21
23 Settembre 2004 Nino Del Prete 1 TileCal, Stato del rivelatore Stato dei lavori in corso: • Commissioning/Installazione •Test Beam Combinato • Analisi Cosa succedera’ a breve • Il 2005

TileCal, Stato del rivelatore

  • Upload
    lieu

  • View
    46

  • Download
    0

Embed Size (px)

DESCRIPTION

TileCal, Stato del rivelatore. Stato dei lavori in corso: Commissioning/Installazione Test Beam Combinato Analisi Cosa succedera’ a breve Il 2005. Installazione. ½ Barrel e’ installato in UX15 in schedula. I tests meccanici sono terminati - PowerPoint PPT Presentation

Citation preview

Page 1: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 1

TileCal, Stato del rivelatore

• Stato dei lavori in corso:• Commissioning/Installazione •Test Beam Combinato• Analisi

• Cosa succedera’ a breve• Il 2005

Page 2: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 2

Installazione

½ Barrel e’ installato in UX15 in schedula

• I tests meccanici sono terminati

• Il cilindro verra’ completato quando Lar sara’ installato (fine Nov. 2004).

• Spostamento nella posizione finale quando i toroidi saranno installati (Agosto 2005)

• Stiamo lavorando sul debugging e QC dei moduli e “servizi”.

UX1526 April 2004

Page 3: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 3

Installazione (2)

• Shape del cilindro e’ quella teorica ( ±3 mm)• La pre-installazione di ECB e’ finita, ECA e’ molto avanzata (24

moduli) • L’elettronica di FE (drawers) e’ installata• I Low Voltages PS hanno una schedula un po’ marginale ma

dovrebbero essere pronti ad Agosto 2005.• Cs (calibrazione) in preparazione, installato per Agosto 2005

Problemi:• Ci sono ritardi nell’installazione del Barrel dovuti al ritardo del

Larg (2 mesi), potrebbero essere recuperati nel 2005– Installazione di 6 moduli/sett e’ possibile -> 2 mesi “full speed”– La partecipazione al CTB continuera’ fino a fine Novembre

• Qualche problema di interferenza geometrica tra rivelatori. • A causa del taglio delle ME abbiamo dovuto interrompere la

nostra partecipazione all’installazione (4 mu invece dei 5 promessi)

Page 4: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 4

Test Beam Combinato (1)

• Il CTB e’ stato (ed e’) un successo.– I problemi (molti) che sono stati incontrati (DAQ,

elettronica, LV&HV...) sono stati risolti– Tutti i rivelatori hanno partecipato e sono acquisiti– Abbiamo molti dati, con tutti i rivelatori, da analizzare– Per molti giovani e’ stata la prima esperienza di un “quasi

esperimento”

• Per Pisa in particolare:– I nostri ragazzi si sono fatti onore prendendo molte

responsabilita’ e iniziative• Monitor online• Temporizzazione dei moduli di TileCal• Identificazione dei mu in TileCal• Per un lungo periodo sono stati “esperti” nel software

e DAQ affiancando gli esperti ufficiali

Page 5: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 5

Test Beam Combinato (2)

Page 6: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 6

Test Beam Combinato(3)

Up to now Lar calibration are not available, resolution is still poor.Intercalibration of calorimeters will be the next step.

(Martine)

Page 7: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 7

CTB, Risoluzione TileCal standalone (Martine)

Tile raw

+MIP in Lar

+MIP in Sci davati a TILE

TileCal resolution agrees with previous Test Beam calibrations. Resolution is poor due to the low statistics.

Etile (GeV)

150 GeV beam

Page 8: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 8

Test Beam Combinato, MDT-Tile

Ebeam = 350 GeV, pions

N.O

. M

DT t

ub

es a

bove t

hre

sh

.

Etile (GeV)

Etile (GeV)

Page 9: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 9

Test Beam Combinato

Timing (Vivarelli) e’ stato fatto nel run 25 ns di Giugno. Buoni risultati, la risoluzione temporale di Tile e’ migliore di 1 ns.

Identificazione dei (Usai) in Tile (ROD), ancora in attesa di RODs con CPU. L’algoritmo e’ stato implementato nel monitor al LVL3 (EF) in Athena.

Hits MDTTags Tile

ETILE (MeV)

=80%

EBEAM=180 GeV

Page 10: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 10

Monitor: Status of the project (C. Roda)

A first version of the complete chain is working at the Combined Test Beam

User Detector groups are Tilecal, MDT, RPC, Beam, Pixel, TRT

Hope to integrate more detectors during CBT (SCT, CSC, LVL1 calo trigger...)

Ongoing developments on: CMT package mantainence, reference histograms, trigger selection, automatic, storing of histograms...

Export a strip down version to MobiDAQ system

Monitoring Developers: P. Adragna, A. Dotti, R. Ferrari, C. Roda, W. Vandelli, F. Zema.

Users: M. Alviggi, I. Boyko, M. Brinet, D. Dedovitch, M. Della Pietra, L. Santi & people from Monitoring Developers.

DAQ support: M. Caprini, S. Kolos.

Page 11: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 11

Commands to the Core : rebinning, reset ...

Monitoring at CTB - MDT

Page 12: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 12

Monitoring at CTB – Tile + Beam

Back

Page 13: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 13

Monitor for MobiDAQ System (Dotti, Roda)

UX15 USA15

External PS

Mobi DAQ

MobiDAQ is a DAQ that is used for the QC and debugging of the modules installed in the Pit (up to 8 drawers); it uses preliminary cables (TTC, G-Link, CAN, Trigger, HV?).

Tilecal racks

Page 14: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 14

gnam monitor for MobiDAQ (Dotti)

•The ATLAS DataFlow and Online software are used for the data acquisition (the raw data are in the ATLAS Format) •A small partition composed of two emu-RODs, ROB and ROS has been prepared•First tests have been carried out reading successfully 2 drawers•gnam low level monitoring package used for the Combined TB will also be used to check in real time the quality of the data for the drawers under tests.•A special library is under development to perform some basic tests (pedestal and charge injection) for data from drawers and ADCs

Example histograms obtained on a MobiDAQ pedestal run (run number 1042)

Page 15: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 15

Milestones 2004

30/6/2004: Tile Monitor pronto per CTB: OK

31/7/2004: EBA pre-assemblato: OK

30/9/2004: TileMuId sui RODs: NO; la versione attuale dei ROD e’ troppo primitiva e non ha CPU, nessun software e’ stato ancora implementato.

TileMuId in funzione nell’EF ed in Athena.

31/10/2004: EBA pronto per l’installazione: OK; EBA/EBC saranno custoditi in un angolo del Bld 185 (che verra’ usato dai mu) in attesa dell’installazione in UX15 (2005).

31/12/2004: Tile Barrel completamente installato in UX15: improbabile, il ritardo sull’installazione del Lar difficilmente sara’ recuperato.

Page 16: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 16

Molto lavoro sta andando avanti anche a Pisa

•Simulazione del CTB (Lupi)•Simulazione G4 di TileCal (in ATLAS) (Lupi)•Validazione di G4 (Lupi, Dotti)•Identificazione dei mu in Tile, correzione per “energy loss” (Usai)

•Analisi dati del TB combinato (tutti)•Studio della calibrazione dei jets (Roda, Vivarelli)•Analisi dei dati delle calibrazione (un articolo di sommario e’ in preparazione) (Roda, Vivarelli)

•Analisi di Fisica (Z->bb, H->bb, HAbb->4b) (Cavasinni, Vivarelli)

Al CERN il TBC continuera’ fino a fine Novembre, assieme al lavoro di QC e debugging del rivelatore in UX15. Difficilmente, con le ME residue, potremo essere incisivi.

Page 17: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 17

Calibrazione dei jet

Metodo alla H1 : Calibrazione dei jet: si assegna un peso Wi

dipendente dal deposito di energia nella cella ad ogni sample calorimetrico.

Ogni peso è parametrizzato come

i

iiii E

baEw )(

WEmB2,WEmB3

WTile0,WTile1,WTile2

WEm2,WEm3

WHEC1,WHEC2,WHEC3,WHE

C4I pesi sono ottenuti minimizzando la risoluzione:

e MC

MCii

E

EEw2

Page 18: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 18

Analisi di Higgs MSSM H bb (bb H/A 4b, Mh=500GeV)

preliminare

Le diverse curve corrispondono a diverse soglie in PT dei jet. Per l’analisi e’ essenziale poter fare la sottrazione affidabile del fondo attraverso le side bands.

Fondo QCD

Set: Pth1=150 GeV, Pth2=100 GeV (curva blu), Con 30 fb-1 si ha S/B=2%, S/B=7.1

Rates LV1 2 KHz LVL2 3 b-tags 0.01 Hz

Page 19: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 19

Cose da fare nel 2005Al CERN:

•Completamento di Tile-Barrel in UX15 (7 mu per tecnici)•Monitor per MobiDAQ (Dotti, Roda)•QC e commissioning del Barrel (Dotti, Vivarelli, Usai)•Temporizzazione di Tile (Laser e cosmici) (Vivarelli)

•Installazione EBC (EBA?)•Run di cosmici (2004-2005)

I tempi (schedula attuale):BARREL:

Genn-Ago 2005 commissioning (on truck)Ago 2005 posizionamento finaleSett 2005-Genn 2006 cabling/testing/commissioning

EBC:Giu-Ago 2005 installazione Sett 2005-Genn 2006 cabling/testing/commissioning

Page 20: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 20

Scafolding for ID/calorimeter services installation with barrel at z=0-In current schedule calorimeter cabling to the detector: 15Aug-15 Oct 2005-After scafolding is removed to allow for muon chambers installationScaffoding has to be modified - should not block Fingers covers; - safe extensions for drawers extraction tool

Back

Page 21: TileCal, Stato del rivelatore

23 Settembre 2004

Nino Del Prete 21

Cose da fare nel 2005

A Pisa:Analisi e simulazioni (continua il lavoro del 2004)

•Simulazione G4 di TileCal (in ATLAS) (Lupi)•Continua lo studio su G4 (Lupi, Dotti, Roda)•Analisi dati del TB combinato (tutti):

•Intercalibrazione calorimetri•Algoritmi ricostruzione energia adronica

•Analisi dei dati delle calibrazione (un articolo di sommario e’ in preparazione) (Vivarelli, Roda)•Analisi di Fisica: abbiamo partecipato a studi su vari canali di Higgs, riteniamo che sia il momento di rilanciare questa attivita’

Tests di laboratorio su due elementi attivi che possono rivelarsi critici a lunghi periodi:

PMT, FibreQuesta attivita’ e’ importante per ATLAS ma anche per la formazione dei giovani ricercatori.