Energy‐Saving Audit Project
in Malaysia
June,2011
JAPAN EXTERNAL TRADE ORGANIZATION (JETRO)
Satoshi Kubota, Abubakar Rasol, Daisuke Arai, Yuki Kyozuka
Overview
1. Background
2. About Energy-Saving Audit Project
3. Process
4. Model Company
5. Request for MGTC
6. Ending
1.Background
1.Needs
(1)Malaysia
~ National Green Technology Policy
(From July-2009~)
(2)Japan
~ International Cooperation
~ Technology Transfer
2.PotentialEnergy efficiency saving potentials identified in MIEEIP (Malaysia Energy Efficiency Improvement Program)
PULP&PAPERS, 31.4%
FOOD, 14.5%
WOOD, 14.0%
CEMENT, 13.4%
IRON&STEEL, 10.5%
RUBBER, 6.3%
CERAMIC, 6.0%GLASS, 4.0%
1.Background
Source: MIEEIP Final Completion Report, PTM,2007
2.About Energy‐Saving Audit Project
1. Purpose
(1) Implement more high level energy-saving
to model company.
(2) Share energy-saving technology
in Malaysia.
Energy recovery by micro-hydro system
Warm water
Cold water
Recoverytank
Steam trap
Exhauststeam
Exhaust steamheat exchanger
Drainrecovery
Heat shield painting
Boiler and furnace
Fuel for in-house power generation
Purchased electricity
Power Air conditioningand freezing
Lighting and office equipment
Factory energy that can be saved
Cooling water
Temperature sensor Turbo freezer
Commercial electricity
supply
InverterRotation speed:
70-100%
Inverter control unit
Frequency command
Gas turbine cogeneration system
Factory EnergyManagement
System(FEMS)
Monitor energy consumptionon the Web
Water recyclingHeat-retention by insulator
Inverter air conditioning
Exhaust heat recovery System
Heat shielding
Highly-efficient lighting
・Inverter fluorescent light
・Highly-efficient mercury lamp
・LED lighting
Energy-Saving
Technology e.g.
Introduction and utilization of inverter
Report e.g. CO2 Emission
Reduction t/y
-
38,5
335,1
-
-
-
-
730,4
-
-
124,6
-
-
-
1.228,6
Savings in
US$/y
-
6.042
52.777
-
-
-
-
114.473
-
-
19.533
-
-
-
192,.825
Field of Improvement
Cost & Energy Management
Energy saving
Energy saving
Steam system reliability & Maintenance
Steam system reliability & Maintenance
Steam system reliability & Maintenance
Steam system reliability & Maintenance
Energy saving
Product Quality & Maintenance
Product Quality
Energy saving & Reliability
Productivity & Reliability
Productivity & Reliability
Energy saving, Maintenance
Total
Investment
Group
B
B
C
C
C
C
C
B
B
B
B
B
A
B
Plant & Proposal
1. Flow Meter Installation
2. Boiler blow down heat recovery (Case 1)
3. Economizer Installation
4. Steam Main Line Layout
5. Proper Trapping of the Steam Main Line
6. Support of Steam Main Line
7. Air venting of the Steam Main Line
8. Steam leaks in the Steam Main Line
9. Clean Hot Water Generation
10. Steam Separators
11. Proper Trapping of Scalders
12. Proper Trapping of Horno Fessmann
13. Stall at Air condition Heat exchanger
14. Long-lasting energy efficient steam traps
2.About Energy‐Saving Audit Project
CHILE CHINA MEXICO MEXICO
2009 2010 2008-2009 2011
Food Water Treatment Steel Chemical
3 2 3 3
15.1 46.6 38.5 6.7
2.5 20.4 53.7 1.1
Period
Source: Each Project Report, J-file(http://www.jetro.go.jp/world/), Applied 5-May-2011 currency rate
Number of companies
Fie ld
Total Cost-Savings(Million MR / Year)
Total CO2-Savings(1 ,000 Ton / Year)
2.About Energy‐Saving Audit Project
Development of Green Technology in Malaysia
Cooperation from Malaysian
Company
Japanese
Technology and know-how
Support of JETRO and
MGTC
3.Process
1. Select model companies
2. Decide specialist
3. Field survey
4. Proposal
5. Feedback seminar
4.Model Company
1. Merits
(1) Grasp the hidden energy-savings potential
in the plant
(2) Share the solutions using advanced technology
and technique
(3) Complement energy-savings by no cost proposal
Moreover…the audit fee is free!
4.Model Company
2. Conditions
(1) Target field : Processed food, beverage
(2) Number of companies : 2~3
(1 plant per 1 company)
(3) Scale : Having a large scale and energy
consuming factory
(4) Other: completely cooperative for an audit
and a feedback seminar
5.Request for MGTC
1. Suggest a recommendation of 2-3 model
company.
2.Cooperating in feedback seminars.
3. Linking the Energy-Saving Audit project to