Page 1: Query alarm and power configuration 2

www.huawei.com

Security Level:

HUAWEI TECHNOLOGIES CO., LTD.

Query Alarm and Power Configuration

Hub Site Down Until_CW 9

Alwan Ramadan WX289116, March 16, 2016

Page 2: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 2 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

20416_Tangguk Bongkar_3G

1. Overview from M2000 no indicated 3G down but from

power database battery back up time is 1.8 hours. And

required to add 1 rectifier module

2. 2G system using Nokia equipment, can’t be monitor by

m2000. Need NOC send the query alarm. Power database

battery backup is more than 2 hours.

3. No diesel generator.

Page 3: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 3 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

20633_MerdekaPekan_TjPura_3G

1. Overview from M2000 no indicated 3G down but from

power database battery back up time is 3 hours.

2. 2G system using Nokia equipment, can’t be monitor by

m2000. Need NOC send the query alarm. Power database

battery backup is more than 2.5 hours.

3. Diesel generator Deactivated

4. LLVD/BLVD was configured, make sure that connection as

well.

Page 4: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 4 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

30661_SITEBA2_3G

1. Overview from M2000 no indicated 3G down but from

power database battery back up time is 2 hours. And

required add 1 rectifier module

2. 2G system using Nokia equipment, can’t be monitor by

m2000. Need NOC send the query alarm. Power database

battery backup is more than 2.5 hours.

3. Diesel generator Deactivated

4. Recommendation to activate LLVD/BLVD and do rewiring

as well.

Page 5: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 5 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

50943_Lintas Timur KM 28_Sakernan_2G<> 50060_Lintas Timur_Sakernan_2G

Page 6: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 6 华为保密信息,未经授权禁止扩散

In a same time GSM in far end is down. Need Checking wiring transmission cable, and make

sure that cable are connected in BLVD

Make sure that LLVD setting is working

Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission

connect to LLVD and do rewiring as well.

In Power database battery back up time ismore than 2 hours.

No Diesel Generator

Page 7: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 7 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

58012_Simpang Kuamang kuning (Repeater Site)

1. Overview from M2000 that site is repeater, can’t query

alarm. Recommendation to create enva and power alarm

indication through transmission. Power database batterys

status are stolen on february 28-2016 . Required to install

new battery 2*100Ah and add 1 rectifier module

2. 2G system using Nokia equipment, can’t be monitor by

m2000. Need NOC send the query alarm. Power database

battery backup is more than 2 hours.

3. Diesel Generator not issue

4. Recommendation to activate LLVD/BLVD and do rewiring

as well.

Page 8: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 8 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

60030_Burangan Seberangulu_2G <> 62211_Era Ilir Timur

Page 9: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 9 华为保密信息,未经授权禁止扩散

In a same time GSM in far end is down, after we trace that problem was’nt on site 60030,

but on site 60027 that impact to another site under.

Please ensure all alarm connected to BTS are function, because the critical alarm like Main

input not detect in M2000.

Recommendation to adjust LLVD Configuration lower than 48Vdc , if actually transmission

connect to LLVD and do rewiring as soon.

In Power database battery back up time is more than 2 hours

No Diesel Generetor

Page 10: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 10 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

161138_Bukit Pinang_2G <> 161155_ Sinbaya Sebulu Modern

Page 11: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 11 华为保密信息,未经授权禁止扩散

While the non priority load like BTS and NodeB are switch OFF, but actually in a same time

the transmission are switch off also and caused far end site down.

Need Checking wiring transmission cable, and make sure that cable are connected in BLVD

Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission

connect to LLVD and do rewiring as well.

In Power database Battery back up time is more than 2 hours

No Diesel Generator

Page 12: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 12 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

280106_Sanghiang_2G

Page 13: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 13 华为保密信息,未经授权禁止扩散

In Power database battery backup time is more than 2 hours.

Need check wiring connection as well

No Diesel Generator.

Page 14: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 14 华为保密信息,未经授权禁止扩散

Query Alarm and Power Configuration

280020_Kp.Karya Mukti-Sindang laya Pagelaran

Page 15: Query alarm and power configuration 2

HUAWEI TECHNOLOGIES CO., LTD. Page 15 华为保密信息,未经授权禁止扩散

Mostly each time the site was down, but there was not alarm power or main input detected in

M2000 before.

Need check alarm connection on BTS and make sure all alarm are function.

In Power database battery back up time is 2 hours.

No Diesel Generator

Page 16: Query alarm and power configuration 2

Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.

The information in this document may contain predictive statements including, without limitation, statements

regarding the future financial and operating results, future product portfolio, new technology, etc. There are a

number of factors that could cause actual results and developments to differ materially from those expressed or

implied in the predictive statements. Therefore, such information is provided for reference purpose only and

constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

Thank you www.huawei.com