41
TRƯỜNG ĐẠI HC NGÂN HÀNG TP.HCM KHOA CÔNG NGHTHÔNG TIN MÔN HTHNG THÔNG TIN QUN TRBÀI TP TÌNH HUNG HĐẠI HC CHÍNH QUY TP.HCM - 2010

Bai Tap Tinh Huong He Thong Thong Tin Quan Tri Ngan Hang

Embed Size (px)

Citation preview

TRƯỜNG ĐẠI HỌC NGÂN HÀNG TP.HCM KHOA CÔNG NGH Ệ THÔNG TIN

���� ���� ����

MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ

BÀI TẬP TÌNH HU ỐNG

HỆ ĐẠI HỌC CHÍNH QUY

TP.HCM - 2010

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 1 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 1.11.11.11.1

LETTERS TO THE DEAD AND OTHER TALES OF DATA DERELICTION

A retailer once launched a targeted customer marketing campaign that had but one tiny flaw: a fifth of

the intended recipients were dead. The letters for them – addressed, with impeccable accuracy, to ‘Dear Mr

Deceased’ – urged them to ‘wake up’ to what the company had to offer.

This mailshot mishap is part of a nightmarish list of corporate data blunders drawn up for the Financial

Times by Detica, a business and information technology consultancy. It includes the tale of the insurance

company that was intrigued to discover the majority of its customers were astronauts – until further

investigations showed that lazy sales staff eager to close deals had simply chosen the first option available

on the pull-down menu of jobs.

Whether grotesque or hilarious, the bloopers have a unifying theme that any business ought to note. As

companies develop ever more sophisticated ways of using data to help win new business and cut costs, the

risk is that they pay too little attention to the quality and organization of the underlying raw information. At

best, this damages efficiency; at worst it can destroy relationships and hamper efforts in crucial areas such

as fighting fraud.

‘Firms have always seen the data as the water that flows around the system’, says Philip Powell,

professor of information management at the University of Bath’s School of Management. ‘They have

invested a lot in the system – the water pipes – without really recognizing the value of the water’.

It is a problem that has come increasingly into focus as technological advances have opened up new

methods of collecting, combining and storing data. Managers have greater quantities of information than

ever before, but are in some ways less well-informed because they do not order it well.

Bill gates, Microsoft chairman, claimed last year that almost a third of information workers’ time was

spent searching for data, costing $18,000 per person per year lost productivity.

Those hundreds of forgone hours are in part a consequence of the explosive growth of the space

available for information storage. While a bulging filing cabinet is a daily reminder of the need for data

discipline, electronic file dumps can grow to gargantuan proportions unseen. They are monitored and

cleansed only by computer experts, rather than by information management professionals applying a

librarian’s discriminating eye.

Information is sometimes duplicated or out of data. A common fault is that companies lack a single

docket on each customer, supplier or employee, instead spreading information across files held in numerous

places by many departments. In the absence of a master copy, updating is done piecemeal, generating

horrors such as the ‘Dear Mr. Deceased’ letters.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 2 / 40

Bridget Treacy , partner at Hunton & Williams, the law firm, says companies are sometimes ignorant of

basic facts about information they hold, who has access to it, and what it is being used for. ‘If people are not

paying attention to it, of course there are going to be blunders’, she says.

A more suitable snare facing companies is their failure to consider the various possible meanings of the

information they gather. The classic example is the sales spike that causes marketing people to sniff an

opportunity, when a risk manager would scent danger. For instance, a customer starting a credit card

splurge might receive an offer for an upgraded deal, when a better response would be to launch an

investigation into card theft and fraud.

In other cases, companies embarrass themselves because their data storage systems have not kept

pace with the complexity of the information they hold. One Detica story concerns an insurer that was unable

to store separate addresses for a couple holding a joint account. When the wife left her violent husband, she

sent her new address to the company, which promptly wrote a confirmation note to her old home, where her

ex-husband was living. The company had to pay to rehouse the ex-wife in a new, undisclosed location.

The need for companies to improve their data management is becoming increasingly urgent as the flow

of information quickens and the uses to which it is put become more complex. Businesses must manage an

increasing amount of ‘unstructured data’, such as voice recordings and pictures.

Above all, the challenge for the companies is to make sure they – and their employees – use

information in ways that make them look clever rather than ignorant, or event heartless. Death, says David

Porter, Detica’s head of security and risk, is the great test of a company’s data deftness. After all, no one

wants to emulate the company personnel department that punctiliously sent out a slew of cheques for £0.00

to its ‘pension leavers’, causing distress to the relatives of all those ‘ who had ‘ left’.

(Michael Peel, FT.com site, published 3 September 2007)

Questions:

1. The case study identifies a number of problems with the way companies store and mange

information. Using your own words, identify and describe these problems.

2. According to the case study, Bill gates has claimed that almost a third of information workers’

time is spent searching for data. Why do you think this is ?

3. What are some of the consequences of relying on inaccurate information ? Refer to the case

study in your answer.

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 3 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 1.21.21.21.2

SUPPLY CHAIN: DEMAND FOR MORE DATA HAS WIDE IMPACT

For US electronics retailer BestBuy, having the right data really matters. Research carried out by the

company found that if a product’s height was wrong by as little as half an inch, customer returns increased

by 3.4 per cent. For a company such as BestBuy, the trend towards flat-screen TVs – which customers often

want to mount on a wall – has turned product descriptions that most shoppers once ignored into a deal-

breaker. It is part of a wider trend for consumers to want to know much more about the products they are

buying. From food to electronic goods, pharmaceuticals to cars, consumers are demanding far more

information on a product’s origins, its ingredients or materials, how it was shipped and even its impact on the

environment. But this information is absent from many companies’ supply chain management systems- or

worse, it is information they simply do not have. The problem is all the more acute because regulators are

asking companies to retain more information about the products they sell, in some cases for six years or

more. But extended supply chains and a growing use of contract manufacturing are making it hard for

companies to say, with certainly, what is in their wares.

‘Senior executives are trying to understand the risks to their business, for example ingredients that can

cause an allergic reaction but are not correctly identified’, says Bryan Larkin, director of strategy for retail

and CPG industries at data synchronization company GXS. ‘Bad data can result in brand damage’.

Improving data quality, on the other hand, can bring immediate benefits to profits. Mr. Larkin, for

example, cites research showing that suppliers to US retailers lost the equivalent of 2 per cent of gross

sales to compliance-related penalties. Typically, data errors cause companies to ship the wrong product or

quantity, or to charge the wrong price. Reducing penalties by half of 1 percentage point in a business with

10 per cent margins means a 5 per cent boost to the bottom line.

Then there is the time taken up resolving both supply disputes and product recalls.’ Handling disputes

takes up a lot of money,’ says Jon Chorley, vice-president for supply chain execution and product lifecycle

management strategy at software vendor Oracle. ‘You also have to be able to track the genealogy of the

products, which means getting that information out of the supply chain’.

Businesses that want to improve data quality face two hurdles, however. The first is how an item is

described and measured. A household chemical could be delivered to a factory in a tanker measured in

gallons, bottled in containers measured in centiliters, packed in cartons by the dozen, transported in 50

cases on a pallet and then sold in a store as a single bottle. Each organization in the supply chain could hold

the correct data for their part of the process, but still be unable to share it with the others.

The second problem is ensuring that the right parties hold the right level of information. ‘There is a cost

to every piece of information, so you have to understand the value of that information, its granular quality

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 4 / 40

and frequency’, says Jeff Wacker, futurist at system integrators EDS.’ You need sophistication to ensure

that the information adds value to the decisions being made’.

Manufacturers might not want to share an entire recipe or bill of materials with a retailer, but the retailer

will want to know that the manufacturer can call up that information on a batch-by – batch basic, for example

if there is a product recall or a health scare. Retailers are also under pressure from consumers to provide

more data, either at the point of sale, online or in catalogues. But there is a strong chance that the financial

and technical burden for gathering and storing such data will fail mostly on producers and manufacturers; as

has largely been the case with electronic data interchange and more recently, RFID.

‘Retailers will only do something if they have to’, suggests John Davison, a vice-president at analysts

Gartner. ‘You could improve the operational efficiency of your company, but retailers are most likely to act if

it improves product availability on shelves’.

(Stephen Pritchard, FT.com site, published 19 September 2007)

Questions:

1. ‘Bad data can result in brand damage’. Explain this statement with reference to the case study.

2. The case study discusses a number of problems caused by poor quality information. Identify

and describe these problems with reference to the attributes of information quality.

3. Why do you think customers are starting to want know more about the products they buy ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 5 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 2.12.12.12.1

VOLVO TRUCKS’ VALUABLE EARLY WARNING SYSTEM

For any manufacturing company, in-warranty failures represent a significant expense. There is the cost

of the repair or replacement itself, administering the process and, often, a loss of customer good will. But an

efficient warranty system can cut these costs and more. Customer satisfaction is higher if any warranty

issues are handled efficiently and quickly. The manufacturer ties up fewer resources handling the repair,

and goods are turned round more quickly. The product itself can even be improved, if the warranty system

can feed data into both the manufacturing process and suppliers. And a good reputation for handling in-

warranty repairs will even justify a price premium in some marketplaces.

These are some of the benefits identified by Volvo Trucks, the heavy goods vehicle manufacturer,

which created a new quality and warranty analysis tool (QWAT) a year ago. The system is based around

SAS Institute’s Warranty Analytics software and an Oracle relational database. The scale of warranty

operations at Volvo’s trucks division is significant. The company currently builds about 100,000 trucks –

mostly tractor units for semi-trailers or rigs – each year. The standard European warranty on these vehicles

is one year, with some vehicles covered by a 300,000 km warranty.

‘With current production levels, and some good will campaigns, 200,000 to 300,000 trucks could

produce a warranty claim or produce a problem that ends up in the analytics system’, says Micke Rydbeck,

project manager for warranty systems at Volvo Truck Corporation. To add to the complexity, in Europe the

vehicle could be taken to any one of 1000 service points or, in North America, one of 350 sites. Added to

this, the vehicles Volvo produces are simple, commodity items. Within the annual production total, perhaps

as few as two vehicles might be identical, such is the range of variants and configuration options available to

customers.

An in-warranty failure might be the result of a particular, and quite possibly very rare, combination of

components. The new system is much more effective at narrowing down the list of vehicles fitted with a

particular part to those that are most likely to have problems. ’It might not show up as a battery problem on

each and every truck, but only when two parts are used in combination’, says Rydbeck.

The business case for Volvo’s project was based on achieving more efficient warranty claims, reduced

fraud, better reporting and improved recovery of warranty costs from suppliers. The warranty tool acts as a

valuable early warning system, helping to pick up any potential faults before they occur in a truck. Improved

trend analysis is a valuable feature of the new system: previously, quality control staff had to use three main

tools and three data sources in what was still, largely, a manual process. But the earlier the company

identifies a problem, the cheaper it is to fix. Advanced warning allows more vehicles to be examined and

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 6 / 40

repaired during regular servicing. This reduces Volvo’s costs but critically, keeps customers’ trucks on the

road for longer.

The system also helps Volvo to give customers a wider range of configuration options without

compromising on the manufacturer’s standards or increasing support costs. ‘ We need to have a situation

where we can produce trucks built to customers’ specifications that still nurture our core values of quality

and safety’, Mr. Rydbeck explains.

Another important part of the analytics-based approach to warranty management is that it helps Volvo’s

design and manufacturing teams react to after-market problems with the trucks, and prioritise design or

production changes. These are all important benefits for Volvo customers. The project has had a significant

impact on Volvo’s after-market costs : cutting them plays a key part in keeping the manufacturer

competitive.

‘Our warranty costs have fallen by 40 to 50 per cent in the past couple of years’, says Mr.Rydbeck. ‘But

it becomes progressively harder to lower these costs and harder to find the problems that cause them. Our

warranty costs are now about the industry average, but were higher’.

He believes that the new warranty management system, and in particular its analytical capabilities, will

allow Volvo Trucks to deliver above- average service to vehicle owners while cutting its prices and

increasing per- vehicle margins.’ If we can reduce our warranty costs, it gives us room to increase our

margins while also being competitive on price’, he says.

Volvo is also using its system to detect unusual or potentially fraudulent warranty claims. The analytics

tool can go through historical claims data and identify claims that need to be checked. Rather than send a

team of auditors to look at a dealer’s books, picking random samples, it can focus on claims that arouse

specific suspicions.

‘During an audit we can focus on three, five or 10 claims that we are really interested in, rather than

picking 20 at random. Dealers are getting the message, and we are at much less risk of fraud now’, says Mr.

Rydbeck.

The system is also being implemented at US truck maker Mack and at Volvo’s bus operations. The next

step for Volvo is to extend the warranty analytics system to key suppliers, a process it started in June this

year. ‘We are opening up the system and showing suppliers information relating to them. Previously we

reported to suppliers twice a year, but now we can show quality information to them and they can improve

products immediately’, says Mr. Rydbeck. ‘Because we can share our information, we can have better

conversation with suppliers’.

(Stephen Pritchard, Financial Times, 19 September 2007)

Questions:

1. What are the benefits of Volvo’s warranty management system ?

2. In general, how does the warranty management system help Volvo to be more competitive ?

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 7 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 2.22.22.22.2

AIRPORT CHECK-IN: BOARD YOUR FLIGHT BY MOBILE PHONE

Ubiquitous and well entrenched as mobile phones may be, some potential uses have yet to catch on

in a big way. Such is the case with mobile check-in at airports. A passenger survey at the end of last year by

the International air Transport Association (lata) found only 2 per cent of respondents had checked in via an

SMS (text message) on their mobile phones. But that number looks certain to rise as more airlines introduce

mobile check-in – those that already have are as enthusiastic about the service as are their passengers. ’To

have your boarding pass on your mobile should be something that really excites the customer’, says Patrice

Quellette, Air Canada’s director of customer service platform, e-commerce.

Last June the airline launched mobile check-in for customers on domestic flights without baggage.

Between one and 24 hours before departure, passengers can enter basic details about themselves and their

flight into their mobile phones, then print out their boarding pass from a self-service kiosk at the airport. In

the next few weeks, Air Canada plans to start pilot testing an ‘E-Boarding passes’ service, in which 2D

barcodes would be sent directly to mobile devices of customers checking in at Montreal for domestic flights.

The customers participating in the pilot would scan their device at airport security and proceed to the gate.

Elsewhere, mobile check-in has inevitably established a foothold in countries where mobile users

have been keen to try innovative or experimental services, pushing the devices beyond simple calling and

texting. Finland and Japan are two good examples. In October 2004 Finnair claimed a first in international

air travel when it launched SMS check-in for frequent fliers. Customer feedback has been extremely

positive, it says, reflecting the fact that the airline takes a proactive approach – it sends a text message and

the customer needs only to reply. On average, says Finnair, about 75 per cent of customers that receive a

message go ahead with the SMS check-in. The system has become the third self-service channel, along

with internet and kiosk check-in, and is now comparable in popularity, with sage falling only when there is

less business travelling.

In Japan, mobile phones can be used as part of Japan Airlines’ ‘Touch and Go’ system, which was

developed in-house for use on domestic routes, and introduced in February 2005. The system allows IC

(integrated circuit) cardholders to board domestic flights without a physical ticket or boarding pass. From

three days before departure and up to one hour before the flight, passengers can make or change a seat

selection and check in via their computer or mobile phone. All relevant data for the booking are recorded

automatically on the IC card, which can then be touched or swiped at machines in front of the airport

security check points and then at the boarding gate. The number of Touch and Go users has been steadily

increasing since the system was introduced, says Ko Yoshida, JAL’s vice-president for domestic marketing

planning, and has already run into millions. Users tend to be individual business travellers.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 8 / 40

At rival airline ANA, check-in via computer or mobile phone has been possible for two years for

domestic flights, and if the phone has an RF (radio frequency) chip it can used to pick up a boarding pass

from a self-service kiosk at the airport. Last August, the airline introduced an enhancement known as Skip,

allowing passengers who have paid for their tickets and reserved their seats – using their computer, mobile

phone or at a travel agent – to skip check-in. One touch of their RF chip-enabled mobile phone, credit card,

ANA Mileage Club or 2D barcode to a sensor at security prints a receipt with the customers on board and a

boarding pass is then printed for final seat number verification. Skip is used by 10,000 – 15,000 customers a

day.

Individual airlines have taken the initiative on these developments and are pushing for an industry

standard that would help widen the usage of mobile check-in, lata says this is a major activity for its

barcoded boarding pass (BCBP) team this year – currently North America, the European Union and Japan

each have a preferred 2D barcode to use on mobile phones for ticketing and other applications, and the

challenge will be to agree one global standard.

There are other obstacles, too. The biggest challenge, says Finnair, is the airport authorities’

requirements for paper boarding passes at the airport service points. ’In Finland, the airport authorities and

customs have accepted our text message confirmation as proof of travel’, says the airline. ‘At most of the

airports in the world that is not the case.

Air Canada, meanwhile, is working with Canadian authorities on its Montreal “E-Boarding passes”

pilot. Talks with authorities about starting the pilot on a limited basis in June were successful, and then

further implementation would be subject to the results of the test and continued working with authorities.

Finnair notes other provisos. Mobile devices must contain the required features by default, removing

the need for customers to install software. Secondly, multimedia message service (MMS) provides a method

to deliver a 2D barcode to a customer but mobile operators need to read – just their pricing policy, says the

airline. It says roaming pricing, in particular, can be ‘a real killer’.

(Andrew Baxter, FT.com site, published 14 May 2007)

Questions:

1. What are the advantages and disadvantages of mobile check-in ?

2. How does being one of the first companies to adopt technologies such as mobile check-in

confer competitive advantage? Refer to the concepts covered in BIS and Strategic Advantage in

your answer.

3. What barriers are there to the widespread adoption of mobile check-in ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 9 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 6.16.16.16.1

IT NEAR ITS LIMITS IN SATISFYING CUSTOMERS

The customer experience used to end at the cash register. Today, that’s where it begins. ‘Woody

Diggs, leader of the global customer relationship management practice for the consultancy Accenture,

quotes this remark to illustrate how customer expectations have changed in recent years. Technology has

played a part in this change and if you look for examples, you will find plenty. Here are three:

The Santiago Bernabeu football stadium in Madrid has installed, in collaboration with Cisco

Systems, an intranet that can control remotely not only the turnstiles and lighting but also the loudspeakers

and security cameras. Epson, the Japanese electronics group, claims a 30 per cent increase in efficiency, a

38 per cent reduction in the cost of handling inquiries and a 1,125 per cent increase in online inquiries after

installing Talisma customer relationship management systems in its European call centres. Alliance 7

Leicester, the UK-based financial services group, worked with a data capture specialist, Digital Vision, to

create a fully automated account switching system, which, it says, has more than doubled the number of

customers switching their current accounts in its favour and achieved operational cost savings of 66 per

cent.

The catch is that it is always easy to find the ones that work; the failures are conveniently kept out of

sight. And customer relationship management (CMR) technology – systems designed to give companies a

single, integrated view of their customers and maintain a mutually beneficial dialogue with them – has a

patchy record of success. Richard Boardman of Mareeba CRM Consulting emphasizes the dichotomy: ‘The

brutal reality is that the majority of CRM projects produce, at best, marginal benefits to the purchaser. Which

isn’t to say’, he adds, ‘that CRM technology doesn’t produce the results; there are also plenty of

organizations enjoying very high returns’. As Spanish football fans, electronics aficionados and British bank

customers can perhaps testify.

CRM is a business problem which technology cannot solve, according to Aki Ratner, chief executive

of the enterprise software group Attunity. He says: ‘It may change the way businesses run, but it does not

address the fact that the knowledge that gives a company competitive edge is not held in structured

databases or processes but within the people who actually run the business. It is people- driven activities,

not process- driven ones, that define the real success of an organisation,’ And there are thousands of ways

to improve the customer experience, many of them involving little technology and little cost. Ed Thompson, a

senior analyst with the Gartner consultancy argues that it is a matter of expectation setting, feedback and

how organisations deal with these issues. He points to the example of Disneyworld, where the introduction

of a simple measuring stick meant an end to the disappointment felt by children who had queued for a

particular ride only to find they were too small to be allowed on board. ‘Another example is Southwest

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 10 / 40

airlines in the US, a no-frills, low-cost airline that was looking for ways to improve customer satisfaction. It

discovered that the best way was for its staff to smile. It put in place a smiles programme and found a

positive correlation with its customer satisfaction scores.’ Mr. Thompson concludes: ‘Employees often have

the biggest impact on the customer experience. Ask customers what they want and they will often say

employees that have the power to “step outside the process”. Customer satisfaction scores are driven most

by delivering on the basics that customers expect – like stock on the shelves, clear transparent pricing, good

build quality and innovative design,’ IT only goes so far in helping with that.

Alan Cane, Financial Times, 13 June 2007 (abridged version )

Question:

Explain the quotation in the case study: ‘it is people-driven activities, not process - driven ones,

that define the real success of an organization.’

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 11 / 40

CASE CASE CASE CASE STUDYSTUDYSTUDYSTUDY 6.26.26.26.2

RETAIL APPLICATIONS OF TPS BY SAINSBURY’S

This case study of UK retailer Sainsbury’s considers the different ways in which a retailer may make

use of TPS.

The company and its customer service objectives:

� 17,000 commodities

� aim is for no more than five commodities to be unavailable at any one time

� order lead time 24-48 hours

� distribution centres mange deliveries of 11 million cases to 335 stores.

How is Sainsbury’s helped by TPS technology ?

� Improved customer service through more choice, lower prices, better quality of produce and full

shelves.

� Improved operational efficiency by automatic links to suppliers and better information on product

demand and availability.

� Assessment of the effectiveness of product promotions through availability of better information.

� Marketing through customer loyalty schemes.

How does Sainsbury’s use technologies ?

� At the till – EPOS and EFTPOS

� On shelves – auto-price-changing LCDs

� On trolleys – ‘ self-scanning systems’

� At home – direct wine sales from the Internet Barclay Square site

� For banking – TPS are vital to providing customer statements and cash withdrawals

� In the marketing department – the effectiveness of marketing campaigns and loyalty card schemes

can be assessed using information on transactions stored in data warehouses. This type of system

is covered in more detail in Chapter 4

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 12 / 40

Questions:

1. Draw a diagram summarizing the links between all the parties who access Sainsbury’s TPS.

2. What benefits will Sainsbury’s gain compared to the time before the introduction of TPS ?

3. Can you think of any problems with using TPS so extensively? What can be done to counter

these problems ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 13 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 7.17.17.17.1

LICENSING: HOW BUYERS CAN FLEX THEIR MUSCLES

Software licensing remains a minefield that all users - whether battle-weary or greenhorns - must

pick their way through with care. While IT suppliers like to trumpet the virtues of software asset

management, it can be user fast track to under licensing. And once users are on the back foot, suppliers can

pretty much dictate the terms of the next licence.

Seasoned negotiators encourage users first of all to get to grips with the terms and conditions of the

software licence. The focus should be to negotiate the best possible terms and then to concentrate on

fulfilling their part of the deal.

One caution from independent advisers is to beware the new trend for subscription licences.

Traditionally, licences were bought in perpetuity with a one-off payment. Subscription licences, by contrast,

offer no ownership, just renewal at regular intervals.

This advice is reiterated by the Surrey Police Force, which has just moved from a Microsoft Office of

Government Commerce Enterprise Agreement to the Home Office Master Agreement, designed specifically

for the police and criminal justice sectors.

‘We buy perpetual licences’, says Russell Fowler, ICT technical support manager. ‘The major

disadvantage of a subscription licence is that you never own it. As a result, you are never able to step out of

the agreement. If you want to use a particular product, you have to continue to subscribe – you cannot take

a break from the agreement.

And all users need to be mindful of support clauses. Within subscription licences, support is often

packaged with a ‘right to use’ aspect. Support needs to be measured and prompted by service level

agreement in the same way as an outsourcing contract.

‘The worst mistake is to think that just because you have the right of termination, you do not have to

build in other remedies’, says Kit Burden, partner with law firm DLA Piper Rudnick Gray Cary.

‘Using the “H-bomb” is not a palatable remedy. You need to incentisive suppliers properly to get it

right the first time.’

Case study: Banking on change

Burden recently negotiated a software licence for an investment bank that was procuring an online

trading application. The rate card price of the standard licence - £8.3m – was just the basis for the

negotiation.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 14 / 40

An important consideration was how long the user envisaged using the application. A warning signal

for Burden was that the supplier was offering a five-year licence while his client envisaged using the

software for eight to 12 years.

‘You might have a situation where the user is happily bedded in with the software after five years,

but the supplier is able to pull the rug out from under their feet because the licence is due to terminate at

that point. The danger is that a supplier can lock the user in and then rack up the licensing costs.’

Burden advised the bank to pay extra t secure a ‘perpetual’ licence, and it agreed to pay a further

£2m for this extension. ‘It is vital to get a licence long enough to get the full return on your investment’, he

says.

The other concern was to provide the bank with options to own the code or modifications, should it

later prove commercially expedient to control these. Burden renegotiated the standard licence to gain two

options.

The first option was for his client to identify functionality that it wanted developed from the core

application – spot trading, for example – and to create an exclusive licence for this part of the code.

An ‘uplift’ in price, to be negotiable according to the size of the modification, would take care of this.

The second option would be where the bank needed to take over development of the application as

a strategic move, whether to safeguard the application’s future or to ensure commercial confidentiality. This

option requires access to source code rather than object code.

If the bank ever wants to exercise this option, it will have to stump up an extra £6.8m.

‘For the right application, you may have to pay a substantial sum to get the licence you want’, says

Burden although the business benefit and peace of mind may make it worthwhile.

‘For users contemplating bespoke systems where millions of pounds will be spent on modifying a

core product, not looking at future scenarios is nothing short of criminally negligent’, he says.

Case study: The capacity model

The pattern of server deployment in Trafford NHS Trust is different to that in the private sector and it

follows that the trust prefers a different model of software licensing.

In the 15 years that Roger Fenton, deputy IT manager at Trafford, has been with the trust, it has

gone through three licensing regimes for back-up software. He is responsible for renegotiating and

introducing the most recent model for licensing back-up.

IT resources are assigned throughout the NHS on a project basis, rather than by central provision,

because of the way budget, rather than by central provision, because of the way that software licences need

to be procured.

‘We have upwards of 40 servers running various applications that all need to be licensed and

maintained’, Fenton says.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 15 / 40

He has just moved to a new licensing regime with his back-up supplier, Computer Associates. The

health authority now pays on the basis of total raw storage capacity rather than per server, and the licence

can be scaled up incrementally.

It is a big improvement on the previous regime, both financially and in terms of simplifying and

reducing administration.

‘The price we secured was embarrassingly good’, says Fenton, who states he saved ‘thousands’ on

the previous licensing bill of £40,000.

Savings accrue chiefly because licensing on the basis of capacity, rather than individual servers,

better suits Trafford’s pattern of deployment; as servers proliferated within its project-led culture, server-

based licensing incurred a financial penalty.

This was compounded by the fact that in the per server model, CA charges both for the software

running on the central back-up server, and for ‘agents’ that run on the application servers that are backed

up.

Keeping track of the annual maintenance charges for the separate agent licences was a major

headache. Every additional back-up agent that ran on the application servers had to be licensed, and the

maintenance fee renewed each year.

‘Potentially, we had loads of different licences to maintain, all expiring on different dates’, says

Fenton.

In addition, the overall cost of the model had become unpalatable, ‘In such an environment, each

time we bought a new server, we were talking about another £750 or more in licence fees’, says Fenton. At

the same time, server costs were falling below the £2,000 mark, making licence costs proportionately

greater.

This licensing overhead had accumulated over time, creeping up on the health trust, which, like

other former Unix users, had no previous experience of licensing back-up.

Before moving to Windows, Trafford had used Unix boxes, which have back-up built-in. Each Unix

server came with its own low-capacity tape drive, and applications were accompanied by a script for the

back-up. ‘They were turnkey systems’, says Fenton.

When the trust moved to Windows it initially repeated its approach with the Unix boxes.

‘We used individual tapes for each SQL server. It was a logical extension of what we did with the

Unix boxes. However, as the number of servers and applications mushroomed, managing tapes and back-

up programs for each server became impractical.’

There are some disadvantages to the new approach. The first is having to licence back-up in blocks

of 1 Tbyte.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 16 / 40

‘As you tip over into a new increment you are faced with buying a large chunk of extra capacity that

may be only partially used’, says Fenton.

A further disadvantage is the way that storage capacity is calculated – according to the raw capacity

of the backed-up drives, rather than the capacity actually utilized. The large disc installed in servers may

only be used nominally, while redundant array of independent disc (Raid) storage architectures are

designed to ensure redundancy.

‘Nonetheless, licensing capacity is cheaper and a lot less hassle for us’, says Fenton.

Beware the chamber of horrors

There are certain scenarios that users should avoid at all costs, says outsourcing broker Quantum

Plus. Above all, always remember the golden rule: there is no such thing as a standard contract.

Seemingly innocuous ‘version updates’

Relatively minor updates of the ‘0.1’ variety can incur unadvertised changes to terms and conditions

that have a significant impact on customers. For example, a version update may change the way that the

number of users is calculated or the nature of server licensing.

Obscure charging mechanisms

Be very sure of the supplier’s charging model for a licence. Is it based on the number of users,

servers or even processors ? Seemingly low-cost software can easily be installed in a non-compliant way.

For example, if software costs are processor-based, and the server is a quad processor, the result is under

licensing and a big bill.

Control of media

A number of suppliers of shrink-wrapped software have clauses in the agreement that require users

to show they control the media on which the software is distributed. Examples of control might include a

single point of contract for receipt of a disc, its safe storage, and an approval process for signing it out. A

supplier could cite a lapse in control as breach of contract.

The outsourcing clause

Supplier may try to insert into terms and conditions their right to renegotiate the licence should the

management of a asset be moved to a third party. This can be invoked for an outsourcing contract, even

when the software and server remain onsite. Suppliers may also reserve the right to charge an

administration fee to transfer the licence to the third party. Beware: the transfer fee could run into thousands

of pounds.

Enterprise licence

If you are underlicensed and on the back foot, the balance of power shifts to the supplier, who may

insist you sign up to an enterprise licence. Such a licence may appear to be all-inclusive and cover every

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 17 / 40

eventuality, but the reality is that it will likely be accompanied by a hefty three-year or more service and

support charge that adds no value.

Source: www.computerweekly.com/Articles/2006/07/25/217102/licensing-how-buyers-can-flex-their-muscles.htm

Question:

Summaries the main differences between ‘traditional’ software licenses and ‘subscription’

licenses including their respective advantages and disadvantages.

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 18 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 7.27.27.27.2

LASCELLES FINE FOODS

Lascelles Fine Foods (LFFL) is a fictitious example of a long-established company operating in the

food industry. The company has its administrative headquarters in Ashville and manufactures on an

adjacent site. All customer deliveries are from the Ashville-based warehouse. In addition, LFFL purchases

finished and semi-finished food products from other manufactures which it then finishes before resale.

The company has enjoyed steady growth in recent years and is now seeking to capitalize on the

current fashion for quality and healthy food products. LFFL’s turnover is £16 million with net profitability of

6.3 per cent of turnover/ It is hoping to gain a competitive edge by providing quality food products which

meet all present and anticipated quality standards and to this end will be applying for BS5750 accreditation

within the next six months. It is hoping to increase turnover by 10 per cent per year after inflation over the

next five years and increase net profitability to 9 per cent of turnover over the same period.

LFFL’s main operations are divided into four main areas:

- Sales and marketing;

- Warehousing and distribution;

- Manufacturing;

- Finance.

All information recording and internal communication is paper based and relies on range of

preprinted documents which are then used as appropriate.

The sales department

LFFL has a diverse customer base, ranging from small health food shops to major supermarket

chains. Orders can be one of two types: standard orders placed in advance for delivery in a specific week or

priority orders placed for immediate delivery.

Orders are placed either directly through sales office ‘account handlers’ or through field sales

persons (each customer has one sales person). Each customer is allocated an account handler who acts as

the main liaison point within LFFL. Besides receiving orders, the account handler is responsible for cash

collection, ensuring satisfactory progress of the order and handing day-to-day queries. Customers are also

placed into sales categories based on geographic location, volume of business and type of customer (e.g.

specialist store vs supermarket chain). The sales director is apt to change his mind about which category a

customer is in and which category means what.

Order processing

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 19 / 40

Once an order is taken, it is recording on a preprinted order form. One copy is retained by the sales

department and two copies are sent to warehousing and distribution.

Warehousing and distribution sort all order forms into date order. When an order is due to be

delivered, products are picked from the warehouse and loaded into the appropriate vehicle.

When an order is delivered, it is accompanied by a consignment note and an invoice. The customer

is required to check the delivery against the invoice and note any errors on the consignment note and if any

errors are noted a corrected invoice is sent to the customer.

Warehousing and distribution

LFFL stores finished products, bought-in products and raw materials in the warehouse. The

warehouse in divided into three areas:

- The general zone, comprising a high-rise bulk storage area with a floor-level picking area;

- The cool zone, comprising low-level storage at 2 to 4oC;

- The frozen zone, with temperatures held to -18oC.

In addition to their role in the order processing cycle, other activities are also performed:

- Internal warehouse movements from high-rise locations to ground-level areas and vice versa;

- Receiving products and raw materials from suppliers and returned products from customers;

- Issuing raw materials to manufacturing in response to submitted requisition forms;

- Receiving finished products from manufacturing and any unused raw materials.

Information about quantities of finished goods and raw materials in stock is recorded in a card file,

which has to be searched manually for the appropriate entry when updating is required.

Manufacturing

Manufacturing ranges in complexity from simple repackaging of bulk-purchased materials to

complex mixing and cooking activities.

Recipes are recorded on 7” by 5” cards and include details of the required ingredients as well as the

processing which is to take place.

Finance

LFFL’s finance department is divided into three areas:

- Accounts payable – when LFFL makes purchases, suppliers will invoice them; LFFL uses a manual

purchase ledge to manager these accounts;

- Financial accounting – management of all monies flowing in and out of the company together with

compliance with legal accounting requirements;

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 20 / 40

- Management accounting – internal accounting information necessary to manage the business more

effectively.

The accounts receivable area is handled by the account handlers who use a manual sales ledger

and make a weekly return to the finance department on the state of their customer’s accounts.

Specific business issues

There are a number of specific issues which relate to the activities of each department. These are

detailed below.

Sales

- The status if an order cannot easily be determined without pestering the warehouse.

- Many customer complaints occur due to delivery of wrong products, orders delivered too late,

incomplete orders and faulty products.

- Warehousing does not deliver the most important orders first – small orders are often given priority

over larger orders from major retailers.

- Orders often cannot be delivered on time because manufacturing produces too late and in

insufficient quantity.

Warehousing and distribution

- Many items have a limited shelf life – warehousing often fails to rotate the stock properly.

- Actual stock levels are rarely in step with the recorded stock levels – this may be due to pilfering,

poor update of stock records or both.

- The sales department often accepts priority orders for products which are not in stock.

- Manufacturing bypasses the normal requisition procedures and simply takes raw materials as

required – it also often fails to return unused materials to warehousing.

Finance

- The sales returns from the account handlers are often incomplete.

- There are several bad debts which cannot be recovered – this is attributed to poor credit control

procedures.

- Management accounting is very difficult due to a general lack of accurate information from other

departments.

- Financial accounts are often published late due to lack of accurate information.

Manufacturing

- Warehousing is slow to respond to requests for raw materials, thus necessitating correct procedures

being bypassed (especially when the sales department is applying pressure).

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 21 / 40

- Lack of accurate forecasting makes it difficult for production to be planned ahead and adequate

suppliers of raw materials to be secured.

General

- There is a rapid turnover of staff, especially in the sales area where the pressure from customers

can be intense. In addition, field sales personnel are apt to make promises which cannot be kept

and new sales personnel are often thrown in at the deep end with little formal training for their jobs.

- There is a high level of sickness in the warehousing and distribution area, due mainly to inadequate

provision of lifting equipment.

- There is a perceived lack of management and technical support which has resulted in a general

lowering of morale.

Future plans

The managing director, Clive Moor, has indicated that he would like to replace the existing paper-

based systems with ‘computers of some kind’. With such a move, he is hoping to improve on the

communication of information at all levels in the organization. However, Mr. Moor knows little about

computer hardware or applications software except that it seems to cost rather a lot.

In order to proceed with the computerisation programme, Mr Moor has asked the following senior

managers to produce a plan:

- Paula Barlow – Finance director

- Terry Watson – Sales and marketing director

- Peter Jackson – Manufacturing operations director

- Frances Clarke – Warehousing and distribution director

However, these directors have varying degrees of enthusiasm for the project, together with a desire

to minimize the risk of damage or exposure within their own departments. One of the key decisions which

must be made will be how LFFL acquires the necessary applications software. One option will be to hire

relevant IT staff and build bespoke applications, while another will be to purchase off-the-shelf packages.

Yet another option will be for end-users to develop their own applications. This last option may prove

awkward, since there is very little IT expertise among the end-users.

Questions:

1. Which method(s) of business systems software acquisition would you recommend to LFFL ?

Explain and justify your answer.

2. Assuming that LFFL decides to go down the route of purchasing off-the-shelf packages, what

steps do you recommend it takes to ensure that the applications which are selected meet their

requirements ?

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 22 / 40

CASE CASE CASE CASE STUDYSTUDYSTUDYSTUDY 7.37.37.37.3

LLOYDS BANK INSURANCE SERVICES APPLIES RAD

When marketing people spot a business opportunity, it is often IT people who have to think and act

the faster.

Systems have to be put in place that meet the stipulated deadline, that work first time, and that fulfil

the expectations of users. Otherwise the opportunity could be lost forever.

That was the situation facing the computer team at Lloyds Bank Insurance Services when a new

product called MUDI (Mortgage Unemployment Disability Insurance) required a telesales quotation system

that had to be fully operational by October 2nd.

Yet it was already mid-August when David Jacklin, IT Development Manager, LBIS, was informed of

the need for new application. It was a moment he remembers well. ‘I faced the classic dilemma of no

available resource within my team and an immovable deadline’, he recalls.

However, in spite of that initial reaction and against some unexpected odds, the race against time

was won. The insurance broker’s objective was achieved with help of a hard-working software house, a

development environment toolset, and a fast-track approach called RAD (Rapid Application Development).

In fact, the entire development took just five weeks.

Reason for the urgency at the LBIS headquarters in Haywards Health, West Sussex was a

government decision to amend the rules relating to the payment of mortgage cover out of social security in

the event of a house-owner being made redundant. This opened a new insurance window which the

company was determined to exploit.

LBIS, a subsidiary of Lloyds Bank and Abbey Life, is a firm of independent brokers dealing in life

assurance, pensions and general insurance. Annual turnover is £100 million and 800 people are employed

at Haywards Health and six regional offices. A significant proportion of the company’s business is generated

through a business unit called Lloyds Bank Insurance Direct.

This is essentially a telemarketing organization based in Bournemouth. About 70 per cent of its

business comes via branches of Lloyds Bank, where advisors take an enquirer’s details and ring LBID for a

quote. The remaining 30 per cent is from people responding to direct mail of advertisement and telephoning

in direct.

A simple version of MUDI was, in fact, available at the bank branches. But there were no facilities for

accurate underwriting and anyone talking up the policy paid a straight £6.50 per £100 of cover (i.e. if the

monthly mortgage payment was £300, the premium was £19.50). The new system would incorporate a

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 23 / 40

complex screen replacing the existing simple paper form, providing the flexibility to quote premiums

appropriate to the enquirer ranging from £4.40 to £9.40 per £100 of cover.

But first the new system had to be built. There already existing another application at Bournemouth

– BIQS (Building Insurance Quotations Service) – but this ran under DOS, so what would almost certainly

be a Windows system could not merely be tagged on.

Jacklin and his team had been looking at development toolsets and the RAD concept earlier in the

summer. They had been particularly attracted by a RAD specialist, MDA Computing, and has already met

the Croydon-based soft-ware house at the end of July.

Suddenly, with the new business-critical requirement looming, the need for RAD became urgent.

‘We had no hesitation going back to MDA. They obviously knew what they were talking about and we were

in urgent need of a system’, says Jacklin.

Some of the main attractions of RAD included the delivery of a workable first version within a very

short time-scale, testing that is integrated within the development cycle, flexibility of the specification, and

user involvement throughout the whole process.

Within days, Jacklin and his colleagues had agreed with MDA the RAD methods to be used. The

software house underlined the need for an appropriate development environment, and recommended

Enterprise Developer. This versatile toolset from Symantec had all the advanced features of a second

generation client/server development system, and this was precisely what the LBIS team sought.

Such systems are repository-based and scaleable, and – specially important according to Jacklin –

are driven by business rules so that future changes are easily made as business needs change. MDA

evaluates every tool that comes on to the client/server market and felt that Enterprise Developer offered the

best set of second generation facilities.

Next step was a demonstration of the Symantec toolset at MDA, ‘The demo convinced us. We had

looked at other development tools but they did not seem meaty enough for our needs. And although MDA

had never built anything with Enterprise Developer they were clearly keen to do so.’ Following that demo

and an agreement of project scope, work began on August 24th.

The key requirement was for a front-end system that would enable telesales staff at 30 screens to

capture a caller’s details and generate an immediate MUDI quotation. The system would be in Windows 3.1

and GUI based, essentially a classic PC LAN application. It would run a Compaq server using Novell.

However, MDA’s first task was systems analysis. At the early stage, LBIS had not formulated all

their needs – not even the design of the ‘forms’ that would appear on the screen. So MDA used RAD

techniques to work out what the requirements would be, and spent three days at LBID in Bournemouth

prototyping the forms on screen using Enterprise Developer. The software house also had to allay fears,

among a user-team with little experience of Windows, about mouse-driven systems.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 24 / 40

In order to get the project started, the use of a Watcom database was assumed. However, following

discussions within LBIS, it was decided that f or strategic and operational support reasons the use of Oracle

was preferred.

MDA had to accommodate a new database in already tight development cycle. The ability to adapt

to the fresh circumstances and still deliver the system on time was a big tribute to the software house’s RAD

methods and the Symantec toolset. (In fact, there were minor compatibility problems which disappeared

when LBIS upgraded to Enterprise Developer 2.5 at the beginning of November.)

The system was delivered in the last week of September for final testing in readiness to go live the

following Monday. By then, LBIS’s own technical team had adjusted the BIQS system so that the telesales

people could flip to it from MUDI, depending on the caller’s needs, with a simple keyboard Alt/Tab

depression.

On ‘live’ day, the telesales team processed 200 customer quotations with scarcely a hitch. Jacklin,

MDA and Symantec had every right to feel pleased with themselves. A business need had demanded IT

support, and that support was implemented on time.

Now the end-users, equipped with telephone headsets, enter personal details which affect ratings,

such as sex, post code and occupation, on to a GUI screen. The quotation then appears on the same

screen. There are five other, supporting screens labeled status, comments, letter print, rating and search for

existing customer.

A happy Jacklin concludes, ‘Here was a software house that gave us what we need. They were

always confident they could do something with Enterprise Developer and within time. There was no slippage

despite it being their first real use of the Symantec product and despite the change in database midway

through. I think that says something for Enterprise Developer too. And we went live on the big day.

‘We like RAD and we shall use it again. In a market-oriented organization like LBIS, we always have

a need to react to business changes quickly, and I suspect that within 18 months we could need a system to

handle all six of our insurance products.’

He adds, ‘The system had allowed LBIS to launch a more competitive product than would otherwise

have been possible, and we have sold more than we would have done. It had to be in at the right time or we

would have missed the boat. From a technical point of view, it forced us to go to Windows which was always

our eventual intention. All this, and the system will pay for itself before Christmas!’

Source: www.dsdm.org

Questions:

1. Why and how did the company choose the RAD approach used for this project ?

2. What disadvantages of the RAD method can you identify from the study ?

3. Do you think that Lloyds can be confident that future RAD projects will be successful ?

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 25 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 7.47.47.47.4

USE OF WATERFALL V. AGILE METHODS AT MELLON FINANCIAL

Mellon Financial’s shift to agile software development is part of an emerging trend. ‘Every

investment bank and hedge fund I’ve spoken to is looking at agile’, says Sungard’s Chapman. A relatively

new term, agile development is based on iterative development – developing software in small, manageable

chunks that can be modified as requirements change, yet using a disciplined software delivery mechanism.

Historically, the software development approach used throughout Wall Street has been the ‘waterfall’

method, which calls for strict, lengthy analysis and documentation of requirements. For a one-year project,

for example, three to six months might be spent on needs analysis. ‘The business people are expected to

define 100 percent of their requirements up front before the project even starts’, Chapman says. ‘People get

stuck in this analysis paralysis – they spend months and months trying to define what they want.’

Another three to six months can be devoted to software design, then the actual program finally is

written. ‘Inevitably what happens is requirements change, integration becomes very difficult and all the risky

software development happens at the end of the development effort’, Chapman explains. ‘The waterfall

approach has a horrible track record of delivery.’

Agile software development is designed to delivery software more quickly yet maintain high quality.

In agile methods, every two or four weeks, businesspeople get a small amount of code to review and the

opportunity to change the requirements. ‘Imagine a hedge fund where traditionally a new credit derivatives

trading system would take a year to build using the waterfall approach, with businesspeople writing six

months’ worth of documentation versus using an agile approach, where some of the system is delivered in

two weeks, and it’s OK if you change your mind’, Chapman says. ‘For the hedge funds particularly, agile is

an extraordinarily good fit because the portfolio managers want to get things done quickly.’

But you every project lends itself to short iterations, Chapman concedes. ‘On Wall Street it’s not so

easy because there are a lot of other systems you need to integrate with’, he says. ‘But I think there are

parts of agile you can use on every project to improve it.’

Agile development had three levels: developer, project and enterprise. ‘Nobody on Wall Street is

using agile at the enterprise level’, Chapman says. ‘A lot of education needs to take place within the banks –

it’s going to take some time. But I think every project could gain some benefit from trying to break down the

project into more manageable chunks that can be delivered in a more iterative and agile way.’

Agile methods even improve software quality, Chapman contends, because they emphasize testing.

Agile methods encourage developers to do their own testing. Agile methods encourage developers to do

their own testing, often code and to develop automated testing routines for the programs they deliver.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 26 / 40

‘Agile development approaches and CMMI are compliant with each other – you can use CMM and

CMMI to make agile software development better’, Chapman adds. On the other hand, he asserts, trying to

use CMM and CMMI on top of waterfall development approaches will just weigh projects down with

bureaucracy and paperwork.

Source:

www.wallstreetandtech.com/advancedtrading/showArticle.jhtml?articleID=199601961&cid=RSSfeed_TechWeb

accessed via www.computing.co.uk

Questions:

1. What does the observation that ‘requirements change, integration becomes very difficult and

all the risky software development happens at the end of the development effort’ suggest

about the traditional waterfall approach to software development with respect to system

design?

2. Do you think there are any dangers in trying to take short cuts around the traditional approach

to systems design ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 27 / 40

ACTIVITY ACTIVITY ACTIVITY ACTIVITY 8.58.58.58.5

DETAILED WEIGHTED ANALYSIS OF AN ERP SOFTWARE DECISION

Table 8.5 shows an analysis for three products from different suppliers that were compared across

many factors to establish which was most suitable. This type of detailed analysis is usually conducted when

a new system costs tens or hundreds of thousands of pounds. The grand total shows that Supplier 3 is the

clear winner.

Table 8.5 - Detailed weighted analysis for ERP soft ware

Decision criteria Weighting

factor Supplier 1 score

Supplier 2 score

Supplier 3 score

A. General functionality

Receive information 70 60 60 60

Verify cut quantity 70 30 40 80

Schedule operations 80 56 56 56

Monitor schedule execution 80 40 40 68

Verify shop data input 80 64 64 64

Verify parts loss reporting 70 28 56 56

Detect labor variances ? 60 30 36 42

Provide real-time status 60 24 19 43

Provide capacity planning ? 70 56 40 50

Calculate incentive pay 70 30 25 35

Provide needed flexibility 80 65 50 55

Verify inventory data entry 60 42 42 42

Provide operation history 60 32 40 42

Provide security 90 30 36 36

A. Subtotal 1000 587 604 729

B. Technical considerations

System reliability 100 56 56 56

Compatibility with other systems 100 56 56 56

Cross-module integration 100 45 70 65

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 28 / 40

Implementation time 100 45 70 65

Ease of customisation 100 60 48 56

B. Subtotal 500 262 300 298

C. Other considerations

Cost 60 36 48 54

Service and support 90 45 50 57

Vendor vision 70 25 25 40

Confidence in supplier 80 35 45 65

C. Subtotal 300 141 168 216

Grand total 1800 990 1072 1243

Questions:

1. Review the different categories and the criteria within them. Do you think that the weighting

factors are valid? Are there other factors that might apply for ERP software ?

2. Look in detail at the values for each product. Comment on the basis for deciding on individual

scores.

3. Given possible deficiencies in 1 and 2 above, comment on the suitability of this technique for

making a decision. Would you use it and why? What would you do differently ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 29 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 8.18.18.18.1

SEDGEMOOR DISTRICT COUNCIL Quick availability or information increases efficie ncy and reduces costs

Sedgemoor District Council is improving the availability of information online to enhance customer

service, increase the efficiency of accessing information and reduce data management costs. The council is

now in a position to remove its planning department’s legacy data management system (DMS), as it had

complete migrating information to its electronic document and records management (EDRM) system, Trim

Context from Tower Software.

Craig Wilkins, information system manager at Sedgemoor District Council, says archived material for

planning stretches from 1974 to 1995. ‘It was in a proprietary DMS but it has been migrated to our EDRM

system and been made available to the public online’, he says.

‘Dropping the DMS means we can improve efficiency and save about £7,000 annually on

maintenance and server hardware. Making planning documents available online has also reduced the

number of phone calls to the council.’

The aim is to replace paper-based systems and integrate all systems with the EDRM software to

centralise the storage and management of all documents, and to remove legacy DMS applications. ‘We now

have a million records in the EDRM system out of 7.5 million documents. We have a variety of systems

covering 14 different business areas and EDRM will underpin them all to attain availability of information

accurately’, says Wilkins.

‘New documents go into the repository as well as archived data being migrated. We can scan

documents into EDRM and recycle paper documents, reducing storage costs. We also aim to specify

retention policies for data to improve information lifecycle management.’

The council had started to fully integrate its Goss iCM content management system with its EDRM

software to assist in making data available via its web site.

As volumes of data multiply, the council has also installed a storage area network to support EDRM.

‘We are scanning documents into the EDRM system and populating the back-office systems with metadata.

We are having to key in metadata manually but the aim is to automate this process, perhaps through a

barcode system, although there is a question over how much metadata a barcode can contain’, says

Wilkins.

Recently the council received confirmation that it is likely to be one of the first local authorities to

comply with the Code of Connection requirements for connecting onto GCSx, part of the Government

Connect programme to provide a common infrastructure for secure electronic transactions between local

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 30 / 40

and central government. Other benefits include making council reports, agendas and minutes available

online – and using Goss software in conjunction with EDRM to ensure the correct document versions are

published online in each service area. The ultimate goal is for the EDRM system to make information readily

available to support customer services through all access channels – the internet, face to face and by

telephone, says Wilkins.

Lisa Kelly, Computing, 11 Oct 2007,

www.computing.co.uk/computing/analysis/2200923/case-study-sedgemoor-district

Questions:

1. Given the intangible nature of some of the benefits from the new information systems, how

might the council have gone about making the investment decision ?

2. Analyse the initiation part of the project in terms of the internal and external factors driving the

systems acquisition process.

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 31 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 9.19.19.19.1

PUTTING AN ALL-INCLUSIVE PRICE TAG ON SUCCESSFUL IT

Failure to derive the expected benefits from IT systems is legendary. Yet organizations still fail to

recognize or accept why this occurs and generally do little to address the root cause in any meaningful way.

The first place to look is the application of the Return on Investment (ROI) tool as the arbiter for

benefits delivery and the subsequent plans for implementing the systems. An ROI is required by most

organizations, but the tool is often applied without fully understanding all of the cost components (full

disclosure)

By definition, IT projects tend to focus on dealing with the technical issues. It is these that get

measured as the cost side of the change – usually the cost of hardware and software with some allowance

for training. Typically, costs are grossly underestimated (often 40 per cent or more) by failing to consider

precisely those factors that are needed to deliver the return.

ROI is a technical measure talking expected returns and expected costs to determine the worth of

the investment. The key word is ‘expected’. The reality, of course, is that the ROI calculation is no more than

a forecast, based upon someone’s view of the costs and benefits. Realising the benefits forecast is where

the hard work arises, there is often a drastic underestimate of the efforts required to ‘make it happen’. The

underestimates are generally in:

- ensuring compliance with the business strategy;

- aligning the people with the processes the business is changing to;

- ensuring that behaviours are commensurate with the required new ways of working.

This assumes processes are being changed – otherwise where are the benefits coming from?

Which means there is an implicit assumption that people somewhere will be doing something differently. It is

the need to ensure and facilitate this change that generates a high proportion of the total project costs. By

including these costs some projects start to appear unprofitable. This, of course, is generally not in the

interests of any systems suppliers. It may, however, stop some projects from getting off the ground and

avoid some of the overspending we have seen in the past. If the way things are done in the business is

being changed the there is a need to understand what that change means. There is a range of

implementation approaches taken by companies including:

- simple ROI and the ‘stuff it at ‘em’ approach that follows the principles of ‘if we tell them what to do

and give them a bit of training then they’ll make it work’;

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 32 / 40

- a considered approach that defines real business need and vision but then fails to communicate this

through to the ‘what’s in it for me’ messages and thereby does not connect with the users;

- development of a system that involves some users early and is well communicated to staff, but is not

properly aligned to the organisation’s strategy and owned by specific, accountable people in the

business.

Quite often, once the decision to invest is made, technology projects are devolved to the IT

department who are then responsible for overseeing through delivery and implementation. Often these

technically focused people are poorly qualified to understand and business nuances and may not have the

required communications skills. Over and above this, who looks at the changes required in human

behavior? Who is addressing the motivational issues that will get the right people doing the right things?

A framework can be proposed to improve chances of success. This is based around the simple

model of People, Process and Technology (PPT) with the added element of environment or context (PPTE).

Context is the first parameter to get right. How does the development proposed relate to the business

strategy? What is the desired outcome for the development, in business benefit terms, so that we know what

is to be delivered and why? After thinking through the application needs and functions, the next useful

question is how is it to be delivered? This should be viewed as problem that the business deals with rather

than abdicating it to the IT group.

Costs can then be assessed in outline for the whole PPTE model. This may include some scenario

planning work fully to appreciate the different ways that the system may work, and identify the best options,

prior to getting the technologists involved. A full disclosure ROI can then be calculated that takes all benefits

and PPTE costs into account. This should include all of the people costs for effective change, from

ownership and visions through stakeholder buy-in, to positive, user-led adoption. Decisions to proceed are

now likely to be better informed and can be done on all fronts of process, technology and people readiness,

perhaps with the ‘go’ decision requiring people readiness to be assured.

Truer costs will be understood and the full implications of benefits will emerge. The business’s

responsible project owner will now have a budget that allows them to plan from concept to execution with

holistic consideration of all PPTE elements. This will give positive adoption of systems that are pulled

through by users who expect what they get and get what they expect. They will ‘pull’ the system through

rather than having it shoved at them.

Ron Barker, Financial Times, 30 May 2007

Question:

Discuss the difficulties in estimating the costs and benefits of an IT project.

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 33 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 9.29.29.29.2

LESSONS FOR BUSINESS FROM THE PUBLIC SECTOR

Stephen King, the thriller writer, might be hard pressed to top some of the horror stories generated

by public sector information technology project. That’s an exaggeration, of course, but only just.

Take the UK’s Child Support Agency, charged with tracing absent fathers and forcing them to pay

child maintenance. The agency is in the process of being abolished, the consequence of an IT foul-up which

meant a government watchdog discovered that costs were eating 70p of each £1 it collected and that it had

a backlog of 300,000 cases. The system, developed by EDS, the US group, at a cost to date of about

£539m is through to have 52 critical faults of which 14 cannot be easily corrected. The CSA has had to

process thousands of cases manually because of system failures. The CSA story is chilling, not least

because of its human implications, but it is almost normal for an industry in which, according to analysts, an

IT project is more likely to be unsuccessful than successful and the bigger the project, the more likely it is to

fail.

There is no real difference between public and private sector projects in this respect. Public sector

failures, however, are more visible and attract media attention more easily. Here is Sir Andrew Turnbull, now

Baron Turnbull, the former UK cabinet secretary, the man with ultimate responsibility for government IT,

talking on the subject before leaving office: ‘There have been plenty of projects, large and small, that have

come in on time and to budget. Of course, you don’t tend to get headlines announcing “Government project

completed on time and to budget. No major problems encountered. Improved services delivered”. The

media inevitably focuses on those projects at the other and of the spectrum.’

This view resonates with Malcom George, executive director, government relations, for EDS in

Europe. He says public sector projects are on a scale rarely seen in the commercial sector and that scrutiny

tends to highlight failure. Successes, such as EDS’s Oyster card payment scheme with London Transport

rarely attract plaudits. Mr George says the most important lesson the commercial world could learn from the

public sector concerned the benefits of sharing pool of knowledge of what makes projects work and what

does not. Competition militated against such sharing, he said.

It is true that successful public sector projects rarely attract standing ovations. In 2002, the UK

government’s Swansea-based Vehicle and Driver Licencing Agency (DVLA) initiated a project to enable

British drivers to license their vehicles either online or by telephone. At present, most drivers renew their

licences at a post office. The system was built in collaboration with IBM at a cost of £30m. At the peak, 80

IBM staff and 20 DVLA IT specialists were involved. Today, two years after completion on time and budget

3m drivers have used the system successfully and it is attracting users at the rate of 400,000 a month. It can

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 34 / 40

be counted as an unqualified success. But it was not a simple project. A licensing authority has to be sure a

vehicle is insured, has passed its roadworthiness test and that payment has been made before a licence

can be issued. The DVLA database had to be linked to the motor industry insurance and roadworthiness

database. And a payment engine with links to the banks had to be created. Julie Palmer, the Vehicle

Programme Manager in charge of the project, says it was important that DVLA and IBM shared the same

vision: ‘To the outside world, we looked like a single team.’ The ground rules were agreed at the start: these

included the degree to which risks were shared and the rules covering change management, the most

critical issue in any big project. Andrew Rhodes, planning and performance manager, pointed to the efforts

made at the beginning to ensure that what was delivered was what customers wanted: ‘The secret in

defining a product your customers will want to use. We could simply have mirrored the existing paper

process but we redefined it in a way that not only met our needs but also out customers’ expectations of

ease of use.’

Nevertheless, there are significant numbers of projects that have lost their way. The Standish Group

in the US has been at the forefront in analyzing and classifying these failures: its 1995 report is regarded as

a classic. Its lasted survey of 9,000 IT projects, more than half of them in the US, suggests that 29 per cent

were successful, 53 per cent were late and/or over budget or with less than optimal functionality and 18 per

cent were cancelled or never used. More recently, the Standish Group’s methodology has been queried,

does it select for failure?, but the fact remains that the rate of failure of big projects is unacceptably high.

Why do IT projects founder? And what can the business world learn? Among the most important is a

failure to align project objectives and the organisation’s strategic priorities, an example being a US

insurance group that took three years to finish a one year marketing project, only to find the product in

question was being sold. A second reason is a lack of ‘ownership’ of a project by senior management. This

comes up time and again in studies: a project needs a champion at senior level who is responsible for

bringing the scheme to fruition on time and to budget. Third, some projects are simply too large to be

managed effectively. More recently, there has been a trend to tackle automation in small steps, linking

successful projects together to create a seamless whole as a final stage.

These issues are underlined by Graham Kemp, in charge of public sector business for Sun

Microsystems in the UK, whose customers include the health service, the Inland Revenue and the Home

Office. He says communication is critical: ‘I think that when projects fail, it is because the rigour around

communications or review and inspection is not what it could be.’ ‘For those engaged in the project, it is

fundamental that all stakeholders are excellent communicators.’ Not engaging all the stakeholders in the

aims and objectives of a project is frequently quoted as a cause of failure. The DVLA licensing project

involved representatives of everybody affected at each stage. Mr Kemp points to the importance of

established and proven methods of project management such as Prince2, a methodology which takes as its

starting point the business case for a project and provides guidance at each stage. He also stresses the

importance of ‘Gateway’ reviews, in which independent scrutineers assess high-risk projects at critical

stages in planning, procurement and implementation, rating them red, amber or green. ‘The proper review

mechanisms have to be in place’, Mr Kemp says. ‘The projects led by governments are sometimes just too

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 35 / 40

big. If they were segmented, then some risks could be mitigated by people with appropriate competences.

Projects and subprojects would be more manageable.’ So the public sector patient is responding to

treatment, if not yet out of intensive care. Is the private sector taking the same medicine? And would we

kmow? ‘The private sector keeps its mistakes to itself’, Mr Kemp notes.

Alan Cane, FT.com site, published 4 October 2006 (abridged)

Questions:

1. What reasons does the case study indicate are responsible for project failure ?

2. What steps can be taken to reduce the risk of project failure ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 36 / 40

CASE CASE CASE CASE STUDY STUDY STUDY STUDY 13.113.113.113.1

AGILE DEVELOPMENT CAN MAKE BUSINESS QUICK AND LIGHT

But ICT must communicate its benefits if managers a re to accept it

Agile software development can prevent organizations becoming locked into yesterday’s ideas and

business strategies, but it makes some managers nervous, experts told New Zealand Computer Society

members at a recent NZCS meeting.

Agile software development is one way IT can guard against becoming an anchor weighing down

changing businesses, according to developer Shane Hastie. Rigid specifications and inflexible development

techniques can lock organizations into yesterday’s ideas and also inhibit commercial evolution. Management

can appreciate the benefits of agile development techniques – but only if these benefits are communicated

properly, he says.

Hastie, who is chief knowledge engineer at Software Education Associates, was one of two

developers who addressed a well-attended NXCS’ birds of a feather’ session on agile development, held in

Wellington earlier this month.

Fellow presenter Stephen Hilson, who currently works for Telecom, says both general and ICT

managers are nervous about the less structured nature of agile methods, especially when it comes to

mission-critical disciplines, such as telecommunications.

Telecom fits agile practices around a skeleton of more conventional waterfall-style development –

starting with a complete specification and working through design, coding and testing stages linearly, says

Hilson.

The essence of agile development is the creation of small pieces of a program, a process that can

sometimes lead to a realization that the original design of that part of the program either won’t work or

should be revised. This results in iterative redesign and re-coding, independently of other parts of the

development.

Superficially, this process looks unstructured, but requirements’ churn’ is actually a fact of

applications development life, the speakers say. In an agile environment, realizing work is off-track often

means that only a little work has to be thrown away, says Hastie.

In contrast, a misconceived design, based on a monolithic specification, could mean throwing away

much more, with major impact on the project schedule. This is important in resource-constrained New

Zealand, he says. And, if the completion target is hard to see at times, agile techniques can at least ‘deliver

enough to keep the business moving forward’.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 37 / 40

The speakers acknowledge that, with agile development, the final product can be quite different from

that originally planned. But it tends to be more aligned with the business’ needs at the time of completion –

rather than its needs at the start, which may now be outdated.

If management and users are involved, they will understand the logic of the way the ICT team

chooses to develop.

‘Two of the most important factors are a high level of customer involvement and chief executive

support. If you have those, you will succeed no matter what technique you’re using’, says Hastie.

The essence of agile development has been known for 10 to 15 years, and recognised as good

practice, Hastie says. The essentials are programming with teams of peers, quick turnaround of small

modules, close contact with customers, and a daily ‘stand-up’, where developers report on the work they

have accomplished since the last meeting, as well as what they plan to do next and any obstacles they have

encountered.

Agile methods – branded as such around 2001 – ‘pull all these good practices together’.

Adapted from an article by Stephen Bell, 13 August 2007.

http:// computerworld.co.nz/news.nsf/devt/943AA253F4D6EADFCC257333000EAF06

Question:

What do the differences between the traditional waterfall model and agile development methods

suggest about their respective applicability to the strategic alignment of business and IS/IT strategies ?

� �

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 38 / 40

CASE STUDY 14.1CASE STUDY 14.1CASE STUDY 14.1CASE STUDY 14.1

WHY DO PUBLIC-SECTOR PROJECTS FAIL ?

Back in the spring of 2007 a doctor application system which was supposed to match junior doctors

to specialist training posts was shelved by ministers. Doctors complained that the system – the medical

training application service (MTAS) – was profoundly flawed and that many juniors had been unfairly

treated. The reorganization of training and the application process meant that 30,000 doctors were chasing

just 32,000 posts in a system poorly thought through. Astonishingly research suggests that one in five

doctors have even considered suicide, such is the depth of the fiasco.

And the story didn’t end there. The MTAS site has also allegedly been the subject of two security

breaches, which caused the opposition to call for the resignation of the then-health secretary, Patricia

Hewitt.

But in the world of public sector technology initiatives, this story was the most recent in a long line of

blunders. One of the most troubled technology outsourcing cases was that of the now defunct Child Support

Agency. The outsourced IT system was at the root of the agency’s problems. An investigation by the

National Audit Office (NAO) found that ‘go live’ of the system had been authorized, despite the CSA and its

supplier being aware that there were 52 defects within the system. The NAO branded the project, ‘one of the

worst public administration scandals of modern times’.

These and other examples of outsourcing have been very damaging to public sector organizations

for a range of reasons. There is of course the waste of money and other resources. Public sector

organizations are effectively answerable to taxpayers – wanton waste of public funds does not bode well for

good relations. These public sector technology catastrophes also attract a good deal of negative publicity –

this can do serious amounts of damage to the organisation’s reputation and dent stakeholder and taxpayer

confidence in the ability of the organization to do a good job. Just look at the CSA – the situation

deteriorated to such an extent that the entire organization was scrapped.

The fact that public sector technology and outsourcing projects go wrong so regularly means we

aren’t surprised by these failures anymore. Public sector projects are so tainted by their poor track record,

expectations are set very low and they now have little to live up to. So why do these failures keep

happening?

There needs to ne an element of realism when looking at major technology projects. The sheer

scale of the larger projects means that inevitably there will be problems along the way. The problem with

many of these initiatives is that the parameters of the project and contract provisions are tightly defined and

the contracts are not managed effectively by the same team through the project lifecycle. When a problem is

encountered often the first reaction of the public sector is to seek to avoid any blame.

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 39 / 40

History has taught us that errors and mistakes should be expected and factored in to the way that

contracts and projects are managed. A shift away from the blame culture to an environment where

successful delivery is valued above all else is required in order to increase the probability of problems being

detected at an early enough stage for them to be dealt with appropriately in a way that works for the supplier

and the public sector.

Problems often arise around the cost issue. Cost is often cited as a major driver in technology and

outsourcing projects. Whilst it is undoubtedly important, public sector organizations have to be wary they are

not blinded in the quest for squeezing as much value for money as possible out of the supplier. This

procurement – led approach to technology and outsourcing cab be problematic as it leaves very little scope

for innovation in the project and makes it much more difficult to cope with problems when they arise.

What appears to be the cheapest deal is often the worst as frequently the service will be

compromised or the final cost will spiral because it was unrealistic in the first place. Of course as a spender

of public funds those in the public sector feel an obligation to get the best deal but nailing the supplier to the

wall financially can often backfire. End users need to realize that any mentality of ‘the cheapest wins’ means

that the more realistic suppliers will be missing out on contracts.

Problems in technology and outsourcing deals can often arise when there are unclear lines of

responsibility both within the public sector and between the public sector and the supplier. Drafting a

contract with clear responsibilities and then managing it appropriately deals with the responsibility between

the public sector and the supplier. However, it does not deal with the constant reorganization that takes

place at central and local government level or the constant churn of ministers and officials on projects.

With this sort of fundamental change, is it any wonder that there is not a great track record of

successful delivery of major technology projects? Failures are often attributed to the supplier but as in any

relationship it takes two to tango. A blame culture often comes to the fore when things go wrong, with the

end user blaming the supplier as operations were not executed to their satisfaction and the supplier blaming

the end user because they were negotiated right down on costs.

Problems worsen as the two parties are more concerned with absolving themselves of wrongdoing

than they are with rectifying the issues. Since differences or disputes are inevitable in relation to large-scale

technology projects, mediation and adjudication – which exist as legal mechanisms for resolving disputes –

should be more widely utilized. Adjudication is a particularly useful dispute – resolution process for obtaining

swift results which has yet to find favour on large-scale technology projects.

From all the press reports that circulate about these problematic projects, it would seem that they

invariably involve the same circle of suppliers. This understandably begs the question, why on earth do

public sector organizations keep selecting them? One of the major problems in the public sector today is the

lack of competition amongst suppliers.

The principle reason behind this is the protracted and complex tendering process that suppliers have

to go through. Far from these being an alleged ‘inner circle’, organizations really are limited when picking a

BÀI TẬP TÌNH HUỐNG - MÔN HỆ THỐNG THÔNG TIN QUẢN TRỊ - Hệ Đại học chính quy

Trang 40 / 40

vendor for projects of this size. More choice would be likely to mean better service. But with such hurdles to

overcome how can smaller, quality suppliers compete in the public sector market? And how can end users

avoid the obvious choice?

Public sector organizations need to take a more strategic approach to outsourcing. They need to

ensure they have a dedicated team that manages the process full time, constantly reviewing existing

contracts and looking for improvements and innovations. Instead of using a ‘one-stop shop’ supplier the

public sector should look to use specialist suppliers for different aspects of a project. This gives smaller

companies a chance of a contract but also gives the end user access to.

Unfortunately the need for an ‘intelligent client’ is often overlooked – with the very expertise the

public sector needs to manage its IT suppliers being outsourced to those suppliers. Public organizations

shouldn’t be held to ransom by a private organization. If they spread the work and therefore knowledge

between a range of suppliers or keep some knowledge in-house then this won’t happen.

The public sector boom of technology outsourcing definitely set to continue but public sector bodies

need to learn lessons from their private peers. Successful delivery needs to be valued within the public

sector more than simply not being to blame for problems. The key to successful delivery is to have continuity

of personnel throughout the project lifecycle; a sensible, balanced contract managed appropriately; effective

dispute resolution; and the retention of an ‘intelligent client’ on the public sector side.

Paul Bentham, July 2007, www.silicon.com/publicsector/0,3800010403,39167934,00.htm

Questions:

1. Public-sector information systems projects have had a chequered history. Is the national

programme for IT proving to be any different from some of the flascos that have preceded it ?

2. The national programme for IT involves a substancial increase in outsourcing. What are the

likely benefits and risks associated with this approach ?

3. Could the COBIT methodology be applied in this context ?

� �