View
6
Download
0
Embed Size (px)
Citation preview
5/27/2018 DHAM140307-1
1/23
Dalian CIMC Logistics Equipment Company
VERSIONA
4000L OFFSHORE PORTABLE TANK
USER'S MANUAL
Model No.O GT 023
Before install and start to use the productPlease read the manual carefully.
2014.03.17
5/27/2018 DHAM140307-1
2/23
Dalian CIMC Logistics Equipment Company
ForewordFirstly, thanks you for adopting our product.The manual is the reference for properly operating and maintaining
the Offshore Portable Tank. If you have any questions, please contact us.
Our professional technicians will serve you sincerely.
The Peoples Republic of ChinaDalian CIMC Logistics Equipment CompanyAdd.Free Trade Zone B-2 Dalian Liaoning ChinaP.C.116600TEL 86-411-39968327FAX 86-411-39968001Websitehttp://www.palletcenter.com/
http://www.cimc.com/
2014.03.17
5/27/2018 DHAM140307-1
3/23
Dalian CIMC Logistics Equipment Company
CatalogNo. Content Page
1 General Introduction 1
1.1 Product Features 1
1.2 General Application 1
2 Technical Data List 1
3 Structural Specialty & Working Principle 2
3.1 Structural Specialty 2
3.2 Main Components & Function 3
4 Operating 6
4.1 Input Liquid Goods 6
4.2 Discharge Liquid Goods 7
5 Trouble Shooting 9
6 Maintenance & Repairing 97 Transportation & Storing 9
7.1 Top Sling Lift 9
7.2 Bottom Fork Lift 9
7.3 Storing 9
Attachment 1 Main Fort Valve Parts Serial No. &
Certification
11
Attachment 2 Fort Valve Offshore Bottom Valve Operation
Instruction
17
2014.03.17
5/27/2018 DHAM140307-1
4/23
Dalian CIMC Logistics Equipment Company
1
1 General Introduction
1.1 Product Features
The product is designed and manufactured according to DNV2.7-1EN12079-1
IMDG CODEASME Div.1Its design review & type test is approved by
Classification Society of DNV, and manufactured under supervision of DNV
surveyors.
1.2 General Application
Its designed to ship liquid goods in accordance with requirements of IMDG
CODE 2010 UN T11. It can be used in marine, and offshore transportation.
2 Main Technical Data List
No. Item Content
1 Design Code
DNV2.7-1
EN12079
IMDG
ASME Div.1
2 Approve Certification DNV2.7-1EN12079-1IMDGT11
3 IMDG Tank Instruction PORTABLE TANK UN T11
4 Exterior Dimension
Length 1995 mm
Width 1995 mm
Height 2534 mm
5 Tank Body Inside Dia. 1800 mm
6 Manhole Dia. 500 mm
7Fork Pocket
Inner Dimension
300X100 mm
8 Nominal Capacity 4000 L
9 Max. filling Capacity 3800 L
10 Weight
Gross weight 10000 KG
Tare weight 2320 KG
Pay load 7680 KG
11 Design Pressure 4 BAR
2014.03.17
5/27/2018 DHAM140307-1
5/23
Dalian CIMC Logistics Equipment Company
2
12 Test Pressure 6 BAR
13 Design TemperatureTank -40 to 50
Frame -20
14 Tank Shell Material 316L
15 Frame Material
SPA-H
Q345D
E36PAD EYES
16 Manhole Seal TPFE(outer)/EPDM(inner)
17 Safety Valve
Manufacturer FORT VALE
Type 01B/16312
Primary material 316
Vacuum pressure 0.21 bar
Setting pressure 4.4 bar
90% Full flow 3.922 NM 3 /s
18 Discharging System
Manufacturer FORT VALE
Type 29F/10520774F00
Primary material 316
Design pressure 4 bar
19 Designed Sling Angle45 MAX.(inclined angle to vertical
plane)
20 StackingStatic 2 high
In transit 1 high
3 Structure & Working principle
3.1 Structure
It consists of two primary parts, the Carbon Steel Frame and Stainless Steel
Tank Body. It includes 17 main components (refer to 3.2).
2014.03.17
5/27/2018 DHAM140307-1
6/23
Dalian CIMC Logistics Equipment Company
3
3.2 Main Components & Function
As below:
1. FrameTo protect tank body.
2. Fork PocketTo fork lift tank.
3. Tank BodyTo contain liquid goods.
4. Manhole CoverInspection and maintenance.
5. Safety ValveKeep inner pressure safe.
6. Air VentKeep air balance.
7. Bottom Valve Discharge liquid goods.
8.Level Gauge:To show the level of goods in the tank.
9. Pad eyeFor top lift.
10. WalkwayFor operator standing.11.Lift set: For top lifting.
12.NameplateTo indicate the mandatory data.
13.Black DecalRecord the temporary information.
14.Antistatic PlateRelease static.
15.Document BoxTo deposit documents.
16.Valve for dipstick:To insert the dipstick.
17. Dipstick:To measure the liquid level.
The components arrangement refer to diagram 1~5.
2014.03.17
5/27/2018 DHAM140307-1
7/23
Dalian CIMC Logistics Equipment Company
4
Diagram 1
3
1
2
12
8 13
15
2014.03.17
5/27/2018 DHAM140307-1
8/23
Dalian CIMC Logistics Equipment Company
5
Diagram 2
Diagram 3
4
5
6
16
17
2014.03.17
5/27/2018 DHAM140307-1
9/23
Dalian CIMC Logistics Equipment Company
6
Diagram 4
Diagram 5
4 Operating
4.1 Input Liquid Goods
When inputting Liquid goods, Open the manhole cover. And then input the liquid
goods into the tank through manhole.After inputting, close the manhole cover and fasten the nut.
WarningADo not input liquid goods exceeding 3800L. Max. Payload is 7680KG.
Refer to diagram 6.BBefore inputting Liquid goods, confirm the Bottom Discharging Valve isclosed.
7
14
9
10
11
2014.03.17
5/27/2018 DHAM140307-1
10/23
Dalian CIMC Logistics Equipment Company
7
CautionAPlease check the compatibility of Liquid goods to Tank body and seal gasket.
After ensuring the compatibility input the liquid goods.BOperator should be careful. For instancedo not climb on the tank body in
thunder storm weather in case of lighting shockdo not climb the ladderin snowing or raining in case of falling down.
CBe careful the ladder safety load is 200 kg.
Diagram 6
4.2 Discharge Liquid Goods
Open the Air vent as shown below(Diagram 7),both of the two ball valves,
remove the Cap and connect the Pipe. Open the Discharge Valve(Diagram 4) to
discharge liquid goods. Close the Discharge Valve and Air vent, fix the Cap when
finished.
Diagram 7
CautionABe sure the Foot valve is open before discharging liquid goodsBBefore carrying out the above operations carefully read the Warnings andinstructions. Refer to Diagram8~Diagram10.
AIR VENT
2014.03.17
5/27/2018 DHAM140307-1
11/23
Dalian CIMC Logistics Equipment Company
8
Diagram 8
Diagram 9
Diagram 10
WarningAWhen input or discharge the Liquid goods, please connect the earth-plate
2014.03.17
5/27/2018 DHAM140307-1
12/23
Dalian CIMC Logistics Equipment Company
9
with earth line to release the static electricity. Diagram 4)BFort Valve Offshore Bottom Valve Operation Instruction please see the
Attachment 2.5 Trouble Shooting
Fault Reason Analysis Trouble shooting Remark
1Liquid Goods can
not be discharged
1.Airvent is closed
2.Footvalve is closed
1.Open the Air vent
2.Open the Footvalve
6 Maintenance & Repairing
In the first 5-year period after initial tests, the tank container shall
be carried out the fixed term of 5-year routine inspection and test. In
the middle of the 5 years (2.5 years), a periodic test and inspection shall
be carried out. It shall be finished in three months of the given date.
All the valves function shall be checked at daily operation. When any thing
abnormal happensshall stop work and check. If it can not repaired,
please replace it.
7 Transportation & Storing
7.1 Top Sling Lift
The tank container shall be top lifted by certified sling sets. All the
components, steel ropebow shacklemaster link, shall comply with the
DNV2.7-1 2013 or EN12097-2 2006.
CautionThe required shackle is8.5 tons shacklepin diameter is 29.3mmThemax. Sling Angle is45between Vertical Plane.
7.2 Bottom Fork Lift
The tank can be stacked and short distance moved by forklift. It is four
ways entry. The forklifts minimum capacity shall be10 tons. The fork
pocket dimension is 300X100mm, fork pocket center distance is 1000mm
CautionPay attention to the fork-prong dimension and their center distance.
7.3 Storing
2014.03.17
5/27/2018 DHAM140307-1
13/23
Dalian CIMC Logistics Equipment Company
10
Full loaded stacking in static status shall be no more than 2 highin
transportation only 1 high required.
2014.03.17
5/27/2018 DHAM140307-1
14/23
Dalian CIMC Logistics Equipment Company
11
Attachment 1 Main Fort Valve Parts Serial No. & Certification
5/27/2018 DHAM140307-1
15/23
Dalian CIMC Logistics Equipment Company
12
5/27/2018 DHAM140307-1
16/23
Dalian CIMC Logistics Equipment Company
13
5/27/2018 DHAM140307-1
17/23
Dalian CIMC Logistics Equipment Company
14
5/27/2018 DHAM140307-1
18/23
Dalian CIMC Logistics Equipment Company
15
5/27/2018 DHAM140307-1
19/23
Dalian CIMC Logistics Equipment Company
16
Attachment 2 Fort Valve Offshore Bottom Valve Operation Instruction
5/27/2018 DHAM140307-1
20/23
Dalian CIMC Logistics Equipment Company
17
5/27/2018 DHAM140307-1
21/23
Dalian CIMC Logistics Equipment Company
18
5/27/2018 DHAM140307-1
22/23
Dalian CIMC Logistics Equipment Company
19
5/27/2018 DHAM140307-1
23/23
Dalian CIMC Logistics Equipment Company
20