Upload
muhammad-arshad
View
198
Download
0
Embed Size (px)
Citation preview
M Arshad Ghaznavi Mobile: +966530231577,+966570231577Current Location: Al-Khobar - Saudi Arabia Permanent Location: Karachi-PakistanEmail: [email protected]
SAP Experience Summary
Have 14 years of IT experience with 10 years in SAP Basis, Netweaver, Infrastructure operations, Security and Authorizations, Implementation, Upgrade, Support and Service Delivery.
I specialize in Service Delivery, I have been working as a SAP Netweaver Basis Consultant focused on the implementation different SAP solutions in variety of complex landscapes, Along with my experiences in infrastructure design and system analysis, I have a comprehensive understanding of system’s, internet and non-internet protocols, networks, firewalls, relational databases, operating systems, and client-server applications. Competency building, SAP Hardware sizing and Server Building, Virtualization of SAP system landscape (using HACMP / VMWare), Design DR and Test drill, SAP Applications Capacity planning, Documenting Basis Operational Manual, SAP System measurement, Lead team in system audit of SAP Basis and Security Authorization areas.
Technical Trainings and Seminars:
Attend SAP TADM70 SAP System: Operating System and Database Migration. Attend SAP BO 4.0 Course: SAP BusinessObjects Business Intelligence Platform: Admin.
Servers Attend SAP BO 4.0 Course: SAP BusinessObjects Business Intelligence Platform:
Administration and Security Attend SAP HANA Course: OKP SAP High-Performance Analytic Appliance 1.0 (SAP HANA
1.0). Attend SAP HANA Course: TZHANA SAP In-Memory Appliance (SAP HANA 1.0) by SAP North
America Attend GRC330 SAP Business Objects Process Control 3. in Progress….. Attend Sap Support Consultant Focus Run SAP Implementation – Change Control Management
Attended Technical Training on Server and Desktop Management Organized by Intel Corporation.
Attended HP Technical training on servers, Printers and Back up Equipment. Attended Training on SAP Basis Administration by Real time Consultants USA. Attended Training for CCNA.
Technical Skills/Expertise
Primary Skills: SAP BASIS / NetWeaver / Security Administration (SAP ERP-2004 - ECC, R/3 Enterprise, R/3, BW 7.0, XI 7.0, Solman 7.0 ,Enterprise Portal 7.0, SRM)
Operating Systems: Sun Solaris, AIX, HP-UX, Linux, Windows 2003 -2008 AdministrationDatabases: Oracle 9i/8i, MS SQL 2000-8 Database AdministrationsPrg Language/Scripts: ASP, PHP, XMLHardware and Storage: HP, IBM, SUN Sparc Platforms, Intel based systems.Case Tools: ITutor, MS Visio.
Career History
Hewlett-Packard Middle East Saudi Arabia
Senior SAP Netweaver Basis Consultant - January 2008 to Current
Project Experience
Saudi Electricity Company – Dammam - Saudi Arabia Feb 2013 – Current
Industry: Power UtilitiesRole: Basis Lead and Technical Architect, my responsibilities were to put down the business blue prints for the technical SAP infrastructure.Duration: Feb 2013 to Current
Project Scope:1st Phase: FI/CO & HR (Go-Live)2nd Phase: Transportation & Fleet Management, MM, SRM, Plant Maintenance, Portal & Business Intelligence. (Expected Go-Live December 2010 & In Phases onwards).3rd Phase: Restructuring Project, Implementation BPC & PM and Transmission Golive for 38 Plants.4th Phase: Implement Principal Buyer, ISO, WCM, and SRM SUS ,E-invoicing.5th Phase: IFRS,
Responsibilities:
Basis Solution Architect with skills to design SAP landscape, prepare and perform installation of SAP Products, Technical configuration, Design and Implement Change management and support strategies.
Client Architecture and configuration Run ASAP Implementation ABAP trouble shooting and programming error determination Transport Management System and automated TMS Performance Monitoring ,re Sizing systems Plan Go-Lives Cutover activities and manage the team on day-to-day technical activities. Plan and Execute installations and technical configuration. Coordination of scheduled and un-scheduled maintenance. Modules included PS, PM, MM, PP, SD, FI, CO, HR. Documentation of all training materials, policies and procedures
Qatar Aluminum Company –Qatar June 2012 – Feb 2013
Industry: Aluminum ManufacturerRole: Senior SAP Basis Netweaver ConsultantDuration: June 2012 to Current
Project Scope:Phase: SAP systems Migration from hosting partner Norway to Qatalum
Responsibilities:
Involve in migration from IBM AIX Oracle to HP windows 2008 R2 SQL2012,2008 Platforms
SAP Basis system (ECC 6.0, Web Application server, PI, Solman 7.1 , BI7.0) All Non-Production systems are migrated in virtual machines (Hyper –V) SAP Production systems are migrated in two nodes Microsoft Clustered Environment Client architecture and configuration Run SAP Implementation ABAP trouble shooting and programming error determination Transport Management System and automated TMS Performance monitoring Support Packs ,EHP installation Plan Go-Lives Cutover activities and manage the team on day-to-day technical activities. Plan and Execute installations and technical configuration. Coordination of scheduled and un-scheduled maintenance. Documentation of all training materials, policies and procedures
Additional roles and tasks:
Installation & configuration of Solution Manager 7.1 for the following scenarios: Implementation project administration Solution Directory, System landscape, Central Monitoring & Administration SolMan Work centers EWA, Service reporting Service level reporting Solution Manager Diagnostics E2E root cause analysis & wily introscope. Service desk Change request Management
Saudi Electricity Company – Dammam - Saudi Arabia November 2008 – June 2012
Industry: Power UtilitiesRole: As a backup of Basis Team Lead and Technical Architect, my responsibilities were to put down the business blue prints for the technical SAP infrastructure.Duration: June 2009 to Current
Project Scope:1st Phase: FI/CO & HR (Go-Live)2nd Phase: Transportation & Fleet Management, MM, SRM, Plant Maintenance, Portal & Business Intelligence. (Expected Go-Live December 2010 & In Phases onwards)
Responsibilities:
Involve in migration from IBM to IBM platforms SAP Basis system (ECC 6.0, Web Application server, PI, Solman, Portal, SRM, MDM
and Trex). Client architecture and configuration Run SAP Implementation ABAP trouble shooting and programming error determination Transport Management System and automated TMS Performance monitoring Support Packs ,EHP installation SAP daily system monitoring Plan Go-Lives Cutover activities and manage the team on day-to-day technical activities. Plan and Execute installations and technical configuration. Coordination of scheduled and un-scheduled maintenance. Modules included PS, PM, MM, PP, SD, FI, CO, HR. Documentation of all training materials, policies and procedures
Additional roles and tasks:
Installation & configuration of Solution Manager 7.0 for the following scenarios: Implementation project administration Solution Directory, System landscape, Central Monitoring & Administration SolMan Work centers EWA, Service reporting Service level reporting Business Process Monitoring Setup Solution Manager Diagnostics E2E root cause analysis & wily introscope. Service desk Change request Management
November 2008 – June 2009
Industry: Power UtilityRole: SAP Technology Consultant, Netweaver IIIDuration: 8 months
Project Scope:1st Phase: FI/CO & HR (Go-Live)2nd Phase: Transportation & Fleet Management, MM, SRM, PM, Portal & BI.
Responsibilities:
Involve in migration from HP to IBM platforms SAP Basis system (ECC 6.0, Web Application server, Solman). Client architecture and configuration ABAP trouble shooting and programming error determination Transport Management System and automated TMS Client copies and database refreshes Performance monitoring Support Packs SAP daily system monitoring Table space monitoring Archiving and backup process Analyzing Database checks Coordination of scheduled and un-scheduled maintenance Modules included MM, PP, BW, SD, FI, CO, HR Documentation of all training materials, policies and procedures Hardening and scrubbing of all sensitive data from related SAP systems prior to release
into the production environments
SABIC Jubail - Saudi Arabia January 2008 – November 2008
Industry: Oil and GasRole: SAP Netweaver ConsultantDuration: 11 months
Project Scope:1st Phase: FI/CO & HR,MM,Portal,BI (Go-Live)2nd Phase: LSO (Learning solution online).
Responsibilities: Configured with Integration of ECC 6.0,EP 7.0, LSO 600(LSOFE, LSOCP, LSOOP). Provided Configuration and Trouble shooting Provided sizing calculations for CMS, ADS, TREX, LSO. Provide Training to Portal Admins, Basis Admins, on the architecture. Documentation of all training materials, policies and procedures
Project Scope:1st Phase: FI/CO, HR, MM, Portal, BI, LSO (Learning solution online) (Go-Live). 2nd Phase: E-recruitment Project
Configured with Integration of ECC 6.0, EP7.0, E -recruitment. Conduct Technical workshop on Technical Infra structure Required for E-recruiting Provided sizing calculations and Technical Design for E-recruiting. Configure ADS for E-recruiting demo.
Coca Cola Pakistan
March 2006 – January 2008
Industry: BeveragesRole: SAP Basis AdministratorDuration: 22 months
Project Scope:1st Phase: FI/CO, MM ,SD,HR
Responsibilities: R/3 Administration
Installation and Configuration of SAP Basis system (ECC, R3 Enterprise, R/3, - Web Application server, Solman 4.0).
Client architecture and configuration ABAP trouble shooting and programming error determination Spool management Transport Management System and automated TMS Client copies and database refreshes Monitoring of sensitive/secret data loads CCMS Performance monitoring Support Packs Kernel upgrades SAP daily system monitoring Table space monitoring Archiving and backup process Analyzing Database checks Coordination of scheduled and un-scheduled maintenance Modules included MM, PP, BW, SD, FI, CO, HR Documentation of all training materials, policies and procedures Hardening and scrubbing of all sensitive data from related SAP systems prior to release
into the production environmentsR/3 Security User master maintenance User and activity group’s creation/modification User creation/deletion/lockdown/activation Profile generator Authorization traces Password management
Lakson Group of Companies (PMI)
December 1996- January 2004
Industry: FMCGRole: SAP Basis AdministratorDuration: 27 months
Project Scope:1st Phase: FI/CO, MM ,SD,HR
Responsibilities: R/3 Administration
Installation of SAP R/3 4.7 software. Creating users, creating groups, setting up proper permissions to the same and configure the server for SAP R/3 server software with Oracle 9.2 database.
Extensively worked on authorizations (manual) and profile generations for all modules Defined systems landscape present in the group of systems (Development, Quality &
Production) and defined System change options for the system. Defined transport layers. Performed setting up of printers through SAP spool system administration for network
printers Responsible for looking after lock entries, dump analysis, system log and process
overview. System performance monitoring: All activities like system response time, processes,
Operating system related issues, memory-CPU, utilization, monitoring.
January 1997 – April 2004
Industry: FMCGRole: Network AdministratorDuration: 7 years
Project Scope:1st Phase: IT Project
Responsibilities:
Manage LAN/WAN Installation/configuration/support (Novell, WinNT4.0 Windows 2000, ISA server, Exchange2000, Share Point Portal) for Head office and remote clients with as many as 300 users, daily backups, connectivity, hardware and software trouble shooting; network virus inoculation; and software troubleshooting; and workstation performance optimization, repair, and configuration key contributions.
Technical Certifications
Sap Support Consultant Focus Run SAP Implementation – Change Control Management Certified by SAP URCA10, E2E100, SMO150, TE2E04, E2E200 Certified by SAP BASIS Certified by SAP OS/DB Migration SAP Certified Technology Associate (Edition 2013) - SAP HANA Cisco Certified Network Associate Passed MCSE Windows2000 Accelerated Microsoft Certified Systems Engineer NT 4.0 Microsoft Certified Professional NT 4.0 Comptia A+ Certified
Academic Qualifications
Karachi University [Oct 1996]Bachelor in Science (B.S.C)
Govt. College for Men, Karachi [May 1994] Higher Secondary Certificate (H.S.C)
Ideal Federal Board of Secondary Education , Karachi [May 1992] Secondary School Certificate (S.S.C)
Personal Attributes
Good problem solving and decision making skills Extrovert personality and friendly nature Own the ability to analyze, organize, plan, develop and complete tasks on schedule. Faster and quicker adaptability.
Professional Recommendations
References: Upon Request
Personal Information
Marital Status: MarriedNationality: PakistaniLanguages: English (business fluent), Urdu (Good), German (Beginners)