25
Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 7996857# To download handouts: Click the Handouts button at the top of the screen, right hand side. The Handouts button looks like this: To ask a question: Click the ‘Q&A’ tab at the top of the screen, type your question in the dialog box, then click ‘Ask’. If you need to provide feedback during the presentation, please click on the drop-down arrow next to the Feedback tool.

Thanks for joining us. We’ll be starting soon

  • Upload
    bona

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 7996857# To download handouts : Click the Handouts button at the top of the screen, right hand side. The Handouts button looks like this: To ask a question: - PowerPoint PPT Presentation

Citation preview

Page 1: Thanks for joining us.   We’ll  be starting soon

Thanks for joining us. We’ll be starting soon.

To join the teleconference, dial 1-888-858-2144, passcode 7996857#

To download handouts: Click the Handouts button at the top of the screen, right hand

side. The Handouts button looks like this:

To ask a question: Click the ‘Q&A’ tab at the top of the screen, type your question

in the dialog box, then click ‘Ask’.

If you need to provide feedback during the presentation, please click on the drop-down arrow next to the Feedback

tool.

Page 2: Thanks for joining us.   We’ll  be starting soon

Updated process and Public Feedback Opportunity

Sequoia National Forest Travel Analysis Process,

Subpart A

Page 3: Thanks for joining us.   We’ll  be starting soon

Travel Analysis Process Team

Maria Ulloa, Forest Program LeadCore Team: Marianne Emmendorfer, team leader Marcos Rios, Engineering Cherie Klein, Mapping and GISExtended Team: Steven Ray, Forest Engineer Karen Miller, Forest Heritage Resource Program

Manager Linn Gassaway, North Zone Archaeologist (Cultural

Resources Data Steward) Fletcher Linton, Forest Botanist

Page 4: Thanks for joining us.   We’ll  be starting soon

Travel Analysis Process (TAP)

The travel analysis process (TAP) is science-based and will inform future travel-management decisions that move administrative units toward the minimum road system (MRS). The TAP considers ecological, social, and economic impacts. The TAP must be documented in a Travel Analysis Report (TAR), which includes: Maps displaying all system roads that shows those

roads which will potentially remain and those that may be removed or changed in the future (under site-specific NEPA).

Information about the analysis as it relates to the criteria found in 36 CFR 212.5(b)(1).

Page 5: Thanks for joining us.   We’ll  be starting soon

Travel Analysis Process Goal:

Management and sustainability of a road system that minimizes adverse environmental impacts by assuring roads are in locations only where they are necessary to meet access needs, and can be maintained within budget constraints.

Page 6: Thanks for joining us.   We’ll  be starting soon

Key Factors regarding Travel Analysis Process, Subpart A:

In Subpart A, use of motorized trails is only included in the recreation access criteria. Travel Analysis of motorized trails occurs in Subparts B and C.

Subpart A is intended to complement, rather than replace, other planning processes.

The Travel Analysis Report does not include a decision under NEPA, instead, it informs future proposed actions regarding the National Forest road system.

Page 7: Thanks for joining us.   We’ll  be starting soon

Sequoia Travel Analysis Procedure

Implement the 2005 Travel Management Rule;

Use the Region 5 Travel Analysis Process, Subpart A Guidebook (November 2012);

Update criteria and analysis from 2003 Sequoia National Forest Road Analysis Process (March 2012); and

Identify opportunities to have a properly sized road system for Sequoia National Forest and Giant Sequoia National Monument.

Page 8: Thanks for joining us.   We’ll  be starting soon

Sequoia Road Analysis Process (RAP)

Sequoia National Forest personnel conducted a RAP in 2003 in accordance with FSM 7712, which: Evaluated the maintenance level 1 through 5

roads, and considered non-system roads (i.e. county, state and private routes) in the assessment of benefit, risk and opportunities.

Maps and spreadsheets displaying all the system roads and their associated risks and benefits.

Information about the analysis as it relates to the criteria found in Forest Service Manual 7700.

Page 9: Thanks for joining us.   We’ll  be starting soon

Comparison of Road Analysis and Travel Analysis Processes

RAP Process (FS-643, p.16) TAP Process (PSW TAP Guide, p.6)Step 1-Set up the analysis Step 1-Set up the analysis

Step 2-Describe the situation Step 2-Describe the situation

Step 3-Identify issues Step 3-Identify issues

Step 4-Assess benefits, problems and risks

Step 4-Assess risks, problems and benefits

Step 5-Describe opportunities and set priorities

Step 5-Describe opportunities and set priorities

Step 6-Report Step 6-Report

Page 10: Thanks for joining us.   We’ll  be starting soon

Sequoia Forest TAP - Aquatic Risk

RAP TAP Guidebook RecommendationsGeologic Hazard

Indicators of Watershed –level Issues: Cumulative effects of roads on aquatic and riparian resources and impact to priority and other high value watersheds

Stream Crossing Density

Riparian Zone – Stream Proximity

Indicators of Degradation of Riparian Areas: Direct effects on channel and riparian habitat and function and impact to high value resources

Aquatic Risk Factor Composite Rating  

Page 11: Thanks for joining us.   We’ll  be starting soon

Terrestrial RiskRAP TAP Guidebook Recommendations

Heritage Resources Indicators of Damage to Cultural Resources: Threatened Sites

Road Density Effects to Wildlife Habitat (roaded miles per mile squared):

Indicator of Road Density: Disturbance due to road concentration  

  Indicators of Degradation and Disturbance based on Land Allocation: Roads in PACs

Scenic Resources -the impacts the road segment prism has on scenic integrity.

 

 Indicators for botanical resources: Indicators for Noxious Weed and Nonnative, Invasive Plants: .

Terrestrial Risk Factor Composite Rating  

Page 12: Thanks for joining us.   We’ll  be starting soon

AccessRAP TAP Guidebook

RecommendationPrivate/Non-recreation Public Access  

Public Access (Recreation)

Indicator of Disruption to Quiet Recreation: Proximity to Selected Trails Indicator of Wilderness Degradation: Road Intrusion in Wilderness

Administrative Site Access.  Vegetation Management  Fire Protection Roads are a useful tool in protecting areas from fires based on position on slope and continuity of fuelbeds, on whether the road provides access to facilities or private property to be protected, and whether there is a high incidence of ignitions.

Indicator of Human-caused Fire: Proximity to Known Human-caused Fire Origin Points

Access Composite Rating

Page 13: Thanks for joining us.   We’ll  be starting soon

SocialRAP TAP Guidebook

RecommendationLifestyle, Attitudes, Beliefs & Values:This factor is based on the extent the road system may affect human lifestyles, attitudes, beliefs, and values. Access to Native American gathering and cultural sites are included here.

The PSW Guidance contains Appendix G: Guidance for Communication and Public Engagement.

Economics by Road Maintenance Level This factor is based on our ability to maintain the existing road system with the current budget.

PSW Guidebook p. 21 states: Appendix C – R5 Economic Analysis Calculator – Annual Road Maintenance was developed to give a broad scale view of the forest’s ability to sustain the unit’s road system at objective maintenance levels with expected levels of funding (FSM 7712.1).

Social Composite Rating

Page 14: Thanks for joining us.   We’ll  be starting soon

A Note about Composite Ratings

A composite rating of low, moderate and high was assigned to each road based on combining values of the risk or benefit factors. A cumulative score was given from a sum total of all the risk or benefit factors. For example, the TAP aquatic risk composite adds the three factors for a composite range of 3 to 12, which were then added to the composite for terrestrial risks (5-15) for a total risk composite of 8 to 27. This composite was rated: Low=8-13, Moderate=14-20, or High=21-27

Page 15: Thanks for joining us.   We’ll  be starting soon

Composites (continued)Similarly, on the benefits side: Access ratings were summed to give a range of 5-21, and Social ratings were summed to give range of 2-6. The total benefit composite for the TAP is: Low=21-27, Moderate=14-20, or High=7-13NOTE: The ratings for risk and benefit are flipped numerically and by color.

The bottom line for the person who just glances through is: large numbers (red color) are “high risk or low use” and low numbers (green color) are “low risk or high use”.

Page 16: Thanks for joining us.   We’ll  be starting soon

Updating the Road SystemThe 2003 RAP considered 1,621 miles of road, and the TAP considers 1,646 miles of road in the Sequoia National Forest designated transportation system. This includes roads designated as “closed”. The additional mileage is due to: Corrections to road mileage from old

cartographic features to surveyed data (i.e. GPS) or current imagery,

Adding existing routes to the designated transportation system (i.e. campgrounds around Lake Isabella).

Page 17: Thanks for joining us.   We’ll  be starting soon

Corrected Road Route Examples

Page 18: Thanks for joining us.   We’ll  be starting soon

Analysis Conducted to Date

Each road was analyzed using the risk and benefit factors.

Criteria where ratings are assigned through GIS analysis were updated in the spreadsheet.

Where roads needed a non-GIS update (generally the access criteria) the TAP team reviewed both the map and spreadsheet to determine whether to keep the existing rating, or update it based on the criteria description.

When manually updating non-GIS criteria, the team erred on the side of maintaining access.

Page 19: Thanks for joining us.   We’ll  be starting soon

Which roads were analyzed?

Page 20: Thanks for joining us.   We’ll  be starting soon

Example of Current Mapped Ratings

Current Risk

Current Benefit

Current Opportunities

Page 21: Thanks for joining us.   We’ll  be starting soon

Sequoia TAP Opportunity Categories Matrix

Risk Equivale

nt

Need or Benefit EquivalentLow/Low: Consider for reduced maintenance level, closure, or decommissioning (low priority)

Low/Moderate:Consider for reduced maintenance level.

Low/High:Consider for reduced maintenance level.

Moderate/Low: Consider for reduced maintenance level, closure, or decommissioning (medium priority).

Moderate/Moderate:Consider for road maintenance priority, storm proofing, or reconstruction (medium priority).

Moderate/High: Consider for road maintenance priority, storm proofing, or reconstruction (medium priority).

High/Low: Consider for reduced maintenance level, closure, or decommissioning (high priority).

High/Moderate: Consider for road maintenance priority, storm proofing, reconstruction, or reroute (high priority).

High/High: Consider for road maintenance priority, storm proofing, reconstruction, or reroute (high priority).

Once roads are sorted into these nine rating pair categories, further screening of individual ratings could be done to further refine opportunities and priorities.

Page 22: Thanks for joining us.   We’ll  be starting soon

How You can ParticipateThough the TAP core team assigned ratings for the access factors, we need you to review and suggest changes to specific factors: Private and Non-recreation Public Public Recreation Lifestyles, Attitudes, Beliefs and Values

We also need your review for typos or other errors.

Page 23: Thanks for joining us.   We’ll  be starting soon

How You can Participate (continued)

Go to the website: http://www.fs.usda.gov/goto/sequoia/TAP Review the maps and spreadsheets for

those roads you’re interested in; Download the Feedback Form, fill it in, and

email it to: [email protected] with Subject: Travel Analysis Process; or

Mail it to the address listed on the form.All Feedback is Due by September 20, 2013

Page 24: Thanks for joining us.   We’ll  be starting soon

With your help we can be strategic in how and which roads are maintained into the future.

Page 25: Thanks for joining us.   We’ll  be starting soon

For More InformationContact:

Marianne Emmendorfer, TAP team leader35860 Kings Canyon RoadDunlap, CA [email protected] extension 313

Website: www.fs.usda.gov/goto/sequoia/TAP