    PROJECT QUALITY MONITORIN

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    2/18

    When construction starts, the contractor must perform the followingrequirements:

    1. Set up a quality management system in which every individual, theconstruction department must follow

    2. Perform materials testing, building components, constructionequipment, technological tools prior to construction and installation inaccordance with construction standards and design requirements3. Set up and test implementation of construction methods, constructionprogress

    4. Create and keep updating a works diary

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    3/18

    Works diary is the original document of construction works inorder to exchange information between

    contractors clients, contractors and architects

    Diary consists of two distinct parts:

    the first part is recorded by contractors the rest is for clients and supervisors

    What is works diary?

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    4/18

    What is inside the diary?

    Contents of works diary

    list of technical staff of the contractors involved in constructionworks (the titles and duties of each person),

    situation of the construction every day,

    situation of the construction for each type of work,

    details of the entire implementation process,

    brief description of the construction methods,

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    5/18

    (continued)

    the actual situation of materials,

    components used,

    the deviation from the construction drawings, specifying thecauses and correction methods

    review of the quality management department on site aboutconstruction quality

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    6/18

    6. Before requesting client acceptance, the construction unitmust check the construction works, construction components,construction process, the construction items and work with theparticipants as follows:

    Leader The person in charge of construction directly Head of construction workers Representatives of the contractors Representative of the quality management team tohelp supervisors Technical representative of the contractor

    5. Inspection of health and safety issues, environmentalcondition inside and outside of construction site

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    7/18

    7. Complete fixing drawings after examination of theconstruction site condition

    8. Report on progress, quality, quantity, health andsafety issues and environmental condition for clients

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    8/18

    ARCHITECT/ENGINEER

    Input Process Output

    Output Input Process Output

    Input Process

    OWNER

    OWNER CONSTRUCTOR

    Requirements

    of owner

    Design

    Phase

    Plans

    andSpecifications ConstructionPhase ConstructedFacility

    Operation

    andMaintenancePhase

    CONSTRUCTION PROCESSCONSTRUCTION PROCESS

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    9/18

    OJECT QUALITY IMPROVING T

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    10/18

    TOTAL QUALITY CONTROL FLOW CHART

    QualityStandard

    QualityManagement

    Construction Management

    Planning &Design

    Construction

    Operation & MaintenancePh

    ases

    Evaluation

    Evaluation

    Evaluation

    Feedback

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    11/18

    Who is customer?

    What Level of Quality do they need?

    Are they purchasing to Some QualitySpecification?

    Any Safety Considerations?

    Future Litigation?

    Ethical Issues?

    QUALITY PLANNING

    Who is customerWhat do they need

    QUALITY CONTROL

    Evaluate, compare, actEstablish infrastructure

    QUALITYIMPROVEMENT

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    12/18

    QUALITY CONTROL

    Inspection Destructive Non-destructive Sampling

    Process Control

    Monitoring Process (relates to inspection) Feedback Control Statistical Process Control (knowing when the process is out of control)

    Correction

    Knowing what to correct when process is out of control

    QUALITY PLANNING

    Who is customerWhat do they need

    QUALITY CONTROL

    Evaluate, compare, actEstablish infrastructure

    QUALITYIMPROVEMENT

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    13/18

    Problem

    Solving

    Steps

    PlanDoStudy

    Act

    Link theseTwo in

    Quality Circle

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    14/18

    Tools for Quality Control

    Check Sheets

    Pareto Charts

    Why-Why Diagrams

    Cause & Effect Diagrams

    Flowcharts

    Histograms

    Scatter Diagram

    Control Charts

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    15/18

    CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram)Used in brainstorming session to help identify the causes of qualitylosses. This diagram is particularly useful after the flow chart and thePareto diagrams have been developed.

    Step 1: Decide on the quality characteristic {e.g. Reduction of wobbleduring machine rotation}Step 2: Set up the fish bone backboneStep 3: Identify main factors causing effect {e.g. Workers, Materials,Inspection, Tools}Step 4: Add Cause to each branch

    CAUSE QUALITYEffect

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    16/18

  • 8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.

    17/18

    Benefits of Cause and Effect Diagram Making diagram is educational in itself Outline relationship Note what samples need to be taken