    Preface

    PREFACE

    This Masters Thesis is the last part of our education in Industrial Management and

    Engineering with concentration towards Quality Technology and Management at Lule

    UniversityofTechnology.ThethesisisconductedatBroseSwedenABinGothenburg.

    Wewould like toexpressourgratitude toour supervisorAndersEricson forgivingus the

    opportunitytodoourMastersThesisatBroseSwedenAB.AndersEricsongaveusexcellent

    guidanceandahelpinghandwhenneeded.

    We would also like to thank Rickard Garvare, our supervisor at Lule University of

    Technology, for excellent feedback and support during the project. Rickard Garvare has

    followedusduringourprojectandalwaysbeenthereforusifneeded.

    At lastwewould like to thank our roommates Sanna Thelin andGustafWikstrm for a

    wonderful timeandmanyhilariousevenings together.Theyhavebeen there forus inour

    upsanddowns,manythanks.

    Gothenburg,February2007

    ______________________ ______________________

    ClaesGustafsson AndreasPersson

  • 8/11/2019 LTU-EX-07082-SE

    3/74

    Abstract

    ABSTRACT

    Brose is a supplier to the automotive industry, with more than 40 vehicle brands as

    customers.It isworldmarket leaders indoorsystemandwindowregulatorsandEuropean

    market leader in seat system. Themanagement system in the new plant inGothenburg,

    Sweden, iscertifiedaccording to ISO14001andTS16949.At theoutsetof this study the

    companywasready togo towardsanewstep, fulfillingcustomerdemands fromFordand

    Volvocars

    to

    become

    certified

    according

    to

    Q1,

    which

    is

    astandard

    for

    management

    sub

    systemsincludingfundamentalqualityandmanufacturingdisciplines.

    Brosewanted theauthors to lead the implementationwork inGothenburgand tomakea

    standardizedworkmodel for other new plants. The collection of data has come through

    interviewsandbrochures,whichwere thenanalysedandusedwhencreatingamodel for

    implementation.Q1,TS16949and ISO14001aresimilar toanumberofotherstandards.

    Wehave

    gone

    through

    some

    of

    them

    and

    made

    comparisons

    in

    order

    to

    find

    ways

    to

    facilitatetheimplementationofQ1.

    Whenworkingwithqualitysystems it isnecessary tocreateawareness for theemployees

    andsetgoalsfortheimplementationwork.Thereisalsoaneedtoeducateemployeesand

    builduptrustforthesystemtomake itusableforthecompany.Theimplementationwork

    has tobedelegated tobeable tocreateawarenessbetween theemployeesand tomake

    them feelneeded.Recurringmeetingsand learningarekeyelements tobuildasuccessful

    qualitywork. The team spirit in the company comes from themanagers expressing their

    gratitude to all employees and making them aware of the situation, the work towards

    customersatisfaction.

  • 8/11/2019 LTU-EX-07082-SE

    4/74

    TableofContents

    TABLEOFCONTENTS

    1 INTRODUCTION..................................................................................................................................... 1

    1.1 CORPORATEPROFILE................................................................................................................................... 1

    1.2 Q1.......................................................................................................................................................... 4

    1.3 PROBLEMDISCUSSION................................................................................................................................. 5

    1.4PURPOSE

    ...................................................................................................................................................

    6

    2 METHODOLOGY.................................................................................................................................... 7

    2.1 LITERATURERESEARCH................................................................................................................................. 7

    2.2 RESEARCHSTRATEGY................................................................................................................................... 7

    2.3

    THE

    DMAIC

    IMPROVEMENT

    PROCESS

    ............................................................................................................

    8

    2.4 DATACOLLECTIONMETHOD........................................................................................................................ 12

    2.5 INTERVIEWS............................................................................................................................................. 12

    2.6 RELIABILITYANDVALIDITY.......................................................................................................................... 13

    3 THEORETICALFRAMEOFREFERENCE................................................................................................... 15

    3.1 Q1REQUIREMENTSANDEXPECTATIONS........................................................................................................ 15

    3.2 TS16949............................................................................................................................................... 17

    3.3 ISO14001............................................................................................................................................. 18

    3.4 ODETTE/MMOG..................................................................................................................................... 19

    3.5QUALITYSYSTEM

    ......................................................................................................................................

    21

    3.6 TQM..................................................................................................................................................... 22

    4 EMPIRICALSTUDIESANDANALYSIS..................................................................................................... 28

    4 1 D 28

  • 8/11/2019 LTU-EX-07082-SE

    5/74

    TableofContents

    TABLEOFAPPENDIX

    BroseCustomer Appendix1

    WorldMapoverBrosePlants Appendix2

    InterviewGuide Appendix3

    Q1ScoringThresholds Appendix4

    OrganisationChart Appendix5

    CustomerEndorsementLetter Appendix6

    CustomerEndorsementMatrix Appendix7

    HandbooktoQ1ImplementationMatrix Appendix8

    Q1ImplementationMatrix Appendix9

  • 8/11/2019 LTU-EX-07082-SE

    6/74

    Introduction

    1 INTRODUCTION

    Thissectionstartswiththecompanypresentationandfurtheronpresentingtheproblemina

    problemdiscussionthatleadstothepurposeofthereport.

    1.1 CORPORATEPROFILE

    The companypresentationwillguide you through the corporationofBrose, theirhistory,

    theirproducts

    and

    their

    way

    to

    produce.

    1.1.1 HISTORYANDBACKGROUND

    In 1908 Brosewas founded in Berlin byMax Brose andwas at first primarily a trading

    company for automotive accessories and aircraftmaterials. Today Brose operates and is

    partnertothe internationalautomotive industryandsuppliesmorethan40vehiclebrands

    around theworld, see appendix: 1.With 8,800 employees at almost 40 locations in 20

    countries, see appendix: 2, Brose isworldmarket leader inwindow regulators and door

    systems(Brose,2006).BroseisalsotheEuropeanmarketleaderinseatsystemsandhasthe

    thirdpositioninclosuresystems(Brose,2006).Becauseoftheirlargemarketsharesthereis

    in factat leastoneBrose component inevery fourth vehicleproducedworldwide (Brose,

    2006).During the time from1908untilnowBrosehasbeenoneof thebiggest innovative

    firmsontheirmarket(Brose,2006).Amongstseveraldifferentinnovationsithasforexample

    beenworld firstwithwindow regulators that couldhold the glass inanyposition (Brose,

    2006). InSeptember2000Brosepresentsa seatadjustermechanismat the International

    FrankfurtMotorshow,theweightisonly28grams(Brose,2006).

    Inthesummerof2004theconstructionoftheBroseGroupsfirstScandinavianproduction

    sitein

    Gothenburg

    was

    started,

    see

    Picture

    1.1.

    This

    plant

    in

    Gothenburg

    is

    ajust

    in

    sequenceplant (explained inchapter1.1.3) thatproducesapproximately5,600unitseach

    weekfordoorsystems.In2006therewereabout50employees,includingthedevelopment

    and customer teams for the Swedish automakers (Brose, 2006), see appendix 5 for the

    currentorganisationchart.

  • 8/11/2019 LTU-EX-07082-SE

    7/74

    Introduction

    1.1.2 THE PRODUCT

    Brosedivides

    its

    products

    in

    two

    categories,

    Technology

    for

    doors

    and

    Technology

    for

    seats.

    Thosecategoriesarefurtherdividedintocomponents,systemsandelectronics.

    1.1.2.1 TECHNOLOGYFORDOORS

    Brosebothdevelopsandproducesallessentialsystemandcomponentsfortheautomotive

    doors.ThemainproductoftheGothenburgplantisasystemsolutionconsistingofdifferent

    subcomponents, steel carrierplate, latch,window regulator, speakersandall surrounding

    systems.Thesedifferentsubcomponentsareassembledontothesteelcarrierplatecreating

    thesteelcarrierplatesystemsolution,seePicture1.2and1.3.(Brose,2006)

    Picture1.2:Thesteelcarrierplatesystemsolution Picture1.3:Thesidedoorlatch

    1.1.2.2 TECHNOLOGYFORSEATS

    Brosesproducts

    in

    seat

    technology

    have

    awide

    range

    from

    manual

    adjustment

    component

    upto18waypowercomfortseatsystems,seePicture1.4and1.5.

  • 8/11/2019 LTU-EX-07082-SE

    8/74

    Introduction

    Picture1.4:Themanualseatheightadjuster Picture1.5:Thepowermultifunctionalseat

  • 8/11/2019 LTU-EX-07082-SE

    9/74

    Introduction

    1.1.3 PRODUCTION

    BrosesplantinGothenburgusesanextensionofjustintimethatiscalledjustinsequence

    (Brose,2006). Just in sequencemeans thateach component reaches thecustomerat the

    righttime, intherightsequence,andintheappropriateversion.Thiswayofproducinghas

    become a necessity because of the changes in the automotive industry. Themajority of

    components isnotproducedby themanufacturerbut comes instead from supplierswith

    increasingnumber

    of

    responsibilities

    in

    the

    production,

    development

    and

    logistics

    (SAP

    AG,

    2003).Asthepicture1.6shows,Broseonlygot180minutesfromgettingthesequencecall

    untilthedeliveryandlinefeedingstarts.

  • 8/11/2019 LTU-EX-07082-SE

    10/74

    Introduction

    improvement.Suppliersareexpected toattainacertainmark, toput the tools inplace to

    maintain excellence and to improve in every area with each passing year. Q1 is also a

    requirement fromFord ifyouwanttobeasuccessfulsupplier toFord (Q1secondedition,

    2003).

    1.3 PROBLEMDISCUSSION

    Highqualityhasoftenbeenan important factorwhenmanufacturing cars,but ithas run

    with

    a

    parallel

    to

    low

    costs.

    The

    main

    thing

    suppliers

    struggle

    for

    is

    to

    meet

    or

    preferably

    exceed the car manufacturers needs, because of the high market competition. Car

    manufacturershaveoftenbeeninthefrontlineofseekingnewwaystosolveproblemsand

    leadthewaytonewqualitytools,asforexampleJustinTimeproduction(JIT)byToyotain

    the1970s.

    Costsofpoorqualityimpactonhowthecompaniesoftodayplantheirstrategy,partlytobe

    morecompetitive

    against

    their

    rivals

    and

    partly

    more

    obliging

    to

    their

    customers.

    A

    car

    manufacturer can often choose and control a supplier; they can put demands on their

    supplier tohavedifferentdiplomasand certificates. In the car industry theneed forhigh

    qualityhasmademanycarmakerstocreatetheirowngradelabelling.Fordnowrequiresits

    supplierstobecertifiedaccordingtotheirownqualitystandard,Q1.TogetQ1statusyou

    first need to be certified according to ISO 16949, 14001 and MS 9000/Odette/MMOG.

    Besidesthese

    ISO

    certifications

    Ford

    has

    numerous

    expectations

    and

    demands

    thats

    needs

    tobefulfilledtogetandkeepQ1status.

    AsasuppliertoVolvo,ownedbyFord,BroseneedstohaveQ1statustobecompetitive.At

    the time of this report Brosewas certified according to ISO 14001 andwas also aiming

    towardsTS16949.ThisisanimportantstepforBrosewhichgoalistobecertifiedwithQ1in

    thebeginningof2007.BrosehasnostandardizedwaytoimplementQ1intheirplantswhich

    canlead

    to

    higher

    costs

    and

    more

    problems

    during

    the

    implementation.

    These

    costs

    and

    problemsmightbeavoidedbyusingastandardizedguideonhowtoimplementQ1intheir

    plants.

    AmanageratBrosesaidthattheirproblemwhenimplementingnewsystemslikeISO14001

  • 8/11/2019 LTU-EX-07082-SE

    11/74

    Introduction

    1.4 PURPOSE

    Thepurpose

    of

    this

    thesis

    is

    to

    develop

    an

    implementation

    model

    for

    the

    customer

    requirementsystemQ1,which isusableandhelpfulforBrosesnewplants,whichneedto

    havetheircertificationsandcustomerstatusapprovalreadyassoonaspossible.

    Theimplementationmodelissupposedtoincludethefollowing:

    Timetable

    with

    explanations.

    Responsibilityareasforalldepartments.

    FocusAreas.

    Allroutinesthatisexpected.

  • 8/11/2019 LTU-EX-07082-SE

    12/74

    Methodology

    2 METHODOLOGY

    In this section apresentation of used methodsfor the report are introduced and how the

    procedureshavebeen.

    2.1 LITERATURERESEARCH

    According toDenscombe (2000) researchersshould startbydoinga literature research to

    getagreater

    understanding

    about

    existing

    knowledge

    in

    the

    chosen

    subject.

    To

    get

    agreater

    understandingofour subjectwe started todo anexaminationof theavailable literature.

    ThiswasdoneatfirstbysearchingthetwodatabasesLuciaandLibrisandcontinuedfurther

    onwithEmeraldandEbsco.WordsusedascriteriastofindarticlesonoursubjectwereISO

    9001, ISO 14001, Q1, implementing quality system.We also tried to use different

    compositionandoperatorsof thesewords to findadditionalarticleson thesubjectas for

    exampleImplementing

    ISO

    9001

    and

    ISO

    14001.

    There

    were

    some

    articles

    that

    were

    useful

    andapplicableonoursubjectbuttheresultsvariedandforwrittenreportsorotherstudies

    onQ1wecouldnotfindanythinghelpful.

    2.2 RESEARCHSTRATEGY

    Denscombe (2000) advocates that case studies are used to study things in detail and

    thereforegain

    valuable

    and

    unique

    insights

    about

    the

    research.

    Denscombe

    (2000)

    mentions

    that case studies concentrates on one or a few unitswith the purpose to get a deeper

    understandingforevents,relations,experiencesorprocessesthatemergesintheparticular

    unit.Denscombe(2000)alsodescribesthatthetypicalobservationischosenbecauseofthe

    possibilitytoapplyresultsfromtheresearchontoothercases.Thismeansthatoneresultis

    possibletogeneralizeontothewholegroup.

    Denscombe(2000)claimsthatsurveystudiesareusedwhentheresearcherwantstohavea

    widerangeofdatathatgivesadescriptionofthepresent.UnlikethecasestudyDenscombe

    (2000)claimsthatsurveystudiespreferablyusesa largenumberofresearchunitstogeta

    wide coverage of data. Further Denscombe (2000)writes that quantitativemethods like

  • 8/11/2019 LTU-EX-07082-SE

    13/74

    Methodology

    ourresearchstrategy.Ourchoicetousecasestudy isalsosupportedbythe factthatcase

    studiesgivetheresearcheradeeperunderstandingofeventsandprocessesintheparticular

    unit,accordingtoDenscombe(2000).

    According toBergman&Klefsj (2001)unwantedvariation isa very important source for

    costs and unsatisfied customers. Bergman & Klefsj (2001) continues to explain that

    elimination of variation can result in dramatic result enhancementswhich are the single

    most important issue forSixSigma.Theyalsomean thatSixSigmagivesasystematicand

    structuredway

    of

    working

    that

    often

    result

    in

    requisite

    enhancements.

    Thisstatesthatwewillusethedifferentphases intheDMAICcycleandapplythemtothe

    casestudyandgainthebenefitsfrombothofthesetheories.Themost importantbenefits

    that we will gain is the structural way of working from DMAIC and the possibility to

    generalizeourresultsfromasingleresearchunittotheotherplantsintheBrosegroup.

    2.3 THEDMAIC

    IMPROVEMENT

    PROCESS

    Sixsigmagivesasystematicproceduretobring therequisites improvements.Accordingto

    Brue(2002),Foster (2003)andPande&Holpp (2001)DMAICconsistsof fivesteps:define,

    measure,analyse,improveandcontrol.

    2.3.1 THE DEFINEPHASE

    This is the first step in the improvementprocess.According toPande&Holpp (2001) the

    teamsgoalwiththe improvementsareto identifyanddefinetheproblem.Theteammust

    firstansweranarrayofquestions:Whatareweworkingon?Whyareweworkingon this

    particularproblem?Who isthecustomer?Whatarethecustomersrequirements?How is

    thework currently beingdone?What are the benefits ofmaking the improvement? This

    couldeasy

    be

    overviewed

    in

    achart

    according

    to

    Pande

    &

    Holpp

    (2001).

    The

    chart

    usually

    contains:

    Abusinesscase:Whyisthisparticularopportunitybeingchosen?

  • 8/11/2019 LTU-EX-07082-SE

    14/74

  • 8/11/2019 LTU-EX-07082-SE

    15/74

    Methodology

    Methods:theproceduresortechniquesusedindoingthework

    Machines:thetechnology,suchascomputers,copiers,ormanufacturingequipment,

    usedinaworkprocess.

    Materials: thedata, instructions,numbersor facts, forms,and files that, if flawed,

    willhaveanegativeimpactontheoutput.

    Measures: faulty data resulting from measuring a process or changing peoples

    actionsonthebasisofwhatsmeasuredandhow.

    Mother Nature: environmental elements, from weather to economic conditions,

    whichimpact

    how

    aprocess

    or

    abusiness

    performs.

    People:akeyvariableinhowalltheseotherelementscombinetoproducebusiness

    results.

    TousetherighttoolsisoneofthebigchallengesintheAnalysisstep, itdiffers,sometimes

    simpletoolscansolveaproblem,asforexamplewhenanalysingqualitativedatawhileother

    timesmoreadvancedtoolsisnecessary,whencalculationsmightberequired.

    2.3.4 THE IMPROVEPHASE

    In the improve phase new ideas to the problems have to be tested, refined and

    implemented.

    Sometimes

    even

    the

    problem

    has

    to

    be

    refined

    when

    new

    information

    raises,

    example fromthetesting.Agoodwayto learnnewwaysofsolvingproblems isto lookat

    othercompaniesorothergroupsintheirbusinesstoseewhethertheycanborrowsolutions

    orideas.Onceseveralpotentialsolutionshavebeenproposed,morecriteriacome,including

    costsandlikelybenefitstodecidethemostpracticalsolution.(Pande&Holpp,2001)

  • 8/11/2019 LTU-EX-07082-SE

    16/74

    Methodology

    Developingamonitoringprocesstokeeptrackofthechangestheyhavesetout.

    Creatingaresponseplanfordealingwithproblemsthatmayarise.

    Helping focusmanagements attention on a few criticalmeasures that give them

    current information on the outcomes of the project (the Y) and key process

    measures,too(theXs).

    Fromthepeoplestandpoint,theteammust:

    Selltheprojectthroughpresentationsanddemonstrations.

    Handoff

    project

    responsibilities

    to

    those

    who

    do

    the

    day

    to

    day

    work.

    Ensuresupportfrommanagementforthelongtermgoalsoftheproject.

    Whenthesolutionhasbeenimplementeditcanseemdifficulttowalkawayfromaproject,

    thattheteamhasbeenworkingoninthelastsmonths.(Pande&Holpp,2001)

    2.3.6 QUANTITATIVEORQUALITATIVEMETHOD

    Denscombe (2000) claims that there is no clear distinction between quantitative or

    qualitativeresearch,primarilybecausetheyarenotexcludingeachother.Nevertheless,the

    largest distinguishing factor between these two research methods is according to

    Denscombe(2000)

    the

    use

    of

    numbers

    or

    words

    as

    the

    analysis

    unit,

    where

    qualitative

    researchusuallyuseswordsastheirprimaryanalysisunit.Denscombe(2000)alsodescribes

    thequalitativemethod aswell suited for smallscale studies thatdescribeseventswith a

    holistic view and that the researchers role in constructingdata is importantbecause the

    researcheristhetoolthatinterpretsalldata.Incontrasttoqualitativeresearch,quantitative

  • 8/11/2019 LTU-EX-07082-SE

    17/74

    Methodology

    2.4 DATACOLLECTION

    METHOD

    Insteadofjustusingliteratureasintroductiontotheresearchitcanalsohaveamorecentral

    roleastheactualobjectforresearch.AccordingtoDenscombe(2000)literaturecanbeused

    in research projectswhen it is used as background information or as a source for data.

    Denscombe (2000) claims that there are seven different subtopics in literature as a data

    sourceandoneofthemisbooksandjournals.

    Denscombe (2000)writes that interviews are a very attractive alternative for researchers

    because it seems easy tomaster. Although it seems easy tomaster Denscombe (2000)

    describesanotherscenarioandarguesthatinterviewsarenotonlyconversations.Insteadof

    a simple conversationDenscombe (2000) describes interviews as a series of assumptions

    based on deep knowledgewithin the areaof the interview.He continues to explain that

    interviewsare

    used

    when

    the

    researcher

    needs

    in

    depths

    information

    on

    the

    subject.

    According toDenscombe (2000) there are two questions that the researcher should ask

    himselfwhendecidingondoinginterviews;

    Isindepthinformationnecessaryfortheresearch?

    Isit

    reasonable

    to

    rely

    on

    so

    few

    sources?

    (Interviews

    cost

    more

    and

    takes

    more

    time

    thanforexampleaquestionnaire,thereforethesameamountisalmostneverviable)

    After having considered these two questionswe came to the conclusion that comparing

    existingliteraturewithinterviewsofkeypersonalforimplementationofQ1wouldprobably

    be thebestdatacollectionmethod.Wealsorealized thatwehadassumptionsonhow to

    solveour

    problem

    that

    needed

    to

    be

    confirmed

    by

    someone

    who

    had

    existing

    knowledge.

    Theassumptionswehadonhowtosolvetheproblemwere:

    To divide the expectations so that it should be more clear

  • 8/11/2019 LTU-EX-07082-SE

    18/74

    Methodology

    wantstobeflexiblewhenitcomestonicheanddevelopinavisualpurpose.Theinterviews

    wheresupportedwiththehelpfromourinterviewguidesinAppendix3.

    Trost (2005)accountsthatthere isoftenbetter thatthe interviewerworks inapar ifthey

    ensembles.Theycansupporteachotherunder the interviewwhile itbecomesbetterand

    more information is usable. Trost (2005) continues to explain that on the other side the

    interviewee perhaps feels under pressure if the interviewer is two,when the subject is

    personal, while if the interviewer represent his business it can be polite if it is two

    interviewer.

    We

    decided

    both

    to

    be

    there

    at

    all

    interviews,

    easier

    to

    remember

    information

    andagreatteamtogetherexceedsthedisadvantages.

    Wedeterminedtonotuseataperecorderduringtheinterviews.AccordingtoTrost,(2005)

    ataperecorderisforexampleusefulifyouarealoneasaninterviewerorifyouareapoor

    handwriter.Wedecided instead thatoneofusshouldwritedownnotesandat thesame

    timetrytosupportactiveintheinterview.

    Tobestcomplywiththepurposeofthisresearchwechosetointerviewpersonsinvolvedin

    somehow with Q1 implementation, they should be at different positions or different

    companiestogetabetteranddeeperunderstandingandmanypointofviews.

    BroseintroducedustoQ1andtheprojectbyhelpingustofindthebrochureaboutQ1and

    by showingus theSIM system,which isusedby the supplier to report to theVolvoSTA.

    Brosealso

    helped

    us

    with

    names

    at

    Volvo

    and

    other

    supplier

    with

    Q1

    status

    that

    we

    could

    contact.Theythen letusfindourownwaytohelpthem.Brosewantedustogathermore

    informationonhowtheimplementationworks,includingtipsandpitfalls.

    2.6 RELIABILITYAND VALIDITY

    Abigaspect inscientificresearches istoachieveabigagreementaspossiblebetweenthe

    theoriesand

    the

    empirical.

    (Andersen,

    1998)

    Bell

    (2000)

    claims

    that

    validity

    is

    ameasure

    on

    how a specific question describes or measures the same as it refers to. Befring (1994)

    describes it as whether the result is agreed with the desired result or if it has been

    influencedbyotherfactors.Bell(2000)describesreliabilityasameasuretowhatextentan

  • 8/11/2019 LTU-EX-07082-SE

    19/74

    Methodology

    data.Afterwardswediscussedtheanswerandtypedtheresultof itsothatwebothhada

    completeawarenessoftheanswers.

    Wehaveall the timebothbeen awareofwhat thenext step is supposed tobe.A close

    discussionhavemadeitclearforbothofus,wethereforehavehadthechancetoachievea

    betterwork and concentrate our skills on themost important, to create a fullyworking

    matrix.

  • 8/11/2019 LTU-EX-07082-SE

    20/74

    TheoreticalFrameofReference

    3 THEORETICALFRAMEOF REFERENCE

    Inthissectionourusedtheoreticalframeisbeingpresented.Thesetheorieswillbeusedlater

    andwillbethebasefortheanalysisandtheresult.

    3.1 Q1 REQUIREMENTS AND EXPECTATIONS

    ToreceiveandkeepQ1status therearenumerousofrequirementsandexpectations that

    haveto

    be

    fulfilled.

    Key

    areas

    are

    capable

    systems

    and

    manufacturing

    site

    assessment,

    besides these two keyareas there are alsoongoingperformance, customerendorsement

    andcontinuousimprovement.

    3.1.1 CAPABLESYSTEMS

    Toevenbeconsidered forQ1 status suppliersneed tohave thirdpartycertification inTS

    16949orQS9000andtheISO14001environmentalstandard.Suppliersalsoneedtoshow

    compliancetoMS9000,OdetteorMMOG(Q1secondedition,2003).Theselfassessmentof

    MS9000,OdetteorMMOGmustbeenteredviaGSDBonlineby1stofAugusteachyear.If

    anyofthesecertificationsarerevokedtheQ1statuswillbeinjeopardy.

    3.1.2 ONGOINGPERFORMANCE

    Ford measures ongoing performance with scoring thresholds and five key performance

    metrics.Dependingonthesiteperformancetheygainorlosepointsaccordingtothescoring

    threshold, see appendix: 4. Every newQ1 supplier starts ofwith 1000Q1 points, these

    pointsarethenrecalculatedandreportedinSIMeachmonthbasedonthemostrecentsix

    month performance. In addition to these metrics manufacturing site assessment and

    warrantyperformancearealsotaken inconsiderationwhencalculatingthemonthlyscore.

    The five key metrics are listed below but manufacturing site assessment and warranty

    performanceisexplainedinthefollowingchapters.

    Fieldserviceactions;hasFordbeenforcedto intervenebecauseofsupplierfailure?

  • 8/11/2019 LTU-EX-07082-SE

    21/74

    TheoreticalFrameofReference

    locations, in proper quantity andwith the right information? (Q1 second edition,

    2003)

    Violationsoftrust;hastheSupplierTechnicianAssistancebeeninformedofchanges

    in the production, changes in equipment, supplier or subsupplier changes? (Q1

    secondedition,2003)

    Ongoing

    performance

    does

    not

    need

    to

    be

    in

    consideration

    during

    the

    implementation,

    but

    it is one of the most important part when achieved Q1 status. Although ongoing

    performanceisnotgradedduringtheimplementationyoustillneedtohavesixmonthofa

    cleanPPMrecord.

    3.1.3 MANUFACTURINGSITEASSESSMENT

    Themanufacturing

    site

    assessment

    defines

    Fords

    quality

    requirements

    and

    is

    akey

    component of Q1. The meaning of the manufacturing site assessment is to evaluate

    suppliers quality system and how well the site performs and plans for manufacturing

    process capability. In order to achieve and keepQ1 status the site need to demonstrate

    evidenceforthesefundamentals.Foraspecificlistoftheexpectationsonthemanufacturing

    siteassessmentseeappendix:9.

    TobeabletoreceiveandkeepQ1statussuppliersneedtobeableto listevidenceofeach

    specificexpectation to theirSTAon themanufacturingsiteassessment.TheSTAwillhave

    thepossibilitytobasetheirdecisionontheselfassessmentthatarereported inSIMorby

    doinganonsiteassessmentofallpoints.

    3.1.4 WARRANTYPERFORMANCE

    WarrantyperformanceissomethingthatwillbeimplementedinQ1lateronbutasfornow

    itisnotimplementedinthescoringthresholdoftheQ1system.

    3.1.5 CUSTOMER ENDORSEMENT

  • 8/11/2019 LTU-EX-07082-SE

    22/74

    TheoreticalFrameofReference

    Recognition;Q1isasignthatyourfacilitystandssidebysidewiththebestsuppliers

    inthe

    world

    (Q1

    second

    edition,

    2003).

    Publicityandadvertisingprivileges;Q1statusallowyoutopublicizeyourcompany

    withtheprestigiousQ1flag(Q1secondedition,2003).

    Self certification; As a Q1 supplier, you will be eligible,with Supplier technician

    assistance concurrence, to selfcertify to the Production Part Approval Process

    requirementsofQS9000andTS16949(Q1secondedition,2003).

    World excellence award; asQ1 supplier youwill be eligible forworld excellence

    award,whichacknowledgethebestofthebest(Q1secondedition,2003).

    PreferredstatuswithFord;thismightbethemostimportantbenefitfromhavingQ1

    status.Preferred statuswithFordgives your facility thepossibility to comeunder

    consideration fordevelopment and sourcingofnewproducts (Q1 secondedition,

    2003).

    3.2 TS16949

    Prior to 1996 the automotive industry had asmany quality standards as therewere car

    producers. Suppliers could supply severalof these carproducers at the same timeand it

    couldbeveryproblematictocomplywithallofthesedifferentqualitystandardsatthesame

    time. This problem came to the automotive industries attention and The International

    Automotive Task Forcewas created in 1996 to resolve this problem. IATF Togetherwith

    representatives from ISOTC 176 started developments towards the new standard

    ISO/TechnicalSpecification 16949startedandtodaytheyaretryingtoadeptISO/TS16949

    to ISO9001. Thequality standards thatwereused todevelop ISO/TS16949 can herebe

    seen:(Bergman&Klefsj,2001).

  • 8/11/2019 LTU-EX-07082-SE

    23/74

    TheoreticalFrameofReference

    VDA 6.1 (Verband der Automobilindustrie) represents the German automotive

    industry

    EAQF (Rfrential dEvaluation dAptitude Qualit Fournisseurs) represents the

    Frenchautomotiveindustry

    AVSQ (ANFIA Evaluation of Quality Systems) represents the Italian automotive

    industry

    (A)QS9000representstheAmericanautomotiveindustry

    3.3 ISO14001

    The Environmental Management Systems is an activity system for companies and

    organisations who want to run an affective and structured environmental work. The

    ManagementSystemconstitutesavoluntarytoolthatshouldmaketheworkeasier,andthe

    standards give a work model for constant improvements (Morris 2004)

    VDA6.1

    EAQF

    AVSQ

    AQS9000

    TS16949

  • 8/11/2019 LTU-EX-07082-SE

    24/74

    TheoreticalFrameofReference

    can for example be environmental certified, assumed that the production fulfils the

    requirementsforthecertification.(Morris,2004)

    3.4 ODETTE/MMOG

    One areawith significant development progress ismaterialmanagement. As automotive

    originalequipmentmanufacturersseektobalanceproductionwithdemand,itisparamount

    thatrightsupplierareattherightplantattherighttimeforproductiontostayonschedule.

    For automotive suppliers that argue delivery performance must be perfect. If supplier

    deliveryperformanceisfaultypenaltiesareappointed.

    Industry collaboration has delivered standardized rules for material management which

    intendedtoimproveefficiencyandaccuracy,aswellasreducecostsfromerrorsandwaste.

    Insightsfromearlyadopterssuggestthatthesestandardsservetheirpurpose,andmore.For

    example it was recognized that effective and efficient materials management can help

    minimizesupply

    related

    risk,

    from

    overstocking

    to

    getting

    the

    wrong

    components.

    To

    get

    a

    handle on material management Ford motor company created materials system

    requirementsandVolvoputlogisticsevaluationdocumentsinplace.

    AutomotiveIndustryActionGroupinNorthAmericaandOdetteInternationalinEuropetook

    noteoftheserulesandguidelines thatwerecreated,andthe fact thateachmanufacturer

    haddifferentsetofrulesandguidelines.These tradegroups tookon the task toestablish

    materialmanagement

    standards

    for

    their

    respective

    regions.

    In2004 these tradegroups took the standardizationa step furtherand compileda single

    standard issue: the joint global Materials Management Operations Guideline/Logistics

    Evaluation(MMOG/LE).TodayGlobalMMOG/LEprinciplesarebeingusedbytheautomotive

    industrytohelpensureeffectiveandefficientmanagementofmaterialsthatsavestimeand

    costs.

    The

    Global

    MMOG/LE

    uses

    a

    self

    assessment

    help

    identify

    what

    process

    adjustments

    thatareneededforworldclassfunction.Theselfassessmentisalsomandatorytobeableto

    applyforQ1asasupplierforVolvo.Seepicture:3.1.

  • 8/11/2019 LTU-EX-07082-SE

    25/74

    TheoreticalFrameofReference

    Picture3.1:SupplierAuditPolicy.

  • 8/11/2019 LTU-EX-07082-SE

    26/74

    TheoreticalFrameofReference

    3.5 QUALITYSYSTEM

    A quality system is a tool to use to control and improve the quality on the companys

    products.Thequalitysystemincludeseverythingfrommethodsandroutinestoorganisation

    andresponsibledistribution.Thecommondenominator isthattheycontrolandaffect the

    quality.(Berggren,Grubb,Hollnder,Kinde,Mellby,SeverinssonSkog,2001)

    Tosecure

    the

    quality

    in

    the

    company

    products

    the

    quality

    system

    must

    include

    and

    control

    alltheessentialpartsofthebusiness.Customerandauthoritiesoftenputsademandonthe

    suppliersproductandthequalitysystemcontentandfunction.Thecompanymanagement

    have the responsibility to have an updated, effective and an affective quality system.

    (Berggrenetal.2001)

    Whenimplementingaqualitysysteminacompanyasystematiclongtermworkisnecessary

    to achieve a good result. In the beginning of the implementation an overview over

    fundamentalquestionsaboutthecompanyactivityandthestructureisessential.Whenthe

    qualitysystemisintroducedacontinuousworkisrequiredtocomplementandimprovethe

    system.Thesystemrequiresdocumentationasfaritpossibleandshouldbeasupportinthe

    dailybusiness;itcouldalsoworkasabasefortheaudits.(Berggrenetal.2001)

    Acertification

    for

    acompany

    quality

    system

    means

    that

    an

    independent

    accredit

    organisation makes an assessment about the requirements in for example ISO 9001.

    (Berggrenetal.2001)

    Acompanysmaintaskistoproducegoodsandservicesandtofulfilthecustomersneeds,

    demandsandexpectations.Allcompanyshaveamainprocessthatgoesfromidentification

    of customerneeds to a completeproduct.Thismainprocess canoftenbedivided into a

    systemof

    processes

    that

    is

    depended

    on

    each

    other.

    (Berggren

    et

    al.

    2001)

    Whenaqualitysystemisimplementeditisimportanttoidentifythecompanyprocessesand

    toestablish the order and collaborationbetween the processes. You also have to decide

    which criteria and methods that needs to make sure that the processes can be controlled

  • 8/11/2019 LTU-EX-07082-SE

    27/74

    TheoreticalFrameofReference

    3.6 TQM

    DaleandBunney (1999)describeTotalQualityManagement (TQM)asveryhard todefine

    becauseof thevariousdefinitions thatexist.AlthoughTQM isveryhard todefine there is

    commongroundbetweenthesedefinitions.

    Systemsforimprovingqualityandqualitymanagementhasimprovedrapidlyduringthelast

    decades,from

    simple

    inspections

    to

    refined

    versions

    of

    quality

    control

    and

    quality

    assurance, and now most companies are working towards TQM according to Dale and

    Bunney(1999).

    TotalQualitymanagement requires that the principles of qualitymanagement should be

    appliedineverybranchandateverylevelintheorganization.Itisacompanywideapproach

    toquality,improvementsundertakenoncontinuousbasisbyeveryoneintheorganization.

    3.6.1 KEYELEMENTS OF TQM

    Despite all different views onwhat constitutes TQM, there are key elements in various

    definitionsthatneedtobesummarized.DaleandBunney(1999).

    3.6.1.1 COMMITMENTAND

    LEADERSHIP

    OF

    SENIOR

    MANAGEMENT

    Without the totalcommitmentof the seniormanagement,nothingmuchwillhappenand

    anythingthatdoeswillnotbepermanent.Theseniormanagementhastobetheonesthat

    provides directions and exercises a forceful leadership.Although the seniormanagement

    usesaforcefulleadershipnothingshouldbeforced,everythingshouldcomenaturally.Dale

    andBunney(1999).

    3.6.1.2 PLANNINGANDORGANIZATION

    Planningandorganization is featured inanumberofareasofa continuous improvement

    process as listed below:

  • 8/11/2019 LTU-EX-07082-SE

    28/74

    TheoreticalFrameofReference

    Putting quality assurance procedures into place which facilitate closed loop

    correctiveaction.

    Planning the approach to be taken for the effective use of quality systems,

    proceduresandtoolsandtechniques,inthecontextoftheoverallstrategy.

    Developing the organization and infrastructure to support the improvement

    activities.

    Pursuing standardization, systematization and simplification ofwork instructions,

    proceduresandsystems.

    Dale

    and

    Bunney

    (1999)

    3.6.1.3 USINGQUALITYMANAGEMENTTOOLSANDTECHNIQUES

    Tosupportanddevelopaprocessofcontinuous improvementanorganizationwillneedto

    useaselectionoftoolsandtechniques.Thetoolsandtechniquesshouldbeintegratedinto

    theroutineoperationofthebusinessandthetoolsandtechniquesthatareintendedtobe

    usedshould

    be

    presented

    in

    aroute

    map.

    Dale

    and

    Bunney

    (1999).

    Examples

    of

    recommendedtoolsare:

    Benchmarking

    FMEA(FailureModeandEffectsAnalysis)

    Flowcharts

    ( l l )

  • 8/11/2019 LTU-EX-07082-SE

    29/74

    TheoreticalFrameofReference

    To ensure the general awareness of qualitymanagement, skills and attitudes employees

    shouldhavetherightleveloftrainingandeducation.Aformalprogrammeofeducationand

    trainingneeds

    to

    be

    planned

    and

    provided

    on

    atimely

    and

    aregular

    basis

    to

    ensure

    the

    generalawarenessofqualityamongsttheemployees.DaleandBunney(1999).

    3.6.1.5 INVOLVEMENT

    Theremustbeacommitmenttothedevelopmentofemployees,withrecognitionthatthey

    are an asset whichwill be appreciated over time. To achieve broad employee interest,

    commitmentandcontribution to thecontinuous improvementprocessallavailablemeans

    fromsuggestionschemes tovarious formsofteamworkmustbeconsidered.Forexample,

    partof theTQMprocess is toensure thateveryemployee isawareofwhat isrequiredof

    themandhowtheirprocessaffectsthebusinessasawhole.DaleandBunney(1999).

    3.6.1.6 TEAMWORK

    Teamworkisoneofthekeyelementsofemployeeinvolvementandwithoutteamworkitwill

    bedifficult to gain commitment andparticipationofpeople throughout theorganization.

    There are several different types of teamswith different operating characteristics, all of

    whichcanactasawaytogetpeople involved in improvementactivities.DaleandBunney

    (1999).

    Teamshave

    anumber

    of

    objectives

    to

    fulfil

    as

    acomponent

    of

    the

    continuous

    improvement

    process.DaleandBunney(1999).Forexamples:

    AidthecommitmentofpeopletotheprinciplesofTQM.

    Provide

    the

    means

    and

    possibility

    for

    people

    to

    participate

    in

    decision

    making.

    Helptodeveloppeopleandencourageleadershiptraits.

  • 8/11/2019 LTU-EX-07082-SE

    30/74

    TheoreticalFrameofReference

    Measurementneedstobemadecontinuallyagainstaseriesofkeyresultsorperformance

    indicators internal and external. The approvedmeasurements and indicators should be

    developedfrom

    existing

    processes

    and

    customers.

    By

    using

    already

    existing

    processes

    and

    customer certain checkpointcanbedevelopedbyusinga roadmapwithbelongingaction

    plansthatisusedtocorrectfaultyvalues.DaleandBunney(1999).

    3.6.1.8 WORKINGTOGETHER

    It is very important to create an organizational environment that is beneficial for the

    continual improvementprocessandwhereeveryonecanparticipate.Bychangingpeoples

    behaviour, attitudes and working practice there will be possible to integrate quality

    assuranceintoallofanorganizationsprocessesandfunctions.Althoughitisveryimportant

    tochangepeoplesbehaviourandattitudes itwillbeoneofthehardesttasksthatthere is

    withinacompany.DaleandBunney(1999).

    3.6.2 TOWARDSTQM

    Joseph Juranadvocates that reducing thecostofquality isamust tobe successful in the

    length.Juranstenpointplanisamilestonetowardsreducedcostofqualityandtotalquality

    success.DaleandBunney(1999).Jurans10pointsare:

    1. Buildawareness

    of

    the

    need

    and

    opportunity

    for

    improvement

    2. Setgoalsforimprovement

    3. Organizetoreachthegoals

    4. Providetraining

    5. Carryoutprojectstosolveproblems

  • 8/11/2019 LTU-EX-07082-SE

    31/74

  • 8/11/2019 LTU-EX-07082-SE

    32/74

    TheoreticalFrameofReference

    businesses.ThefigureisdesignedonthebasisofJonesandSasser (1995).

    Makingthe

    first

    sale

    to

    acustomer

    is

    often

    very

    expensive.

    It

    takes

    alot

    of

    time,

    advertising

    andpromotions.Abigmistaketoomanybusinessesmakeisfocusingonsellingmoretofirst

    timebuyersratherthantrytobuildupsaleswithexistingcustomers.Jones&Sasser(1995).

  • 8/11/2019 LTU-EX-07082-SE

    33/74

    EmpiricalstudiesandAnalysis

    4 EMPIRICALSTUDIESANDANALYSIS

    This chapter describes how theproject was carried out. The chapter is divided up into the

    differentphasesoftheDMAICcycleasdescribedintheprevioustheorychapter.Thefactand

    informationcomesfrominterviewsmadebytheauthors.

    PeopleinterviewedintheDefineandtheMeasurephase:

    STAmanager

    at

    Volvo

    cars

    STAatVolvocars

    ManageratanautomotivesupplierthathasQ1status

    ManagersatBrose,seeorganisationchartinappendix5

    STASupplierTechnicalAssistance

    4.1 DEFINE

    AttheinterviewwiththeSTAmanageratVolvocars,hetoldusthathisearlierassignment

    was todevelop suppliers toa level that is capable to continuousbusiness,whereQ1 isa

    receipt.Oneoftheassignmentswastocollectdatafromsupplierstoaglobalsystem,SIM,in

    Ford. For amonth ago he changedwork to onlyworkwith large cars, and is then the

    responsiblepvpSTAandistheretobethedrivingforcetoaccomplishsolutions.

    Aninterview

    with

    aSTA

    at

    Volvo

    cars

    began

    with

    adescription

    on

    how

    to

    succeed

    with

    the

    implementationwork;youneedtowork inateamwithqualityasthedrivingforce.As for

    example the logistics work with their responsibilities and everyone in the team has

    knowledge for their work. When the third part certification is close it should not be

    necessary for an alarm to complete the action plan

  • 8/11/2019 LTU-EX-07082-SE

    34/74

    EmpiricalstudiesandAnalysis

    WarrantySpikes,incasethatasupplierhascausedanerroronthefield,theyhave

    not

    been

    sticking

    to

    their

    agreement.

    Fieldserviceaction,asforexampleifyouareforcedtocallbackthecarsaninputto

    systemisnecessary.

    Stopshipment.Ifthesuppliercausesastopintheproductionaninputtothesystem

    isnecessary.

    Violationoftrust,ifitshouldcomeforwardthatthesupplierwithholdsinformation

    aninputtothesystemisnecessary.

    TheSTAmanagercontinuoustotellthattheexpectationthatQ1hasistogivesupporttothe

    supplier so itwillbeeasier to solveproblems, if the supplier cant supportFordorVolvo

    whenaproblemoccurstheywillloosetheQ1status.Partnershipandknowledgeaboutand

    withthesupplier ishighlyprioritised. IfthesuppliershouldbedisqualifiedtheSIMsystem

    showsthatthesupplierisrevoked.AnotherproblemthatasuppliercanloosetheQ1status

    by is that theyhaveawrongattitude thatcant keepupwith levelofquality.Before the

    suppliergetsrevokedadialoguebetweenthemselvesaremadetoseeifthereisasolution.

    TheautomotivesupplierhasfulfilledtheQ1statussince2002accordingtothemanager,the

    relationshiphasnotbeenbetteraftertheautomotivesupplier implementedQ1.Sincethe

    beginningof theproduction towardsVolvo therelationshiphasgone fromapersonaland

    closerelationshiptoamoredistantrelationshipthatenduresmorenumbers.

    Whenthemanageratanautomotivesupplierstartedwiththe implementationofQ1they

    startedto

    go

    through

    the

    MSA

    together

    with

    the

    STA

    to

    evaluate

    all

    the

    expectations

    and

    to

    see if they had to change anything, Themanager at an automotive supplier had already

    fulfilledmanyoftheexpectationsalreadysincebefore,sotheydidnotneedtochangethat

    much.

    E i i l di d A l i

  • 8/11/2019 LTU-EX-07082-SE

    35/74

    EmpiricalstudiesandAnalysis

    zerowrong.Thenextstepthattheyhavetoachieve istoestablishaplanwiththecoming

    workthatisnecessarytoachieveQ1status.

    TheSTAmanagersaysthatthemanagementteamagreeswhichpartthatcanbescheduled

    todriveparallel,fromthattheQualitymanagermakesaplan.Tomaketheworkwithagood

    performanceitisnecessarythatthecontinuousworkisapartofthedailyworkandapartof

    themanagementagenda,QOS.

    TheSTAsaysthatbeforeyoubegin towardsQ1theCapableSystems,TS16949, ISO14000

    andOdette

    is

    expected

    to

    be

    completed.

    Odette

    is

    arate

    in

    SIM.

    The

    Focus

    is

    then

    towards

    theMSA,TheSTAsaysthatifthisiscompletedtherestwillbecovered.

    TheSTAimpliedwiththefactthatTS16949andQ1MSAhasmanysimilarexpectations,itis

    easytofollowthesimilarityinTS16949.

    TheSTAmanagersaysthatqualityisasmuchassensitivethatitisasignificantoutputfrom

    allthose

    involved,

    from

    operators

    all

    the

    way

    up

    to

    the

    management.

    An

    operator

    that

    has

    beenmisledby instructionscaneasilymakeamistakewhich thenwillhaveaneffect that

    influenceagreatpartoftheproduction,whichthenalsowilleffectthequality.

    TheSTAmanagersaysthenwhenthesupplierhasimplementedthesystemstheyneed,they

    thenwillhavetoshowthattheycanandareusingit,bothbyworkingandcommunicatingat

    therightwayandbyahighprecisionindeliveryandoutput.

    IftheSTAfindssomethingthatismismatchedfromtheexpectationstheywillnotrevokethe

    supplierimmediately,theywillletthesupplierfixtheirproblemsfromactionplans.TheSTA

    pointsoutthatitismuchbettertoraisethesupplierwithpositivestagesthancuttingthem

    attheirfeets.

    TheSTAsaysthatforthemostthesupplierworksbythemselveswhiletheSTAcomesatthe

    endandchecksifeverythinghasgoneasplanned,theSTAwalksaroundintheplantandsee

    howeveryoneworks.ThemostworkliesintheMSA,bothfortheSTAandthesupplier.The

    STAlikestotakearandomsamplethathasbeenbroughtuponthemanagementmeetings.

    h h d h l h f ll h

    Empirical st dies and Anal sis

  • 8/11/2019 LTU-EX-07082-SE

    36/74

    EmpiricalstudiesandAnalysis

    The STA manager continuous by explaining a few tips regarding implementing, the

    expectationsneedstobemoreprecisetogoalsthatcanmemeasured,andthatitcanbea

    goodplan

    to

    cross

    through

    different

    sites,

    benchmarking.

    A

    view

    between

    the

    plan

    and

    the

    reality isnecessaryforasuccess,andthatthecoworkersfeelfortheirworkandthatthey

    areconsciousandthattheirselvescanhelpiftheydorightandcauseiftheydowrong.

    TheSTAmanagersaysthatatip istostartwithyourselvesandyourdailyworktoseehow

    much time that isputtingonquality.Does themanagementworkon the rightway? It is

    enoughtogo intoQOStosee if itsqualityoreconomicontheagenda. Itshouldalsobea

    clear connectionbetweenquality,production and the coworkers.What is the subjectof

    speech in the mornings? The rate or first time through. The operators have a big and

    important responsibilitywhen they thenhave the final assignment to carry through their

    workattherightway.

    TheSTAmentionsthatitisimportantifyouwanttokeepQ1,complementedimprovements

    shouldbe

    acontinuously

    force

    all

    the

    way

    from

    the

    management

    to

    the

    operators.

    TheSTAmanagersaysthatanimprovementthatsometimesisawishfromthecustomeris

    when the supplier gets stressed and is short of time it is easy to loose communication

    betweenthesuppliercustomer, it is importanttokeep itonahigh level. It isnecessaryto

    have parameters of control and to be able to transfer the verbal that is coming up to

    measurablegoalsandthenhaveaplanaboutwhoisdoingwhat.

    TheSTAsaysthatwhenQ1statushasbeenproven,thestabilityinthePPMlightsupwhere

    youareandishighlyimportant.

    Themanager at an automotive supplier says that theirPPMhasbeendiscussedover the

    yearsandifithasdeviateoutsidethelimitsithasbeendiscussedwiththeSTAatVolvo;the

    discussionhasbeenabouttryingtosolvetheactualproblemandfutureproblems.

    TheSTAsaysthatthesupplierhasbeendividedintoagroupfromonetofour,dependenton

    whattheyproduceandhowimportant itistothecustomer,alsotheirhistoryofproducing

    influence, if theyhavegoodPPM.This isdone tocontrolhow thesupplierworkswith the

    MSA

    Empirical studies and Analysis

  • 8/11/2019 LTU-EX-07082-SE

    37/74

    EmpiricalstudiesandAnalysis

    theyhaveslightlyhigherPPMthangroupnumber4.

    4:HavecontrolonceayearfromtheSTA,characteristicsforthesesuppliers isthat

    theyhavesmallarticlesandagoodPPM.

    The STA says that work instructions are highly strict and are in line with the actual

    productionandwork.Anactionplanthathascontrolovertheprocessisnecessary.

    TheSTA

    continuous

    to

    say

    that

    at

    the

    end

    the

    final

    product

    is

    most

    important

    and

    if

    the

    supplier uses FMEA and has good PPM it is often a good start, especially from a small

    supplier.ForanexampletheSTAmentionsasmallcompanywhereheisSTA,theyhavehad

    alotoftroubleformanyyears,buthasfinallycomedownto3PPMafterimplementednew

    systems suchasFMEA.Aneasyway tosee if theproduction is running smoothlyand the

    workersisfollowingtheinstructionscanbemadebyfollowingtheproductionfromscratch,

    oneproduct

    from

    the

    start

    of

    the

    assembly

    to

    the

    end,

    go

    through

    every

    point

    in

    the

    line

    untilithasreachedthefinalstage.

    The STA says thatmistakes thateasily andoften ismissedwhen implementingQ1 is the

    contactwith the sub supplier, the gage calibration,PPM and FMEA. If it is ahigh lackof

    frequencybytheworkers, it is importanttobeabletohaveeducationwiththeemployees

    tomakethemstaysotheycanusetheircompetence.Abigmistakethateasily ismissed is

    thecontinuous

    work

    from

    the

    management

    meetings,

    where

    updates

    are

    made

    and

    the

    baseforallworkcomesfrom.

    4.3 ANALYSIS

    When implementinganewsystem therehave tobeanunderstandingofwhy this isdone

    throughouttheemployees.Anengagementfromalldepartmentsneedstobemadeandan

    understandingofwhatiscrucialtobeaccomplishedforasuccessfulbusiness.Meetingsand

    presentationsarenecessarytouseto informtheemployeesandtomakeQ1an important

    issue.Awarenessissoimportantandcrucialtosucceedwithasystemimplementation,that

    continuousmeetings and follow ups ismost likely to be arranged everyweek or every

    Empirical studies and Analysis

  • 8/11/2019 LTU-EX-07082-SE

    38/74

    EmpiricalstudiesandAnalysis

    DaleandBunney(1999)agreethattheimplementationworkneedstostartatthemanagers

    showingthatthisisanimportantsteptoabetterfutureinthebusiness.Q1isatooltouse

    tocontrol

    yourself

    and

    acertification

    to

    show

    your

    customer

    that

    you

    follow

    their

    expectationsonhowtowork.Ifalltheemployeeshaveanunderstandingofwhatthismeans

    andhasaworkingplanonhowtheyshouldworkwithactionsplansandwork instructions

    they are well prepared for the customers expectations. It needs to be clear that the

    responsibility does not lie at the Quality manager; every department has their own

    responsibilitytomakeQ1workandsucceedinthecompany.

    Continuous improvementsareanongoingprocessandQ1 istheretocontrolandhelpthis

    process towork. TheSTA is supposed tobeahelpfulhand through theprocessandalso

    checks and controls if the expectations are followed. In the beginning the STA and the

    suppliertogethergatherinformationonwhattheyneedtofulfilandchangeifnecessaryto

    applywiththeexpectations.

    Therequirements

    or

    certifications

    that

    need

    to

    be

    completed

    to

    achieve

    Q1

    status

    are

    TS

    16949, ISO 14001 and Odette. The most important thing in the implementation work

    towardsQ1besidethecertifications istoworkaccordingtotheMSAandhaveaPPMthat

    fulfils thedemands.Q1andTS16949aresimilaraccording tosomeaspects; thosewillbe

    presented in next chapter.A goodway towork is trying to combine the implementation

    workof ISO16949andQ1becausetheyarerelatedtoeachotherandtheybothgiveand

    takefromoneanother.

    Q1 isademand fromthecustomertothesuppliertoraisethecorporationbetweenthem

    both, to build a greater bond between them. In theory there are many demands and

    expectationsthatthesupplierneedstofollow,whowilllooseQ1statusifnotfollowed,and

    thepossibilitytokeepproducingnewproductstothecustomer.AccordingtoEdvardssonet

    althisisawaytobuildupcustomerloyalty.InpracticetheSTAinsteadofrevokingthemhe

    triesto

    communicate

    with

    the

    supplier

    to

    solve

    certain

    issues,

    it

    is

    almost

    always

    better

    to

    helpandtrysolveproblemsandfindsolutionsratherthantocancelarelationship.Inmost

    casestheexistingsupplier isbettertodeliverright insteadoftryingtofindanewsupplier.

    ThisisalsosupportedbyDaleandBunney(1999).

    Empirical studies and Analysis

  • 8/11/2019 LTU-EX-07082-SE

    39/74

    EmpiricalstudiesandAnalysis

    mistakeatthemanagersaremade itwilloftentake longeruntiltheeffect isseenthrough

    thecompany.

    WhenQ1hasbeenproventhemostimportantfactorisPPM,itlightsupwhereyouareand

    iseasy tomeasure and to control for the customer. If the goals isnt fulfilledaproblem

    solutiondiscussionwiththecustomerisnecessarytomakeanoverviewofwhatisneededto

    bechanged.

    At theendcertificationsanddiplomaswillnotautomaticallycreateagoodproduct,but it

    canhelp

    by

    implementing

    control

    processes,

    for

    example

    by

    using

    FMEA

    when

    finding

    failures inaproductorDMAICwhenworkingonaproject.Certificationsareboth for the

    supplierandthecustomer.Positive forthesupplier isthathegetsmorecontrolovertheir

    productionandprocesseswhen implementingnewcertificationswithaudits.Thecustomer

    getsareceiptorcertificationfromthesupplierthatthesupplierworkstowardsconsistently

    improvements,notonlyattheproductionbutevenatthemanagers.

    Asystemthat iscreated fromthecustomerthat issupposedtobe forusebythesupplier

    ofteninvolveshighcostsandeffortinformofmanpowerfromthesupplier.Itisnotalwaysa

    systemlikethisisgoodforabusiness,thefocusisoftennotatthemainprocessandinstead

    itcanbeatmaterialhandlingormeetingsdiscussingirrelevantforms,thefocusneedtobe

    clearandunderstoodfromallparts,whichalsoisaccordingtoDaleandBunney(1999).

    4.4 IMPROVEMENT

    In the improvement phase we will discus the problem areas and a solution for these

    problems.

    4.4.1 IDENTIFIEDPROBLEMAREAS

    Earlierwork

    towards

    Q1

    within

    Brose

    has

    according

    to

    our

    research

    and

    knowledge

    several

    problemareas.TheseproblemareasarenotonlybecauseoffaultyroutinesfromBrosebut

    alsolackofinformationfromVolvo.Wediscoveredthefollowingproblemareas:

  • 8/11/2019 LTU-EX-07082-SE

    40/74

    EmpiricalstudiesandAnalysis

  • 8/11/2019 LTU-EX-07082-SE

    41/74

    p y

    WebelievethatourworkandtheworkwithourguidewillgiveBrosesavingsaround42,000

    52,500EURduringaperiodof10years.Aswebelieve thereshould takeapproximately

    oneemployee

    at

    least

    1

    2months

    of

    part

    time

    work

    to

    get

    the

    understandings

    about

    Q1

    thatarenecessary tobeable to implementQ1 ina successfulway.Aprojectgroup,one

    fromeachdepartmentneedstospendabout128hours together intoQ1 implementation;

    we have approximately saved them halfof theirwork,64 hours.And becauseBrose is a

    successfulcompanythathasgreatpotentialwebelievethattheywillhaveapproximately4

    5newFordsites thatneeds tohaveQ1status inaperiodof10years.Thisassumption is

    basedon

    the

    success

    of

    Volvo,

    the

    reorganisation

    of

    Ford

    and

    the

    very

    likely

    growth

    of

    Brose.Our guide should reduce theworkload of the personwhom is responsible forQ1

    implementationwithabout11.5monthsparttimework.Thisgivesthecalculationforour

    potentialsavings:

    OnepersonworkingparttimewithQ1for11.5months 4,000EUR

    ProjectGroup,timesaved64hours 3,500EUR

    Othercosts(suchastravellingexpenses,telephonecallsetc) 2,000EUR

    TroubleshootingandRework 1,000EUR

    Summary 10,500EUR

    These cost savingswillbedoneateachnew site thatwillbe required tohaveQ1 status

    whichaccordingtoourbelievesthereshouldbeabout45sites.

    4sites*10,500EUR=42,000EUR

    5sites*10.500EUR=52,500EUR

    EmpiricalstudiesandAnalysis

  • 8/11/2019 LTU-EX-07082-SE

    42/74

    4.5 CONTROL

    The work from our implementation matrix and our way of working during the

    implementationtowardsQ1hasbeensuccessfullyapprovedbytheSTAatVolvocars.There

    were no drawbacks or changes that needed to bemade. Thereforewe can say that the

    matrix and the comparison between TS 16949, ISO 14001 and Q1 has made the

    implementationwork lessdemanding for theplant, thenextplantsdontnotneed togo

    throughall

    points

    in

    Q1

    because

    it

    has

    similarities

    in

    the

    other

    systems.

    Conclusions

  • 8/11/2019 LTU-EX-07082-SE

    43/74

    5 CONCLUSIONS

    Inthischapterourconclusionsandmostimportantrecommendationsarestated.

    WebelievethatourmatrixandthisreportwillbeagreatassetforallBrosesitesthatmust

    beQ1 certified in the future.Ourbiggest expectation from thematrix is that the similar

    routineswiththeTS16949andtheISO14001arepointedoutwhichthenmakeslessdouble

    work inthe future.Thetimetableandtheeasystepbystephandbookwillalsobeaguide

    throughQ1

    in

    asimple

    way.

    By

    this

    report

    we

    state

    out

    that

    Q1,

    TS

    16949

    and

    ISO

    14001

    can

    beimplementedatthesametime,itwillbothsavetimeandmoney.

    Coming intotheautomotive industrywebelievedthateverythingregardingqualitywould

    be taken very seriously, and most quality issues were. But when we increased our

    knowledgeaboutQ1,TS16949andISO14001weactuallybecameastonishedwhenseeing

    all the correspondence between Q1, TS 16949 and ISO 14001. Because of all the

    correspondenceroutines

    between

    Q1

    and

    TS

    16949

    we

    asked

    ourselves

    what

    the

    meaning

    ofQ1was.

    Afterhavingperformedinterviews,meetingsanda lotof literaturestudieswecametothe

    conclusionthatQ1willnotgainsuppliersinanywaybesidesthoseadvantagesthatFordhas

    statedintheirbrochureaboutQ1:seeourTheorychapterforfurtherinformation.

    Recognition

    Publicityandadvertisingprivileges

    Selfcertification

    Worldexcellenceaward

  • 8/11/2019 LTU-EX-07082-SE

    44/74

    Discussion

  • 8/11/2019 LTU-EX-07082-SE

    45/74

    6 DISCUSSION

    Inthischapterwewilldiscussaboutourreport,whatcouldhavebeendonedifferent?

    Thereporthasbeenourfinalprojectattheuniversitywhilethereforewewantedtouseour

    knowledge ina real lifeproject.Ourpurposewas tohelpBrosewith the implementation

    workoftheFordsupplierrequirement,Q1.WithjustonlyonebrochureaboutQ1wehadto

    interview a few people to getmore knowledge togetherwith tips and tricks to have as

    smoothimplementation

    as

    possible.

    Thepersons thatwe interviewedatVolvo, theSTAs,hadaverypositiveattitude towards

    Q1,therefeelingthatthiswasaworkingsystemforthesupplierandaneededstatusmight

    havehadanaffectonus.Whenwediscussed itwithasupplierhehadadifferentviewon

    thesystemandsaidthattheirrelationshipwithVolvohadbeen lesspersonalsincetheQ1.

    Q1 is a required status for a supplier while therefore at the moment is a necessary

    implementationfor

    afactory.

    The reliability and validity have been a concerned regarding the people we have been

    interviewing.Sometimestheyhaddifferentopinionsandfacts.Wecouldhavesolvedthisby

    interviewingmoresuppliersandmoreSTAs,butthetimeframedidnotallowthattogether

    withnonecooperatingsupplierstoVolvo.

    Weneed

    to

    highlight

    that

    our

    compared

    points

    with

    Q1,

    TS

    16949

    and

    ISO

    14001

    might

    not

    havetheexactsimilaritybutithasthesamemeaningandsignificance.

    Asa finalword for thisprojectwewould like topointout thatwe think if thehandbook

    togetherwith ourMatrix is used; the time and cost effortwill be very positive for the

    factory.

    References

  • 8/11/2019 LTU-EX-07082-SE

    46/74

    7 REFERENCES

    Inthissectionapresentationofusedreferencesforthereportwillbeintroduced.

    Andersen,I.(1998).Denuppenbaraverkligheten Valavsamhllsvetenskapligmetod.Lund:

    Studentlitteratur.

    Befring,E.(1994).Forskningsmetodikochstatistik.Lund:Studentlitteratur.

    Bell,J.

    (2000).

    Introduktion

    till

    forskningsmetodik.

    Lund:

    Studentlitteratur.

    Berggren,Grubb,Hollnder,Kinde,Mellby,Severinsson&Skog.(2001)9000Godard att

    byggaettkvalitetssystemifretag.Mlndal:IVF.

    Bergman,B.&Klefsj,B.(2001).Kvalitetfrnbehovtillanvndning.Lund:Studentlitteratur.

    Brue,G.(2002)SixSigmaforManagers.Blacklick,OH,USA:McGrawHillProfessional.

    Dale&Bunney.(1999).Totalqualitymanagementblueprint.Oxford:Blackwell.

    Denscombe,M.(2000).ForskningshandbokenFrsmskaligaforskningsprojektinom

    samhllsvetenskaperna.Lund:Studentlitteratur.

    Ford.(2003).Q1secondedition.

    Foster,T.(2003).Managingquality:anintegrativeapproach.UpperSaddleRiver,N.J;Great

    Britain:PrenticeHall.

    Jones&Sasser.(1995).Whysatisfiedcustomersdefect.HarvardBusinessReview.

    Morris,AlanS.ISO14000EnvironmentalManagementStandards:EngineeringandFinancial

    Aspects.

    Hoboken,

    NJ,

    USA:

    John

    Wiley

    &

    Sons,

    Incorporated,

    2004.

    Odette.se. Global Materials Management Standard Charts a Course for Industry Advantage .

    Pande&Holpp.(2002).WhatIsSixSigma?.Blacklick,OH,USA:McGrawHillProfessional.

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    47/74

    APPENDIX1:BROSECUSTOMER

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    48/74

    APPENDIX2:WORLDMAPOVERBROSEPLANTS

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    49/74

    APPENDIX3:INTERVIEWGUIDE

    STAManager

    1. CanyoudescribeyourrollintheQ1work?

    2. CanyouinshortdescribewhatQ1is?

    3. Canyou

    describe

    anormal

    implementation

    process

    to

    reach

    Q1?

    4. Canyoulistthemostcommonproblem?

    5. CouldyougivesometipstofutureQ1companies?

    STA

    1. Howwouldyoustarttheworktowardsasuccessfulimplementation?

    2. CanyourecommendawaytoworkforBrosetoachieveandkeepQ1status?

    3. WhatMSApointsdoyouseeasmostimportant?

    4. Howdoes

    the

    Q1

    scoring

    work?

    5. IsitcorrectthatmanyoftheQ1MSApointsexistinTS16949?

    6. Whatisthebiggestmistakeacompanymakesduringtheimplementationwork?

    Manageratanautomotivesupplier

    1. CouldyoudescribeyourwaytoimplementQ1inyourcompany?

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    50/74

    APPENDIX4:Q1SCORINGTHRESHOLDS

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    51/74

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    52/74

    APPENDIX5:ORGANISATIONCHART

    Weitergabe sow ie Vervielfltigung

    dieser vertraulichen Unterlage(n),

    Verwertung und Mitt eilung ihres

    Inhalts ist nicht ohne unsere vor-

    herige schriftli che Genehmigung

    gestattet. Zuwiderhandlungen

    verpflichten zu Schadenersatz.

    Alle Rechte f r d en Fall der Patent -

    erteilung oder Gebrauchsmuster-

    Eintragung vorbehalten.

    Thecopying, use, distr ibution or

    disclosureof the confidential and

    proprietary information contained in

    thisdo cument(s) is strictly

    prohib itedw ithout pr iorwr it ten

    consent. Any breach shall subject

    the infringing party to remedies.

    Theowner reserves all r ights in the

    event of the grant of a patent or the

    registration of a utility modelor

    design.

    Source: Brose Fahrzeugteile GmbH & Co. Kommanditgesellschaft

    Organization Chart

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    53/74

    APPENDIX6:CUSTOMERENDORSEMENTLETTER

    This

    appendix

    contains

    the

    original

    Customer

    Endorsement

    letter.

    Appendix

    R f C E d

  • 8/11/2019 LTU-EX-07082-SE

    54/74

    RequestforCustomerEndorsement

    (ProForma)

    To: Date:

    From: Q1Candidate SupplierCode:___________

    Subject: Q1EndorsementoftheFacility/Organization

    The

    (Company/Division/Operating

    Group)

    is

    petitioning

    for

    Q1.

    SinceyourFacility/OrganizationisacustomerofthepetitioningFacility/Organization,your

    endorsementisrequired.Pleasereturnyourcompletedendorsementwithin30days.

    Thescopeofyourevaluationshouldbethemostrecent___months,withanyexceptions

    identified.Anyadditionalinformationordetailthatyouwishtoprovidewouldalsobe

    appreciated.

    DoyouendorsethisFacility/OrganizationforQ1? Yes_____ No_____

    Ifno,pleasedetailanyissues/concernswhichrequireresolutioninordertoassistusin

    continuousimprovementofourabilitytosatisfyyourrequirements.

    ___________________________________________________________________________

    ___________________________________________________________________________

    ___________________________________________________________________________

    ___________________________________________________________________________

    ___________________________________________________________________________

    _______________________________________________________________

    Appendix

  • 8/11/2019 LTU-EX-07082-SE

    55/74

    APPENDIX7:CUSTOMERENDORSEMENTMATRIX

    Plant name

    or division

    Name Title Address Tel e-mail

    Buyer Volvo Cars

    Torslanda

    David

    Rohman

    Logistic Manager VCT Volvo Car Corporation

    Dept 79000

    Geo loc TVKV

    S-405 31 Gteborg

    +46-31-597006 [email protected]

    STA Eng Volvo Cars

    Torslanda

    Jimmy Sj STA Volvo Personvagnar

    Dept. 53240 Geo Plac.

    PVH-55 Ljusgrd40531 Gteborg

    +46-31-3253382 [email protected]

    Appendix

    APPENDIX 8 HANDBOOK TO Q1 IMPLEMENTATION

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/11/2019 LTU-EX-07082-SE

    56/74

    APPENDIX8:HANDBOOKTOQ1IMPLEMENTATION

    HandbooktoQ1implementation

    1. Setupaprojectgroup.

    a. GoodifitisthesameasTS16949andISO14001.

    2. Checkthetimeplanandseeifyouareabletoputtheeffortasnecessary.

    a. Readthe

    steps

    and

    look

    for

    the

    explanation.

    b. SetupDeadlines.

    3. Theprojectleaderappointsmeetingsforeverydepartment.

    4. Go through the points in Q1 implementation matrix and see if any point is

    completed.Atthesametimeyouwillhaveafastoverviewoverwhatisnecessaryto

    bemade.

    a. Including:

    i. CapableSystems

    ii. WarrantyPerformance

    iii. ManufacturingSiteAssessment

    iv. CustomerEndorsement

    5. Send Customer endorsement letters in time; itmight take up to threeweeks to

    receivethem.

    6. Keepacontinuous

    contact

    with

    your

    STA.

    Appendix

    APPENDIX 9: Q1 IMPLEMENTATION MATRIX

  • 8/11/2019 LTU-EX-07082-SE

    57/74

    APPENDIX9:Q1IMPLEMENTATIONMATRIX

    This appendix contains the Q1 implementation Matrix that was used by us during the

    implementation work including Time plan, Capable Systems, Warranty and the

    ManufacturingSiteAssessment.TheMatrixhasbeenadjustedtofitinsidethethesis.

    Q1 Time Table

    R Denotes responsibledepartment

  • 8/11/2019 LTU-EX-07082-SE

    58/74

    departmentS Denotes supportive

    department

    Index Process

    Gene

    ralPlantManager

    Quality&Environment

    Projectd

    evelopmentsTK5

    P

    roductionSystem

    Commerc

    ialAdministration

    H

    umanResources

    Logistics

    Assembly

    P

    roductionFacility

    Actionstobetaken

    ActionstakentoDate

    Requiredcompletiondate

    Actua

    lcompletiondate

    Status

    Explanation

    T.1. Time TableT.1.1 Contact Ford

    STAR 2006-11-06 2006-11-07 Completed By Contacting the Ford STA site

    engineer you will be guided through thenecessary steps before you can do aformal Q1 application.

    T.1.2 Q1 metricshistory

    R 2007-01-01 Completed Your STA engineer will use your recentsix months of key performance metricsthat are reported in SIM as one of theelements for his final recommendation

    Q1 t t Th fi

  • 8/11/2019 LTU-EX-07082-SE

    59/74

    on Q1 status. There are fiveperformance metrics, Field serviceaction, Stop shipments, PPMperformance, Delivery performance andViolation of trust.

    Be sure to check your performancemetrics and be ready to explain eventualproblems at the on site assesment.

    T.1.3 Working withexpectations

    R R R R R R R R R 2006-12-01 Completed The manufacturing site assessment is akey component to Q1. Be ready to show

    compliance for each expectation that ispresented in the manufacturing siteassessment matrix at the "on siteevaluation".

    T.1.4 Warranty (exp) R 2006-12-01 Completed The warranty expectations is a necesarycomponent in the evaluation of Q1status. A supplier can gain or lose Q1points depending on demonstratedwarranty performance.

    T.1.5 CapableSystems

    R R 2006-12-01 Completed Work towards third-party certifications inTS-16949 and ISO-14001. Also worktoward compliance according to MS-9000/Odette/MMOG. (because ISO-14001 and TS-16949 already isimplemented, the timeplan only takesOdette, MS-9000 and MMOG in toconsideration)

    T.1.6 Self Evaluation R 2006-12-08 Completed Your facility will conduct a self-evaluationto ensure that you meet Q1 criteria. Thisself evaluation will concern Working withexpectations. More specific explanationon expectations are supplemented in theManufacturing site assessment page.

    T.1.7 Self Correction R 2006-12-15 Completed After the Self Evaluation you might haveseen missing or missled information thatdoes not meet the Q1 criteria. Here youhave time to take action.

  • 8/11/2019 LTU-EX-07082-SE

    60/74

    T.1.8 CustomerEndorsement

    R 2006-12-19 Completed Once you believe your facility is ready,based on the site performance reported

    in SIM and the manufacturing siteassessment expectations the next step isto obtain the necessary customerendorsements. These endorsements willbe valid for six months from the date ofthe signature.

    Be sure to gather all endorsements fromall your Ford customers.

    T.1.9 FormalApplication

    R 2006-12-20 Completed Send a formal Q1 application to FordSTA along with documentation of yourcertification to TS 16949 (or QS-9000until December 14, 2006) and ISO14001, and compliance with MMOG (orMS-9000 or Odette).

    T.1.10 On Site

    Evaluation

    R 2006-11-05 Completed Q1 on-site evaluation may be scheduled

    to review your qualifications for Q1 byFord STA. The on site evaluation willdiscuss, demonstrated site capabilities,performance metrics, manufacturing siteassessment and the overall Q1 pointsmaintained during the prior six months ofdata.

    T.1.11 Finalrecommendation

    R 2007-01-08 A final recommendation about your Q1status by Ford STA will be presented.

    Q1 Capable Systems

  • 8/11/2019 LTU-EX-07082-SE

    61/74

    R Denotes responsible department

    S Denotes supportive department

    Index Process GeneralPlantM

    anager

    Quality&Enviro

    nment

    Projectdevelop

    mentsTK5

    ProductionSystem

    CommercialAdministration

    HumanResourc

    es

    Logistics

    Assembly

    ProductionFacility

    Actionstobeta

    ken

    Actionstakento

    Date

    Requiredcompletiondate

    Actualcompleti

    ondate

    Status

    Explanation

    C.1. Capable Systems

    C.1.1 Third Part Certification:

    ISO 14001 - Environmental Management System

    R 2006-12-01 Completed

    C.1.2 Third Part Certification:

    QS-9000 - Quality Management SystemTS 16949 - Supplier Quality System

    R 2006-12-01 2006-11-02 Completed

    C.1.3 Compilance According to:

    MS 9000 - Material Management SystemRequirementsMMOG - Material Management OperationGuidelineOdette

    R 2006-12-01 In progress

  • 8/11/2019 LTU-EX-07082-SE

    62/74

    Q1 ExpectationsCompleted

    98% x.x.x.x CorrespodI

  • 8/11/2019 LTU-EX-07082-SE

    63/74

    ndenceroutine

    Inprogress 3%

    *= Denotes focus area R Denotes responsible department Behindschedule NoCorrespondenceS Denotes supportive department Critical

    Index Process GeneralPlantManager

    Quality&Environ

    ment

    Projectdevelopm

    entsTK5

    ProductionSystem

    CommercialAdministration

    HumanResources

    Logistics

    Assembly

    ProductionFacilit

    y

    Actionstobetake

    n

    ActionstakentoD

    ate

    Requiredcomplet

    iondate

    Actualcompletion

    date

    Status

    Explanation

    TS-16949Routine

    s

    ISO-14001Routines

    I.1. Quality procedures/QS-9000/TS 16949/QOS R

    I.1.1 Supplier's quality system is third-party certified tothe QS-9000 or TS 16949 (full compliance to TS16949 by December 14, 2006) requirements.

    R 2006-12-01

    2006-11-07

    Completed

    I.1.2 Existing Supplier's environmental system will becertified to ISO 14001 by July 1, 2003. Non- Q1suppliers must comply to ISO 14001 requirementsprior to Q1 award or Q1 reinstatement.

    R 2006-12-01

    2006-11-07

    Completed

    I.1.3 Supplier's quality manual contains processes for all

    areas of the site assessment. The quality manual isupdated as needed to drive statistically validcontinual improvements in the quality system.Supplier's Senior Management Team includingrepresentatives from Manufacturing, Quality,Engineering and Human Resources perform thesereviews.

    R 2006-

    12-01

    2006-

    11-07

    Completed Finished

    for theTS-16949audit.

    4.2.2

    I.1.4 Non-conformances identified in internal audits arenot repeated.

    R 2006-12-31

    Inprogress

    Finishedfor theTS-16949audit.

    8.2.2

  • 8/11/2019 LTU-EX-07082-SE

    64/74

    I.1.5 Supplier has a document process to identify andregularly update customer expectations, objectives

    and requirements.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor the

    TS-16949audit.

    5.2,5.4.1.1,

    7.2.1,8.2.1

    I.1.6 Supplier has a document process to identify andregularly update internal expectations, objectivesand requirements.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949audit.

    8.2.1

    I.1.7 Supplier has a documented process to identify and

    regularly update internal expectations, objectivesand requirements into QOS measurable.

    R 2006-

    12-01

    2006-

    11-07

    Completed Finished

    for theTS-16949audit.

    8.2.1

    I.1.8 Supplier has a documented process to assigntargets and objectives to each QOS measurable.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949audit.

    5.4.1

    I.1.9 Supplier has a documented process to assignchosen measurable to appropriate managementlevels for review, follow-up and improvements.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949audit.

    5.4.1

    I.1.10 Supplier utilizes action plans to drive statisticallyvalid continual improvements of chosen metricsand are a tracked at QOS review meetings.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949

    audit.

    8, 8.4

    I.1.11 Supplier's management team holds monthly QOSperformance review meetings with representativesfrom Manufacturing, Quality, Engineering andHuman Resources. Improvements actions aretaken by cross-functional teams that include levelsof the organization.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949audit.

    5.6.1

    I.1.12 QOS reviews include a review of all applicableFord SIM metrics, key process metrics andcustomer satisfaction metrics.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949audit.

    8.2.1.1

  • 8/11/2019 LTU-EX-07082-SE

    65/74

    I.1.13 Metrics monitoring customer satisfaction that arerelated to supplier manufacturing are understood

    and tracked.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor the

    TS-16949audit.

    5.2,8.2.1

    I.2. FMEAs/Control Plans* R

    I.2.1 All Ford parts have documented design andprocess failure mode and effects analysis (DFMEA,PFMEA and Control Plans (or DCPs)). There is arobust process in place for these documents.

    R 2006-12-01

    2006-11-21

    Completed Finishedfor theTS-16949

    audit.

    7.3.1.1,7.3.3.1,7.3.3.2

    I.2.2 FMEAs are reviewed annually or as issues arise. APareto is used to focus on 1) severity 2) theproduct of severity and occurrence, and 3) toidentify high RPNs in order to prioritize actions todrive improvements.

    R 2006-12-01

    2006-11-21

    Completed Reviewed onregularbasis

    7.5.1.1

    I.2.3 All error detection areas are reviewed and plansexist to move to error prevention devices (pokejoke), where feasible.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    7.3

    I.2.4 Supplier, in cooperation with their customers, hasidentified Significant Characteristics (SCs) andHigh Impact Characteristics (HICs), whereapplicable, on their PFMEAs and Control Plans forevery Ford part or family of Ford parts.

    R 2006-12-01

    2006-11-21

    Completed Finishedfor theTS-16949audit.Coincides with TSroutine

    7.3.2.3

    7.3.2.3

    I.2.5 Supplier works with Ford (i.e., Program VehicleTeams (CRT), Supplier Technical Assistance (STA)to establish final agreement of SCs and HICs.Suppliers obtain specific agreement from Ford forany parts not having SCs or HICs.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    I.2.6 Supplier ensures that all print dimensions and call-out notes on the engineering drawing are alwaysmet through Control Plans, work instructions, job

    set-up instructions and receiving inspection.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    I.2.7 Supplier verifies pass-through characteristics andensures that zero defects are at Vehicle Operations(VO) and final customer.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    7.1.2

    I.2.8 Control Plan is a result of appropriate qualityplanning and includes clear linkage between

    R 2006-12-01

    2006-11-21

    Completed Finishedfor the

    7.5.1.1

  • 8/11/2019 LTU-EX-07082-SE

    66/74

    planning and includes clear linkage betweenDFMEA and PFMEA.

    12 01 11 21 for theTS-

    16949audit.I.2.9 Control Plans contain the following elements:

    Operation number/namePart Name/Part NumberInspection RequirementsSpecificationsControl MethodsSC, CC, HIC (where applicable) and EngineeringSpecifications (ES) requirements are identifiedSC, CC, HIC (where applicable) and ES ControlMethods (in-process checks, process gaging, andpart gaging) are appropriateError-proofing methodsIn-process control methodsSample size and frequencyRequired tools, gages and other equipmentReaction plans must clearly direct the operator onhow to act when a process begins to go out ofcontrol, or a product fails an inspection or test

    R 2006-12-01

    2006-11-21

    Completed Finishedfor theTS-16949audit.

    7.3.2.3,7.3.3

    I.3. Employee Readiness/Training Review R 4.4.2

    I.3.1 Supplier is responsible for assessing the skillsrequired to perform all activities that affect productquality.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949

    audit.

    6.2.2

    I.3.2 Employees have had a skills assessment, atraining plan and evidence of training.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-16949audit.

    6.2.2

    I.3.3 Supplier ensures that only trained and qualifiedpersonnel are involved in all aspects of themanufacturing of Ford parts.

    R 2006-12-01

    2006-11-07

    Completed Finishedfor theTS-

    16949audit.

    6.2.1

    I.4. APQP/Launch/PPAP/Run-at-Rate Review* R

    I.4.1 Supplier has a APQP tracking mechanism in place. R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    I 4 2 Supplier has a system to manage new vehicle R 2006- 2006- Completed Reviewe

  • 8/11/2019 LTU-EX-07082-SE

    67/74

    I.4.2 Supplier has a system to manage new vehicleprogram launches.

    R 200612-01

    200611-21

    Completed Reviewed prior to

    TS auditI.4.3 Supplier has a process in place to support Ford

    prototype and pre-production build events in atimely manner.

    R 2006-12-01

    2006-11-21

    Completed Finishedfor theTS-16949audit.

    7.3.6.2

    I.4.4 Supplier has a process to continuously monitor andimprove launch performance.

    R 2006-12-01

    2006-11-21

    Completed Finishedfor theTS-

    16949audit.

    7.5.1.1

    I.4.5 All PPAP documentation must contain theinformation per the PPAP manual published by theAutomotive Industry Action Group ( AIAG) - thisinformation must also be available for Ford review.Suppliers in North America have a process in placeto comply with Phased PPAP initial run-at-rate,production verification and capacity verification.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    I.4.6 Suppliers require sub-suppliers to have a processin place that effectively satisfies all PPAPrequirements regardless of sub-supplier businessrelationship with Ford.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    I.4.7 Run-at-rate must be completed and support thestated program requirements (at full-volumeproduction levels) for all Ford parts.

    R 2006-12-01

    2006-11-21

    Completed

    I.4.8 Run-at rate must include the following elements

    and be performed on the entire process or theslowest operation (process bottleneck): machineavailable hours, shifts, days, machine downtime(planned and unplanned), machine change-over,breaks, and quality or scrap.

    R 2006-

    12-01

    2006-

    11-21

    Completed

    I.4.9 Supplier monitors capacity has a process to ensureongoing sufficient capacity on all Ford parts.

    R 2006-12-01

    2006-11-21

    Completed

    I.5. Manage the Change R

    I.5.1 Supplier has a documented process to effectivelyimplement post - Job 1 design changes, processchanges or volume changes.

    R 2006-12-01

    2006-11-21

    Completed Reviewed prior toTS audit

    I.5.2 Supplier effectively reviews and updates its qualitysupporting documentation for these changes.

    R 2006-12-01

    2006-11-21

    Completed Finishedfor the

    4.2.4

  • 8/11/2019 LTU-EX-07082-SE

    68/74

    Examples of documents that may require changes:Process Flow Diagrams, FMEAs, Control Plans,Operator Instructions, Visual Aids and PPAPdocumentation.

    TS-16949audit.

    I.5.3 Supplier follows a documented process to ensurethat proper Ford approvals are gained prior tomaking process changes. The approval processwill include use of Supplier Request forEngineering Approvals (SREAs), ChangeRequest/Concern Report (CR/CR) in Worldwide

    Engineering Release System (WERS),Management Alerts and revised PPAPdocumentation, as appropriate

    R