1R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
LAN Switching UpdateDesktop Switching, IE & SmartGrids, LMS 4.0, EnergyWise
R&S Zákaznické VT
Jaroslav Číž[email protected]
Prosinec 2010
2R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Agenda
Cat2960-S/3k-X přepínače
– IOS / HW roadmap
Industriální a SmartGrid přepínače & routery
LMS 4.0
EnergyWise
Wireless LAN
3R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Agenda
Cat2960-S/3k-X přepínače
– IOS / HW roadmap
Industriální a SmartGrid přepínače & routery
LMS 4.0
EnergyWise
Wireless LAN
4R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
NEW Intelligent Secure Access Fixed Switching Solutions
Catalyst 2960-S/3k-X
Bu
sin
ess C
on
tinu
ity
Business Agility
Converged Services
Intelligent Services
Evolves With Your Business
Catalyst 2960-S w/ LAN Base
Catalyst 3K-X w/ IP BaseCatalyst 3K-X
w/ LAN Base
Catalyst 3K-X w/ IP Services
Cisco EnergyWise
Reliable Voice, Video Scalable Medianet
Automated Smart Operations Non Stop, Self Preserving
Enterprise Services
New
NewNew
NewNewThreat Intelligence Role-based Access, Secure Traffic
Entry-Level to Cisco Experience
Catalyst 2960-S w/ LAN Lite
3750-X – 45,000+ units shipped
3560-X – 25,000+ units shipped
2960-S – 130,000+ units shipped
5© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
24/48 10/100/1000 ports with fixed uplinks
Fixed Uplink Options: 4x1G or 2x10G SFP+
FlexStack Technology
–Brings stackable ease-of-use features to the 2960 family, features 20G stacking links
Power over Ethernet
–Full standards-based PoE on every port
–PoE+ support for next-generation high-power devices
Sustainability - GREEN
–Very low power for Gigabit Ethernet Switch
–New EnergyWise functionality to control PHY power
–Half the power of Catalyst 2960G
• E-LLW, NBD and 90 day TAC support
Introducing Catalyst 2960-S
LAN Lite and LAN Base
Software Options
LAN Lite option provides
entry-level Gig-E platform
6© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Catalyst 2960-S FlexStack
FlexStack available with optional Module
–Hot Swappable with two wire-speed 10G ports
Up to 4 switches in a stack
Unified management, control, and data plane (similar look and feel as StackWise)
3 FlexStack Cable lengths supported
–0.5 meters, 1.0 meter, 3.0 meter
7© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Cisco® Catalyst® 2960 and Catalyst 2960-S
LAN Lite vs. LAN Base Highlights
Functions LAN Lite LAN Base
Layer 2
• Entry-level access Layer 2
Basic Layer 2 access features, including 802.1Qtrunking, (M)STP, STP extensions, Cisco Discovery Protocol, DTP, UDLD, VTPv2, PAGP/LACP, LLDP, and storm control
• Enterprise Access Layer 2
Wide range of Layer 2 access features for enterprise deployments, including FlexLinks, VTPv3, and LLDP MED
Layer 3• No routing support
Support for Layer 3 management interface• Static Routing Support
Manageability
• Entry-level manageability
Express setup, Cisco Device Manager, SNMPv3 (with cryptography), RMON, SPAN, TDR, Auto Smart Ports, and Smart Install client
• Basic manageability
Support for a wider range of MIBs, IPSLAResponder, and RSPAN
Security
• Entry-level access security
SSH v2 server, SSL, HTTPS, SCP, TACACS+, RADIUS, port security, 802.1x (with guest VLAN), MAB, private VLAN edge, and NAC
• Enterprise access security
DHCP snooping, IPSG, DAI, PACLs, Cisco Identity 4.0, and 802.1x features
QoS• Entry-level access QoS
Ingress and egress queuing, scheduling, Priority Queuing, and SRR
• Enterprise access QoS
Ingress policing, Trust Boundary, AutoQoS, and DSCP mapping, service policy
Note: LAN Base feature set includes all LAN Lite features.
8© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Catalyst 2960-S Sustainability GreenCisco Technology Innovation
Lowest Power Consumption in Industry
–Improving Gigabit Ethernet switching power efficiency
–Cisco low power consumption ASICs
–Uses 50% power of equivalent Ethernet switches in the market
Additional Power savings
–Interfaces power down when interface not in connected to reduce power
EnergyWise Capable
9© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Next Generation Gigabit Ethernet 24 and 48 port, Data and PoE+ Switches
StackPower – Power aggregation
Network Modules – Field replaceable uplink
Dual redundant power supplies and fans
Full 802.3at PoE+ Support
MACsec – Hardware encryption
Three IOS feature sets
Full Energy-Wise support
Catalyst 3750-X and 3560-XWhat’s New
10© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Stackwise & StackPower
Redundant, Dual PS, either AC/AC, AC/DC, AC, or DCcombinations
StackPowerCables
FRU DualRedundant Fans
Stackwise Plus4 Switches
Console, 10/100 port, and USB type A
11© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Optional Network ModuleMain features
FRU Network module supports OIR
Provides flexibility with two options at FCS:
– Four 1G ports (SFP)
– Two 10Gig port (SFP+) or Four 1G ports (SFP)
Port numbering changed
–Interface Gig 1/1/1 – 1/1/4
–Interface TenGig 1/1/1 – 1/1/2
Network Modules for the Catalyst 3750-X and 3560-X Series
C3KX-NM-1G= 1G network module spare
C3KX-NM-10G= 10G network module spare
C3KX-NM-BLANK= Network module blank spare
12© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Catalyst 3750 Models comparison
3750-X 3750-E 3750G
StackPower Yes No No
FRU Network Module
Yes No No
FRU Power Supplies
Yes, Dual PS Yes No
Encryption Yes (Downlink) No No
PoE+ 30W/port Yes No No
IOS
LAN Base OptionYes No No
Management Options
Console RJ45, USB console, and Out of band
Ethernet
Console RJ45 and Out of Band Ethernet
Console RJ45
RPS / XPS XPS RPS RPS
EnergyWiseReport Actual Power use
PoE & System
Report Actual Power use
PoEReport Budgeted Power
13© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
MACsec (Crypto)Main features
Standards based encryption (802.1AE) on all user ports
Line rate performance
Standards based key exchange protocol, MKA, included in 802.1X-Rev
Tested with current Intel NIC cards
Some newer Intel’s LOM chip set supports MACsec
Industry Leadership
14© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Cisco Catalyst 3560 and Catalyst 3750, Including E and X Series
Cisco® Catalyst® 3560-X and Catalyst 3750-X
LAN Base vs. IP Base and IP Services Highlights
Functions LAN Base IP Base IP Services
Layer 2+
• Enterprise access Layer 2
Wide range of Layer 2 access features for enterprise deployments
• Complete Access Layer 2
Supports all Cisco Catalyst 2000 and Catalyst 3000 Layer 2 features, including hot standby protocols; supports Cisco StackPower™ technology (Cisco Catalyst 3750-X)
Layer 3
• No routing support
Support for SVI with no IP routing support
• Enterprise access Layer 3
RIP, static and stub PIM, and EIGRP
• Complete access Layer 3
OSPF, EIGRP, BGP, IS-IS
VRF-lite, WCCP, and PBR
Manageability
• Basic manageability
Support for a wide range of MIBs, IPSLA Responder, and RSPAN
• Enterprise access Layer 3
Gold-Lite and Smart Install Director
• Complete access Layer 3
EEM and IPSLA Initiator
Security
• Enterprise access security
DHCP Snooping, IPSG, DAI, PACLs, Cisco Identity 4.0, NAC and 802.1x features
• Complete access security
Router and VLAN ACLs, private VLANs, complete identity and security, TrustSec SXP, and IEEE 802.1AE (Cisco Catalyst 3560-X and Catalyst 3750-X)
QoS
• Enterprise access QoS
Ingress policing, Trust Boundary, AutoQoS, and DSCP mapping
• Complete access QoS
Support for all Cisco Catalyst 2000 and Catalyst 3000 QoS features, including per-VLAN policies
Note: IP Services feature set includes all IP Base features. IP Base feature set includes all LAN Base features.
New
15© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
<Segue Slide>
March 2011 releaseFuture Possibilities
16© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
3750X – GE SFP switch
12 and 24 port GE SFP ports with StackWise+
4x GE SFP or 2x10G SPF+ Modular Uplinks
Dual redundant Power supplies and fans
StackPower, MACSec
FCS – Mid-2011
3750v2100FX switch
24 100FXSFP ports, 2x GE SFP uplinks, StackWise
Backward compatible, part of the 3750V2 family
FCS – Jan 2011
17© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Service Module
2x10Gig (or 2x1G) Uplink Module with additional hardware to facilitate delivery of new services
Summer 2011
Uplink Options List Price
C3KX-NM-1G $500
C3KX-NM-10G $2500
C3KX-SM-10G TBD
18© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Built-in configurations for increasing number of devices
For 802.1x and MAB devices have built in configurations for successful as well failed authentication
Enable for a range of interfaces
Define Custom configuration for when the device unplugs
Optional Auto Sticky mode to save configuration to memory
Auto Secure state when the device is plugged out
Support for legacy devices
New in 12.2(55)S
E
Device unplugged and unknown device plugged in – Auto Secure State
Auto-Provisioning of Switch portsAuto Smart Ports
Device Identified and Switch Port Auto configured with built-in or custom made configuration
Shipping since Fall 2009
Coming in Mar 11
19R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Savings with Auto Smart Ports
Traditional Switch Ports Auto Smart Ports
vs.
Traditional SW Port
deployment
Time and Cost Auto Smart Port
deployment
Time and Cost
Produceqos, security
configs/device type
10-12 lines of config.
1-2 hours
Built-in Configuration for
common devices
0
Test configuration end
to end and fine tune
1-2 weeks All built-in configs are
solution tested
0
Manual and Static
Configuration per port
300-500 hours per
1000 employees
Detect Device type and
auto configure
0
Adds, moves and
changes manual
100 hours annually per
1000 employees
Adds moves and
changes automated
0
800+ man hours
saved per 1000
employees
20R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Built-in Traffic Simulatoraka IPSLA Video Operation
Built-in traffic simulator with a variety of traffic profiles
Calibrate network performance before rolling out new applications
Recreate traffic scenarios for troubleshooting or fine tuning
A custom profile tool available to allow creating profiles for any kind of traffic in your network
XX
Coming in Mar 11
21R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Savings with Built-in Traffic Simulator
Traditional Switch Cisco 3K Series Switch
vs.
Traditional SW Port
deployment
Time and Cost Cisco 3K Switch Deployment Time and
Cost
Purchase Traffic
Simulation
$10-200K Built-in traffic simulator 0
Travel to site to
connect the simulators
$5-10K per site Can be enabled remotely 0
Run tests over
extended durations
1 week Includes a scheduler to run
periodic test over extended
durations
0
Scale limitation for
endpoints
Scales to 1000s of new devices 0
Coming in Mar 11
22R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
MPLS
Trace the path of the media stream
Using hop by hop statistic collection find the source of problems
Adding jitterDropping packets
For pre-deployment or troubleshooting scenarios mediatrace can be used in conjunction with the traffic simulator
SiSi SiSi
SiSi SiSi
Mediatrace Coming in Mar 11
23R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Savings with Mediatrace
Traditional Switch Cisco 3K Series Switch
vs.
Traditional SW Port deployment Cisco 3K Switch Deployment
Study the L2/L3 topology to predict the
mediapath
Mediatrace automatically traces the mediapath
Check interface statistics and logs at every hop
AND/OR
Travel to site to connect the sniffers
Hop by Hop statistics collected to find the
problem node. It can be enabled remotely
Manually simulate the problem It can be used in conjunction with the traffic
simulator to recreate problems.
Intermittent problems are time consuming It can be left on for extended duration to capture
intermittent problems
Coming in Mar 11
24R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Manageability
Forwarding
Forwarding
Blocking
Blocking
Rolling Stack Upgrade (under investigation): procedure reloads
and optionally upgrades one stack member at a time while preserving regular
L2 connectivity with the distribution switches. It also preserves the control
plane integrity of the stack. Leverages inherent redundancy of the network -
EtherChannels, dual uplinks, dual downlinks
Coming in Mar 11
25R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
New 3560C and 2960C compact switches
Provide Network Extension
PoE/PoE+/PoEPP pass through on the switch to enable PoE devices from switch outside the wiring closet without a power supply
Enhanced Security
MACSec allows hop-by-hop L2 encryption on downlink & uplink ports providing L2 data encryption between compact switches and 3560X/3750X or Cat4K
Enhanced user experience
Smart Operations and USB interface for easy manageability
New easy to use interface and bezel design for placement outside wiring closet
FCS Target : Q1CY11
26R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Public Sector Deployment ScenarioCisco Connected Classroom
BenefitsReal time streaming teaching contentPaperless teaching experienceHigher school safety/security
Number of ports required for a checkout stationPoE ports (5-7)
- Smart Board- IP Camera (2)- IP Speaker (2)- Access Point - HVAC sensor
Data ports (3-5)- Voice/ Paging- Data- Door Access Control
27R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Printer
BenefitsReal time advertisementReal time inventory management
Number of ports required for a checkout stationPoE ports (2)
- UC- Printer
Data ports (2)- Weighing machine- VISA
Retail Deployment ScenarioCisco Connected Kiosk
28R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Hospitality Deployment ScenarioCisco Connected Cabin Room
BenefitsHotels gain control of video contentReal time, customized marketing contentCabling saving – single cable to roomStreamline IP security and VLANconfig
Number of ports required for a room
PoE ports (4)
-3 IP Phones
- AP
Data ports (4)
- Wired Internet Access
- Laptop
- IP TV
- In room automation
29R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Next Generation 3560C and 2960C compact switches
2960CG-8TC-L
8 10/100/1000 PoE+ ports
2 dual-purpose uplink ports
IP Base image
3560CG-8PC-S
8 10/100/1000 PoE ports
2 PoE++ input ports
IP Base image
2960C-8PT-L
8 10/100 PoE ports
2 PoE+ input ports
LAN Base image
Key features : Enhanced user experience design, Network Extension, L2 hardware security
8 10/100 ports
2 PoE+ input ports
LAN Base image
8 10/100/1000 ports
2 dual-purpose uplink ports
IP Base image
8 10/100/1000 ports
2 dual-purpose uplink ports
LAN Base image
New
2960C-8TT-L
3560CG-8TC-S
3560CG-8PT-S
Catalyst
2960C
Catalyst
3560C
30© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
Agenda
Cat2960-S/3k-X přepínače
–IOS / HW roadmap
Industriální a SmartGrid přepínače & routery
LMS 4.0
EnergyWise
Wireless LAN
31© 2010 Cisco Systems, Inc. All rights reserved. R&S Zákaznické VT, Prosinec 2010
1985
Million
Billion
Trillion
The Third Great EraEvolution of IP Networks
2010 2020+
Internet-of-Things represents huge opportunity for Cisco across all industries:Manufacturing, Rail/Metro, MassTransit, Oil&Gas, Mining, Chemical, Utility, Ports, Public Security,
Healthcare…
32R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Current IE Product Offerings
DIN rail mount
Modular design
Configurable 4 to 24 FE downlink
ports
2 GE uplink ports (SFP combo)
L2 LAN Base, L3 IP Service IOS
L3 IP Base (March 2011)
Output alarms
19” rack mount, 1RU
Fixed 24 FE downlink ports, 2 GE
uplink ports (24 copper or 16 SFP + 8
PoE+)
L2 LAN Base IOS at FCS
L3 IP Services (Oct 2011)
Input / Output alarms
Front / back LED panels
33R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
SmartGrid Cisco PortfolioSubstation Automation
Substation LAN Substation WAN Protection Network Physical Security
Secure network
for NERC/CIP
SCADA & IP
communications
Virtual networks
in one platform
Optical solutions
for tele-protection
Secure WAN
communications
for SCADA
Substation access
control
Perimeter and
equipment
monitoring
Station Bus
communications
Enterprise
communications
Function
CGS 2520 Connected Grid Switches
Industrial Ethernet IE 3000 Switch
CGR 2010 Connected Grid Router
Optical Networking ONS 15454
Aggregation Services Routers ASR 1000
Video Surveillance IP Cameras
Physical Access Gateway
34R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
The Making of The Broadband Wireless ISRExtending the Network to the Micro Branch
3.5/3.7G Wireless WAN
Small RetailBranches in Emerging & Rural Markets
Outdoor ATM & Kiosks
OutdoorDigital Signage
EnterpriseVehicles
RemoteTelemetry
Broadband Wireless ISR
Key Attributes for Remote ATM Machine:• 98.6% Uptime (~ 5 days downtime per year)• Monitor State of Health – Max 10 min Cycle Time to ALIVE • Size, Fan less, Extended Temperature, Dust Protection• 5 Year Life Cycle
SMALL FOOT PRINT
HARDENEDOPTION
ASYNC SERIAL & FE LAN PORTS
SMS/GPSSUPPORT
3G MIB & OUT OF BAND MNGMT
3.5G & 3.7GPHASE II (4G & 802.11)
DUAL USIM SUPPORT
OTA FW UPGRADE
35R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
819 819H 819W 819WH
3G/4G WAN EVDO or HSPA+ EVDO or HSPA+ EVDO or HSPA+ EVDO or HSPA+
3G Antenna External/Diversity External/DiversityEmbedded &
External/DiversityEmbedded &
External/Diversity
WLAN (a/b/g/n) no no 2.4 or 5.0 GHz 2.4 or 5.0 GHz
Unified Support (Licensed Option) no no yes yes
Wifi Antenna no no External External
Onboard WAN Ports 1 GE 1 GE 1 GE 1 GE
12-in-1 Serial (Licensed Option for Sync WAN)
1 1 1 1
Onboard LAN Ports 4 FE 4 FE 4 FE 4 FE
GPS / SMS yes yes yes yes
IOS (Universal Image) 15.1(4)M &15.2(1)T 15.1(4)M &15.2(1)T 15.1(4)M &15.2(1)T 15.1(4)M &15.2(1)T
Reset to Safe/Golden IOS & Config yes yes yes yes
WAAS Express ( Option) TBD TBD TBD TBD
Hardened (-20/60C / IP41) no yes no yes
Power Supply External External External External
Dimensions (HxDxW) 178x173x44 mm 178x173x44 mm 178x173x44 mm 178x173x44 mm
Estimated Availability April 2011 April 2011 July 2011 July 2011
Introducing the Cisco 819 Series Broadband Wireless ISR
Coming in April11
36R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Agenda
Cat2960-S/3k-X přepínače
–IOS / HW roadmap
Industriální a SmartGrid přepínače & routery
LMS 4.0
EnergyWise
Wireless LAN
37R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
CiscoWorks LMS 4.0 Release Goals and Objectives
Cisco Differentiation
•BN Services
• EnergyWise
• Security (TrustSec)
• Medianet (Coming)
•Switch differentiators
• Auto Smartports
• Smart install
•CCIE in-a-box
• Best practices config& monitoring
Ease-of-Use and Ease-of-Operations
•Simplified installation and setup
•Enhanced automation
•Workflow-centric user experience
•Instructional VoDs
•Operational Work Centers
Manageability
•Day-1 device support
•Day-1 feature support
•3rd party device support
•Monitoring & Troubleshooting
•Config& compliance
•Software image management
•Powerful reporting tools & dashboards
•EoL/EoS&PSRIT
Reduce customer OPEX, increase customer confidence, highlight
Cisco differentiated BN services & enhance Cisco stickiness
38R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
39R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
40R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
41R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
42R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Agenda
Cat2960-S/3k-X přepínače
–IOS / HW roadmap
Industriální a SmartGrid přepínače & routery
LMS 4.0
EnergyWise
Wireless LAN
43R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
EnergyWise Overview
Businesses want energy solutions:
Monitor & manage power consumption of IT & building systems
Cisco’s solution and vision is EnergyWise
IOS technology built into Cisco switches and routers
Extends to any energy consuming building devices
IT PCs, IP phones, wireless APs,…
Building HVAC (Heating, Ventilation, Air conditioning), lighting,…
EnergyWise delivers:
1) Monitoring Real-time energy reporting by device empowers finance, individual departments and end-users
2) Control Unlocks ROI and savings
44R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
CiscoWorks LMS (Now)
Orchestrator (Now)
SolarWinds
(SNMP, API is TBD)
EnergyWise Toolkit SDK
EnergyWise Toolkit Management API
Cat 2K (now)
Cat 3K (now)
Cat 4K (now)
Cat 6K (now)
ISR G2 (now)
Joulex
(Nov, 2011)
IBM Tivoli
(SNMP, API is TBD)
Enterprise Building Architecture
Campus IT Devices
IP Phones (May, 2011)
Orchestrator PC Clients
(Now)
Agentless PC Clients
(Oct, 2011)
Wireless APs & Controllers (Aug, 2011)
IP Ethernet Building Devices
CDN Partners Supporting SDK+ (CY 2011 onwards)
Building Protocols and non-Ethernet connectors
Legacy Building Devices
Cisco Mediator (CY 2011)
JCI Metasys (TBD)
Schneider Gateway (TBD)
Protocol Translators / Gateways
Honeywell Tridium (TBD)
BMS
Open Framework Provides
Solutions for Every Scenario!
POE POE
POE POE
Vizelia
(Feb, 2011)Pulse Energy
(TBD)
Cisco Confidential – NDA Only
45R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Cisco EnergyWise Orchestrator
First dedicated power management application based on Cisco EnergyWise
Additional PC/Desktop power management functionality
Release:
Limited FCS release
Licensing free up to 100 PCs, after which license fee per PC, free for all other end-devices
Measure &
Benchmark
Report & Monitor
Manage
46R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Cisco IP Phone EnergyWise Support
Upcoming release:
•EnergyWise with Power Save Plus mode for 69xx, 89xx, 99xx and 3rd generation non-SIP 79xx phones
•6921, 6941, 6961, 89xx and 99xx phones will have a button to manually power up
•For existing phones it’ll require an IP Phone software upgrade and the Cisco Unified Communications Manager (CUCM) software to be at 8.5 (1) release
•Creates two modes: Power Save and Power Save Plus.
• Power Save (existing feature that can integrate into EW) leaves the switch active and recovers in approx. 25 msecs. POE port is still active.
• Power Save Plus (new EnergyWise feature) takes the phone to less than a Watt and requires the 45 – 60 second boot time for recovery. Phone’s PC port isn’t active. For older phones the user can’t manually wake them up
Now:
• IP Phones supported via POE on/off
47R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
Agenda
Cat2960-S/3k-X přepínače
–IOS / HW roadmap
Industriální a SmartGrid přepínače & routery
LMS 4.0
EnergyWise
Wireless LAN
48R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
MitigateWireless LAN Controller
What is CleanAir Technology?
Cisco CleanAir
Cisco CleanAir Technology integrates interference information from the AP into the entire system.
Classification processed on Access Point
Interference impact and data sent to WLC for real-time action
WCS and MSE store data for location, history, and troubleshooting
Maintain Air Quality
GOODPOOR
CH 1 CH 11
LocateWCS, MSE
Visualize and Troubleshoot
• Classification processed on Access Point
• Interference impact and data sent to WLC for real-time action
• WCS and MSE store data for location, history, and troubleshooting
49R&S Zákaznické VT, Prosinec 2010 © 2010 Cisco Systems, Inc. All rights reserved.
A