Vision : To be a World Class Integrated Aluminium & Power Producer Generating Sustainable Value for All Stakeholders
Care
Respect
Innovation
Excellence Integrity
Trust
Entrepreneurship
CORE VALUES
CII Excellence in
Energy Management Award
Vedanta Limited, Aluminium - BALCO | 1
BALCO OVERVIEW
Bharat Aluminium Company (BALCO) is the 1st PSU in India’s Aluminium sector incorporated in 1965. One of the first disinvestments of the Government of India & it is now a part of Vedanta Limited, with 51% stake
held by Vedanta Limited and 49% held by Government. Balco is based in Chhattisgarh State having Captive Bauxite mines in Mainpat and Kawardha, Captive coal mines in
Chotia, with 2010 MW power generation capacity and 5.7 LTPA Aluminium Smelting capacity at Korba Complex.
Number of units – 4
Capacity of each unit – 135 MW
Make: Harbin
Spec: Single drum, Natural Circulation, Pulverized Fuel fired, Single Reheat, Balance Draft, and Tangentially Corner Fired
Make: Dongfang
Spec: Reheat, Double steam exhaust, two casing condensing steam turbine
Plant Overview (CPP 540MW)
Vedanta Limited, Aluminium - BALCO | 2
PROCESS FLOW : POWER PLANT
CPP 540 PLANT PROCESS FLOW DIAGRAM
SEC AIR
300°C
FLUE GAS
340°C
CLEAN GAS
BOTTOM ASH
ASH SLURRY
PRIMARY
AIR GAS
TRAFO
220 KV step up
OLTC
Forced Air Cooled
G 135MW
13.8 kv
SWITCH
YARD
SLURRY PIPE LINES
FLY ASH
COAL PILE
290°C
STEAM TURBINE (135MW)(30+1 STAGE) HIP/LP,Double Exhaust,
Double Casing, Condensing Steam Turbine
POWER
SUPERHEAT STEAM
Pressure=13.7Mpa
Temperature=537°C
ASH SLURRY PIT
COALYARD Ф=80000 T
CRUSHER HOUSE
Ф=4*1000 T/H
COAL BUNKERS (4*4 Nos) Ф=496 T
COAL FEEDERS, Ф= 37 t/h
COAL MILLS(BOWL & ROLLER) Ф=75 t/h
BOILER (PF, Corner Fired, single reheat)
Pressure=14.29Mpa;
Temperature=540°C;Flow= 460 T/h
COAL
CONDENSER (-90kpa) Cooling Area=8500 m3
No. of Tubes 13400 No
INDUCED COOLINGTOWER
Range=8.4 Approach=4
CONDENSATE EXTRACTION PUMP (2) Nos. of Stage- 5, O/L Pr. =18.91 Ksc; FLOW=373 m3/h
LP HEATERS, 4 Nos.
DEAERATOR & FST Pr.=0.709Mpa, 140m3
BOILER FEED PUMP(2Nos.) O/L Pr=181.45 Ksc (max) Maximum Flow=560T/H
HP HEATER, 2 Nos
FEED WATER
166.6 Ksc, 245°C
FD FANS(2 Nos), FLOW=342 t/h
AIR PRE HEATER, 2 Nos
PA FANS(2 Nos)
T FLOW=196 t/h
ESP (2*5 Fields) U#2 (1
st 2 field BAG FILTER)
ID FANS(2 Nos), FLOW= 855 t/h
STACK
H=275 mtr.
TO ATMOSPHERE
DEWATERING BIN, 3 Nos
ASH DYKE
AIR FROM ATMOSPHERE
CW PUMP(2 Nos.)
Flow=10800 M3/H
147°C
141°C
169°C
171°C
44°C
COAL
COAL WITH HOT PA
FLY/BOTTOM ASH
COLD AIR SUPERHEATED STEAM
CONDENSATE WATER
HOT AIR
COOLING WATER
MIXING TANK, 2 Nos
FLY ASH
SILO (2 Nos)
GEHO, 2Nos (208m3/hr)
ASH
CONDITIONER
Seal Air Fan
Vedanta Limited, Aluminium - BALCO | 3
ENERGY OBJECTIVES
EnMS Objective (FY 18)
Reduction in Specific Coal Consumption(SCC) from 720 gms/ kwhr to 707 gms/ kwhr Reduction in Specific Oil Consumption (SOC) from 0.35 ml/ kwh to 0.28 ml/ kwhr Reduction in Auxiliary power consumption (APC) from 10.11% to 9.62%
Reduction in Specific Coal Consumption(SCC) to 690 gms/ kwhr Reduction in Specific Oil Consumption (SOC) to 0.22 ml/ kwhr Reduction in Auxiliary power consumption (APC) to 9.30%
EnMS Vision (FY 21)
Vedanta Limited, Aluminium - BALCO | 4
S. No Description Certification
1 Quality management system ISO 9001:2008
2 Environment Management System
ISO 14001:2004
3 Occupational Health & Safety Management System
OHSAS 18001:2007
4 Energy Management System ISO 50001:2011
5 Asset Management System ISO 55001:2014
6 International Automotive Task force
TS 16949
ENERGY POLICY & CERTIFICATION
Vedanta Limited, Aluminium - BALCO | 5
ENERGY CONSERVATION JOURNEY & REVIEW MECHANISM
Energy Excellence Model
Bench-marking
Innovation Awareness Involvement Certification
& Awards
Energy Saving, Cost Reduction, Sustainable Operation
Corporate Sustainability Review
Monthly Management Review by CEO
Monthly Operational Review by Plant Head
Weekly Energy Cell review by Energy Manager
SBU Level review – Daily War Room Turbine Steam Path Audit
Energy Efficient Drives
Ultra High Filtration System
CW Pump Trimming & Coating , Replacement turbine seals
2015
2016
2018
2017
Vedanta Limited, Aluminium - BALCO | 6
BENCHMARKING
<300 MW
KPI UOM
BALCO CPP 4x135 MW
JSG 9x135 MW
LAPANGA 6x150 MW
KSK WARORA 4x135 MW
JSW TORANGALLU
2x130 MW
NALCO 10x120
MW
2015-16 2016-17
PLF % 74 70 82 67 73 98 64
PAF % 87 93 92 100 85 98 85
APC % 10.7 10.11 9.8 8.2 9.66 8.93 11
Heat Rate
Kcal/ KWh
2686 2593 2450 2370 2400 2493 2790
Vedanta Limited, Aluminium - BALCO | 7
INNOVATIVE PROJECT 1 - TURBINE HPDE & LPDE CORRECTION
Why: To maintain MS and RH steam parameter at rated value. How: Modification at front pedestal & HP/LP rotor coupling
Front Pedestal
HIP Turbine LP Turbine
1 2 3 & 4 5
1. HIP Front Pedestal (MOP, Bearing -1)
2. 2nd Pedestal (HIP LP Rotor Coupling, 2 no Journal Bearing, 2No Thrust Bearing)
3 &4. 3rd Pedestal (LP Generator Coupling, 3rd Journal, 4th Journal Bearing, Turning Gear)
5. Generator Rare Pedestal (5th Journal Bearing & Excitation System)
Gen
Expansion Increased from 10 mm to 20mm
Spacer plate width reduced by 2mm
LPDE reduced from 7.5 to 4.5 mm
Vedanta Limited, Aluminium - BALCO | 8
TURBINE HPDE & LPDE CORRECTION
welded Joint between header and Bearing pedestal
Flexible joint between header and Bearing pedestal
HP Turbine Front Pedestal Modified Lub oil piping
Before After
Vedanta Limited, Aluminium - BALCO | 9
SAVING- TURBINE HPDE & LPDE CORRECTION
0
1
2
3
4
5
6
7
8
mm
LPDE
2016
2017
Result: During turbine major overhauling, LPT Bottom casing and front bearing pedestal is removed and its contact surface finishing for smooth expansion of casing. Bellow installation in pipe for lube oil inlet & outlet for main oil pump to facilitate the free movement of front pedestal.
500
505
510
515
520
525
530
535
540
545
o C
Main Steam Temperature
2016
2017
450
460
470
480
490
500
510
520
530
540
550o C
Reheat Steam Temperature
2016
2017
Description Savings Unit Temperature Utilisation in MS & RH Cycle
15/60 Deg C
Impact on Specific Coal Consumption
8.609 Gms/KW
hr Direct saving in Coal Consumption
28668 MT / Year
Cost Saving @ 2.74 788.37 Lacs in
INR
0
0.5
1
1.5
2
2.5
3
3.5
mm
HPDE
2016
2017
Vedanta Limited, Aluminium - BALCO | 10
INNOVATIVE PROJECT 2 - APH PA SECTOR MODIFICATION
Why: To reduce primary air pressure difference across Air Pre Heater. How: By reducing the SA side opening & modification of PA sector plate
Vedanta Limited, Aluminium - BALCO | 11
INNOVATIVE PROJECT 2 - APH PA SECTOR MODIFICATION
APH Primary Air side Old Sector Plate APH Primary air side new sector plate
Degree of opening for PA section has been increased from 50 deg to 60 deg Degree of opening for SA section has been decreased from 130 deg to 120 deg New main 20 degree sector plate were erected in both Hot & Cold end center sections
Vedanta Limited, Aluminium - BALCO | 12
SAVING - APH PA MODIFICATION
0
50
100
150
200
250
300
350
400
mm
of H
2O
APH – A PA Differential Pressure
2016
2017
Result:
PA DP across APH reduced to 180 mm H2O from 325 mm H2O after modification
Additional PA fan stopped.
0
50
100
150
200
250
300
350
mm
of H
2O
APH – B PA Differential Pressure
2016
2017
Specific Power Consumption Power Saving Unit
Stoppage of PA fan 6.50 MU/Year
Cost Saving in INR 133.68 Lacs/Year
Vedanta Limited, Aluminium - BALCO | 13
INNOVATIVE PROJECT 3 - REDUCTION IN RH ATTEMPERATION
Why: To reduce attemperation in hot reheat steam
How: Removal of outer loop of final reheat panel.
RH tube loop removed and made dummy towards header side
0
2
4
6
8
10
12
14
16
April May June
T/H
r
RH Attemperation Spray
2016
2017
Description Savings Unit
Reduction in RH
Attemperation Spray 8 T/Hr
Impact on Specific Coal
Consumption 1.89 Gms/KWhr
Direct saving in Coal
Consumption 6318.03 MT / Year
Cost Saving 173.74 Lacs in INR
Vedanta Limited, Aluminium - BALCO | 14
Utilization of heat in flue gas: Utilization of waste heat from the flue gas leaving the boiler by installing additional tubes at the bottom bank of economizer, thereby achieving 12o C reduction of flue gas temperature at APH inlet after modification.
Description Savings Unit
Reduction in Exit Flue gas temperature of APH
8 deg C
Impact on Specific Coal Consumption 2.27 Gms / KWhr
Direct saving in Coal Consumption 7581 MT
Cost Saving 208.4 Lacs in INR
Old tubes
New tubes
Old tubes
Vedanta Limited, Aluminium - BALCO | 15
MAJOR ENERGY CONSERVATION PROJECTS
S.No Title of Project Saving
Lacs / Annum in INR
1 Reduction in O2 % in flue gas (0.29MU) 82
2 Improvement in condenser vacuum(0.66MU) 180
3 Power consumption reduction in Compressors(0.067MU) 18.6
4 Improvement in belt conveyor utilization factor(0.2MU) 54
5 Installation of 10000 18 W LED tube lights in place of 40 W conventional tube lights through EESL scheme (0.91MU) 27.3
6 Installation of Motion Sensors for lighting control in Washrooms / Conference room (0.09MU)
2.7
7 Installation of no's 420 90W LED Street lights in place of 250W HPSV (0.3MU) 9
8 Installation of Led Down-lighter lights in Canteens (0.04MU) 1.2
Total 374.8
Vedanta Limited, Aluminium - BALCO | 16
Modification done to reduce Turbine LPDE for increasing MS & Reheat Steam temperature.
Addition of extra coil in economiser to reduce exit flue gas temperature
Installation of additional CT cell to reduce cooling water inlet temperature to condenser
Reduction in Specific Coal Consumption (Gms/KWhr)
Reduction in Auxiliary Power Consumption (Kwhr) Installation of VFD in FD & ID
fans. APH modification done to reduce
PA DP and stop one PA fan. Logic provided in DCS to stop
Standby Mill LOP after 30min if mill is not taken in to service.
TRENDS – PERFORMANCE IN PREVIOUS YEARS – SCC & APC
Vedanta Limited, Aluminium - BALCO | 17
Improvement in availability of boiler & turbine auxiliaries
Deaerator preheating Oil gun Igniter length adjusted to
increase gun reliability. Oil gun nozzle plugging done to
increase operating pressure of oil system and hence impacting atomization
Reduction in Specific Oil Consumption (ml/KWhr)
Reduction in Specific Water Consumption Replacement of drift eliminators Optimization of CT blowdown Zero discharge pit for drainage
water Utilization of ETP Water in AHP &
Fire Fighting water Utilization of storm water Plant Drain line modification to
ensure zero discharge and 100 % utilization of drain water
TRENDS – PERFORMANCE IN PREVIOUS YEARS – SOC & SWC
2.57
Vedanta Limited, Aluminium - BALCO | 18
Action Plan
Turbine seal replacement Dynamic classifier Operational changes to be discussed and
implemented. Condenser tube bundle replacement Arresting air ingress in boiler Reduction in super heater attemperation
707
701
695
FY 17-18 FY 18-19 FY 19-20
SCC (Gms/Kwh)
FUTURE TARGETS – SPECIFIC COAL CONSUMPTION
Vedanta Limited, Aluminium - BALCO | 19
Action Plan Reliability improvement of boiler & turbine auxiliaries Oil gun nozzle modifications to be done to minimize oil
consumption during startup Feasibility study to be done for use of plasma ignition Operational changes to be discussed and implemented
Action Plan
Inspection and replacement of all Boiler feed pumps cartridge to be done.
All lighting in open areas to be replace by timer control or based on sensor control.
Reduction in compressed air consumption
FUTURE TARGETS – SOC & APC
Vedanta Limited, Aluminium - BALCO | 20
EMPLOYEE INVOLVEMENT TOWARDS ENCON
ENERGY MONTH PRIZE
DISTRIBUTION
Vedanta Limited, Aluminium - BALCO | 21
Reduction in BALCO’ Specific water consumption 2.3 m3/MT (FY16) to 1.4 m3/MT (Lowest ever)(FY17) Balco has won the "FAME Excellence Award 2016" in Environment Protection - Gold Award Balco has been awarded for being the Winner in the LARGE SCALE Manufacturing category [Above 3000
employees] of Safety, Health & Environment Awards 2015-16 from the Confederation of Indian Industry.
ENVIRONMENT MANAGEMENT INITIATIVES
IMS Year No. of NC No. of Observation Open NC Open Observation
CPP 540 15-16 0 7 0 0
CPP 540 16-17 0 4 0 0
Status of EnMS (ISO 50001:2011) Audit Observation
ESP Bag Filter Retrofitting
Design ESP had 5 Fields Ammonia Dosing was in practice to
increase the conductivity of fly ash Average SPM was more than
100mg/Nm3
In ESP, last three fields were replaced with fabric filters
Ammonia dosing stopped in all units
Average SPM is below 25 to 30mg/Nm3
Vedanta Limited, Aluminium - BALCO | 22
Tangible Benefit : 23.79 Cr of Indian rupees till Mar’2017 Environmental Benefit : Saving of 85384 MT of Coal till Mar’2017. : Reduction in Greenhouse gas emission of 96388 tCO2e.
GHG INVENTORISATION
Actual unit generation at 69% PLF for
FY 16-17 3284
Million
unit
Coal consumption @ SCC of 746 2449864 MT
Coal consumption @ SCC of 720 2364480 MT
Total coal saving 85384 MT
Coal price FY 2016-17 per MT 2787 Rs
Total saving 23.79 Cr Rs
GHG emission
GHG Emission @ SCC of 746
4602747 tCO2e
GHG Emission @ SCC of 720
4506359 tCO2e
Total reduction 96388
tCO2e
Vedanta Limited, Aluminium - BALCO | 23
ENERGY MONITORING SYSTEM
1. Installation of Online EMS system
2. All relevant energy data is captured from these resources at
regular intervals by PDHR data..
3. Integrated energy monitoring system in place
Pro
cess S
core
Card
PERFORMANCE INDICATORS Unit ON DATE
BP Actual
Gross Generation MU 9.29 12.365
Gross Generation MW 387.10 515.21
PLF % 71.68% 95.41%
Aux.Cons. (MU) 1.21 1.21
Aux Cons. % 13.02% 9.82%
Coal consumption MT 8914 8587
SCC (based on actual GCV) (gms/kwh) 960 694
LDO consumption KL 1.13 0.00
HFO consumption KL 2.26 0.00
Total Oil Consumption KL 3.39 0.00
SOC (ml/kwh) 0.36 0.00
AP
C &
SC
C V
aria
nce
Online EMS System
Vedanta Limited, Aluminium - BALCO | 24
Use of Drain water in AHP:- By connecting drain line to bottom ash slurry Pit. By this modification, we are able to utilise rain water.
Rainwater harvesting is carried out as part of the Company’s commitment towards environment
100% utilization of ETP discharge water in AHP, Fire fighting and in gardening.
Recycling of plastic waste generated after CT cell fills replacement. Installed 28 KW Grid connected Solar power plant & Planning for
Installation of 5 MW Grid connected Solar power plant. Planning to make Green building in township
ENVIRONMENTAL & RENEWABLE ENERGY PROJECTS
Real Time SPM
data
monitoring &
acquisition
Fire fighting
water line
rerouting from
underground
to overhead
line
Drain water line
connected to Ash
Slurry Pit
Segregation
biodegradable
& Non
biodegradable
waste
Action Plan for Installation of Solar lighting in Area
SNo. Area Start of Project End of Project
Investment Payback
(Years) Status ( In Lakhs
)
1 Comprehensive Building 01.06.2016 31.03.2017
3 7
28kwp
system
installed 2 DM Plant 25
3 Lab building
01.04.2017 30.10.2017
10
7 4 Canteen Plant-2 3
5 HSE office - Plant-1 20
6 Rectifier - Potline-1 01.11.2017 31.03.2018
25 7
7 Rectifier - Potline-2 10
Total 96 7
Vedanta Limited, Aluminium - BALCO | 25
WASTE MANAGEMENT
Zero Discharge Project: 100% utilization of ETP water for water washing in AHP & boiler area. CT Over flow reduction/ blow down optimisation & maintaining COC above 8.0. Storm water drain line modification to ensure zero discharge and 100 % utilization of drain water.
Ash Utilization:
Ash utilization increased from 30% to 40%
1. Chotia mines backfilling : 10%
2. Ash dyke rising : 20%
3. Road & Brick : 5%
4. Low lying area backfilling : 5%
Vedanta Limited, Aluminium - BALCO | 26
GREEN SUPPLY CHAIN
Usage of domestic coal instead of imported coal.
Increased capacity of coal trucks from 20 Ton to 32 Ton.
Unloading of coal through Truck Tippler project.
Use of aluminium boxes in place of wooden boxes by local vendors
Door delivery of stores material.
Usage of energy efficient SKF bearings
FY 15 – 183700 FY 16 – 102500 FY 17 – 87000
Additional measures for energy reduction :-
Distribution of 5000nos Energy booklet in all schools of BALCO for increasing awareness towards energy conservation.
Implemented Cardinal rules for energy savings best operational practices.
Distribution of total- 48717 Nos energy efficient light fittings and fans through Ujjala Scheme of EESL:- (May-16-June-16) & (Jan-17 –Apr-17)
PLANTATION DRIVE
Vedanta Limited, Aluminium - BALCO | 27
ENERGY SAVINGS FROM EMPLOYEE & STAKEHOLDER INVOLVEMENT
Details Unit 2014-15 2015-16 2016-17
FIP Projects No. 5 3 6
QCs / Kaizen Projects No. 25 15 18
Energy Savings Kwh 7664358 4375000 26892304
Benefits due to energy savings Rs. lacs 229 131 806
Vendus Meet to promote Energy Conservation
and Sustainability among Vendors
LED distribution Counter (EESL) at township
Vedanta Limited, Aluminium - BALCO | 29
Title of Project Name of the
Vendor
Per unit energy consumed % Improvement
Before Project After Project
Distribution of energy efficient light fittings and fans through Ujjala & Pawan Scheme in Balco township
EESL 72000 Kwh/day 68000 Kwh/day 5.55%
IMPLEMENTATION OF BEST PRACTICES
Implementation of Idea generation portal & !DEA@BALCO APP for generation of idea for All Balco & Contract employees. Idea generated - 826 Idea implemented - 105 Idea under implementation - 206
Initiatives taken by supplier has resulted in energy consumption reduction