Sequence of Presentation

• Background• Year wise details of Rains• Impact of the Rain• Objectives• Storm Water Drainage System• Stream Discharging rain water directly in to the Sea• Existing Situation• Preparedness Measures• Pre Rain Measures• Identified low lying areas• Geography of Nullah under KMC Responsibilities• KMC Measures• Measures during rains• Post Rain Measures• Functions performed by other Departments• Emergency/Imortant Telephone Numbers

Page 3: Kmc rain emergency plan 2014 final

Karachi Rain Emergency Plan 2013

Background:

• Karachi is situated in the south of Sindh on the coast of Arabian sea. By virtue of geographic location it tends to have a relatively mild climate with low levels of average precipitation (approximately 250 mm per annum)

• Heavy rainfall received in a relatively short span of time, caused flash floods.

• Synchronization of the peak floods with high tide in the sea.

Page 4: Kmc rain emergency plan 2014 final

Karachi City and surrounding cris-crossed by many nallah which generally flow from the North East to South West. These nallahs act as natural drains and carry storm water from Kithar Range down till sea. The major rivers in the area are Malir River in the East and Lyari River in the West. Which further have their own small tributaries (nallahs) falling in to them. During the floods of 2013, a new central nallah (Wateen Wari Nullah). Which originates from Kirthar Range, was identified which cause flooding in Karachi. Based on the experience of floods of 2013, it can be generally concluded that the drainage of Karachi is dependent on three Rivers/ nallahs. Which may cause flooding, due to overflow. These are Malir River in the East, Wateen Wari Nallah in the Middle and Lyari River in the West.

Page 5: Kmc rain emergency plan 2014 final

YEAR WISE DETAILS OF RAINS (In MM)

Year June July August September Total

2006 0 66.2 148.6 21.8 236.6

2007 110.3 41 250 0 401.3

2008 0 94 37.5 Trace 131.5

2009 3.6 159.9 44 68.9 276.4

2010 97.4 130.4 11.5 42.7 382

2011 0 7.7 60.1 213.3 281.1

Page 6: Kmc rain emergency plan 2014 final

IMPACT OF THE RAIN

• The traffic system cease to work• Failure of electric power and other utility services• Choked sewerage system causing difficulties to public,

and Katchi Abadies get submerged, resulting in epidemic diseases like Gastroenteritis, Cholera, Malaria, Skin Diseases and Conjunctivitis.

• Advertisement Boards/fall of trees – causing havoc and loss of precious lives

• Contamination of drinking water• Damage to Road infrastructure

Page 7: Kmc rain emergency plan 2014 final

OBJECTIVES

• In view of the previous experiences, it became imperative to introduce updated Rain Emergency Plan with a systematic approach for the safety of property and lives of Karachities and a provision of better relief system to them

• To counter flood like situation in Lyari River, Malir River and Major Nallahs like their link Nallahs during heavy rain fall

• For awareness information of concerned agencies/DMCs where unauthorized settlement and inhabitants are this plan would help and assets for them rescue and relief living in dangerous environment of River Beds

• A coordinated/comprehensive/update Rain Emergency Plan is very much needed to prevent and manage the pre, during and post rain situation.

Page 8: Kmc rain emergency plan 2014 final

STORM WATER DRAINAGE SYSTEMAn overview of Storm Water Drainage System:

There are 13 major Nallahs running through out the city and most of them discharging their affluent into the 2 major rivers i.e. Lyari and Malir

Details of Nullahs:• Soldier Bazar Nallah• Farrier Nallah/Glass Tower Nallah• Chakora Nallah• Golden Town Nallah• Korangi Nallah• Picture Nallah• Gujjar Nallah• Orangi Nallah• Zehri House Nallah/Manzoor Colony Nallah• Monchko Nallah

Page 9: Kmc rain emergency plan 2014 final

Stream Discharging Rain Water Directly in Sea.

• Nehr-e-Khayyam• Frere Nallah• Pitcher Nallah• Kalri Nallah• Soldier Bazar Nallah• Manzoor Colony Nallah

Page 10: Kmc rain emergency plan 2014 final

EXISTING SITUATION

• Most of the drains are:

- Heavily encroached and peoples are living un-authorizedly on both sides of these Nallah

- Choked with silt and garbage• Their water carrying capacity is at the minimum level• Stagnation of rain water on road, lanes and streets due

to chockage and non cleaning of Nallahs, in case of rain fall.

Page 11: Kmc rain emergency plan 2014 final

KARACHI DRAINAGE NETWORK

Storm water drains of Karachi have been converted into sewers over the years and they lack the capacity to drain off rain water or any other runoff water. Salient are as following :-a. The drains, which are supported to remain dry through out the year,

have been turned into sewer conduits for the city.b. A rise in the number of slums and squatter settlements built on the

banks of the drains have made the issue further complicated.c. Almost all 13x large and over 250x small storm water drains have

been encroached and these encroachments have clogged the Storm water drains.d. Few pictures of various nallahs, drains and rivers and related

important information which may help in understanding the overall the state of drainage system in the city as given below:-

1. Sungal Nallah (White House Area North East Karachi.2. Encroachment of silt and Garbage.3. Picher Nallah (Landhi Sector) Mixing of Sewerage Line and Garbage 4. Azim Pura Divisionary Nallah.5. Vegetation and Wild Growth in Nallah.

Page 12: Kmc rain emergency plan 2014 final

MALIR RIVER Malir River flows through eastern part of Karachi from North East to the South West and falls into the Arabian Sea. Salient are as under:-a. It has two many tributaries. Thuddo and Sukhan nallahs.b. In the rainy season, this river experience heavy water flow.c. It drains almost 35-40 % of flood water and the drainage of Eastern

region is dependent in this river. d. Generally in previous year of floods, its surrounding populated areas did not face any over flow because of its wide span and capacity.e. Its banks have experienced growth of katchi Abadi and encroachments at some places.

Tributaries (Major nullahs) Malir River are as under:-

a. MANZOOR COLONY NALLAH 1. It drains water from adjoining areas of Shahrah-e-Faisal, Manzoor

Colony, M Ali Jinnah Society and DHA.2. It was able to drain the flood water from surrounding areas in 2013.3. Gradually, its boundaries are being encroached which may result in

narrowing its span and causing overflow of flood water.

Page 13: Kmc rain emergency plan 2014 final

Tributaries (Major Nallahs) Malir River are as under:-

a. MANZOOR COLONY NALLAH

1. It drains water from adjoining areas of Shahrah-e-Faisal, Manzoor Colony, M Ali Jinnah Society and DHA.

2. It was able to drain the flood water from surrounding areas in 2013.

3. Gradually, its boundaries are being encroached which may result in narrowing its span and causing overflow of flood

water.

b. KORANGI NALLAH

(1) It drains water from Korangi Industrial Area and surrounding direct into the sea.

(2) Surrounding parts of this nallah are mostly flood free.

(3) This nallah has also been encroached

Page 14: Kmc rain emergency plan 2014 final

c. NEHR-E-KHAYYAM

(1) Drains water from Clifton and Defence areas and falls directly into sea.

(2) This drainage also requires dredging/de-silting.

d. AZEEM PURA DIVERSIONARY NULLAH

(1) Capacity of nallah has diminished due to worst encroachment linkage to sewerage lines and heavy silting.

(2) Its span was around 100ft once it was constructed presently it has been reduced to 20ft (average).

(3) Purpose of the diversionary nallah is to drain water from Air Port area and surroundings and deliver it to Malir Naddi.

(4) New construction of the same nallah are under progress. It will flow underground in Azim Pura localities.

Page 15: Kmc rain emergency plan 2014 final

WATEEN WARI NALLAH AND ITS EXTENSION DOWN TILL MALIR

RIVER This nallah originates from Kirthar Range and passes through Saforan Goth where it is named Soforan Nallah and then further southwards. Pahelwan Goth Nallah and Jauher Nallah also joins in and it is then named as Chakora Nallah which finally outfalls into Malir Rivers.

THE MAJOR LINKED IN WATEEN NALLAH ARE AS FOLLOWS:-

a. Phelwan Goth Nallah

(1) This nallah originates from race course Ground and has enough area to take water load of its share.

(2) It drains water from Pehlwan Goth and surroundings.

(3) The nallah is also being encroached.

Page 16: Kmc rain emergency plan 2014 final

b. JAUHAR NALLAH

(1) This Nallah join the Pehalwan Goth Nallah near Gulistan-e-Jauhar Colony Bridge.

(2) This Nallah needs parallel to Pehalwan Goth Nallah but passes through Gulistan-e-Jauhar area.

(3) Because of Heavy encroachments water over flows and floods the area for limited period.

(4) Pehalwan Goth Nalllah and Gulistan-e-Jauhar Nallah meet near the colony bridge from this point onwards this Nallah is named Chakora Nallah which ultimately drains water of both the Nallah to Malir Nadi.

c. SAFORAN NALLAH

(1) This nallah drains the water of Pehalwan Goth, Gulistan-e-Jauhar and Shah Faisal Colony.

(2) Span of this nallah has reduced manifolds due to encroachments.

(3) Condition of vegetation and wild growth is also alarming.

(4) This nallah over flow during flood.

(5) There is no major flood threat but life of public comes to a standstill till pumps/ drain out water from the roads to diversionary nallahs.

Page 17: Kmc rain emergency plan 2014 final

LYARI RIVER

Lyari River flows from North East to the center and drains into the Arabian Sea at Manora Channel. The river is about 50 KM long. It carries the surface water/ run off water into sea. Encroachment is also common phenomenon astride the river. Its tributary nallahs are as under:- a. SUNGAL NALLAH

(1) It drains rain water from Sohrab Goth, Bara Area and surroundings.

(2) It had successfully drained water and surroundings were not effected in 2013. However, span of this nallah has reduced due to heavy encroachments.

b. PICHER NALLAH(1) This nallah drains water from Jamila Street, Light House

area, Lee Market area, Khara Dar and Meetha Dar areas and flows into sea.

(2) This nallah is totally sited, filled with garbage and sewerage water and only a portion of real picher nullah is oval on ground whereas rest of its portion has been encroached.

Page 18: Kmc rain emergency plan 2014 final

c. KALRI NALLAH

(1) It originates from Juna Masjid and drains water from Old City and Central Karachi directly into the sea.

(2) Like Picher Nallah, this Nallah is also sited and full of garbage.

(3) Flow of water through this nallah seems impossible as it is covered till top with Solid Waste etc.

(4) Encroachments along the banks are also alarming.

d. SOLDIER BAZAR NALLAH

(1) It drains water from areas of Guru Mandir, Patail Parah, Garden Police HQ and surroundings (Central Karachi areas).

(2) It flows into sea near Boat Basin area.

(3) This nallah is also encroached at many places.

Page 19: Kmc rain emergency plan 2014 final

PREPAREDNESS MEASURES

a. Pre-rain measures

b. Measures during rain floods emergency

c. Post rain measures

Page 20: Kmc rain emergency plan 2014 final

PRE-RAIN MEASURES

The following actions are required:• De-silting of storm water drains• Repair, maintenance and procurement of dewatering pumps/

pumps.• Repair of roads and filling of trenches• Identification of troubled spots• Activation of early warning system• Prevent deaths due to wire snapping / electrocution• Provision of Rescue Teams• Evacuation to relief camps ear-marked in different education DCs

Schools and DMCs• Prevention from infectious diseases/epidemics/fumigation long drive

with the coordination with DMCs

Page 21: Kmc rain emergency plan 2014 final

• Provision of first aid & medical facilities

• Cleaning of all chocked gratings alongside all main roads by Technical Services Department, KMC.

• Cleaning/maintenance/provision of generators at all under passes and especially Gharibabad/Liaquatabad/Nazimabad/Clifton underpass by Municipal Services Department, KMC.

Page 22: Kmc rain emergency plan 2014 final

IDENTIFIED LOW LYING AREAS• Near Governor House• Near Chief Minister House• I.I. Chundrigar Road• Shaheen Complex• City Business Area• Shahrah-e-Faisal:

a. Jinnah Bridgeb. Natha Khanc. Nurseryd. FTC Flyovere. Karsaz Linkf. Airport (Falak Naz)

Page 23: Kmc rain emergency plan 2014 final

• M.A Jinnah Road:

a. Gurumondir

b. Business Recorder Road.• University Road:

a. Old Sabzi Mandi

b. Civic Center

c. NIPA Flyover• Rashid Minhas Road• Near Stadium Flyover• Near Liaquatabad No. 10 Flyover• Near Karimabad Flyover• Near Nagan Chowrangi Flyover• At-grade road of Banaras Flyover• KDA Chowrangi (North Nazimabad)

Page 24: Kmc rain emergency plan 2014 final

Geography of Nallah under KMC Responsibility

NAME OF NALLAH

LOCATION

Pitcher Nallah Start from Jamila Street and ends at Mauripure Road passing through Lyari, Saddar and Keamari and dispose off into the sea.

Jubilee Nallah Segment of different nallah i/c channel along pir Muhammad Road, Bhund Muhallah Nallah and others

Kalri Nallah Start from Tannery Road and ends at Mauripure Road passing through thickly populated areas of Lyari and ultimately dispose off into the sea

Soldier Bazar Nalah Start from Gurumondir and ends at Jijrat Colony/Sultanabad into sea via Doli Khata behind Holy Family Hospital, Jublee Market, Aurangzeb Market, Urdu Bazar, Sindh Secretariat, Shaheed Complex & PIDC

Page 25: Kmc rain emergency plan 2014 final

Ferer Nallah From Glass Tower to Nehr-e-Khayyam Clifton

Shahrah-e-Quideen Nallah

From society office to PECHS Block-6 upto Mehmoodabad

Waris Shah Nallah

Along Waris Shah Road PECHS Block-6

Mehmoodabad Nallah

From Mehmoodabad to Manzoor Colony

Page 26: Kmc rain emergency plan 2014 final

KMC Measures

• The Administrator and Metropolitan Commissioner, KMC held several meeting to review the arrangements made during rainfall and to face any eventuality. Also held coordination meetings with concern departments and stakeholders of other agencies in the City.

• The utility agencies i.e. KESC, SSGC, PTCL etc have been advised to make necessary arrangements and set up emergency centers.

• Additional Relief Commissioner, PDMA and Met Office, shall be ensured for management and updatation of early warning system.

• All DGs, Sr. Directors of KMC and Municipal Commissioners of DMCs have been instructed to activate their control rooms round the clock during Monsoon season.

Continued

Page 27: Kmc rain emergency plan 2014 final

• Pre-rain arrangements i.e. desilting of storm water drain started in April 2014 by Municipal Services Department, KMC and is still going on.

• A Special Monitoring and Coordination Cell to deal with rain emergency has already been established in Administrator Secretariat which shall remain operative round the clock.

• All newly constructed roads, underpasses and flyovers have been provided with storm water drainage facility with stand by generators in case of power failure.

• Rain Emergency Centers to be established in all DMCs• Machinery available (working condition) with Municipal Services

Department, KMC:a. Dump Trucks 85b. Grab Cranes 09c. Sludge Carriers 20d. Wheel Loaders 10e. Dewatering Pumps 15

Page 28: Kmc rain emergency plan 2014 final

MEASURES DURING RAINS:

• Deployment of staff, pumps and related machinery at Civic Center and other specific vulnerable points with especial emphasize on Shahrah-e-Faisal

• Establishment of control rooms at Municipal Services Department, KMC at Civic Center.

• Activation of Emergency Response Center at Hawks Bay/Mubarak Village.

• Establishment of control room at 16 Control Room and 1339 Complaint Center for public complaints.

• Cancellation of leave of all the Emergency Staff.• Deployment of City Wardens at Vital Points• Deployment of Urban Search and Rescue Team at KMC

Head Office, M.A Jinnah Road.

Page 29: Kmc rain emergency plan 2014 final

POST RAIN MEASURES

Health and Hygiene:• Removal of stagnant water from Main Roads and other

locations• Fumigation drive through out the city.• Coordination with all DMCs with regards to removal of

accumulated garbage backlog.• Removal of fallen trees, sign boards and bill boards.• Filling of pot holes, repair of trenches.• Public Education and awareness through print, electronic

and Rising Karachi Project.

Page 30: Kmc rain emergency plan 2014 final

ROLE OF OTHER DEPARTMENTS IN THE CITY

Karachi Water and Sewerage Board:

• Executive Engineer (Sewerage), KWSB shall be responsible to open the chocked gutters/main holes/sewerage lines, keeping in view that the stagnant / sewerage water may be drain out quickly. All the machinery should be ready and standby to meet the emergency.

• All main holes should be covered, Ring Slabs & main hole covers may be kept/provided at Emergency Centers to cover the main hole during the rain emergency.

• All trenches, excavated by Sewerage Department may be filed before Rain fall.

• One Representative of Sewerage Department may be deputed at Rain Emergency Center to receive / forward and ensure to resolve the complaints.

• Arrangements of stand by generators at Clifton and Jamilla Pumping stations, in case of power failure

Continued

Page 31: Kmc rain emergency plan 2014 final

• Executive Engineer (Water) KWSB is responsible to repaired water leakage to avoid water contamination. All trenches excavated may be filled immediately before rain fall and during the rainy season.

• One representative of water department may be deputed at Rain Emergency Center to receive / forward and ensure to resolve the complaints.

K.E.S.C

• The Executive Engineer KESC will arrange the availability of KESC staff to test out the feeble poles & Electric wires and should be replaced without any further delay and also ensure immediate disconnection of electricity either if any pole/wire fall down or electric shock passes the poles.

• One representative of KESC may be deputed at Rain Emergency Center to receive / forward and ensure to resolve the complaints.

• Special attention is required to ensure continuous electric supply in old city area, to keep Clifton and Jamilla Pumping Station functioning.

Continued

Page 32: Kmc rain emergency plan 2014 final

Karachi Building Control Authority

• Deputy Controller of Buildings shall point out the dangerous buildings and shall be responsible to vacate the buildings for which he may seek help from the Area Police

Police Department:

• The Superintendent of Police of the Districts and Area SHOs shall stand by/ red alert in the area to meet any emergency and also provide the necessary information through to Landhi and other Law Enforcing Agencies.

• The Superintendent of Police, especially Landhi shall keep vigilant eye on flow of water in Malir River and will remain in close coordination with the Superintendent of Police, Shah Faisal, in case the stream flow up to alarming point the Causeway from Murtaza Chowrangi to Jumma Goth Malir may be closed for traffic immediately

Page 33: Kmc rain emergency plan 2014 final

OBSERVATION FROM PRE FLOOD RECONNAISSANCE 2014

a. Karachi drainage system not only requires immediate attention but also require physical measures for its cleanliness. Any efforts in the absence of master plan

will be futile exercise for overall drainage system of Karachi.b. Capacity enhancement of present drainage system is required as encroachments and lack of maintenance has reduced the designed capacity of existing drainage system. c. Most of the drains/nallahs require cleaning and removal of garbage.d. Diversionary Nallahs have been planned however progress of construction is at

snail pace due to various issues like non availability of funds, be immediately resolved to speed up the construction work.

e. Sewerage lines are being discharged in rain water drains resulting in accumulation of silt and garbage. f. Wild growth and vegetation needs to be removed for smooth flow of water in all

channels.g. Continuous increase in the encroachments along drains/ nallahs must be

checked.h. No flood risk mapping of Karachi exist which can help in better planning of the entire flood fighting efforts.

Page 34: Kmc rain emergency plan 2014 final

RECOMMENDATIONS

a. Master plan for complete drainage system of Karachi should be prepared and executed.

b. KMC/DMCs should be pro-active in preventing flood like situation due to heavy rains by undertaking following:-

(1) Ensure removal of encroachment of drains/ natural drains.

(2) Construction of storm water drains and maintenance of existing drainage system.

(3) Make a plan to absorb volunteers / NGO’s to create energy to fight flood emergency. A well-coordinated flood relief/ rescue plan is required incorporating all civil resources. Same should be rehearsed by KMC/DMCs to coordinate the response of various agencies.

(4) Sewerage lines linked t drainage channels should be separated to avoid silting and blockade of drains/ nallahs.

(5) KMC/DMCs should check encroachments astride the various nallahs and drains and should also undertake dredging operation of these nallahs to enhance their capacities.

Continued

Page 35: Kmc rain emergency plan 2014 final

c. Dewatering pumps/ equipments must be maintained before the onset of monsoon season.

d. Flood risk mapping of Karachi should be done by PDMA.

e. Flood risk zoning and surface water management of all zones should be undertaken.

Page 36: Kmc rain emergency plan 2014 final

ACTIVATION OF EMERGENCY CENTERS (CONTROL ROOMS)

Municipal Services Deptt, KMC 99230071 (Fax:99230068)

Complaint Center, KMC CCIS-1339

Complaint Center, Fire Brigade 99230060 (five lines)

Fire Head Quarter 99215007-8

Gulistan-e-Mustafa Fire Station 99246268-99246316

Landhi Fire Station 35015988-35015888

Lyari Fire Station 32527521-32528090

Page 37: Kmc rain emergency plan 2014 final

FOCAL PERSONS FOR CLEANING OF NALLAH

1 Mr. Noman Arshad Director, Machine Pool Depot

0321-2384090

2 Mr. Ibrahim Baloch Chief Engineer/ Director, Storm

Water Drainage, TS, KMC

0333-2746391

Page 38: Kmc rain emergency plan 2014 final

SOLID WASTE MANAGEMENT DEPARTMENT

Sr.# Name Designation Office Mobile

1 Mr. Sohail Ahmed Director 99231341 0336-2262250

2 Mr. Saleem Shaikh Addl: Director -do- 0300-2069050

3 Mr. Raees Siddiqui Deputy Director -do- 0300-2604554

4 Mr. M. Irshad Deputy Director -do- 0300-8238491

Page 39: Kmc rain emergency plan 2014 final

Important Telephone Numbers of Municipal Services Department, KMC (All Zones)

S# NAME SITE MOBILE

Incharge Mr. Azhar (South) Cell No. 0300-26291337

1 Safdar Shaheen Complex 0300-3553301

2 Mr. Asghar Marriot Hotel/ Glass Tower 0300-2329940

3 Mr. Asif (MPD) Tower/ Kharadar 0300-2693102

Incharge Mr. Anwer Baloch (East) Cell No.

4 Mr. Mehmood FTC 0341-2009172

0300-2624061

5 Mr. Asim CNG Petrol Pump 0300-9210519

6 Mr. Ajoon CNG Petrol Pump 0300-2242284

7 Mr. Niaz Uddin (MPD) CNG Petrol Pump 0346-2381098

Incharge Dr. Hamid Mustafa (Central & West) 0332-3371377

8 Mr. Sagheer Under Bypass & K.D.A Chowrangi 0321-9215955

Page 40: Kmc rain emergency plan 2014 final

IMPORTANT NUMBERS OF MACHINE POOL DEPOT

S. NO NAME OF OFFICER DESIGNATION PHONE NO

1 Mr. Noman Arshad Director 0321-2380490

2 Mr. Muhammad Azhar Dy: Director 0300-2629137

3 Mr. Aslam Dy: Director 0345-2208676

4 Mr. Anwer Baloch Asst Director 0300-2038682

5 Mr. Shahbaz Inspector 0345-2580499

6 Mr. Niaz Uddin Inspector 0346-2381098

7 Mr. Asif Khan Inspector 0300-2639106

8 Mr. Asfar Ali Inspector 0300-2329940

9 Mr. Zameen Khan Inspector 0300-2436653

10 Mr. Faraz Inspector 0344-2688714

11 Mr. Sagheer Ahmed Inspector 0321-9215959

Page 41: Kmc rain emergency plan 2014 final

IMPORTANT TELEPHONE NUMBERS OF MUNICIPAL PUBLIC HEALTH

S.NO NAME DESIGNATION TELEPHONE NO

1 Dr. Mansoor Shaikh Director, MPH 0300-2208362

2 Dr. Hamid Mustafa Dy: Director, MPH 0332-3371377

3 Anwer Malaria Supervisor 0300-2669097

4 Nazeer Malaria Supervisor 0344-2940261

5 Muhammad Zaman Malaria Supervisor 0345-2494717

6 Roshan Malaria Supervisor 0344-2677829

7 Asim Malaria Supervisor 0300-9210519

8 Muhammad Hanif Malaria Supervisor 0321-2536570

9 Ajoon Malaria Supervisor 0300-2242284

10 Shafiq Malaria Supervisor 0300-2202798

11 Malik Zaman Malaria Supervisor 0345-2736004

12 Waheed Malaria Supervisor 0312-2032699

13 Naeem Malaria Supervisor 0300-3628928

Page 42: Kmc rain emergency plan 2014 final

FIRE BRIGADE TELEPHONE NUMBERS

S# Name of Station Name of Officer Designation Cell No Office No

1 Head Quarter Ehtishamuddin Saleem

Chief Fire Officer 0346-2371026

0345-8685330

99215652

99215002

2 Head Quarter Imtiaz Afzal Dy: Chief Fire Officer

0301-2245266 99238921

3 Korangi Fire Station Ishtiaq Ahmed Station Officer 0333-2356516 99215007-8

4 Central Fire Station Wajahat Hussain Station Officer 0334-3076441 99260331-2

5 New Karachi Mazhar Rafi Station Officer 0344-2739588 36974020-30

6 Gulshan-e-Iqbal Khalid Hussain Station Officer 0300-2160392 99244490

7 Gulistan-e-Jauhar Buland Iqbal Station Officer 0300-9219441 34016255

34631918

8 Gulistan-e-Mustafa Arif Mansoori Station Officer 0333-2213146 99246316

99246268

9 Landhi Fakharuddin Station Officer 0345-2146273 35015888

35015988

10 Korangi Zafar Khan Station Officer 0300-9209902 3566260-1

11 Manzoor Colony Mubin Ahmed Station Officer 0333-2179171 35804097

Page 43: Kmc rain emergency plan 2014 final

S# Name of Station Name of Officer Designation Cell No Office No

12 Shah Faisal Colony Saeedullah Station Officer 0300-2354717 99239112

13 Saddar Tauheed ur Rehman Station Officer 0333-3028991 99215095-8

14 S.I.T.E. Tehseen Siddiqui Station Officer 0300-9242498 2562243-45

15 Orangi Aslam Sub Fire Officer 0321-9250142

0300-9250142

36651222

36650515

16 Bolton Nadeem Zehri Sub Fire Officer 0300-2218706 32562243-45

17 Baldia Murtaza Station Officer 0321-2888041 32810015

18 Lyari Zaheer Siddiqui Station Officer 0333-2182896 32528090

32527521

19 Truck Stand Abrar Sheikh Station Officer 0300-2179172 32353333

20 Malir Nisar Khalid Station Officer 0315-2617624 34112599

34504922

21 Gulshan-e-Maymar Humayon Sub Fire Officer 0300-2259819

22 Cattle Colony Javeed Hussain Station Officer 0322-2076149 34100491

23 Civic Center Abdul Nasir Station Officer 0344-2739588 99231808

24 ERC Mairaj Station Officer 0345-2263450

Page 44: Kmc rain emergency plan 2014 final
Page 45: Kmc rain emergency plan 2014 final

KARACHI WATER & SEWERAGE BOARD RAIN EMERGENCY PLAN - 2014

DETAILING RELIEF MEASURES FOR RAINY SEASON, MAY- 2014

• In view of likely rains, the KW&SB has chalked out a Comprehensive Rain Emergency / Contingency Plan to combat any situation in the face of up-coming monsoon season. This is in clear understanding of the fact that the operation, maintenance and cleaning of storm water drains and nallahs is a function of the KMC who have already undertaken the work of desalting and cleaning of storm water drains / nallahs with appreciation of following points:

Basic Rationale

• The sewerage system of city is insufficient for the intake of rainwater of the city.• The solid waste, debris and garbage of roads flow into the sewerage lines while running with rainwater during

rains which causes sewage blockades. • With cognisance of these facts, KW&SB has made efforts for smooth maintenance of city’s sewerage system

as a precautionary measure and also provide maximum relief to general public by maximizing the efficiency of its sewer cleaning system during rains.

• Other steps taken under Rain Emergency Plan are as follows: -

High Alert

• High alert is in place with instructions to all KW&SB engineers and personnel for fulltime preparedness of rain emergencies.

• Special emphasis has been laid on upkeep and readiness of emergency fighting machinery and equipment available at KW&SB.

Focal Person

• The Chief Engineer- Electrical & Mechanical (Sewerage) Mr. Zaheer Abbas Zaidi has been nominated as the focal person for all rain emergency actions who will co-ordinate all KW&SB efforts in the matter.

• He will interact with all District CEs, CE (BT), CE (E&M) and all concerned and liaison with KMC and DMCs in the city.

• The District CEs and Town SEs have been mobilized to ensure efficiency in all sewerage division within their jurisdiction.

• They have streamlined all sewerage wings at all Towns level through respective EEs sewerage.

Page 46: Kmc rain emergency plan 2014 final

Focal Point

• The 1339 Complaints Centre / Customer Service Centre, Block-A at 9th Mile, Karsaz, Shahra-e-Faisal, Karachi, has been made focal point for Rain Emergency Operations.

• Following steps may also be ensured to prevent rain related problems in the city:• All physical resources (equipment, machinery etc) and personnel would be pooled and controlled from this

point. Communication facilities shall be kept in order and readily available for backup wherever required.• The Central Machinery Pool and Central (Workshop Division), Karsaz, Central Pumping Station, PIDC Clifton

and Jamila Pumping Station, Lyari shall work in full capacity with backup support of standby generator and fulltime availability of fuel during Rain emergency.

• All Sewer Cleaning / Jetting / Suction / Pumping Machines / Mobiles, Standby Generators and other equipment shall be in field on 24-hours basis instead of only day shifts during rain emergency.

• In case of any crises machinery including generators and cranes shall be arranged on rent as an exigency alternate.

• During Rain Emergency, the Complaint Centers shall be activated in the field offices of all District Chief Engineers and Town Superintending Engineers to facilitate general public.

• Efficient Officials shall be deputed on these Centers for lodging / recording complaints of consumers in person or on phone with proper reporting system on 24-hours basis.

• These officials shall work in shifts with clear instructions not to leave the duty until their reliever may report during emergency period.

• Constant liaison may be maintained with the control room setup in the offices of Commissioner Karachi, District Dy. Commissioners, KMC and ZMCs by all District Chief Engineers to mitigate the rain sufferings.

• All field staff will be on high alert with preparedness and round the clock area monitoring may be ensured to check and addressed public complaints related to sewage overflow and congestion problems.

• Low lying areas of the city and Towns on the coastal belt including Keamari, Saddar, Korangi, Landhi, Bin Qasim may be placed under special observations during rain emergency.

• List of complaint centers key personnel/facilitators included the appendices as listed.

Coordination & Liaison

• There will be a Coordination Committee headed by Managing Director, KW&SB and comprising of all KW&SB Chief Engineers to review and manage rain emergency. It will meet on weekly basis or even earlier in accordance with the situation.

• The KMC including the Administrator’s Secretariat shall be coordinated at appropriate level.• All CEs, SEs and EEs will remain in contact with respective Town and UC Administrations constantly and

closely to meet any emergency and resolve the problems of people.

Page 47: Kmc rain emergency plan 2014 final

Public Awareness & Cooperation

• Citizens are being advised not to open the manhole covers to drain rainfall run-off into sewerage pipelines, as it will chock & restrict sewer flow.

• Awareness messages are being propagated through print & electronic media and advertisement in the news.

• Various NGOs and community circles have also been taken on board for public awareness through seminars and meetings.

Patrolling & Monitoring

• Round the clock patrolling of the bulk transmission system, canal, syphons, conduits and other installations in remote areas i.e. Dhabeji, Gharo, NEK pumping station & filter plants etc. would be undertaken.

• Round the clock monitoring of sewerage pumping stations would be carried out to monitor operational efficiency.

• Sour points where problems have been experienced as per previous records of rainy season in the past have been identified to pay extra attention and prevent re-occurrence of problem.

Power Failure

• Immediate reporting of power failures & faults to KESC in respect of KW&SB installations is arranged, so that water and sewerage pumping stations may function smoothly.

• Alternate arrangements of standby generators in case of power breakdown are also being made upto possible extent.

Precautionary Measures

• Covering of manholes on main roads, streets and footpaths is given priority to avoid any accidents. Fixing of missing / stolen manholes covers has been ensured.

• Complaints of open manholes are being taken up on top priority basis.• Desilting / cleaning of sewerage lines in each town before rains is being carried out.

Review & Feedback

• Daily progress review would be done at Chief Engineer level regarding desilting of sewerage lines, missing manholes covers etc.

Page 48: Kmc rain emergency plan 2014 final

RAIN EMERGENCY PLAN - 2014

MAY-2014

KARACHI WATER & SEWERAGE BOARD

Page 49: Kmc rain emergency plan 2014 final

KARACHI WATER AND SEWERAGE BOARDTELEPHONE NUMBERS OF KEY PERSONNEL, KW&SB

SR. # DESIGNATION IMPORTANT NUMBERS

1 Mr. Qutubuddin Shaikh

Managing Director

99245154 / 99245155 / 99245156

Cell # 0300-2001344

2 Mr. Waqar Ahmed Hashmi

Principal Staff Officer

99245159

Cell # 0321-2049716

3 Mr. Tahseen Manzar

Director, Implementation/TRG

99245178

Cell # 0313-4948874/0302-2129020

4 Mr. Najm-e-Alam

DMD (TS)

99245146

Cell # 0321-8749091

5 Mr. Mashkoor ul Husnain

DMD (Planning)

99245136 / 0300-2313823

6 Mr. Najam-e-Alam

CE (B/T)

99245130

Cell: 0321-8749091

7 Mr. Iftikhar Ahmed Khan

CE (BT)

99231226

Cell # 0323-2739170

8 Mr. Anwar Saeed Khan

CE (WTM)

99245161

Cell # 0314-2005253

9 Mr. Zaheer Abbas

CE (Sewerage)

99245028

Cell # 0333-3156584

10 Mr. Asadullah Khan

DCE (E/M) - Water

99240803

Cell # 0300-2723545/0321-3789379

Continued

Page 50: Kmc rain emergency plan 2014 final

SR. # DESIGNATION IMPORTANT NUMBERS

11 Mr. Ghulam Qadir Abbas

CE (East)

99231221

Cell # 0333-3092418

12 Mr. Muhammad Arif

CE (Saddar & Jamshed)

99231221

Cell # 0300-2992627

13 Mr. Fahim Zaidi

CE (Central)

99230318

Cell # 0321-3782790

14 Mr. Ovais Malik

CE (West)

99230318

Cell # 0300-9269683

15 Mr. Imdad Hussain Magsi

CE (Malir)

Cell: 0321-2422897

16 Mr. Muhammad Usman Khaskhely

CE (Lyari & Keamari)

Cell: 0333-3642630

17 Mr. Noor Muhammad Chohan

CE (E/M)-Water

99240318

Cell: 0333-3629447

18 KW&SB – Central Complaint Center

KW&SB 1339-Incharge

99245138-99245139/99245140

19 Mr. Nazir Mateen

Director Public Relation

992450821

Cell # 0300-2889782

Page 51: Kmc rain emergency plan 2014 final

KWSB RAIN EMERGENCY24-Hours Complaint Centers

1339-Complaints /Customer Service Center Block-A, Karsaz99245138-40

Head Office Complaint CenterCivic Center Annexe, Gulshan

99230317 /99230318 / 9923221

Rain Emergency Focal Person: Engr. Syed Zaheer Abbas Zaidi Chief Engineer – Electrical/Machanical (Sewerage)Off: 99245028Cell: 0333-3156584

Page 52: Kmc rain emergency plan 2014 final

List of KW&SB Rain Emergency CentersELECTRICAL & MECHANICAL WING

24-Hours Operation During Rain Emergency – 2014

KW&SB – 1339 - COMPLAINT CENTERBlock-A, 9th Mile – Karsaz, Shahra-e- Faisal, Karachi.Tele # 99245138- 99245139 & 99245140

ELECTRICAL & MECHANICAL WING

SEWER CLEANING EQUIPMENT DIVISION/SUCTION –JETTING MACHINES

COMPLAINT OF POWER BREAKDOWN AT KW&SB INSTALLATIONS

Mr. Noor Muhammad ChohanCE (E/M), Sewerage - KW&SB

Cell # 0333-3629447Off # 9245027Fax # 9245028Res #

1 Mr. MazharExecutive Engineer

Cell # 0300-2189703 Off # 0323-2025306

2 Mr. Suhail JaffriAE (E/M)

Cell # 0322-2109383

1 Mr. Nadim Hadi Khan

EE (E/M)

Cell # 0333-2138721

Res # 36616999

Page 53: Kmc rain emergency plan 2014 final

TREATMENT PLANTS CIRCLE KEY PERSONNEL

SEWERAGE PUMPING CIRCLE KEY PERSONNEL

1 Mr. Manzoor KhatriSE – SPD Cell # 0301-2053281Off # 9204336

2 Mr. Wasim ShaikhEx. Engineer – SPD-I (Saddar Town-Sew)

Cell # 0333-3167848Off # 9204342 Res # 5414112

3 Mr. Ajeet KumarEx. Engineer – SPD-II, Lyari-Sew

Cell # 0323-2507106

1 Mr. Qaiser AliSE – TPs, Circle

Cell # 0333-3856343Res # 4406920

2 Mr. Akhtar SamiEE – TP-I

3 Mr. Jagdesh EE – TP-II

Cell # 0333-3458338Res #

4 Mr. Nadim AhmedEE – TP-III

Cell # 0300-2183653Res # 9230372

Page 54: Kmc rain emergency plan 2014 final
Page 55: Kmc rain emergency plan 2014 final
Page 56: Kmc rain emergency plan 2014 final

INTRODUCTION

• Hyderabad Municipal Corporation is the 2ND largest City of Sindh. It is also the largest business city of Sindh after Karachi. The climate of Hyderabad is moderate.

• The total area of Hyderabad Municipal Corporation is about 14710 sq acres having population

of 1.8 Million. Hyderabad Municipal Corporation consists of 37 Union councils of Hyderabad City and Latifabad.

• Every year, Hyderabad Municipal Corporation takes serious efforts to combat Flood / Rain and there is no doubt that in the past when Rain Emergency was declared during the rainfall, Hyderabad Municipal Corporation completed the task successfully.

• SOP for combating summer Flood / Rain of 2014 is prepared for taking preventive and remedial measures in advance to avoid any unpleasant incidence during the Flood / Rain.

ZAHID HUSSAIN KHEMTIO

Municipal Commissioner

Hyderabad Municipal Corporation

Hyderabad

QAMAR-UD-DIN SHEIKH

ADMINISTRATOR

Hyderabad Municipal Corporation

Hyderabad

Page 57: Kmc rain emergency plan 2014 final

IMPORTANT PHONE NOS OF CONCERNED OFFICER / OFFICIALS / CENTRE INVOLVED FOR RESCUEPROGRAME DURING MOON SOON SEASION IN HMC HYDERABAD 2014.

1. Administrator Phone No. 9210071 Mob. 0300-2627607

2. Municipal Commissioner Phone No. 9210193 Mob. 0300-3013110

3. Director Health Services Mob: 0300-3012952

4. Executive Engineer Mob: 0333-2609057

5. Assistant Executive Engineer (City) Mob: 0313-3221982 0321-9274090

6. Assistant Executive Engineer (Latifabad) Mob: 0333-2724745 0345-9199910 0321-3004927

7. Assistant Director Health Services (Latifabad) Mob: 0333-2759051

8. Assistant Director Health Services (City) Mob: 0315-8824072

9. (Chief Fire Officer) Mob: 0300-3017382

10. Market Fire Brigade Phone No. 2612211

11. Faqir ka Pir Fire Brigade Phone No. 2616975 (16)

12. Nashterabad Fire Brigade Phone No. 2616976 (16)

13. 139 Complaint Centre Mob. 0300-3038606

14. (Mechanical) Engineer Workshop Phone No. 2720058 Mob: 0321-3957702

Page 58: Kmc rain emergency plan 2014 final

The SOP for combating summer floods & Rains of 2014.

The Following low-lying areas have been identified in the action plain.

1. Liaquat Colony Ground UC # 10

2. Tando Mir Mehmood Graveyard UC # 14

3. Laloo Lashari Goth UC # 16

4. Khursheed Town UC # 16

5. Solangi Goth Hala Naka UC # 01

6. Mir Nabi Bux Town ( Noorani Basti) UC # 17-16

7. Hyder Shah UC # 19 Electric Pump

8. Mirza Para (Sikanderabad) UC # 20

9. Katchi Para UC # 20

10. Malka Nagar UC # 16

11. Sardar Colony UC # 17

12. Ehsanabad UC # 16

13. Fakir Ka Pir Fire Brigade # 07

14. Railway Colony UC # 09

15. Aliabad UC # 16

16. Hyder Chowk Qazi Qayoom Road UC # 09

During rain emergency the diesel pumps will be provided at low-lying areas on demand and as per need and condition of rain water.

Page 59: Kmc rain emergency plan 2014 final

In order to meet any sort of emergency during the rainy / flood season, the following emergency centers are established to receive and rectify the complaints of public of the respective areas:-

DETAIL OF EMERGENCY CENTRE

1. CITY:

Sr.# Location of Center Union Council # Name of In-Charge of Centre

1 Market Fire Station Phone # 261221 1 to 5Rehmat CSI (i) Ahmed Hussain I/C UC # 03(ii) Aslam Rehmat I/C UC # 04

2Inayatullah (Shaheed) Fire Brigade(Fakir Ka Pir) 16 Phone # 2616975

6 to 9

Mr: Abdul Karim CSI Mr: Mehsar Pailad Incharge UC # 08Mr: Shahid Rajput Incharge UC # 08Mr: Dileep Incharge UC # 09

3 Nazim Office (Firdous Colony UC # 11 10, 11, 16

Ilyas Qureshi CSI Ramesh Mata din UC # 10Papan Lakhmi UC # 11 Faqira Pamma UC # 16

4Nazim Office (Bakra Mandi) UC # 12Phone # 2636709

12 to 15

Ashraf Hussain Siddiqui CSI Perdeep UC # 12Mansha Masih Mucd: UC # 13 Budhan UC # 15

5Nashterabad Fire Station Phulleli Pretabad 2616976

17 to 20Complaint

Centre 139 Paretabad

Khalid Khursheed CSI Abbas UC # 17Amanwal Mucd: UC # 18Rasheed UC # 19Hanif UC # 20

6 139 Complaint Centre Main Office 2616939 139 /

UC #06/ UC # 09

Amir Nagar Incharge 139Iftikhar Naeem Ahmed Incharge Nalla

Gang

Page 60: Kmc rain emergency plan 2014 final

2. LATIFABAD

A. Workshop Qadam Gah Moula Ali

1. Mr: Asgher Sub-Engineer Incharge 2. Mr: Asgher Pump Incharge3. Mr: Imran Mechanic

B. Workshop Hali Road Latifabad

1. Mr: Haseeb AEE Incharge 2. Jamil Ahmed Chief Inspector 3 Mr: Ahmed4. Mr: Arif 5. Farhat

C. Office of Assistant Director Health Services Unit # 09

1. Mr: Habib-ul-allah Chief Inspector Incharge 2. Mr: Faiz Alam Sub-Engineer 3. Mr: Akber Clerk 4. Amjad Naib Qasid

The above said centers will work round the clock during rain / flood emergency

Page 61: Kmc rain emergency plan 2014 final

The details of Staff working on Permanent Electric Pumping Station (City)

Mr. Yousuf Sardar Incharge Electric Pumps Mobile No: 0345-3607987

SR. # PUMPING STATIONPUMP OPERATOR / PUMP

DRIVERCONTACTS

1.Bhatti Village Pumping Station UC # 20

A: Noor Muhammad B: Frances C: Pervaiz

0331-3542374

2.Pinyari Disposal Pumping Station UC # 19

A: Aftab Hussain B: Anwar Rahim C: Arshad Saleem Babo Din (G.O)

0345-35779910344-3613573

3.Hyder Shah Pumping Station UC # 19

A: Bahadur B: Arif Masih C: Ghualm Qadir

4.Sultan Shah Pumping Station UC # 16

A: Nasir Ali B: Khadim Hussain C: Abid Hussain

5.Rishi Ghat Pumping Station UC # 12

A: Muhammad Iqbal B: Naveed C: Muhammad Ahsan

0300-3066913

6.Sattar Shah Pumping Station UC # 02

A: Abdul RasheedB: Aslam Sharif C: Arslan

0312-3575815

7.Fakir Ka Pir Pumping Station UC # 07 On any emergency

A: Umar Daraz 0315-5761878

Page 62: Kmc rain emergency plan 2014 final

DETAILS OF ELECTRIC PUMPING STATION WORKING PERMANENTLY (CITY)

SR. # NAME OF PUMPING STATION hp TOTAL

1. Pinyari Disposal Pump 50 HP 02

2. Old Power Hose 50 HP 02

3. Rashi Ghatt 25 HP 01

4. Sultan Shah Colony 20 HP 01

5. Hyder Shah Colony 25 HP 01

6. Bhatti Village 50 HP and 40 HP 02

7. Sattar Shah 25 HP and 50 HP 02

8. Fakir Ka Pir 25 HP 01

Page 63: Kmc rain emergency plan 2014 final

LIST OF PERMANENT PUMPING STATIONS IN LATIFABAD Sr. #

Location of Pumping StationsNo. of

Pumps In case of electric failure alternate arrangement

Remarks

1.

Hali Road pumping station. (i) 100 HP Electric Motor Pump(ii) 50 HP Electric Motor Pump(iii) 40 HP Electric Motor Pump(iv) 30 HP Electric Motor Pump

2 No: 1 No:1 No:1 No:

Stand b Generator 250 KV

Working Condition Working ConditionWorking Condition

Under Repair Under Repair

2.American Quarters Pumping Station (i) 30 HP Electric Motor Pump (ii) 25 HP Electric Motor Pump

1 No: 1 No:

1. Stand by Generator Under Repair

Working Condition

3.Gul-shan-e-Hali Pumping Station (i) 30 HP Electric Motor Pump (ii) 10 HP Electric Motor Pump

1 No: 1 No:

1. Stand by Generator Working Condition

Under RepairUnder Repair

4.Visram Pumping Station (i) 15 HP Electric Motor Pump (ii) 7 HP Electric Motor Pump

1 No: 1 No:

1. Stand by Generator Working Condition Working ConditionWorking Condition

5.Hussainabad Pumping Station (i) 50 HP Electric Motor Pump (ii) 30 HP Electric Motor Pump

1 No: 1 No:

1. Stand by Generator Working Condition

Under Repair Working Condition

6.Hazara Colony (i) 15 HP Electric Motor Pump

1 No: Nil Working Condition

7.Bhatti Goth Tandri Pumping Station. (i) 15 HP Electric Motor Pump

1 No: 1. Stand by GeneratorWorking Condition Working Condition

8.Tando Yousuf Pumping Station(i) 7.5 HP Electric Pump

1 No: 1. Stand by GeneratorUnder Repair

Working Condition

9.Gujrati Para Pumping Station (i) 10 HP Electric Motor Pump

1 No: 1. Stand by GeneratorNew working due to unstable voltage

Working Condition

Page 64: Kmc rain emergency plan 2014 final

THE DETAILS OF STAFF WORKING ON PERMANENT ELECTRIC PUMPING STATION (LATIFABAD)

Gulshan-e-Hali Electric Pumping Station American Quarter Electric Pumping Station

S. No. Name Designation Shift S.No Name Designation Shift

1. Arshahd Khan

Pump Driver A 1. Zia Pump Driver A

2. Guddo S.W A 2. Charanji S.W A

3. Ajaz Pump Driver B 3. Anwer Banta Pump Driver B

4. Aziz S.W B 4. Siraj S.W B

5. Anwer Masih Pump Driver C 5. Naeem Pump Driver C

6. Boota S.W C

Continued

Page 65: Kmc rain emergency plan 2014 final

Hussainabad Electric Pumping Station Visram Pori Electric Pumping Station S. No. Name Designation Shift S.No Name Designation Shift

1. Taj Pump Driver A 1. Bashir Pump Driver A

2. Pawan Pump Drive B 2. Gopal SW A

3. Chand SW B 3.Noor Muhammad

SW B

4. Barkat Pump Drive C

5. Sanjay SW C

Continued

Page 66: Kmc rain emergency plan 2014 final

Hussainabad Electric Pumping Station Visram Pori Electric Pumping Station

S. No. Name Designation Shift S.No Name Designation Shift

1. Nadeem Helper B 1. Thams Diesel Pump Driver Tando Yousuf

2. Ilyas SW A 2. Haroon Diesel Pump Driver Badin Chali

3. Tehseen Pump Driver B 3. Faisal Diesel Pump Driver Khaskheli Para

4. Akram SW B 4. Suleman Diesel Pump Driver Gujrati Para

5. Rafique Pump Driver C 5. Farhan Diesel Pump Driver Minority Graveyard

6. Mushtaq SW C 7. Ramzan Diesel Pump Driver Goth Aliabad UC # 05

7.Babo Gama SW A

Continued

Page 67: Kmc rain emergency plan 2014 final

DETAILS OF DIESEL PUMPING STATION WORKING

PERMANENTLY (CITY)

Hazara Colony Electric Pumping Station

S. No. Name Designation Shift

1. Arib Jamali Pump Driver A

2. Shoukat Pump Driver A

Hatti Goth Electric Pumping Station

S. No. Name Designation Shift

1. Aqleem Pump Driver A

S. # Name of Pumping station HP Total

1. New Aliabad 16 HP 01

2. Solangi Town 12 HP 01

3. Tando Mir Mehmood 16 HP 01

4. Paretabad (Zacha Khana) 16 HP 01

5. Mustafa Colony 16 HP 01

6. Gatta Ground 12 HP 01

Page 68: Kmc rain emergency plan 2014 final

DIESEL PUMPS AVAILABLE

Sr. # Pumps HP Total Various Sides

Available in Workshop

1. Diesel Pumps 16 HP 13 04 09

2. Diesel Pumps 12 HP 03 02 01

3. Diesel Pumps 7 HP and 5 HP 03 ---- 03

4. Diesel Pumps 04 HP 02 ---- 02

5. Petrol Engine Pumps 7 HP 01 ---- 01

6. Petrol Engine 5 kv 02 ---- 02

7. Petrol Engine 2 kv 06 ---- 06

8. Diesel Mobile Engine 50 HP 01 ---- 01

9.Electric Motor Pump Single Face

5 HP 01 ---- 01

10.Electric Motor Pump Three Face

40 HP 01 ---- 01

11.Electric Motor Pump Single Face

15 HP 02 ---- 02

Page 69: Kmc rain emergency plan 2014 final

LIST OF PERMANENT DIESEL ENGINE PUMPS SITES, (LATIFABAD)

Sr. # Name of Pumping station HP Quantity Remarks

1. Khaskheli Goth 16 1 Nos Working Condition

2. Badin Challi 16 1 Nos Working Condition

3. Minority Graveyard Tando Yousuf 16 1 Nos Working Condition

4. Gujrati Para 16 1 Nos Working Condition

5. Goth Aliabad Unit No: 04 16 1 Nos Working Condition

6. Bhatti Goth 16 1 Nos Working Condition

Page 70: Kmc rain emergency plan 2014 final

RAIN NALLAS In city area, there are two main rain Nallas which drain out sullage water from half of the city area.

One runs from universal book depot towards Makrani Para Maki Shah Passing through tulsidas road.

Other one runs from Sattar Shah Pumping Station towards old Power house pumping station Tando Mir Mehmood. Both Nallas run by natural gravity towards their end points.

1st Nalla is covered by rooftop from universal book depot up to sultan hotel but in some places slabs are kept over the holes. By removing these slabs through sanitary workers the excavator can disilt this nalla only to those points.

From Sultan Hotel onwards the whole Nalla in open except some places which are encroached by shopkeepers. Here it is difficult to disilt the nalla. This Nala from universal book depot upto Tulsidas Pumping station is about 10 feet in width through out. From here it passes beneath the overhead bridge and turns into small drain, approximately 3 feet in width, emerging from market and passes beside the railway colony carrying its sullage water towards Makrani Para in a pit. From there it is lifted by HDA pumping stations of Barkat Bhai / Makrani Para.

The work of Desilting of this Nalla is being carried out again and again except those areas which are fully covered with rooftop.

This will cost much more and will cause problems for shopkeeper and public. If sufficient amount is allocated to Hyderabad Municipal Corporation for this purpose, the target can be achieved easily.

Continued

Page 71: Kmc rain emergency plan 2014 final

Other Nalla which runs from Sattar Shah Pumping Station Liaquat Colony towards Tando Yousuf Railway Crossing is divided into 3 parts for draining out the sullage water.

1st part runs from Cattle Piri Shahab Cinema towards Sattar Shah pumping Station and drain out the sullage water of UC # 10, 11, 4 and 3.

2nd part runs from Chori Para Ilyasabad towards Rishi Ghat Pumping Staiton. Here Nalla which is 10 or 12 feet in width turns into 2 to 3 feet drain and runs from sweet shop towards Rishi Ghat Pumping Station. The Disilting of Ilyasabad Nalla has been carried out while the drain will be desilted by deploying main power of Nalla Gang to do the need full.

3rd part of rain water Nalla runs from Nishat Plaza towards Tando Yousuf Railway Crossing. From Nishat Plaza upto sitara mosque, the above said nalla is fully covered with rooftop except some places where the slabs are kept to disilt but the problem will not be solved until & unless the roof top on the nalla is removed. Here there is Asia’s largest chori market and the shopkeepers & nearby residents throw all their waste material and garbage in it. Keeping in view, all there difficulties the disilting of work has been carried out where there is access of machine.

From sitara mosque near capital plaza upto faqir ka pir culvert the Nallas is encroached by nearby residents who have built their houses on nalla. Here the access of machine to disilt in difficult but some places are there to do the need full.

From faqir ka pir culvert upto guru nagar culvert the same situation is there but there are some places open to disilt and the work of disilting has been carried out.

From guru nagar culvert upto tando yousuf railway crossing, complete disilting work has been carried out.

Page 72: Kmc rain emergency plan 2014 final

LIAQUAT COLONY NALLAS In Rainy Session as the Liaquat Colony is low lying area so in heavy rain the water accumulate

in that area due to poor drainage system. The reason for that is the encroachment over the Nallas by the nearby residents & shopkeepers. Other factor is that proper Disilting of these Nallas have not been carried out previously.

The length of these Nallas is approximately 1KM each from both sides and lies in UC # 10 & UC # 11 respectfully.

UC # 10, Nallas runs from Sakhi Pir culvert towards Pathan Hotel and the Nalla is divided into two parts 1st part runs from Din Mohammad Milk Diary towards Sakhi Pir Culvert and other part runs from Firdous Jamia Mosque to Pathan Hotel near mutton slaughter House. In between this Nalla is totally covered by mosque, shopkeepers and a petrol pump.

UC # 11 Nalla runs from Sakhi Pir Culvert towards Mutton slaughter house separating the Nalla into two parts. 1st parts runs from Modern Plaza towards Mutton Slaughter House and other runs from Modern Plaza towards Sakhir Pir Culvert.

The following action will be taken before Moonson season to rectify the problem.

1. Disilting campaign will be launched immediately on both Nalla (work in progress).

2. Department of Encroachment will be taken into task to remove the encroachments where the problem lies.

3. In the case of heavy rain Diesel pump will be installed at the both ends of Nallas to drain out the rain water smoothly.

Page 73: Kmc rain emergency plan 2014 final

PROBLEMS:1. Shortage of Pump Operators and Labour for loading and Shifting of Diesel pumps.

2. Vehicle for shifting and loading of Diesel Pump

3. Sanitary Staff Shortage

4. Accessories of Pumps (Electric / Diesel).

5. Non-availability of Movable generators which are required in case of Load Shedding.

6. 3 phase electric connection for electric pumps.

REQUIREMENTS:

1. At least 10 Electric Pump Operators, 40 Pump Operators for Diesel Pumps (Sub-Division City and Latifabad)

2. Shahzoor Pickup 2 in number for City and Latifabad.

3. 100 sanitary staff for Disilting of Chamber of Pumping Stations (City and Latifabad)

4. Details of Accessories required. Generators 5 in number1 50kv + 2 Nos: 100kv for city Division 2 No: 50kv for Latifabad Division

5. 5000 sand bags in case of emergency.

6. Electric Connection.

Page 74: Kmc rain emergency plan 2014 final

RESPONSIBILITIES:1. Sattar Shah Pumping Station

2. Haider Shah Pumping Station

3. HDA WASA will be responsible to install Generators at their permanent electric pumping stations for proper functioning in case of any emergency / failure of Electricity.

1. Tulsi Das Pumping Station

2. Affandi Town

3. Peretabad PDI Rehman Town

4. PD-II, Hashmat Banu Town

5. Gujrati Para Near Tando Yousuf Railway Crossing

6. Unit No: 2 Pumping Station

7. Public School Pumping Station

8. LD4 Pumping Station

9. Unit No: 10, Pumping Station

10. Unit No: 9, Pumping Station

11. Disposal Unit No: 11, Pumping Station

12. Airport Road Pumping Station

13. Makrani Para Pumping Station

14. Barkat Bhai Town Pumping Station

15. Mir Khan Pumping Station Auto Bhan Road.

In case of any emergency HESCO will be responsible to provide 3 phase connection