会議報告 Cost Management Group Meeting at DESY 2008.05.05 – 08. 設楽 哲夫 LC GDE 報告会  2008.05.12. http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2709 Password Protected. Challenges & Issues. RDR – 1年を経過 過去の遺産か? 日に日に忘れられて行く - PowerPoint PPT Presentation

Citation preview

Page 1: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

会議報告Cost Management Group  Meeting at DESY

2008.05.05 – 08

設楽 哲夫LC GDE 報告会  2008.05.12

http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2709Password Protected

Page 2: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Challenges & Issues

• RDR – 1年を経過– 過去の遺産か?– 日に日に忘れられて行く– 緊急課題 : VALUE estimate と RDR design

document との traceability

• 2012 までのプログラムの遅れ– Accelerator physics design の役割は?

• RDR は今でも十分か ?

– Limited resources: DR, BDS, sources significantly reduced

• But management still in place and on-board• How best to use this group? Keep motivation?

Page 3: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Challenges & Issues

• In a predominantly R&D phase, who is worrying about the collider design?– Despite above comments, AP&D is still critical

during TD Phase I

• Cost Containment / Reduction– Need to demonstrate clear effort to re-evaluate

the design and reduce the cost– “Minimal” 200-500 GeV Collider Concept

• Strategic planning– Updated (new!) value estimate will be critically

reviewed• Internally in 2010• Publically in 2012

Page 4: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Cost Management Group

• Small focus group to “manage the costs”

• Take top-level ownership

• Forward planning to critical cost review– Philosophy / Structure / implementation– Update review 2010 (internal)– New value estimate 2012 (external)

• Push-back on the design (cost awareness)

Page 5: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Cost Management Group

• “Task Force-like” (prefer think-tank)• Goals

– Re-structure and consolidate existing cost information for “better access”

• New tool

– Examine the cost data for inconsistencies, discrepancies, questionable entries, missing information

– Re-establish traceability with RDR design requirements (together TAG leaders)

• Or identify missing information that needs to be supplied

– Prepare for cost-reduction design scenarios

• Coordination with TAG leaders / technical groups essentially– Primarily via PM, APM, PMO

Page 6: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Cost Management Group メンバー

• PMs: M. Ross, N. Walker, A. Yamamoto• Cost Engineers: W. Bialowons, P. Garbincius, T. Shidara• APMs: J. Carwardine, F. Lehner• PMO: E. Elsen, E. Paterson• Others: T. Himel, +++

Page 7: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Defining our (CMG) Goals

review: start here

Page 8: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Elements: VALIDITY

What documentation will we require for a critical cost review?

How do we intend to present it?

Page 9: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Elements: TRACEABILITY

Critical link between design and cost-estimate documentation

Understanding the formal link between the two:

Maintaining integrityRole of change control ( Toge)Initial configuration (consolidating RDR)

Page 10: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Elements: COMPLETENESS

Definition of (i.e. level of detail) must be defined up-front

Use RDR value estimate as a guideline (e.g. 1% level)

Build ‘ideal’ CBS structure (based on above)

Understand how current information maps to ideal structure

Where is information missingWhat to do with too-detailed information

Page 11: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Elements: RISK

Maintaining a risk register

Understanding (quantifying) value uncertainty

Formally integrating methodology into scheme (tools)

Page 12: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Cost Reduction

“First step to containing / reducing cost is to keep good track of the existing ones” – anon.

Page 13: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

CMG responsibilities

• Define new documentation organisation for TD phase– ILC-EDMS design documentation

• Part Breakdown Structure = PBS– VALUE estimate (tool?)

• Cost Breakdown Structure = CBS

• Consolidate RDR data– Existing data into newly defined structures– Identify missing components

• Catalogue and prioritise

• Begin (continue) drill-down RDR data– Design modification catalogue

• Define minimum 200-500 GeV machine?– Can coordinate but TAG leaders must clearly be

involved

Page 14: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Goals for this meeting

• Attempt to address all questions raised on previous slides– Identify lead person(s) for identified critical items

• Understand what we as a group can accomplish directly, and where we need to delegate– Generate action item lists for TAG leaders (or others)– Generate action items for us!

• Make plans (i.e. identify deliverables) for– Dubna (June)– ILC08 (November)

Page 15: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

CMG meeting scheduleMonday Tuesday

8:30 Introduction, goals for meeting (Nick) RDR Positron Source costing (Peter)9:00 RDR cost estimates + website walkthrough (Nick/Peter)9:3010:0010:30 Tesla costing comparisons (Nick/Wihelm) Positron Source options (Ewan) 11:00 USTOS Costings (Himel)11:30 XFEL cost management (Nick to arrange)12:0012:3013:0013:30 Cost Management - Traceabilty (Peter/ J ohn) RDR HLRF costing + options (Tetsuo)14:00 Cost Management - Information management (Peter/ J ohn)14:30 Organizing Costing information (Tom)15:0015:30 RDR water costing (Marc) RDR Magnet Systems cost walkthough (J ohn)16:0016:30 Tesla/XFEL water cost estimates (Wilhelm)17:00 30 Magnet Systems cost reductions (Cherrill/Paul by webex)

Page 16: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

CMG meeting scheduleWednesday Thursday

8:30 Staging, accelerator design (Ewan) Discussion9:009:3010:0010:30 Single tunnel considerations (Tom) Planning, action items (Nick/ J ohn/All)11:00 RDR Underground volume (Peter)11:30 Wrap-up (Nick)12:0012:3013:0013:30 How to evaluate cost reduction proposals (discussion)14:00 30 CFS/ Dubna Webex Meeting (All)14:30 Cost /  design change management (discussion)15:0015:30 Cost Management 2 - information management (Peter/ J ohn)16:0016:30 Vision for using Triad Consulting (Marc)17:00

Page 17: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Monday 05 May 2008 09:00->12:00    Monday Morning 09:00 Introduction (1h00') Nicholas Walker (DESY) 10:00 RDR Cost Estimate website walk-through (1h00')  Peter Garbincius (FNAL) 

11:00 Cost Management discussions (1h00')12:00 Lunch13:30->17:00    Monday Afternoon 14:00 Process Cooling Water Cost Reduction Strategies (1h30')Wilhelm Bialowons (Deutsches Elektronen-Synchrotron DESY) 

15:30 Main Linac Cooling Water (1h00')Marc Ross

Page 18: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Tuesday 06 May 2008  09:00->12:00    Tuesday Morning (Convener:Ewan Paterson) 09:00 Positron Source Cost Estimate drill-downPeter Garbincius (FNAL) 

10:30 Positron Source design options (1h30') Ewan Paterson (SLAC) 

12:00 Lunch13:30->17:00    Tuesday Afternoon (Convener:J. Carwardine) 13:30 Requirements Traceability (1h00') John Carwardine (Argonne / ILC GDE) 

14:30 Cost Analysis with spreadsheets (1h00') Thomas Himel (SLAC) 

15:30 High Level RF cost estimate drill-down (1h00') Tetsuo Shidara (KEK) 

Page 19: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Wednesday 07 May 200809:00->12:30    Wednesday Morning 09:00 Mid-week summary, task assignment N. Walker (DESY)09:30 Staging, accelerator design (1h00') Ewan Paterson (SLAC) 10:30 Cost considerations for one vs two tunnelsThomas Himel11:30 USTOS cost comparisons (30') Thomas Himel (SLAC) 12:00 Tesla cost comparisons (30') Nicholas Walker (DESY)12:00 Lunch13:30->19:00    Wednesday Afternoon 13:30 Underground Space: tunnels, shafts, caverns P. Garbincius15:00 Cost Management consulting (1h00') Marc Ross (FNAL) 16:00 Magnets & Power Supplies cost estimate drill-down (1h00') John Carwardine (Argonne / ILC GDE)

17:00 Magnets & Power Supplies cost reduction options (1h00') Paul Bellomo (SLAC) ,Cherrill Spencer (SLAC) 

Page 20: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Thursday 08 May 2008 09:00->11:00    Thursday Morning 09:00 Summary and wrap-up (15') Nicholas Walker (DESY)10:00 Follow-up discussion with Lars Hagge on EDMS (1h00')  Carwardine, Garbincius, Himel, Shidara

Page 21: 会議報告 Cost Management Group Meeting at DESY  2008.05.05 – 08

Global Design Effort

Output of this Meeting

• Close-out summary of key issues, including:– Identify critical action items– Deliverables & dates– Decisions !– Remaining (outstanding) issues

• Written summary report– For publication (to organisation)– Basis for presentation to EC