not inundated

0

50

100

150

200

250

300

Railway(km)

Pipeline(km)

Road(km)

Bridge (n) ElectricStation

(n)

num

ber/k

m

inundated not inundated

Page 36: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

36

Subandono-DKP

9

;

Z

8

^

^

^^

^

^

^^

^

^ ^^

KK

K KK

K

K

KK K

K

#

#

#

##

#

#

#

# #

##

# #

#

#

###

##

#

# #

#

INDIAN OCEAN

0 1 20.5Kilometers

µ

Special Sites

Kindergarten school

LegendZ Airport

; City_hall

9 Governor

8 Prison

^ Electrical_station

K Hospital

# Bridges

0 - 5

6 - 15

16 - 42

0 - 2

3 - 5

6 - 9

Disable people

Inundation boundary

Water pipeline

Subandono-DKP

DISCUSSION

• The framework is potential to be used for other coastal cities

Page 37: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

37

Subandono-DKP

DISCUSSION

• The framework is potential to be used for other coastal cities

Subandono-DKP

DISCUSSION

• The framework is potential to be used for other coastal cities

• The model for tsunami run up calculation is reliable and has been used in different areas (Aegean Sea, Tagus Estuary Lisbon, and Flores Island)

Page 38: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

38

Subandono-DKP

DISCUSSION

• The framework is potential to be used for other coastal cities

• The model for tsunami run up calculation is reliable and have been used in different areas (Aegean Sea, Tagus Estuary Lisbon, and Flores Island)

• hazard delineation needs ground checking

Subandono-DKP

DISCUSSION

• The framework is potential to be used for other coastal cities

• The model for tsunami run up calculation is reliable and have been used in different areas (Aegean Sea, Tagus Estuary Lisbon, and Flores Island)

• Hazard delineation needs ground checking

• The result can be used as a guidance on mitigation program and action to be implemented

Page 39: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

39

Subandono-DKP

CONCLUSION

• Padang City is vulnerable to tsunami because it is located in very active plate margin.

Subandono-DKP

CONCLUSION

• Padang City is vulnerable to tsunami because it is located in very active plate margin.

• Distribution of vulnerability and risk are not same for all sub districts and villages that imply the different mitigation action.

Page 40: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

40

Subandono-DKP

CONCLUSION

• Padang City is vulnerable to tsunami because it is located in very active plate margin.

• Distribution of vulnerability and risk are not same for all sub districts and villages that imply the different mitigation action.

• High risk areas are characterized by its short distance from coastline, low elevation, high number of population, female, children, elderly, and disable people, fishermen and low income group.

Subandono-DKP

RECOMMENDATION

a. incorporate tsunami risk information in all aspects

Page 41: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

41

Subandono-DKP

RECOMMENDATION..cont

a. incorporate tsunami risk information in all aspects

b.address high risk population, social and economic infrastructure and critical facilities through special tsunami mitigation programs.

Subandono-DKP

RECOMMENDATION..cont

a. incorporate tsunami risk information in all aspects

b.address high risk population, social and economic infrastructure and critical facilities through special tsunami mitigation programs.

c. conduct regular and systematic awareness and education about tsunami hazard for community with high social vulnerability.

Page 42: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

42

Subandono-DKP

SOME EXAMPLES OF EXISTING CONDITIONS

Subandono-DKP

EXISTING PLAN (PADANG SPATIAL PLANNING 2004 -2013)

• Water front city vision

• Service and trading development for central of the city

• Settlement and industry development for north area

Center for public service, administration, offices, tourism, business

North area

Center area

East area

Central business district (CBD)

Transportation and economic activities

Transportation, social and cultural activities

Indian Ocean

Page 43: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

43

Subandono-DKP

WHAT IS WRONG WITH THE PLAN?

• Most of development areas are in flooding boundary

• the plan is still on going and not yet revised or adjusted

Indian Ocean

Subandono-DKP

• New Airport

• 30 km from city

• Very close to the sea

• Highly vulnerable for tsunami

EXISTING DEVELOPMENT

Page 44: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

44

Subandono-DKP

For Risk Analysis

Vulnerability information

Determine priority for physical construction, shelter distribution, awareness campaign, etc

Hazard distribution

Information about the most risky areas, population, building, etc

Subandono-DKP

PENDIDIKAN DAN PENYADARAN OLEH DKPPENDIDIKAN DAN PENYADARAN OLEH DKP

Tabligh Akbar.

WORKHOP/BIMBINGAN TEKNIS dang dut

Page 45: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

45

Subandono-DKP

Beberapa Contoh Peta dan Petunjuk Jalur Evakuasi serta ZonaRelokasiyang dipasang di berbagai lokasi di Kota Padang

XXX M DPL

KEMAMPUAN TAMPUNGXXXX ORANG

KETINGGIAN XXX M DPL

Subandono-DKP

INFORMASI UNTUK EVAKUASI

Page 46: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

46

Subandono-DKP

PAPAN INFORMASI DI TEMPAT-TEMPAT RAWAN TSUNAMI

Daerah rawantsunami

MenujuTempatamanTsunami

MenujuGedungbertingkat

MenujuBukit

Subandono-DKP

PAPAN INFORMASI

Page 47: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

47

Subandono-DKPPENGATURAN BANGUNAN PADA KAWASAN PESISIR PENGATURAN BANGUNAN PADA KAWASAN PESISIR

Subandono-DKP

Page 48: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

48

Subandono-DKP

Subandono-DKP

RELOKASI PEMUKIMAN DI PANTAI SIDEM, TULUNG AGUNG

Page 49: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

49

Subandono-DKP

CONTOH SISTEM PERINGATAN DINI GEMPA DAN TSUNAMI

Subandono-DKP

MITIGASI STRUKTURAL/FISIK

Page 50: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

50

Subandono-DKP

MITIGASI STRUKTURAL

Subandono-DKP

Rute evakuasi

Tanda daerah yang aman

Page 51: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

51

Subandono-DKP

Subandono-DKP

BUKIT BUATAN/ARTIFICIAL HILLATAU MASJID YANG KOKOH

Page 52: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

52

Subandono-DKP

KONSEP BUKIT BUATAN

Subandono-DKP

KOMBINASI TEMBOK LAUT, GREENBELT DAN RUMAH PANGGUNG SANGAT EFEKTIF MEREDAM TSUNAMI

50 - 100m

Tsunami yang telahteredam energinyaHWL

MWLLWL

21 3

(1b) Tembok laut, sewall dll

Hutan Pantai(casuarina etc.)

Rumah Panggung

Alternatively: innovative damping structures (Norderney Type further developed for tsunami )

Page 53: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

53

Subandono-DKP

PENANAMAN MANGROVE DI DUSUN MOROSARI, DESA BEDONO (MONITORING APRIL 2005) oleh DKP

Penanaman tahun 2003

Penanaman tahun 2004

Subandono-DKP

Penanaman Vegetasi Pantai oleh DKP diPangandaran

• Cemara Laut.• Waru Laut• Ketapang• 3 x3 m2

Page 54: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

54

Subandono-DKPSALAH SATU HUTAN DI BANYUWANGI DAPAT DIPAKAI SBG PEREDAM TSUNAMI

Subandono-DKP

PENENTUAN TEBAL JALUR HIJAU MANGROVE

B?PerikananPenyerap LimbahTsunamiErosi

Page 55: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

55

Subandono-DKP

PERBANDINGAN KETEBALAN GREENBELT

GREENBELTGREENBELT KEUNTUNGANKEUNTUNGAN KERUGIANKERUGIAN CATATANCATATAN

TEBALTEBALCOCOK UNTUK COCOK UNTUK PROTEKSI TSUNAMIPROTEKSI TSUNAMI

LAHAN LAHAN BUDIDAYA BUDIDAYA MENJADI SEMPITMENJADI SEMPIT

I D E A LI D E A L M I N I M U MM I N I M U MO P T I M U MO P T I M U MPEDOMAN PEDOMAN

PENELITIANPENELITIAN

TIPISTIPIS

DAERAH UNTK DAERAH UNTK BUDIDAYA CUKUP BUDIDAYA CUKUP LUASLUAS

RENTAN RENTAN TERHADAP TERHADAP TSUNAMITSUNAMI

PERLU PERLU INFORMASI INFORMASI KETEBALAN KETEBALAN MAKSIMUMMAKSIMUM

PERLU PERLU INFORMASI INFORMASI TENTANG TENTANG KETEBALAN KETEBALAN MINIMUMMINIMUM

Subandono-DKP

MEKANISME REDUKSI KECEPATAN ALIRAN

ζB

ALIRAN

V = Cz ( R S )0,5

V zh

Page 56: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

56

Subandono-DKP

Pengembangan Silvo-fishery (Wanamina) Empang (20%) dan Mangrove (80 %)

Zon

aP

enya

ngg

a

Sun

gai

Zona Penyangga

Laut

Mangrove

Man

grov

e

Mangrove

0,5

ha

tam

bak

0,5

ha

tam

bak

0,5

ha

tam

bak

Man

grov

e

Konservasi & RehabilitasiMangrove

Subandono-DKP

Pola Wanamina Empang Parit

Konservasi & RehabilitasiMangrove

Page 57: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

57

Subandono-DKP

Pola Wanamina Empang Parit Yang Disempurnakan

Empang Tempat pememelihaan Ikan

Mangrove

Konservasi & RehabilitasiMangrove

Subandono-DKP

Pola Wanamina Komplangan

Konservasi & RehabilitasiMangrove

Page 58: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

58

Subandono-DKP

L au t

Sung

ai

G R E E N B E L TM A N G R O V E

P eta kT a m b a k

P eta kT a m b a k

P eta kT a m b ak

P etakT a m b ak

P eta kT a m b a k

P eta kT a m b a k

P eta kT a m b a k

P eta kT a m b ak

P etakT a m b ak

P eta kT a m b a k

P eta kT a m b a k

P etakT a m b ak

P eta kT a m b ak

P eta kT a m b a k

P eta kT a m b a k

P eta kT a m b a k

P eta kT a m b ak

P etakT a m b ak

P eta kT a m b a k

P eta l P ercam p u ra nA ir A sin d a n T a w a r

P etakT a m b ak

P eta kT a m b ak

P eta kT am b a k

P eta kT am b a k

P eta kT am b a k

P eta kT am b a k

S alu ranA ir L au t

P eta kT am b a k

G R E E N B E L TM A N G R O V E

10 0 M

1 00 M

1 0 0 M

10 0 M

sem p ad ansu ng aino n -m ang rov e

sem p ad an su n gai m an grov e

300 m300 m 300 m

S a lu ran A ir T aw ar

V egeta si m an grove

Konservasi & RehabilitasiMangrove

Subandono-DKP

0.5

0.4

0.3

0.2

0.1

0.0

Dia

met

er(m

)

12 3 4 5 6 7 8

102 3 4 5 6 7 8

100Forest density( trees No./100m2)

Shuto(1985)Munakata(1991)Aburaya(2000)Original data

Page 59: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

59

Subandono-DKP

Table. Peredaman Tsunami oleh Greenbelt

Tinggi Tsunami(m) 1 2 3

Hutan Pantai(Shuto, 1985)

Mitigasi kerusakan, Stop puing/perahuMengurangi energi tsunami

50m 0.98 0.86 0.81

100m 0.83 0.80 0.71

200m 0.79 0.71 0.64

400m 0.78 0.65 0.57

50 0.86 0.86 0.82

100 0.76 0.74 0.66

200 0.46 0.55 0.50

400 --- 0.11 0.18

50 0.71 0.58 0.54

100 0.57 0.47 0.44

200 0.56 0.39 0.34

400 --- 0.31 0.24

50 0.53 0.48 0.39

100 0.33 0.32 0.17

200 0.01 0.13 0.08

400 --- 0.02 0.01

Gaya hidrraulik Ketebalangreenbelt

Arus tsunami Ketebalangreenbelt

Kedalamangenangan

Ketebalangreenbelt

Jarak Run up Ketebalangreenbelt

Subandono-DKPPembangunan Rumah Ramah Bencana

Gempa dan Tsunami

Page 60: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

60

Subandono-DKP

1. AKOMODASI/ADAPTASI DENGAN MEMBUAT RUMAH PANGGUNG

Subandono-DKP

Rumah Ramah Bencana Bencana Kabupaten Lombok Tengah(Retrofitting)

Page 61: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

61

Subandono-DKP

RUMAH RAMAH BENCANA KABUPATEN PESISIR SELATAN (Retrofitting dan Relokasi)

Subandono-DKP

Rumah Ramah Bencana Kabupaten Pariaman (Retrofitting)

Page 62: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

62

Subandono-DKP

GEDUNG TINKAT DENGAN LANTAI BAWAH TERBUKA

Subandono-DKP

SHELTER DI BANGLADESH

Page 63: TSUNAMI Subandono-DKP PETA LOKASI GEMPA BUMI DI INDONESIA (1600-2004) LEMPENG EURASIA LEMPENG INDO-AUSTRALIA 6 cm/tahun LEMPENG PHILIPPINE 8 cm/tahun LEMPENG PASIFIK 12 cm/tahun

63

Subandono-DKPphoto by Okushiri-town

Subandono-DKPSHELTER DI AONAE OKUSHIRI

Nishiki Tower in Mie Prefecture, Japan