Upload
asmara-kanthi
View
222
Download
0
Embed Size (px)
Citation preview
8/10/2019 AliYanto
1/5
Ali YantoJr. Project Leader Engineer di PT. Gran kar
Ringkasan
My name is Aliyanto, 23 years old, male, single, energic and healthy. I am former PT Grand Kartech as Jr.Project Leader and Engineer. I would like to have career to expand my experiences.
My personality as a hardworking, have a high motivation, Creative, Innovative responsible, able to work
together in teams and independent, ready to work under pressure. For your consideration, I attach a curriculum
vitae and other equipment that can support and provide a picture of myself.
I am very eager to work in the field of piping in the business of oil and gas, petrochemical, power plant, general
industrial, or treatment as Owner, engineering, contracting, or a consultant.
Pengalaman
Junior Project Leader Engineer at PT. Grand Kartech Tbk
November 2014 - Saat ini(1 bulan)
Project Description
Project : Facility CED Coating Line for PT Benecom Tricom
Location : Cibitung West Java-Indonesia
Job Description
Review document and drawing to identify & quantify scope of work.
Prepare PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client to Pipe, fitting pipe, support,
stand, painting, equipment pump, filter and tank.
Prepare Piping Material Spesification database for MTO calculation.
Prepare Fabrication, Transportation and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Supervision on site
Request and Prepare Tools and Facility for Instalation
Survey Location Instalation
Coordinator Subcontracting
Monitoring and Update Client Property Mapping Man power for Instalation and Fabrication
Scadule Kick of Meeting dan meeting client
Document Index and transmittal
Jr. Project Leader Engineer at PT. Grand Kartech Tbk
Maret 2014 - Saat ini(9 bulan)
Project Description
Halaman1
8/10/2019 AliYanto
2/5
Project : Mezanine Booth Painting Suzuki Indo Mobil
Location : Cikarang West Java-Indonesia
Job Description
Review document and drawing to identify & quantify scope of work.
Review PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client
Prepare Material Spesification database for MTO calculation.
Review Fabrication, Transportation and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Request and Prepare Tools and Facility for Instalation
Coordinator Subcontracting
Mapping Man power for Instalation and Fabrication
Memo drawing fabrication
Junior Project Leader Engineer at PT. Grand Kartech Tbk
Juli 2014 - September 2014 (3 bulan)
Project Description
Project : Supply Thinner and Recovery Systerm Line 3 and Line 4
Location : Cikampek West Java-Indonesia
Job Description
Review document and drawing to identify & quantify scope of work.
Prepare PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client to Pipe, fitting pipe, support, stand, painting,
equipment pump, filter and tank.
Prepare Piping Material Spesification database for MTO calculation.
Prepare Fabrication, Transportation and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Supervision on site
Request and Prepare Tools and Facility for Instalation
Survey Location Instalation
Coordinator Subcontracting
Monitoring and Update Client Property
Mapping Man power for Instalation and Fabrication Scadule Kick of Meeting dan meeting client
Jr. Project Leader Engineer at PT. Grand Kertech Tbk
Juni 2014 - Juli 2014 (2 bulan)
Project Description
Project : Redesign and drafting Production Separator( EJ-V-003) 66
Inch OD x 210.25 InchLegth (S/S)
Halaman2
8/10/2019 AliYanto
3/5
Project title : Pertamina PHE ONWJ
Job Description
Drafting and redesign Production Separator( EJ-V-003) 66 Inch OD x 210.25 InchLegth (S/S)
3D describe in full by the standards of ASME section VIII
BOM automatically obtain and update automatically between 3D and 2D images that do not
need redrawing so help design engineer
Calculate the volume of welding on the layer of the layer, the actual cutting plan that helps
estimator
Efficiently and effectively to client requests for live updates OD all the spec in the BOM will
also change according to ASME section VIII
Stress Analysis by Equipment Support
Jr. Project Leader Engineer at PT. Grand Kartech Tbk
April 2014 - Mei 2014 (2 bulan)
Project Description
Project : Supply Thinner and Recovery Systerm Line 1 and Line 2
Location : Cikampek West Java-Indonesia
Job Description
Review document and drawing to identify & quantify scope of work.
Prepare PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client to Pipe, fitting pipe, support,
stand, painting, equipment pump, filter and tank.
Prepare Piping Material Spesification database for MTO calculation.
Prepare Fabrication Scadule, Transportation Scadule and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Supervision on site
Request and Prepare Tools and Facility for Instalation
Survey Location Instalation
Coordinator Subcontracting
Monitoring and Update Client Property
Mapping Man power for Instalation and Fabrication
Asisstant Laboratorium Drawing Engineering Manuals and Computer Aided Design atMuhammadiyah Applied Tecnology Center MATC Patners Autodek
September 2010 - Januari 2013 (2 tahun 5 bulan)
Project Description
Project : Training Manual Drawing and Computer Aided Design to AUTOCAD and INVENTOR
Location : Malang East Java-Indonesia
Job Description
Training schedule
Collection trainees
Halaman3
8/10/2019 AliYanto
4/5
Presentation lessons
Prepare the exam and tutorial classes
Explain procedures and training time
Give participants
Keahlian dan KeterampilanPiping Drafting Tools : Autocad, PDMS andAutodek Inventor
Piping Design Tool : Autocad, PDMS and AutodekInventor
Piping Engineering Tool : CAESAR II for PipeStrees Analysis
3D Modeling Analysis : Autodesk Inventor for Staticand Dinamic Analysis S
BOM : Autodesk Inventor Ilogic, Ipart, BoQ, InputNew Materials
Ms. Excell : Ms Excell for Compare + Rekapitulasi(BoQ, Drawingand Actual)
Ms. Project : Ms. Project for Scedule Fabricationand Instalation,Transpo
Supervisory Skills
Personnel Management
Simulation Software
Pendidikan
Universitas Muhammadiyah Malang (UMM)
Bachelor's degree, Mechanical Engineering, 2009 - 2013Nilai: 3.48Aktivitas dan Kegiatan Sosial: Futsal, Organitation Campus and Assistant Laboratorium Drawing EngineeringManuals and CAD
Minat
Piping Engineer, Oil and Gas, Pelatihan manajemen, teknologi baru, investasi, fotografi digital, Futsal,
Travelling,
Halaman4
8/10/2019 AliYanto
5/5
Ali YantoJr. Project Leader Engineer di PT. Gran kar
Hubungi Ali di LinkedIn
Halaman5
https://www.linkedin.com/profile/view?id=336987892&authType=name&authToken=wR5j&goback=%2Epdf_336987892_*1_*2_name_wR5j_AliYanto_true_*1https://www.linkedin.com/profile/view?id=336987892&authType=name&authToken=wR5j&goback=%2Epdf_336987892_*1_*2_name_wR5j_AliYanto_true_*1