Upload
ahmed-helmy-hegazy
View
220
Download
0
Embed Size (px)
Citation preview
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 1/10
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 2/10
2.1 Batteries discharge test
V A V A V A V A V A V A
3. Temp. Measured 4. Site Equipment (Data)
210 Mins
String # 2 String # 4 String # 5Rectifier
After Connecting Rectifier
10 Mins
Before disconnecting Rectifier
30 Mins
150 Mins
90 Mins
30 Mins
Rec Bus Bar String # 1
Time: min (h)
Before disconnecting Rectifier
180 Mins
60 Mins
10 Mins
150 Mins
210 Mins
240 Mins
120 Mins
90 Mins120 Mins
60 Mins
Rectifier
Time: min (h)Room Temp. ◦C
180 Mins
240 Mins
After Connecting Rectifier
6P ERICSSON MW link
Type of 3G CabinetNo. of 3G RF Module (NSN)
No. of DCS RF Module (NSN)
No. of PDUNo. of ADM
6N ERICSSON MW link
Data for links
No. of MW Links 1+0No. of MW Links 1+1
No. of SDH
BSC Type
# of BTSBTS Type
Site Type
Mobinil NetworkTotal Site Config.# of BSC
To
No. of Twin DCS
No. of MRFU (Huawei)
No. of GSM RF Module (NSN)
No. of Single GSMNo. of Single DCSNo. of Twin GSM
Ipasoo 1000 NEC MW linkNEO NEC MW linkV4 NEC MW link
20P ERICSSON MW linkIpasoo 200 NEC MW linkIpasoo 400 NEC MW link
A/C2 CapacityStatus Of A/C1Status Of A/C2
A/C1 TypeA/C2 TypeA/C1 Capacity
Site Category
String # 3
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 3/10
2.2 Voltage Measured
StringNumber
BatteryNumber
Measured
Before180 Mins
1
2
3
4
1
2
34
1
2
3
4
1
2
3
4
10 Mins 30 Mins 150 Mins90 Mins 100 Mins 210 M
1
2
3
4
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 4/10
ar photo for Rectifier
Rectifier Photo
Batteries Photo
ar Photo for Batteries
tteries C.Bs Photo
photo for batteries C.Bs
AGLI
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 5/10
208 W * No. of lin
54 W * No. of linkTotal power consumpa
453W * No. of link* No. of link* No. of link
370 W * No. of lin952 W * No. of lin128 W * No. of lin
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 6/10
VoltageMeasured After
connecting
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 7/10
Reserve 1 description
Write full description for the reserve
Reserve 2 Photos
Reserve 1 Photos
Reserve 2 description
Write full description for the reserve
Reserve 3 description
Write full description for the reserve
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 8/10
Reserve 3 Photos
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 9/10
8/13/2019 Blank BDT 2014
http://slidepdf.com/reader/full/blank-bdt-2014 10/10