ANALISIS TEGANGAN TERHADAP RISIKO TERJADINYA BUCKLING PADA PROSES PENGGELARAN PIPA BAWAH LAUT LABORATORIUM KEANDALAN DAN KESELAMATAN JURUSAN TEKNIK SISTEM PERKAPALAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER ANDHIKA HARIS NUGROHO NRP 4210 100 090

ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

  • Upload
    vantruc

  • View
    222

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

ANALISIS TEGANGAN TERHADAP

RISIKO TERJADINYA BUCKLING

PADA PROSES PENGGELARAN PIPA

BAWAH LAUT

LABORATORIUM KEANDALAN DAN KESELAMATAN

JURUSAN TEKNIK SISTEM PERKAPALAN

FAKULTAS TEKNOLOGI KELAUTAN

INSTITUT TEKNOLOGI SEPULUH NOPEMBER

ANDHIKA HARIS NUGROHO

NRP 4210 100 090

Page 2: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Pokok Bahasan

2

•Outline Skripsi

•Target Hasil Akhir

Pendahuluan

•Proses Pengerjaan

Metodologi Penelitian

•Analisis Penggelaran Pipa dengan OFFPIPE

•Cek Buckling dengan DNV 1981

•Cek Buckling dengan DNV OS-F101

•Vaidasi dengan Pemodelan Solidworks

Analisa dan Pembahasan

Kesimpulan dan Saran

Page 3: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Latar Belakang

3

Source : (PC Ketapang II LTD., 2008)

Gambar Denah Lokasi Blok Bukit Tua,

Ketapang

Page 4: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Perumusan Masalah

4

• Bagaimana cara menghitung local buckling dan propagation buckling yang terjadi pada daerah sagbend dan overbend pada pipeline saat proses laying. 1

• Bagaimana mengetahui lokasi lokasi yang memiliki resiko terjadinya buckling dengan nilai yang melebihi standart. 2

• Bagaimana pengaruh kedalaman pipa terhadap kemungkinan terjadinya buckling pada proses penggelaran pipa. 3

• Bagaimana mengetahui distribusi tegangan pada pipa dengan menggunakan metode finite element. 4

Page 5: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Tujuan Skripsi

5

1 • Menghitung local buckling dan propagation buckling yang terjadi pada

daerah sagbend dan overbend pada pipeline saat proses laying.

2 • Menentukan lokasi dengan tingkat stress yang mendekati standart

maksimum.

3 • Mengetahui pengaruh kedalaman pipa terhadap resiko buckling pipa

pada saat penggelaran.

4 • Mengetahui distribusi tegangan pada pipa dengan menggunakan

metode finite element.

Page 6: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

6

Batasan Masalah

Objek yang dianalisa ialah jalur pipa gas 12” dari FPSO menuju ORF.

Analisa tegangan saat lying pipa menggunakan software Solidworks

Standart yang digunakan untuk menghitung allowable stress yang terjadi menggunakan standart DnV 1981 dan juga DnV OS F101 ‘Submarine Pipeline System’

1

2

3

Page 7: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

GOAL

Penilaian Risiko

Buckling

Penentuan Lokasi Kritis

Pemodelan dan

Validasi

7

Target Tugas Akhir

Page 8: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

8

START

Studi Litelatur

· Jurnal Ilmiah· Paper· Standart· Buku Litelatur· Website

Pengumpulan data dan

Perencanaan

Perhitungan Stress untuk kondisi statis

Cek Buckling dengan DNV 1981

Cek Buckling dengan DNV OS-F101 (2000)

Analisa hasil pemodelan

menggunakan FEM

Validasi Perhitungan dan Pemodelan

Kesimpulan dan Saran

FINISH

YES

NO

Simulasi dengan

Solidworks

Metodologi

Analisis Tegangan dengan Offpipe

Penilaian dengan DNV

1981

Penilaian dengan

DNV OS F 101

Pemodelan dan Validasi dengan

Solidworks

Page 9: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Penentuan Risiko Buckling

Cek Buckling dengan

DNV 1981

Input data Symbol Unit Operation Hydrotest

Pipe Outside Diameter D mm 323.9 323.9

Selected Wall Thickness tn mm 9.5 9.5

Specific Minimum Yield Strength SMYS Mpa 448 448

Steel Young`s Modulus E Mpa 200000 200000

Design Pressure Pi Mpa 10 15

Content Density rcon kg/m3 71.9 1025

Corrosion Allowance CA mm 3 0

Trench Dept td m 2 2

Dencity of Sea Water rw kg/m3 1025 1025

Hoop Stress Design Factor Fi - 0.3 0.6

Longitudinal Joint Factor fe - 1 1

Temperature Derating Factor T - 1 1

Pioisson`s Ratio v - 0.3 0.3

Gravitational Acceleration g m/s2 9.81 9.81

Soil Specific Gravity g - 2.8 2.8

Output Data Symbol Unit Operation Hydrotest

Inner Diameter ID mm 303.3 303.3

Minimum External Pressure P ex min MPa 0 0

Net. Max. Internal Pressure Pd MPa 10 15.2

Minimum Wall Thickness for

Internal Pressure t min i mm 15.47 9.36

Summary

Outer Diameter D mm 335.1 335.1

Recommended Wall Thickness tn mm 15.9 15.9

From KP 22.5

To KP 47.5

323.9

9.5

API 5L X65

5.5mm Thk

AE Type 2B

70

3044

160.5

1.88

29

21

12

55

-

Pipe Outside Diameter (mm)

Pipe Wall Thickness

Pipe Grade

Segmen 3

Submerge Weight (kg/m) (Pipe Empty)

Specific Grafity (Installation)

Maximum Allowable Operation Span, Installation (m)

External Corrosion Coating Thickness

Concrete Thickness (mm)

Concrete Density (kg/m3) (Dry)

Pipeline Burial Depth (m)

Maximum Allowable Operation Span, Hydrotest (m)

Maximum Allowable Operation Span, Operation (m)

Depth of Pipe

Page 10: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Pembahasan Pengumpulan Data

10

UnitGas Export

Pipeline

- BTJT-A

- ORF

- Dry Gas

Inch 12

mm 323.9

Zone 1 mm 9.5

Zone 2 mm 10.3

- CS Rigid

- API 5L X65

mm 3

MPag 10

Psig 1450.37

MPag 7

Psig 1015.26

MPag 15

Psig 2175.56oC 94oC 0

kg/m3 71.9

kg/m3 34.3

km 110

Maximum Product Density

Minimum Product Density

Nominal Length

Field Hydrostatic Pressure

Maximum Design Pressure

Minimum Design Pressure

Design Pressure

Max. Operating Presssure

Parameter

Originating Facility

Receiving Facility

Product

Nominal Bore

Pipeline Wall

Thickness

Material Type

Material Grade

Internal Corrosion Allowance

Barge Parameters

Name of Barge Timas DLB 01

Length Overall 121.9

Beam 32.3

Depth 8.7

Draft 5.5

Freeboard 3.2

Page 11: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Detail Data

11

From 0.000 (SP) 0.060 0.500 4.000 47.000 79.393 101.200 103.810

To 0.060 0.500 4.000 47.000 79.393 101.200 103.810 110.394 (EP)

Item No. 1

60 m

Item No. 2

440 m

Item No. 3

3500 m

Item No. 4

43000 m

Item No. 5

32.393 m

Item No. 6

21.807 m

Item No. 7

2610 m

Item No. 8

6584 m

323.9 323.9 323.9 323.9 323.9 323.9 323.9 323.9

10.3 10.3 9.5 9.5 9.5 9.5 10.3 10.3

API 5L X65 API 5L X65 API 5L X65 API 5L X65 API 5L X65 API 5L X65 API 5L X65 API 5L X65

2.5mm

Thk 3LPP

5.5mm

Thk AE

Type 2B

5.5mm

Thk AE

Type 2B

5.5mm

Thk AE

Type 2B

5.5mm

Thk AE

Type 2B

5.5mm

Thk AE

Type 2B

5.5mm

Thk AE

Type 2B

5.5mm Thk

AE Type 2B

70 70 70 70 70 70 70 70

3044 3044 3044 3044 3044 3044 3044 3044

162.0 166.50 160.5 160.5 56.5 106.1 166.5 166.5

70 70 70 70 30 50 70 70

600 600 600 400 600 400 400 400

130.9 130.9 130.9 86.7 48.8 58 86.7 86.7

9 9 9 10 8 3 3 3

1 4 32 353 332 596 72 180

12 12 12 17 19 16 19 17

- - - - - Note 13 2 m Top 2 m Top

Anode Quantity (No.) (Note 8)

Maximum Allowable Operation Span (m)

Pipeline Burial Depth (m)

Aluminium - Zinc - Indium Anode Thickness (mm)

Anode Length (mm)

Anode Nett Mass (kg)

Anode Spacing (Joint)

Kilometer PointMaterial

Supply

Linepipe Material Take-OffBare Steel

Linepipe

Supplied

By

Company

Pipe Outside Diameter (mm)

Pipe Wall Thickness

Pipe Grade

External Corrosion Coating Thickness

All

Coatings

and Anode

Supplied

By

Offfshore

Installation

Contractor

Concrete Thickness (mm)

Concrete Density (kg/m3) (Dry)

Submerge Weight (kg/m) (Pipe Empty)

Page 12: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Data Laybarge

12

Page 13: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Data Laybarge

13

Page 14: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Segmentasi

14

Segmentation From ToWater

Depth

Segmen 1 KP 0.0 KP 0.5 60

Segmen 2 KP 0.5 KP 22.5 60

Segmen 3 KP 22.5 KP 47.5 55

Segmen 4 KP 47.5 KP 70.5 50

Segmen 5 KP 70.5 KP 74 45

Segmen 6 KP 74 KP 77 40

Segmen 7 KP 77 KP 78.5 35

Segmen 8 KP 78.5 KP 79 30

Segmen 9 KP 79 KP 79.5 25

Segmen 10 KP 79.5 KP 80.5 20

Page 15: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Penentuan Risiko Buckling

15

Analisis tegangan kondisi Statis

dengan Offpipe • Profil barge rollers

dan stinger rollers

• 2 Tensioner

• Kedalam Pipa

• Detail Pipa

Page 16: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Penentuan Risiko Buckling

16

Analisis tegangan

kondisi Statis dengan

Offpipe

Page 17: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Cek Buckling DNV 1981 Local Buckling

17

Permissible buckling factor ; hxp = 0.86

hyp = 0.75

Functional load usage factor ; hh = 0.72

Specific Minimum Yield Strenght (SMYS)

= 448 MPa

Coefficient of thermal

expansion ; α =

oC

Modulus Young ; E = 200000 Mpa

Poisson ratio ; v = 0.3

Linepipe Outer Diaameter ; D = 323.9 mm

Wall Thickness ; t = 9.5 mm

OD / Thickness Ratio ; D/t =

34.0947

4

Distance to normal axis (D/2) ; y = 161.95 mm

Installation pressure ; pi = 0 MPa

Sea water density ; rsw = 1025 kg/m3

Residual Force ; Fres = 694.29 kN

Momment due to lay tension ; Mz = 5341 N.m

Water Depth ; WD = 20 m

Gravity Force g = 9.81 m/s2

π 𝐷 − 𝑡 𝑡

π 𝐷 − 𝑡 𝑡

𝜋

4𝐷 − 𝑡 2 𝑡

UC =

+

Syarat agar pipa aman terhadap

terjadinya local buckling, sesuai

standart nilai UC tidak boleh

melebihi 1

Segmen Local Buckling

Overbend Sagbend

1 0.2344 0.234797

2 0.25829 0.258608

3 0.281694 0.282866

3b 0.248328 0.280477

Page 18: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Cek Buckling DNV 1981 Propagation Buckling

18

Menurut standart DNV 1981, syarat untuk propagation buckling adalah Pe < Ppr

Ppr = 1 15 𝜋 𝑆𝑀𝑌𝑆 𝑡

𝐷 𝑡 Pe = rsw . g . W . D

Ppr = 4.994 Pe = 0.201105

pe < ppr ( No need buckling arrestor)

Page 19: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Cek Buckling DNV OS-F101 Local Buckling

19

Pipe Outside Diameter OD = 323.9 mm

Pipe Inside Diameter ID = 304.9 mm

Selected Wall Thickness t = 9.5 mm

Specific Minimum Yield Strength SMYS = 448 Mpa

Specific Minimum Tensile Strength SMTS = 530 Mpa

Steel Young`s Modulus E = 200000 Mpa

Material Strenght Factor αu = 0.96

Fabrication Factor αfab = 0.93

Material Resistance Factor gm = 1.15

Safety Class Resistance Factor gSC = 1.5

Dencity of Sea Water rw = 1025 kg/m3

Hoop Stress Design Factor Fi = 0.3 -

Longitudinal Joint Factor fe = 1 -

fy,temp = 0

Temperature Derating Factor T = 1 -

Pioisson`s Ratio v = 0.3 -

Gravitational Acceleration g = 9.81 m/s2

Soil Specific Gravity g = 2.8 -

Momment Bending Md = 694.29

Gaya Aksial Tension Sd = 5341

Water Depth WD = 20

Factor used in combined loading criteria b =

Syarat agar tidak terjadi local buckling

karena overpressure adalah, tekanan

eksternal maksimum pipa tidak boleh

melebihi tekanan internal pipa.

𝛾𝑆𝐶𝛾𝑚𝑀𝑑

𝛼 𝑀 𝑡2+ 𝛾𝑆𝐶𝛾𝑚

𝑆𝑑

𝛼 𝑆 𝑡2

2 2

+ 𝛾𝑆𝐶𝛾𝑚𝑃𝑒 −

𝑃𝑚𝑖𝑛

𝑃 𝑡2

2≤ 1

Segmen Local Buckling

Overbend Sagbend

1 0.102596 0.403701

2 0.068905 0.069778

3 0.097232 0.101983

3b 0.064775 0.064778

Page 20: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Cek Buckling DNV OS-F101 Propagation Buckling

20

Syarat untuk tidak terjadinya propagation buckling adalah :

𝑃𝑝𝑟𝛾𝑆𝐶𝛾𝑚

Pe ≤ Ppr =

= 2.0624427

35.fy. 𝑡2

𝑑2

Pe = rsw . g . WD

0.201105 MPa

Pe ≤ 1.195618933

( No need buckling arrestor)

Page 21: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Simulasi Solidworks

21

Page 22: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Pemberian Beban pada

Solidworks

22

Page 23: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Hasil Simulasi

23

Page 24: ANDHIKA HARIS NUGROHO NRP 4210 100 090 - digilib.its.ac.id · •Outline Skripsi •Target Hasil Akhir Pendahuluan •Proses Pengerjaan Metodologi Penelitian •Analisis Penggelaran

Sekian dan terima kasih