    Ali YantoJr. Project Leader Engineer di PT. Gran kar

    [email protected]

    Ringkasan

    My name is Aliyanto, 23 years old, male, single, energic and healthy. I am former PT Grand Kartech as Jr.Project Leader and Engineer. I would like to have career to expand my experiences.

    My personality as a hardworking, have a high motivation, Creative, Innovative responsible, able to work

    together in teams and independent, ready to work under pressure. For your consideration, I attach a curriculum

    vitae and other equipment that can support and provide a picture of myself.

    I am very eager to work in the field of piping in the business of oil and gas, petrochemical, power plant, general

    industrial, or treatment as Owner, engineering, contracting, or a consultant.

    Pengalaman

    Junior Project Leader Engineer at PT. Grand Kartech Tbk

    November 2014 - Saat ini(1 bulan)

    Project Description

    Project : Facility CED Coating Line for PT Benecom Tricom

    Location : Cibitung West Java-Indonesia

    Job Description

    Review document and drawing to identify & quantify scope of work.

    Prepare PR, BoQ, and Master Scadule.

    Request material Purchase for BoQ and Drawing

    Review Material Specification and Technical Query to Client to Pipe, fitting pipe, support,

    stand, painting, equipment pump, filter and tank.

    Prepare Piping Material Spesification database for MTO calculation.

    Prepare Fabrication, Transportation and Instalation Scadule

    Update Progress Fabrication and Instalation for Client and Managemant

    Supervision on site

    Request and Prepare Tools and Facility for Instalation

    Survey Location Instalation

    Coordinator Subcontracting

    Monitoring and Update Client Property Mapping Man power for Instalation and Fabrication

    Scadule Kick of Meeting dan meeting client

    Document Index and transmittal

    Jr. Project Leader Engineer at PT. Grand Kartech Tbk

    Maret 2014 - Saat ini(9 bulan)

    Project Description

    Halaman1

  • 8/10/2019 AliYanto

    2/5

    Project : Mezanine Booth Painting Suzuki Indo Mobil

    Location : Cikarang West Java-Indonesia

    Job Description

    Review document and drawing to identify & quantify scope of work.

    Review PR, BoQ, and Master Scadule.

    Request material Purchase for BoQ and Drawing

    Review Material Specification and Technical Query to Client

    Prepare Material Spesification database for MTO calculation.

    Review Fabrication, Transportation and Instalation Scadule

    Update Progress Fabrication and Instalation for Client and Managemant

    Request and Prepare Tools and Facility for Instalation

    Coordinator Subcontracting

    Mapping Man power for Instalation and Fabrication

    Memo drawing fabrication

    Junior Project Leader Engineer at PT. Grand Kartech Tbk

    Juli 2014 - September 2014 (3 bulan)

    Project Description

    Project : Supply Thinner and Recovery Systerm Line 3 and Line 4

    Location : Cikampek West Java-Indonesia

    Job Description

    Review document and drawing to identify & quantify scope of work.

    Prepare PR, BoQ, and Master Scadule.

    Request material Purchase for BoQ and Drawing

    Review Material Specification and Technical Query to Client to Pipe, fitting pipe, support, stand, painting,

    equipment pump, filter and tank.

    Prepare Piping Material Spesification database for MTO calculation.

    Prepare Fabrication, Transportation and Instalation Scadule

    Update Progress Fabrication and Instalation for Client and Managemant

    Supervision on site

    Request and Prepare Tools and Facility for Instalation

    Survey Location Instalation

    Coordinator Subcontracting

    Monitoring and Update Client Property

    Mapping Man power for Instalation and Fabrication Scadule Kick of Meeting dan meeting client

    Jr. Project Leader Engineer at PT. Grand Kertech Tbk

    Juni 2014 - Juli 2014 (2 bulan)

    Project Description

    Project : Redesign and drafting Production Separator( EJ-V-003) 66

    Inch OD x 210.25 InchLegth (S/S)

    Halaman2

  • 8/10/2019 AliYanto

    3/5

    Project title : Pertamina PHE ONWJ

    Job Description

    Drafting and redesign Production Separator( EJ-V-003) 66 Inch OD x 210.25 InchLegth (S/S)

    3D describe in full by the standards of ASME section VIII

    BOM automatically obtain and update automatically between 3D and 2D images that do not

    need redrawing so help design engineer

    Calculate the volume of welding on the layer of the layer, the actual cutting plan that helps

    estimator

    Efficiently and effectively to client requests for live updates OD all the spec in the BOM will

    also change according to ASME section VIII

    Stress Analysis by Equipment Support

    Jr. Project Leader Engineer at PT. Grand Kartech Tbk

    April 2014 - Mei 2014 (2 bulan)

    Project Description

    Project : Supply Thinner and Recovery Systerm Line 1 and Line 2

    Location : Cikampek West Java-Indonesia

    Job Description

    Review document and drawing to identify & quantify scope of work.

    Prepare PR, BoQ, and Master Scadule.

    Request material Purchase for BoQ and Drawing

    Review Material Specification and Technical Query to Client to Pipe, fitting pipe, support,

    stand, painting, equipment pump, filter and tank.

    Prepare Piping Material Spesification database for MTO calculation.

    Prepare Fabrication Scadule, Transportation Scadule and Instalation Scadule

    Update Progress Fabrication and Instalation for Client and Managemant

    Supervision on site

    Request and Prepare Tools and Facility for Instalation

    Survey Location Instalation

    Coordinator Subcontracting

    Monitoring and Update Client Property

    Mapping Man power for Instalation and Fabrication

    Asisstant Laboratorium Drawing Engineering Manuals and Computer Aided Design atMuhammadiyah Applied Tecnology Center MATC Patners Autodek

    September 2010 - Januari 2013 (2 tahun 5 bulan)

    Project Description

    Project : Training Manual Drawing and Computer Aided Design to AUTOCAD and INVENTOR

    Location : Malang East Java-Indonesia

    Job Description

    Training schedule

    Collection trainees

    Halaman3

  • 8/10/2019 AliYanto

    4/5

    Presentation lessons

    Prepare the exam and tutorial classes

    Explain procedures and training time

    Give participants

    Keahlian dan KeterampilanPiping Drafting Tools : Autocad, PDMS andAutodek Inventor

    Piping Design Tool : Autocad, PDMS and AutodekInventor

    Piping Engineering Tool : CAESAR II for PipeStrees Analysis

    3D Modeling Analysis : Autodesk Inventor for Staticand Dinamic Analysis S

    BOM : Autodesk Inventor Ilogic, Ipart, BoQ, InputNew Materials

    Ms. Excell : Ms Excell for Compare + Rekapitulasi(BoQ, Drawingand Actual)

    Ms. Project : Ms. Project for Scedule Fabricationand Instalation,Transpo

    Supervisory Skills

    Personnel Management

    Simulation Software

    Pendidikan

    Universitas Muhammadiyah Malang (UMM)

    Bachelor's degree, Mechanical Engineering, 2009 - 2013Nilai: 3.48Aktivitas dan Kegiatan Sosial: Futsal, Organitation Campus and Assistant Laboratorium Drawing EngineeringManuals and CAD

    Minat

    Piping Engineer, Oil and Gas, Pelatihan manajemen, teknologi baru, investasi, fotografi digital, Futsal,

    Travelling,

    Halaman4

  • 8/10/2019 AliYanto

    5/5

    Ali YantoJr. Project Leader Engineer di PT. Gran kar

    [email protected]

    Hubungi Ali di LinkedIn

    Halaman5

    https://www.linkedin.com/profile/view?id=336987892&authType=name&authToken=wR5j&goback=%2Epdf_336987892_*1_*2_name_wR5j_AliYanto_true_*1https://www.linkedin.com/profile/view?id=336987892&authType=name&authToken=wR5j&goback=%2Epdf_336987892_*1_*2_name_wR5j_AliYanto_true_*1