21
IBS Score Calculati on Examples

IBS Score Calculation

Embed Size (px)

DESCRIPTION

Examples. IBS Score Calculation. Kaedah Penilaian IBS Content Scoring System (“IBS Score”). Jumlah keluasan pembinaan 1,000 m2. Keluasan penggunaan kaedah pasang siap (precast) beam/column/slab = 750m2 = 75%. Keluasan penggunaan kaedah konvensional (insitu) = 250 m2 = 25%. - PowerPoint PPT Presentation

Citation preview

Page 1: IBS Score Calculation

IBS Score Calculation

Examples

Page 2: IBS Score Calculation

Kaedah Penilaian

IBS Content Scoring System (“IBS Score”)

Keluasan penggunaan kaedah pasang Keluasan penggunaan kaedah pasang siap (precast) beam/column/slabsiap (precast) beam/column/slab

= 750m2 = 75%= 750m2 = 75%

Table 1, for precast beam/column/slab, F = 1.0Table 1, for precast beam/column/slab, F = 1.0

Keluasan penggunaan kaedah Keluasan penggunaan kaedah konvensional (insitu)konvensional (insitu)

= 250 m2 = 25%= 250 m2 = 25%

Jumlah keluasan pembinaan 1,000 m2Jumlah keluasan pembinaan 1,000 m2

Page 3: IBS Score Calculation
Page 4: IBS Score Calculation

Kaedah Penilaian

IBS Content Scoring System (“IBS Score”)

Keluasan penggunaan kaedah pasang Keluasan penggunaan kaedah pasang siap (precast) beam/column/slabsiap (precast) beam/column/slab

= 750m2 = 75%= 750m2 = 75%

Table 1, for precast beam/column/slab, F = 1.0Table 1, for precast beam/column/slab, F = 1.0

Table 1, for in-situ, F = 0Table 1, for in-situ, F = 0

Keluasan penggunaan kaedah Keluasan penggunaan kaedah konvensional (insitu)konvensional (insitu)

= 250 m2 = 25%= 250 m2 = 25%

Jumlah keluasan pembinaan 1,000 Jumlah keluasan pembinaan 1,000 m2m2

Page 5: IBS Score Calculation
Page 6: IBS Score Calculation

Kaedah Penilaian

IBS Content Scoring System (“IBS Score”)

Keluasan penggunaan kaedah Keluasan penggunaan kaedah pasang siap (precast) pasang siap (precast) beam/column/slabbeam/column/slab

= 750m2 = 75%= 750m2 = 75%

From Table 1, for precast beam/column/slab, F = 1.0From Table 1, for precast beam/column/slab, F = 1.0

From Table 1, for in-situ, F = 0From Table 1, for in-situ, F = 0

Area using in-situArea using in-situ= 250 m2 = 25%= 250 m2 = 25%

Jumlah keluasan pembinaan 1,000 Jumlah keluasan pembinaan 1,000 m2m2

Maka, bagi Part 1 (Structural System) IBS Score Maka, bagi Part 1 (Structural System) IBS Score = ( (75% x 1.0) + (25% x 0) ) x 50% = ( (75% x 1.0) + (25% x 0) ) x 50% = 37.5 %= 37.5 %

Page 7: IBS Score Calculation

Kaedah Penilaian

IBS Content Scoring System (“IBS Score”)

Panjang dinding panel pasangsiap (precast Panjang dinding panel pasangsiap (precast panel)panel)

= 7,500m = 75%= 7,500m = 75%

Table 2, panel pasangsiap, F = 1.0Table 2, panel pasangsiap, F = 1.0

Table 2, dinding bata, F = 0Table 2, dinding bata, F = 0

Panjang dinding bata (brick)Panjang dinding bata (brick)

= 2,500 m = 25%= 2,500 m = 25%

Jumlah panjang keseluruhan dinding Jumlah panjang keseluruhan dinding ialah = 10,000 m runialah = 10,000 m run

Page 8: IBS Score Calculation
Page 9: IBS Score Calculation

Panjang dinding panel pasangsiap Panjang dinding panel pasangsiap (precast panel) = 7,500m = 75%(precast panel) = 7,500m = 75%

Table 2, panel pasang siap, F = 1.0Table 2, panel pasang siap, F = 1.0

Table 2, dinding bata, F = 0Table 2, dinding bata, F = 0

Panjang dinding bata (brick)Panjang dinding bata (brick)

= 2,500 m = 25%= 2,500 m = 25%

Jumlah panjang keseluruhan dinding Jumlah panjang keseluruhan dinding ialah = 10,000 m runialah = 10,000 m run

Maka, jumlah score Part 2 (Wall System) Maka, jumlah score Part 2 (Wall System) = ( (75% x 1.0) + (25% x 0) ) x 20% = ( (75% x 1.0) + (25% x 0) ) x 20% = 15%= 15%

Kaedah Penilaian

IBS Content Scoring System (“IBS Score”)

Page 10: IBS Score Calculation
Page 11: IBS Score Calculation

EXAMPLE

IBS Score Calculation

&

Page 12: IBS Score Calculation

Example 1

2-storey Terrace House

Page 13: IBS Score Calculation

Say, from measurement taken from drawings:

1) Construction area

i) Construction area ground floor = 117.0 m2 ii) Construction area 1st floor = 117.0 m2 iii) Construction roof area = 117.0 m2 Total construction area = 351.0 m2

2)Structural Systems

i) Beams: Precast concrete beamsii) Columns : In-situ concrete using steel formworksiii) Floor slab: Precast half slabs floor iv) Roof truss: Prefabricated timber roof truss.

3) Wall Systemi) Internal wall: Precast concrete panel ii) External wall: Precast blockworks

Page 14: IBS Score Calculation

Other simplified construction solutions

i) Beams: 60% complies to MS 1064

Columns: 100% complies to MS 1064

Walls and slabs: Less than 50% complies to MS 1064

Doors : 80% complies to MS 1064

Windows: 0% complies to MS 1064

ii) Horizontal repetition of structure = 100%

Page 15: IBS Score Calculation

72.1IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)

16Total Part 3

6100%iv) Horizontal repetition of structure = 100%

480%iii) 80% of door sizing follow MS 1064 Part 4: 2001

4100%ii) 100% of column sizing follow MS 1064 Part 10: 2001

260%i) 60% beam sizes follow MS 1064 Part 10: 2001

Part 3: Other simplified construction solutions

14.81.00167.3mTotal Part 2

0.48 x 1.0 x 20 =9.6

(79.5/167) =0.48

1.0079.5mInternal wall using precast concrete panel

0.52 x 0.5 x 20=5.2

(87.8/167)=0.52

0.587.8mExternal wall using precast concrete blockworks

Part 2: Wall System

41.31.00351.0 m2Total Part 1

0.33 x 1.0 x 50=16.5

(117/351)=0.33

1.0117.0 m2Roof truss using prefab roof trussRoof area = 117.0m2

0.33 x 0.6 x 50=9.9

(117 / 351)=0.33

0.6117.0 m2

Precast beams + in-situ column with reusable formwork (no floor)1st floor area = 117.0m2

0.33 x 0.9 x 50=14.9

(117 / 351)=0.33

0.9117.0 m2

Precast beams + in-situ column with reusable formwork + precast concrete half slab floor.Ground floor area = 117.0m2

Part 1: Structure Elements

IBS SCORE

COVERAGEIBS FACTOR(1)

AREA (m2) orLength (m)

ELEMENTS

Page 16: IBS Score Calculation

Example 2

18 Storey Condominium

Page 17: IBS Score Calculation

Say, from measurement taken from drawings:

1) Construction Area Area for 1 unit of condominium = 94.4 m2

Lift lobby area = 140 m2

Area for 1 floor = [94.4 x 6 units + 140] =706.4 m2

2) Structural Systemsi) Tunnel formwork system

ii) Roof truss: prefab steel roof truss.

3) Wall System/ floor i) precast blockworks (6 units + lobby area)= 263 m

length ii) Tunnel formwork (6 units + lobby area) = 120 m

length

4) Other simplified construction solutions i) Doors : 100% comply to MS 1064 Windows: 100% comply to MS 1064 ii) Repetition of floor to floor height =

90% Vertical repetition of structural floor layout =

80%

Page 18: IBS Score Calculation

53.6IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)

12Total Part 3

280%iv) Vertical repetition of structure floor layout = 80%

290%iii) Repetition of floor height = 90%

4100%ii) 100% of windows complies to MS1064

4100%i) 100% door sizes complies to MS1064

Part 3: Other simplified construction solutions

Total Part 2 10.61.006,894

0.31x 0.6 x 20 =3.72

2,160/6,894 =0.310.62,160ii) Tunnel formwork Total length = 120 m x 18 storey

0.69 x 0.5 x 20 =6.9

4,734/6,894 =0.690.54,734i) Internal wall: precast blockwork Total length = 263 m x 18 storey

Part 2: Wall System

31.01.0013,421.4 m2Total Part 1

0.05 x 1.0 x 50 =2.5

706.4/13,421.4 =0.05

1.0706.4 m2ii) Roof truss - prefab steel Roof area = 706.4m2

0.95 x 0.6 x50=28.5

12,715 / 13,421.4=0.95

0.6012,715 m2

i) Tunnel formwork system Total area = 706.4m2 x 18 storey = 12,715m2

Part 1: Structure Elements

IBS SCORE

COVERAGEFACTORAREA (m2) orLength (m)

ELEMENTS

Page 19: IBS Score Calculation

Example 3

Ibs score for project (group of buildings)

Page 20: IBS Score Calculation

Project information: - Main buildings in the development consist of 5 blocks of buildings.

The IBS score for each building are:- i) Block A - 5 storey apartment

Construction area, QST (building)A = 3,000 m2 IBS Score(building A) = 83

ii) Block B - 5 storey apartmentConstruction area, QST (building)B = 3,000 m2 IBS Score(building B) = 87

iii) Block C - 4 storey apartmentConstruction area, QST (building)C = 3,200 m2 IBS Score(building C) = 35

iv) Block D - 4 storey apartmentConstruction area, QST (building)D = 3,200

m2 IBS Score(building D) = 47

v) Block E - 3 storey office blockConstruction area, QST (building)E= 3,000 m2 IBS Score(building E) = 75

Total construction area (block A + B + C + D + E ) = 15,400m2

Page 21: IBS Score Calculation

BlockConstruction

Area (m2)Coverage

IBSScore(building)

IBS Score(project)

A 3,0003000 / 15400 =

0.19583 0.195 x 83 = 16.2

B 3,0003000 / 15400 =

0.19587 0.195 x 87 = 17.0

C 3,2003200 / 15400 =

0.2135 0.21 x 35 = 7.4

D 3,2003200 / 15400 =

0.2147 0.21 x 47 = 9.9

E 3,0003000 / 15400 =

0.19575 0.195 x 75 = 14.6

Total 15,400 1.0 65.1