NURSERY BUILDING
HALMSTAD,SWEDEN
NURSERY BUILDING
HALMSTAD,SWEDEN
ANA LATORRE
NURSERY BUILDING
HALMSTAD,SWEDEN
ANA LATORRE
Ana Latorre Nursery building
ININDESXLKÑDSCOÇDÈX
I- INTRODUCTION……………………………………4
II- TECHNICAL DESCRIPTIONS………………….16
III- GANTT CHARTS…………………………………..34
IV- HEALTH AND SAFETY…………………………..37
V- BUDGET………………………………………………75
VI- DISABLED STUDY……………………………….120
VII- CONSTRUCTION DRAWINGS………………125
INDEX
Ana Latorre Nursery building
• 1.1 AREA AND SITUATION…………………………….6
• 1.2 ACTUAL BUILDINGS AND NEAR
BUILDINGS…………………………………………………….8
• 1.3 IDEA AND PURPOSE………………………………...14
INTRODUCTION
Ana Latorre Nursery building
• 2.1 DEMOLITION………………………………………..18
• 2.2 CONDITIONING OF THE AREA……………….19
• 2.3 FOUNDATION AND GROUND SLABS……...20
• 2.4 STRUCTURE…………………………………………..22
• 2.5 CARPENTRY…………………………………………..24
• 2.6 THERMICAL STUDY……………………………….26
• 2.7 EXTERIOR WALLS AND FINISHINGS……….29
• 2.8 PLUMBING INSTALATIONS……………………31
• 2.9 PROTECTION AGAINST FIRE………………….32
• 2.10 TELECOMUNICATION INSTALATIONS….33
• 2.11 ELECTRICAL INSTALATIONS…………………34
TECHNICAL DESCRIPTIONS
Ana Latorre Nursery building
• LOT DIMENSION……………………………………1
• AREA……………………………………………………2
• DIMENSIONATED PLAN…………………………3
• ALL FACADES…………………………………………4
• WEST FACADE……………………………………….5
• EAST FACADE…………………………………………6
• SOUTH FACADE………………………………………7
• NORTH FACADE……………………………………..8
• ROOF……………………………………………………..9
• ROOF DETAIL………………………………………….10
• SECTIONS PLAN………………………………………11
• CROSS SECTION 1……………………………………12
• CROSS SECTION 2……………………………………13
• CROSS SECTION 3……………………………………14
• FOUNDATION…………………………………………15
• COLUMNS STRUCTURE……………………………16
• STEEL COLUMN DETAIL……………………………17
• STEEL BEAM DETAIL………………………………...18
• STRUCTURE……………………………………………..19
• CARPENTRY……………………………………………..20
• DETAIL METAL WINDOWS………………………..21
BUDGET CONSTRUCTION DRAWINGS
Ana Latorre Nursery building
• ELECTICAL INSTALATION………………………….22
• MECANICAL VENTILATION……………………….23
• PLUMBING SYSTEM…………………………………24
• HEATER SYSTEM………………………………………25
• PROTECTION AGAINST FIRE………………………26
• HEALTH AND SAFETY 1……………………………..27
• HEALTH AND SAFETY 2 …………………………….28
• HEALTH AND SAFETY 3……………………………..29
• HEALTH AND SAFETY 4 ……………………………..30
• HEALTH AND SAFETY 5………………………………31
• HEALTH AND SAFETY 6………………………………32
• DISABLED STUDY 1…………………………………….33
• DISABLED STUDY 2…………………………………….34
• DISABLED STUDY 3…………………………………….35
Ana Latorre Introduction
6
1.1 AREA AND SITUATION:
The lot in which I am going to construct this one placed closely together of the city centre. The
exact position of the area, we can see in the following real photos. As we can see our lot is
next to the river Nissan.
HALMSTAD CITY
LOT
Ana Latorre Introduction
7
Our lot does not have a regular form, has a trapezoidal form, in such a way that one of his
faces is parallel to the river.
The lot is big enough, and has a few approximate dimensions of approximately 90 meters in
the long face and approximately 40 meters more or less in the small zone.
The lot has a total surface of approximately 3400 m².
Ana Latorre Introduction
8
1.2 ACTUAL BUILDINGS AND NEAR BUILDINGS
When I took the pictures, November 2008 in the lot there was a building; it was like a factory
of the company “Matador”. Currently this building was not too interesting and for that they
demolished it .In fact the whole area close to the this factory, it will be constructed again,
giving him a more tourist vision.
The building had two floors with 9 meters of high more or less. The facade of the building in
the river side was made with yellow metal plates giving an industrial looking to the building.
From the back side in the Södra Vägen Street the facade was made with yellow bricks. The
building was really simple because it was made just to make the function of factory.
This place is built by the main river of Halmstad (Nissan River) in an important place.
Currently, this zone is still with a lot of industries. The actual Planning still allows buildings
industries around the river close to sea. In the near future this will change. There are plans for
making this zone more attractive for tourism. In order to make this possible, all the industries
around this area will have to move another place.
In January 2008 they start to demolish the factory and now is just a lot where build something.
Ana Latorre Introduction
9
Ana Latorre Introduction
10
Ana Latorre Introduction
11
The surroundings of the area are most of them residential buildings.
1
1 2 4
3
5
Ana Latorre Introduction
12
2
3
Ana Latorre Introduction
13
4
5
Ana Latorre Introduction
14
1.3 IDEA AND PURPOSE
I wanted to build a school for small children, a nursery, a place for take care of the
children in the time of their parents are working.
The first idea of this building is separate the nursery in three places; one for the
children with age between 4-12 months, another one for ages between 12-24 months
and the last one for ages between 24 and 36 months. This idea is for the different
kinds of attention that the children needs with this age. For instance in the first period
is no necessary toilets just a place for change the nappies though in the last period the
children need toilet because they are learning how to use them.
The first place is going to be prepared for a maximum of 8 children, the second place
for a maximum of 13 children and the last one for a maximum of 20 children.
Separately of this zone, in the west of the building it will be the place for the teachers,
the kitchen, the laundry and all the things necessary for the nursery.
Outside it will be a playground for entertainment.
Another idea is to build a green roof; it means the roof of the building is partially or
completely covered with vegetation and soil, or a growing medium, planted over a
waterproofing membrane. We find several advantages with this kind of roofs as can
be:
-Reduce heating (by adding mass and thermal resistance value) and cooling(by
evaporative cooling)loads on a building.
-Grow vegetables, fruit and flowers.
-Reduce storm water run off.
-Filter pollutants and carbon dioxide out of the air
-Increase roof life span.
-The soil and plants on green roofs help to insulate a building for sound; the soil helps
to block lower frequencies and the plants block higher frequencies.
-Filter pollutants and heavy metals out of rainwater
-Increase wildlife habitat in built-up areas.
Ana Latorre Introduction
15
I thought this idea when I visited Augustenborg´s botanical roof garden in Malmö, later
I checked the Scandinavian Green Roof Association and I got a lot of information.
The materials of the building are a combination of bricks in the facades with big
windows of glass and wood.
In the lot I’m going to build separately a playground, this playground is going to be
built with prefabricated materials as is common here in Sweden.
I’m not going to pay attention to this, just said the area of this playground is 59,12m2,
is built with wood (prefabricated) and is shown in the distribution plans.
Ana Latorre
2.1 DEMOLITION
We have to proceed to the demolition of the building that nowadays exists in our lot.
The current building a factory, his name is “Matador”, and the demolition of this
building has to be done in two phases:
The first phase will be a manual demolition, to recover and to be able to re
elements that now exist in the current building. This first phase is important, because
recycling, we will have less garbage, an
The second phase of the demolition, it will be done by suitable machinery, and with
these machines we will knock down all that we could not recover and re
Technical description
18
We have to proceed to the demolition of the building that nowadays exists in our lot.
The current building a factory, his name is “Matador”, and the demolition of this
building has to be done in two phases:
The first phase will be a manual demolition, to recover and to be able to re-use most of
elements that now exist in the current building. This first phase is important, because
recycling, we will have less garbage, and also we will have a profit.
The second phase of the demolition, it will be done by suitable machinery, and with
these machines we will knock down all that we could not recover and re-use.
Technical description
We have to proceed to the demolition of the building that nowadays exists in our lot.
The current building a factory, his name is “Matador”, and the demolition of this
use most of
elements that now exist in the current building. This first phase is important, because
The second phase of the demolition, it will be done by suitable machinery, and with
use.
Ana Latorre Technical description
19
2.2 CONDITIONING OF THE AREA:
The cleaning of the terrain will be made with vegetal land retired and piled up, either if
it´s by manual means or by mechanics, but always being observed by the criteria of the
Technological Regulation. Later, the corresponding land transport will be made with
machine trucks loaded until the next garbage dump of the work.
Once the place is clean will be come to the reframing of the zones to excavate, letting
witnesses of this reframing to be able to make the pertinent verifications at any time.
The drain will be made by mechanic method, being adopted the opportune measures
to avoid as much adjacent own damages as to the public way, being observed at any
moment the fulfillment of the regulation. The leftover grounds of the drain will be
transported with loaded trucks to machine next to garbage dump of the work.
The ditches for strep footings of inclined wall and party wall, and the wells for drains
and curb box will be excavated by mechanical or manual method, being made always
by hand the outlined of their walls, remaining always clean and rubbish and ground,
with clean cuts and horizontal bases .It will follow the criteria of the Regulation. The
leftover ground will be transported with machine trucks loaded, until next garbage
dump of the work.
Ana Latorre Technical description
20
2.3 FOUNDATION AND GROUND SLABS
The wells, ditches and raft will fill up with prepared reinforced concrete HA-
30/B/25/IIIb-H with 300 kg/cm² of characteristic resistance. This concrete will be
prepared for marine ambience (corrosion induced by chlorides from seawater) and
freezing (IIIb-H). The criterions are explained then.
1º.
• HM (hormigón en masa) Concrete mass.
• HA (hormigón armado) Reinforced concrete.
• HP (hormigón pretensado) Prestressed concrete.
2º. R (resistencia) It´s the characteristic cube strenght at the age of 28 days in N/mm².
Normally we use this values 20, 25, 30, 35, 40, 45, 50 N/mm².
3º. C (consistencia).It identifies the consistence:
• S Seca. (dry)
• P Plástica. (plastic)
• B Blanda. (soft)
• F Fluida. (fluid)
4º. TM (tamaño máximo). It´s the maximum size of the soil in mm.
5º. A (ambiente) It´s the different kinds ofexposure:
-We have four kinds of main exposure clases:
I: No risk of corrosion or attack
II: Corrosion induced by carbonation.
III: Corrosion induced by chlorides from seawater
IV: Corrosion induced by chlorides other than from seawater
Ana Latorre
-Specified exposure clases:
Q (Químico): Chemical attack.
E: Erosion
H: Freeze/thaw attack with or without
This concrete will be elaborated,
instruction. First layer of about 100mm of thi
concrete in the base of the laying of
reinforcements do not move and that has the neces
made with a base of ballasts and compacted artificial skittles of 200mm of thickness
with mechanic methods. It will be demanded in work that the materials like cement,
plasters or stucco that are used have quality mark.
will have quality seal and will be from only one manufacturer.
After the layer of cleaning concrete
in the Isover book, this consist in five layers; the first one with a dr
a thickness of 150 mm, later 3 layer
thinner with 50mm and the last layer with concrete and 100 mm of thickness.
Technical description
21
Freeze/thaw attack with or without de-icing agents.
elaborated, transported and put in work according to the
instruction. First layer of about 100mm of thickness will be spilled with cleaning
the base of the laying of foundations, on which the corresponding
reinforcements do not move and that has the necessary coverings. The raft
a base of ballasts and compacted artificial skittles of 200mm of thickness
with mechanic methods. It will be demanded in work that the materials like cement,
plasters or stucco that are used have quality mark. The steel for reinforced concrete
will have quality seal and will be from only one manufacturer.
After the layer of cleaning concrete for prepare the land we will use the solution
in the Isover book, this consist in five layers; the first one with a drainage material and
a thickness of 150 mm, later 3 layers of insulation, two with 100 mm and another one
thinner with 50mm and the last layer with concrete and 100 mm of thickness.
Technical description
transported and put in work according to the
ckness will be spilled with cleaning
, on which the corresponding
sary coverings. The raft will be
a base of ballasts and compacted artificial skittles of 200mm of thickness
with mechanic methods. It will be demanded in work that the materials like cement,
steel for reinforced concrete
the land we will use the solution G:201
ainage material and
s of insulation, two with 100 mm and another one
thinner with 50mm and the last layer with concrete and 100 mm of thickness.
Ana Latorre Technical description
22
2.4 STRUCTURE
The structure will be made with steel, with laminated profile in columns and beams.
After calculate the loads in the roof considering the snow load as 100kg/m² , the floor
structure load 350 kg/m² and for have a flat roof we have to add a use load of
minimum 150kg/m² and checking the tables for beams IPE we have to take the beam
IPE 240. The dimensions of this kind of beam are described in the next image and
table:
Designation Dimensions Weight h s g t R kg/m IPE 80 80 46 3,8 5,2 5 6,0 IPE 100 100 55 4,1 5,7 7 8,1 IPE 120 120 64 4,4 6,3 7 10,4 IPE 140 140 73 4,7 6,9 7 12,9 IPE 160 160 82 5,0 7,4 9 15,8 IPE 180 180 91 5,3 8,0 9 18,8 IPE 200 200 100 5,6 8,5 12 22,4 IPE 220 220 110 5,9 9,2 12 26,2 IPE 240 240 120 6,2 9,8 15 30,7
IPE 270 270 135 6,6 10,2 15 36,1 IPE 300 300 150 7,1 10,7 15 42,2 IPE 330 330 160 7,5 11,5 18 49,1 IPE 360 360 170 8,0 12,7 18 57,1 IPE 400 400 180 8,6 13,5 21 66,3 IPE 450 450 190 9,4 14,6 21 77,6 IPE 500 500 200 10,2 16,0 21 90,7 IPE 550 550 210 11,1 17,2 24 106,0
We are going to build the floor slabs with a semi-precast construction system called
FILIGRAN; this method has a lot of advantages as can be the efficient and economical
series production in the factory, the time savings at the building site and also the
reduced labor requirement on site.
Ana Latorre Technical description
23
For the columns the procedure is the same and calculating the loads and checking the
tables it will be made with laminated profile KKR-rör square of 100x100, 140x140 and
rectangular 140x100. All the welding will be made according to the regulation.
Ana Latorre Technical description
24
2.5 CARPENTRY
In this building we have a lot of doors, in different models. The exterior doors are a
combination of wood and glass and inside the doors are just with wood.
Interior door
We have a big wood door for the baby carriage with dimensions 135 x 240cm.
6 exterior doors with two sheets with dimensions 100 (each door) x 240 cm.
Three of these exterior doors are making a entrance hall and they are with another
door consecutive, because here in Sweden in almost all the public places I have seen
this, for instance the university, two doors before go inside for avoid the cold enter
and keep the heat inside.
12 interior doors with two sheets with dimensions between 155x 210 cm.
18 exterior doors with dimensions 82 x 240 cm.
34 interior doors with dimensions 82 x 210 cm.
4 interior doors with dimensions 114 x 210 cm.
1 door with fire resistance 120 with dimensions 155x210cm.
1 door for go out to the patio with dimensions 195 x 240 cm.
Ana Latorre Technical description
25
The windows are in dark aluminum with double glass and we have also a lot of areas
with glass finished with aluminum as well.
Ana Latorre
2.6 THERMICAL STUDY
The thermical study is calculated
For this thermal calculation the S
the layers in the wall and if the relative humidity is less than 100% we won’t find
problems of condensation.
1. EXTERIOR WALL
The studied façade is composed by several
next picture for the dimension
small one with 8 centimeters, the next one 17 cm. and the last one 12 cm.
Technical description
26
THERMICAL STUDY
is calculated in the exterior wall and in the roof.
For this thermal calculation the Swedish procedure has followed. We will analyze all
the layers in the wall and if the relative humidity is less than 100% we won’t find
The studied façade is composed by several layers, I have chosen the first option in the
for the dimension, we have 3 layers of insulation in different sizes; the
small one with 8 centimeters, the next one 17 cm. and the last one 12 cm.
Technical description
We will analyze all
the layers in the wall and if the relative humidity is less than 100% we won’t find
the first option in the
we have 3 layers of insulation in different sizes; the
Ana Latorre Technical description
27
2. GREEN ROOF
In the roof we have also several layers and we are going to follow the same
procedure than in the exterior wall.
Ana Latorre Technical description
28
GREEN ROOF DETAIL:
Ana Latorre
2.7 EXTERIOR WALLS
The exterior walls will be made with bricks, the
the IsoverBoken (Isover book) and is the solution Y:201.
The bricks are in a light colour for obtain a contrast with the dark wood in
porch´s roof.
Technical description
29
EXTERIOR WALLS AND FINISHINGS
The exterior walls will be made with bricks, the solution that I have chosen appears in
the IsoverBoken (Isover book) and is the solution Y:201.
cks are in a light colour for obtain a contrast with the dark wood in doors, details and
Technical description
solution that I have chosen appears in
doors, details and
Ana Latorre Technical description
30
The floor is finished with parquet in a clear shade. The walls inside are finished with a white
paint and completely smooth. As we explain before the windows are in metal and the doors in
wood.
Rough example of the interior of the school :
Ana Latorre Technical description
31
2.8 PLUMBING INSTALATIONS
Hot and cold water:
All the network of hot and cold water distribution will be made with electrolytic copper
pipe with meetings welded, in dimensions and diameters according to plane of project,
installed, verified and measured according to regulation. The pressure of the
connection is 5 atm., the maximum height of supply is 2 meter and the flow of the
main connection of the house is 4,9 m³/s with this information we can calculate the
diameters of the pipes and we obtain:
Exterior pipe……………50mm
Installation room……..30mm
Common areas ………..20mm
Individual branch………12 mm
The production of hot water is produced by an instantaneous heater of sanitary hot
water situate in the installation room.
Plumbing fixtures:
The sanitary apparatuses will be of vitrified porcelain with white color.
Ana Latorre Technical description
32
2.9 PROTECTION AGAINST FIRE
The installation is in agreement with the effective regulation NBE-CPI-96(Norma Básica
de la Edificación y Condiciones de Protección contra Incendios).
Building use………………Educational use
Evacuation height……. h<4meters.
All the building obey that regulation, this building has a lot of doors to the exterior
because in the evacuation of the small children they need help of somebody so all the
rooms have evacuation doors. The main corridor is 2,5m. width keeping like this the
1,2 m. of the regulation.
In agreement with the regulation we´ll need fire extinguishers each at least 15 meters
with a minimum efficacy of 21A-113B.
Signs for the exit of the building, the fire extinguisher and we`ll need
Fire alarms for have a building between 1000 and 5000 m² and smoke and fire
automatic detectors.
Emergency illumination in the installation room, general evacuation route and in the
rooms planned for more than 100 persons.
An extractor fan in the kitchen.
For the characteristics of this building we don’t need to install automatic sprinkler, or
fire hydrant (>2000 m²).
Ana Latorre Technical description
33
2.10 TELECOMUNICATION INSTALATIONS
One will settle in agreement with the actual regulation and project written up by
engineer in telecommunication.
2.11 ELECTRICAL INSTALATIONS
The electrical system will be made interlocked, with copper conductor of double
protected plastic isolation with flexible tube of P.V.C., verified and measured,
according to the construction regulations and Electro-technic Regulation of Low
Tension. It will have a general box of protection.
Ana Latorre Technical descriptions
Ti= 18º C Te= -10ºC / Hri= 75% Hre= 95%
CONCEPT L λ R ∆Tª POINT Tª Vs δ Z ∆V V RÅ OBSERVATIONS
IN
A 18 15,36 11,52 75% No condensation in
this point Plaster 0,013 0,22 0,059 0,165 5X10⁻⁶ 2,6X10³ 0,011
B 17,83 15,18 11,51 75,8% No condensation in
this point Insulation 0,120 0,039 3,077 8,643 1,5X10⁻⁶ 8X10⁴ 0,329
C 9,2 8,94 11,18 73,6% No condensation in
this point Waterproof
film 0,000 0,000 0,000 0,000 2X10⁶ 8,24
D 9,2 8,94 2,94 32,8% No condensation in
this point Insulation 0,170 0,039 4,359 12,244 1,5X10⁻⁶ 1,13X10⁵ 0,465
E -3 3,82 2,47 64,7% No condensation in
this point Plaster 0,013 0,22 0,059 0,165 5X10⁻⁶ 2,6X10³ 0,011
F -3,1 3,79 2,46 64,9% No condensation in
this point Insulation 0,080 0,039 2,051 5,761 1,5X10⁻⁶ 5,3X10⁴ 0,218
G -8,9 2,35 2,24 95% No condensation in
this point Air chamber 0,020 0,125 0,16 0,449 1X10⁻⁶ 2X10⁴ 0,0824
H -9,4 2,25 2,16 95% No condensation in
this point Bricks 0,120 0,6 0,20 0,562 4X10⁻⁶ 3X10⁴ 0,124
I -10 2,14 2,03 95% No condensation in
this point OUT
RT= 9,965 ZT= 2,3X10⁶
Ana Latorre Technical descriptions
Ti= 18º C Te= -10ºC / Hri= 75% Hre= 95%
CONCEPT L λ R ∆Tª POINT Tª Vs δ Z ∆V V RÅ OBSERVATIONS
OUT
A -10 2,14 2,03 95% No condensation in
this point Soil 0,25 0,8 0,312 0,85 6X10⁻⁶ 4,16X10⁴ 0,158
B -9,15 2,3 2,18 94% No condensation in
this point Drainage
material 0,12 0,059 2,034 5,546 1X10⁻⁶ 1,2X10⁵ 0,456
C -3,6 3,64 2,64 72% No condensation in
this point Insulation 0,18 0,039 4,61 12,57 1,5X10⁻⁶ 1,2X10⁵ 0,456
D 8,96 8,8 3,0 34% No condensation in
this point Waterproof 0 0 0 0 2X10⁶ 7,6
E 8,96 8,8 10,69 94% No condensation in
this point Concrete 0,3 0,25 1,2 3,272 2X10⁻⁶ 1,5X10⁵ 0,57
F 12,23 10,8 11,26 93% No condensation in
this point Insulation 0,08 0,039 2,05 5,59 1,5X10⁻⁶ 5,3X10⁴ 0,201
G 17,82 15,18 11,46 75% No condensation in
this point Plaster 0,013 0,22 0,06 0,163 5X10⁻⁶ 2,6X10³ 0,0099
H 18 15,365 11,47 75% No condensation in
this point IN
RT= 10,266 ZT= 2,48X10⁶
Ana Latorre Gantt chart
35
NAME OF THE PROJECT: NURSERY
DATE TO START: 01/09/2009
DATE TO FINISH: 12/05/2010
DURATION TOTAL OF THE WORKS: 8 MONTHS AND 12 DAYS (180 DAYS OF WORK)
18 WORKERS
TASKS:
DEMOLITION 15 DAYS
EARTHWORK 11 DAYS
FOUNDATION AND STRUCTURE 65 DAYS
ROOF AND FAÇADE 35 DAYS
TELECOMMUNICATION INFRAS. 3 DAYS
VENTILATION AND AIR CONDITIONING 9 DAYS
ELECTRICAL INSTALATION 10 DAYS
PLUMBING INSTALATION 10 DAYS
PARTITIONS 20 DAYS
GLASS WALLS 12 DAYS
FIRE PROTECTION INSTALATION 4 DAYS
COATINGS 30 DAYS
FURNITURE AND KITCHEN EQUIPMENT 3 DAYS
PLUMBING FIXTURES 3 DAYS
PAINTS 10 DAYS
CARPENTRY 7 DAYS
CLEANING OF THE AREA 7 DAYS
CONDITIONING OF THE AREA 20 DAYS
GANTT CHART
Ana Latorre Gantt chart
36
Ana Latorre Health and safety
38
Safety and Health study establishes, during the construction of the work, the forecasts
respect to prevention of risks and occupational accidents so that all the works that
compose this work develop surely, avoiding dangerous actions or situations by lack of
foresight, lack of information on the possible risks or means insufficiency, as well as
the sanitary services common to the workers.
It will be serve to give basic directives to the companies’ contractors to carry out his
obligations in prevention field of professional risks taking easy his development under
the control of the Coordinator in Security and Health during the execution of the work.
A Plan to Emergencies is described in addition that guarantees in addition that
guarantees performance standards at the time of facing situations of gravity which
they could take place to assure the attendance, evacuation and putting out of danger
of the personal that works, or is in the work at the moment of the emergency.
The works to make consist of the construction of a NURSERY in Södravägen with
Klyrevagatan in Halmstad (Sweden).
The projected Nursery will be located in Halmstad south-west of Sweden; beside the
Nissan River according to graphic in the situation plane. The accesses are not
completely urbanized which are still an industrial area.
The site has a surface of 3400m² approximately. The topography is flat.
Referring to the services, the lot has provision of electrical energy, water supply,
residual water evacuation through formation communications net.
PROMOTER: Högskolan I Halmstad
BUDGET EXECUTION OF THE PROJECT: 1.062.703,18 euros.
IMPLEMENTATION TIME: 8 months and 12 days.
NUMBER OF WORKERS ANTICIPATED: for the totality of the project will not surpass the
number of 18 workers with different specialities.
AUTHOR: Ana Latorre Martínez (Technical Architect)
HEALTH AND SAFETY
Ana Latorre Health and safety
39
1- Previous works to the realization of the work
Before beginning the execution of a work, the first thing that it will be necessary to
consider is the order of realization of the preliminary works, keeping in mind the risks
that can involve. The characteristics of the building won´t only be known to build but
rather, in the visit to the land registrations will located wells, caskets and everything
that indicates the existence of underground conductions, will be requested to the
suppliers companies of service (water, gas, electricity) the different data where they
are signal the situation of the different facilities.
During the previous phase to the execution of the work will be defined the services
which can be affected and that they are necessary for the execution in different phases
of the same one, it will be also proven if the structures of the adjacent buildings can
suffer some damage during the execution of these previous works.
For the level of risk that they offer, the provisional installation of electricity can
damage at third, even it can cause serious accidents. The provisional installation of
water, besides being able to cause damages at third, will also become special attention
to the break of conductions of water that they can be the cause of detachments of the
land with possible repercussions in the foundations in the adjacent buildings.
Finally for the execution of these works the first consideration will be to check the
existence of air or underground conductions and to obtain the pertinent information
on the same ones, the second consideration, not less important than the previous one
it will be to know the data corresponding to the state of the buildings mediators. For
the storing of materials and machinery, it loads and it discharges, as well as the
auxiliary works will not be used the space of the lot occupied by the contructions that
will be carried out.
Barriers
Before the beginning of the work, it will be carried out the edge of the lot along all
their perimeter, maintaining a distance of security from the barriers until the border of
casting of lands similar to 2.00 m. This distance will stay so much in the perimeter of
the work like in the access areas to the same of the machinery and of the personal that
works in her. The hedge will be carried out with welded net, supported with metallic
feet fixed on bases of armed concrete, assuring its assurance and resistance.
These barriers will be built according to the plans and before start to work.
The characteristics of the barrier should be:
Ana Latorre Health and safety
40
-The height of the barrier will be same or superior to two meters.
-An access will be enabled for vehicles of 4.5 m of width.
-An independent access will be enabled for personal with a width of leaf of 1m. It’s no
allowed the access of personal for the vehicle access.
Besides this protection hedge a signaling hedge exists, made so that it can be willing of
vertical form and to inform for half symbols and colours that is location should not be
passed over.
Signaling
It will be present at least the following signaling:
-Its obligatory use the safety helmet inside of the construction site.
- Forbidden to park in the area of entrance of vehicles.
-Forbidden the step of pedestrians for the entrance of vehicles.
-Obligatory to use the footwear of the security in the enclosure of the work.
-Forbidden the entrance to all people unaware to the work.
-Work poster
Ana Latorre Health and safety
41
2. Provisional facilities of work
A.Service of hygiene
Based on the maximum number of workers who can be found in work, we will
determine the necessary surface and elements for these facilities. In our case the
greater presence of simultaneous personal is approximately 20 workers, determining
the following sanitary elements:
Showers……………………2
Toilets………………………2
Washbasin………………..2
That facilities supplemented by auxiliaries needed as towel, soap…
The changing rooms will be equipped with seats and individual lockers with key, to
store clothing and footwear.
Be available in hot and cold water showers and toilets.
Also, dining rooms equipped with tables and chairs is sufficient number will settle. In
case restaurants exists next to the lot or bars are understood that the work is
equipped for the dining room necessities.
There will be a container for garbage collection.
Perfect state of cleaning and conservation will stay in.
In the work office one will settle a medicine kit of first aid with the minimum content
indicated by the effective legislation, and a multipurpose dry dust extinguisher.
B. Electric installation
According to that said previously we will check the pertinent information to what
refers as regards electric facilities under floor or conduits for where cables of high
intensity circulate or it lowers. Once known this and having the information of the
supplier company will be marked the itinerary and depth of the underground
conduction with the maximum precision. The axis of the conduction will be traced,
being placed a poster that indicates the existent danger, being left an area of security,
to both sides of the excavation axis, of 1.5 meters. The underground conductions of
electricity, they will cover with sand, bricks, tape of plastic in red color and filler
material. With this information, it will be able to begin the works, hedges and
provisional facilities of work. The measures to take will be:
Ana Latorre Health and safety
42
1. They will be make with excavating shovel until the depth that the company
authorizes. Starting from there the excavation will continue with manual tools not
pointed.
2. The equipments of individual protection that the workers will use are helmets,
gloves and dielectrics boots. The tools that use will be isolated.
Once we have covered the gutter and before a later mishap or modification is easy to
determine its location if they are followed this: the minimum free depths, of the
different types of service with relationship to the level of the sidewalk, measure in
meters, will be;
- Electricity of High tension 1.2m
- Electricity of Low tension 0.7m
- Lighting 0.40m
Therefore our line it will be of low tension (220-380 volts) so we will locate it of level
from the sidewalk to 0, 7 m. and the illumination 0, 40 m.
The distances among conductions according to the N.T.E. -I.E.R. it has more than
enough external net you line buried they will be:
- High tension, with line of low tension telephony, watter, gas, etc...
0.25m
- Low tension with telephony, watter, gas, etc.. 0.20m
- High tension with line A.T (to same tension) in the same gutter, 0.08m
- High tension with line of A.T with different tension 0.25m
- Low tension with line A.T 0.25m
According to N.T.E. -I.E.R and that predisposed by our project will use
that of Low tension therefore we will have to keep in mind that pointed out
previously concerning our line. Besides that described according to N.T.E. -
I.E.R. for buried lines of low tension the minimum depth will be of 0.7m
following the side walk line and with a minimum separation of 1m. We will also
keep in mind that for the illumination their spread will be able to be carried out
following the line of sidewalks with the medium ones from roadway separation
to a minimum depth of 0.4m and a separation of the line of curb of 0.75m.
Once open the gutter:
1. Placement of layer of colored sand.
2. Placement of the protection conduction that it has also a certain color.
3. Cover the conduction with colored sand and a plastic tape with an
annotation.
4. Placement of line of bricks.
When is finished this it will proceed to cover and compact the earth.
Besides the previous considerations the elevation machines will have
Ana Latorre Health and safety
43
anchorages or electric blocks or mechanics that prevent to surpass the
minimum distances of security, being signaled the areas that should not be
passed over, by means of barriers that impede all contact with the parts in
tension.
C. Water supply
This kind of underground canalizations of drinkable water, residual or of watering are
conductions with flow and variable pressure before a break or overflow, they present
flood risk, with nuisances and delays.
In our work, the installation of a provisional net of supply of drinkable water will be
executed to satisfy the necessities. Once it is hired the supply of the assault with the
supplier company, it will be settled the accountant, the general key and the exit to the
different distributions. The assault is located in Södra vägen.
It will settle a derivation for the work huts that it will reflect buried, protected and
signaled.
Ana Latorre Health and safety
44
3. Protection against fire:
Types of fires that we will be able to find:
1. In the foundation: electrocution for contacts with buried electric facilities
2. In the structure:
-electrocution for accumulation of takings of earth of the electric machinery
-placing the reinforced steel: fires for the high temperatures in the welding
point and the projection of sparks and incandescent particles.
3. In the waterproof sheet of the cover:
-fires and explosions.
4. In the endings:
-in general in all the operations where electric machinery is used there are
electrocution risk and fires, as well as whenever the welding is used
-in the paintings and varnishes: explosions or fires for inflammation of the
mixture of air / vapors of the solvents.
5. In the permanent facilities:
-in general in all the operations where electric machinery is used there are
electrocution risks and fires, as well as whenever the welding is used
-before the presence of gas the risk of explosions increases.
Fire prevention and fire fighting:
All appropriate measures should be taken by the employer to:
1. Avoid the risk of fire.
2. Control quickly and efficiently any outbreak of fire.
3. Bring about a quick and safe evacuation of persons.
-Sufficient and suitable storage should be provided for flammable liquids,
solids and gases.
-Secure storage areas should be provided for flammable liquids, solids and
gases such as liquefied petroleum gas cylinders, paints and other such materials in
order to deter trespassers.
-Smoking should be prohibited and "No Smoking" notices be prominently
displayed in all places containing readily combustible or flammable materials.
-In confined spaces and other places in which flammable gases, vapors or
Ana Latorre Health and safety
45
dusts can cause danger:
1. Only suitably protected electrical installations and equipment, including portable
lamps, should be used.
2. There should be no naked flames or similar means of ignition.
3. There should be notices prohibiting smoking.
4. Oily rags, waste and clothes or other substances liable to spontaneous ignition
should be removed without delay to a safe place;
5. Adequate ventilation should be provided.
-Combustible materials such as packing materials, sawdust, greasy/oily
waste and scrap wood or plastics should not be allowed to accumulate in workplaces
but should be kept in closed metal containers in a safe place.
-Regular inspections should be made of places where there are fire risks.
These include the vicinity of heating appliances, electrical installations and conductors,
stores of flammable and combustible materials, hot welding and cutting operations.
-Welding, flame cutting and other hot work should only be done on the
orders of a competent supervisor after appropriate precautions, as required, are taken
to reduce the risk of fire.
-Places where workers are employed should, if necessary to prevent the
danger of fire, be provided as far as practicable with:
1. Suitable and sufficient fire-extinguishing equipment, which should be easily visible
and accessible;
2. an adequate water supply at ample pressure.
-Fire-extinguishing equipment should be properly maintained and inspected
at suitable intervals by a competent person. Access to fire-extinguishing equipment
such as hydrants, portable extinguishers and connections for hoses should be kept
clear at all times.
-All supervisors and a sufficient number of workers should be trained in the
use of fire-extinguishing equipment, so that adequate trained personnel are readily
available during all working periods.
-Where necessary to guard against danger, workers should be suitably
trained in the action to be taken in the event of fire, including the use of means of
escape.
-Where appropriate, suitable visual signs should be provided to indicate
clearly the direction of escape in case of fire.
-Sufficient and suitable means to give warning in case of fire should be
provided where this is necessary to prevent danger. Such warning should be clearly
Ana Latorre Health and safety
46
audible in all parts of the site where persons are liable to work. There should be an
effective evacuation plan so that all persons are evacuated speedily without panic and
accounted for and all plant and processes shut down.
-Notices should be posted at conspicuous places indicating:
1. The nearest fire alarm;
2. The telephone number and address of the nearest emergency services.
Facilities for the extinction of fires:
It will be in the work two extinguishers portable manuals of powder which can be use
for everything. One will remain in the work hut, in an appropriate place for it, and the
other one in the low plant of one of the housings located in the centre of the lot, in a
place appropriate for it.
Personal protections for the workers:
-Helmet of incombustible material
-Clothes insulating of amianthus or knitted with aluminum
-Gloves
-Boots
-Masks
-Leggings
-Teams of autonomous breathing
Signs for the protection against fire:
Ana Latorre Health and safety
47
4. Stages of work´s execution
A. Movements of Lands
Description and organization of the Works:
The topography of the land is sensibly horizontal without appreciable
differences. The excavation will be carried out to open sky, to 350 mm deep,
with mechanical facilities (front loader shovel to go down to the required bench
mark, later on retro shovel for the elimination of the ramp).
The earth movements to carry out are:
- The cleaning of the layer of vegetable earth or clear.
- The excavation of the land until arriving to the bench mark required for
the support of the foundation flagstone.
- The excavation of the perimeter executing a gutter to 550 mm deep,
bench mark required for the support of the half-boot run low load walls.
Most common risks:
In the clear:
- Accidents, blows and collisions with machines and vehicles
- Overturns and false maneuvers of the machinery for movement of lands
(excavating machines and trucks)
- Noise and vibrations
- Over efforts
- Others
In the realization of the excavation:
- Fallen to the same one and the different level of people or machinery
- Landslide of the land, buries (for filtrations, vibrations, it overloads, etc.)
- Accidents, blows and collisions with machines and vehicles
- Overturns and false maneuvers of the machinery for movement of lands
(excavating machines and trucks)
- Fall of objects, vehicles, machinery from a superior level
- Floods
- Noise and vibrations
- Over efforts
- Others
Ana Latorre Health and safety
48
Preventive norms
In the clear:
- Before the beginning of the works, one will keep in mind the possible
interference with affected services. If it is air electric lines, their discharge will be
requested and it will be signaled with orange net, in a longitudinal way and at a
distance of 5 meters (horizontal plane) regarding the affected line.
- It will be limited the interference with third placing foot barriers in passing in areas of
pedestrians, making you use of the signaling if it is affected to circulation roads, using
you signs as: "Warning gutters”.
- The minimum distances of separation will be delimited among operatives in function
of the tools that use.
- The operatives who don't manage the machinery will remain outside of the radius of
action of the same one, paying special attention when they develop their work near
the machines.
- The works will be suspended under the regimen of rains
In the excavation of gutters and wells
- When the vehicles circulate in normal direction to the cut, the enclosed area will
enlarge that direction in two times the depth of the cut and not less than 4 meters
when it is necessary to place signaling of reduction of speed.
- When the extracted lands are polluted they will be disinfected as well as the walls of
the corresponding excavations.
- Anybody won't work simultaneously in vertical different levels of the same one. In
the event of having to work under these conditions, the operative of the inferior level
will remain with the helmet of security during his work.
- They will be revised the contentions before beginning the work day, tightening the
elbow pieces when they have loosened
- They will be proven that they are expedite the beds of superficial waters.
- These preventions will be carried to an extreme after work interruptions of more
than 1 day and/or atmospheric alterations as rains or icy
- In the event of presence of water (strong rains, breaks of pipes, floods,
Etc.) it will proceed immediately to its reduces, in prevention of alterations of the
land.
- The extracted lands will be gathered at a distance of the border of the excavation, as
minimum, similar to the depth of the gutter. In contented gutters this distance will be
same or bigger to 1 m
- The contention elements won't be used to ascend or to lower the gutter.
- The contentions or part of these will take off when they stop to be necessary only
and for horizontal fringes beginning with the inferior part of the cut.
Ana Latorre Health and safety
49
- Any step that is necessary to make on the gutters, will be made with gangplanks
protected in its perimeter with handrails of 0.90 m, intermediate bar and baseboard.
- It will prepare in the work, to provide in each case the indispensable team to the
operative, of a provision of levers, wedges, bars, props and planks that won't be used
for the contention and they will be reserved for their use by the salvage team, as well
as of other means that can be good for eventualities or the operatives' aid that could
have an accident.
- In the works in gutters will have a signalist in the hoisted of loads when the
maneuvers are difficult or the field of vision is limited. The operatives won't remain
under the loads. It will be verified the state of the elements daily of hoisted elements.
- It will be placed some endings which prevent that the vehicles approach on the edge
of the gutters.
- To humidify the front of attack of the excavation to eliminate the powder that takes
place as much as possible.
- When the level of noise taken place by the used machinery will be equal or bigger
than 80 decibels the operatives has to use auditory plugs.
Personal protection
In the clear and in the excavation of gutters and wells:
- Polyethylene helmet (workers will use it, machinists and truck drivers that want or
they should abandon the booths of conduction of the vehicles will use it too).
- Security footwear
- Security rubber boots (or PVC)
- Leather gloves and canvas against mechanical risks
- Work clothes
- Raincoats for humid or rainy atmospheres
- Auditory protection in works with pneumatic machinery
- Glasses against projections
- Mask of filter mechanic (against powder)
- Lumbar bands
B.Works with reinforced steel
Description and organization of the works The steel will be given ready for its placement in work.
The groups of diameters should be hugged with cables.
Detection of the most frequent risks
- Squashing during the load operations and discharge of diameters packages
Ana Latorre Health and safety
50
- Squashing and trappings during the operations of assembly of the reinforced steel
- Cut and wounded in hands and feet for handling of round of steel and tools
- Fallen in the placement and bundle of reinforced steel
- Fallen at the same level in the displacements on the reinforced steel
- Trips and twists when walking on the reinforced steel
- Footfalls on sharp objects
- Those derived of the eventual breaks of the steel diameters during the operations of
benting or stretched
- Overefforts
- Others
Basic norms of security
In the reception and manipulation:
- To have a crane of enough capacity and appropriate slings to the discharge to make
- To pay special attention to the elevation operations and transport of the diameters
packages. When the operator of the crane doesn't have enough visibility there will be
somebody that indicates him/her the maneuvers to make
- For the elevation and transport of the packages, they will never be suspended of the
ropes, they will be surrounded with the sling of two points forming an angle of 90º
- During the transport of the packages, nobody will remain under loads
- The storing of the diameters won't affect in passing to the areas
Placement and assembly of the reinforced steel:
- The diameters will be transported suspended of the hook of the crane for their
placement, with slings or stirrups, of two distant points to avoid deformations or
dangerous displacements
- The mounted reinforced steel will never move in a vertical way in their transport,
only for the exact location in situ"
- The location maneuvers in situ of mounted reinforced steel won't be guided
manually, it will be do with ropes in two addresses. Once placed in position, the one
plumbed will be carried out in a manual way
Personal protection
- Security helmet
- Work clothes
- Leather gloves
- Footwear of security (preferably boots)
- Glasses against projections
- Belt behaves – tools
- Security belt (with harness in assembly operations and placement in height, where
risk of fall of height exists)
Ana Latorre Health and safety
51
C. Formwork and concrete work
General provisions
-The erection or dismantling of buildings, structures, civil engineering works,
formwork, falsework and shoring should be carried out by trained workers only under
the supervision of a competent person.
- Adequate precautions should be taken to guard against danger to workers arising
from any temporary state of weakness or instability of a structure.
-Formwork, falsework and shoring should be so designed, constructed and maintained
that it will safely support all loads that may be imposed on it.
-Formwork should be so designed and erected that working platforms, means of
access, bracing and means of handling and stabilising are easily fixed to the formwork
structure.
Detection of the most frequent risks
- Fall of people at the same level.
- Fall of people y/u objects at different level.
- Fall of people y/u objects to the emptiness.
- Formwork collapse.
- Formwork breakage.
- Footsteps on sharp objects.
- Footsteps on transit surfaces.
- The derived ones from works on humid or wet grounds.
- Contacts with the concrete (dermatitis by cements).
- Tramping.
- Electrocution. Electric touches.
- Others
Preventive measures type of application during the spill of the concrete.
a) Spill by means of bucket or bucket.
- Forbidden to load the bucket over the permissible fully factored load of the crane
that sustains it.
- The opening of the bucket for spill will be executed exclusively by the incorporated
suitable mechanism to the same one in avoidance of accidents by - blockage or - corks.
b) Norms or preventive measures type of application during the concrete process one
of walls.
- Before the beginning of the spill of the concrete, the Overseer (or Ordered), will
review the good state of security of the timbering of territories containment of the
slopes of the drained one that they interest to the zone of wall that goes away has to
concrete, to make the reinforcements or sanitation that were necessary.
Ana Latorre Health and safety
52
- The access to extrados of the wall (formwork space between external and the slope
of the drained one), will take place by means of ladders: Forbidden access, formwork
climbing, being an uncertain action.
- Before the beginning of the concrete one, the Overseer (or Ordered), will review the
good state of security of the formworks ones in prevention of blow-out and I spill.
- Before the beginning of the concrete, and as the formwork ends of the works of, the
servicing platform of coronation of the wall from which will have been constructed to
help the workings of vibrated spill and.
- The formwork for spill and vibrated platform of coronation of, that will settle down
all along of the wall; it will have the following dimensions:
- Length: The one of the wall.
- Width: 60 cm., (3 planks minimum).
-Attachment: Struts on the formwork.
- Protection: Railing of 90 cm. of height formed by banister rails, intermediate strip and
end tile of 15 cm.
- Access: By means of prescribed ladder.
- They will settle down to a minimum range of 2 m.s, (like general norm), forts tops of
end of route, for the vehicles that must on the brink of madness come near the slopes
of the drained one, to spill the concrete (Dumper, truck, concrete mixer).
- The concrete spill in the interior of the formwork one will be made distributing it
throughout the same one uniformly, by regular layers, in avoidance of overloads props
that can deform or burst the formwork.
c) Norms or preventive measures of application during the concrete process one of
forged pillars:
- Before the beginning of the concrete spill, the Overseer (or Ordered),will review the
good state of the security of the formwork, in accident prevention by blow-out or I
spill.
- Before the beginning of the concrete process, one will review the correct disposition
and state of the networks of protection of the works of structure.
- Forbidden final, to climb up the formworks ones of the pillars or to remain in balance
on such.
- Formworks will be watched good behaviour during the spill of the concrete,
paralyzing them at the moment that detects failures. The spill will not be started again
until restoring the decreased stability.
- The good state of the hollows in the forged one will be reviewed, reinstall - the covers
that lack and nailing the releases, daily.
- The good state of the visors of protection against fall of objects, being solved will be
reviewed daily the deteriorations.
- Accesses easy and safe will be arranged to arrive at the work places.
- Forbidden to concentrate concrete loads in a single point. The spill will be made
extending the concrete with smoothness without abrupt unloading, and in ample
surfaces.
- Movable platforms of minimum of 60 cm. wide will settle down (3 joined planks to
each other), from which they execute the works of vibrated of the concrete.
Ana Latorre Health and safety
53
- Belt roads will settle down on the surfaces to concrete formed by lines of 3 planks of
minimum total width of 60 cm.
Erection and dismantling of steel and prefabricated structures
-As far as practicable the safety of workers employed on the erection and dismantling
of steel and prefabricated structures should be ensured by appropriate means, such as
provision and use of:
a. ladders, gangways or fixed platforms;
b. platforms, buckets, boatswain's chairs or other appropriate means suspended from
lifting appliances;
c.safety harnesses and lifelines, catch nets or catch platforms;
d .power-operated mobile working platforms.
-Steel and prefabricated structures should be so designed and made that they can be
safely transported and erected, and if required by national laws and regulations each
unit should be clearly marked with its own weight.
-In addition to the need for the stability of the part when erected, when necessary to
prevent danger the design should explicitly take into account:
a.the conditions and methods of attachment in the operations of transport, storing
and temporary support during erection or dismantling as applicable;
b.methods for the provision of safeguards such as railings and working platforms, and,
when necessary, for mounting them easily on the structural steel or prefabricated
parts.
-The hooks and other devices built in or provided on the structural steel or
prefabricated parts that are required for lifting and transporting them should be so
shaped, dimensioned and positioned as:
a.to withstand with a sufficient margin the stresses to which they are subjected;
b.not to set up stresses in the part that could cause failures, or stresses in the structure
itself not provided for in the plans, and be designed to permit easy release from the
lifting appliance. Lifting points for floor and staircase units should be located (recessed
if necessary) so that they do not protrude above the surface;
c. to avoid imbalance or distortion of the lifted load.
-Storeplaces should be so constructed that:
a.there is no risk of structural steel or prefabricated parts falling or overturning;
b.storage conditions generally ensure stability and avoid damage having regard to the
method of storage and atmospheric conditions;
c.racks are set on firm ground and designed so that units cannot move accidentally.
-While they are being stored, transported, raised or set down, structural steel or
prefabricated parts should not be subjected to stresses prejudicial to their stability.
-Every lifting appliance should:
a.be suitable for the operations and not be capable of accidental disconnection;
b.be approved by a competent person, or tested under a proof load 20 per cent
heavier than the heaviest prefabricated part.
-Lifting hooks should be of the self-closing type or of a safety type and should have the
maximum permissible load marked on them.
Ana Latorre Health and safety
54
-When necessary to prevent danger, before they are raised from the ground, structural
steel or prefabricated parts should be provided with safety devices such as railings and
working platforms to prevent falls of persons.
-While structural steel or prefabricated parts are being erected the workers should be
provided with and use appliances for guiding them as they are being lifted and set
down, so as to avoid crushing of hands and to facilitate the operations.
-Before it is released from the lifting appliance a raised structural steel or prefabricated
part should be so secured and wall units so propped that their stability cannot be
imperilled, even by external agencies such as wind and passing loads, in accordance
with national laws and regulations.
-At workplaces adequate instruction should be given to the workers on the methods,
arrangements and means required for the storage, transport, lifting and erection of
structural steel or prefabricated parts, and before erection starts a meeting of all those
responsible should be held to discuss and confirm the requirements for safe erection.
-During transport, attachments such as slings and stirrups mounted on structural steel
or prefabricated parts should be securely fastened to the parts.
-Structural steel or prefabricated parts should be so transported that the conditions do
not affect the stability of the parts or the means of transport result in jolting, vibration
or stresses due to blows, or loads of material or persons.
-When the method of erection does not permit the provision of other means of
protection against falls of persons, the workplaces should be protected by guard-rails,
and if appropriate by toe-boards.
-When adverse weather conditions such as snow, ice and wind or reduced visibility
entail risks of accidents the work should be carried on with particular care, or, if
necessary, interrupted.
-Structures should not be worked on during violent storms or high winds, or when they
are covered with ice or snow, or are slippery from other causes.
-If necessary to prevent danger, structural steel parts should be equipped with
attachments for suspended scaffolds, lifelines or safety harnesses and other means of
protection.
-The risks of falling, to which workers moving on high or sloping girders are exposed,
should be limited by all means of adequate collective protection or, where this is
impossible, by the use of a safety harness that is well secured to a sufficiently strong
support.
-Structural steel parts that are to be erected at a great height should as far as
practicable be assembled on the ground.
-When structural steel or prefabricated parts are being erected, a sufficiently extended
area underneath the workplace should be barricaded or guarded.
-Steel trusses that are being erected should be adequately shored, braced or guyed
until they are permanently secured in position.
-No load-bearing structural member should be dangerously weakened by cutting,
holing or other means.
-Structural members should not be forced into place by the hoisting machine while any
worker is in such a position that he could be injured by the operation.
Ana Latorre Health and safety
55
Cast-in-situ concrete structures
-The construction of cast-in-situ, large span and multi-storey concrete structures
should be based on plans that:
a.include specifications of the steel, concrete and other material to be used, including
technical methods for safe placing and handling;
b.indicate clearly the position and arrangement of reinforcements in structural
elements;
c.provide, if appropriate, calculations of the load-bearing capacity of the structure.
-During the construction of cast-in-situ, large span and multi-storey concrete
structures, a daily record should be kept of the progress of the work, including
indications of all data which could affect the curing of the concrete.
-Precise procedures for all stages of erection should be prepared and a competent
person appointed to co-ordinate the work and check procedures.
-During pouring, shuttering and its supports should be continuously watched for
defects.
-Loads should not be dumped or placed on setting concrete.
Formwork
-All formwork should be properly designed.
-Clear and concise procedures to cover all stages of work should be prepared.
-A competent person should be appointed to coordinate the work and check that the
procedures are being followed.
-No changes should be made without consulting the co-ordinator.
-All materials and scaffolding should be carefully examined and checked with the
drawings before being taken into use.
-The foundations should be checked to see that the excavated ground conditions are
as the original soil report suggested.
-Shuttering should be examined, erected and dismantled under the supervision of
qualified and experienced persons and, as far as practicable, by workers familiar with
the work.
-The necessary information for the erection of shuttering, including particulars of the
spacing of stringers and props to stringers, should be provided for the workers in the
form of sketches or scale drawings.
-Lumber and supports for shuttering (forms) should be adequate, having regard to the
loads to be borne, spans, setting temperature and rate of pour. Where necessary to
prevent danger, adequate shoring should be provided to support slabs and beams as a
protection against superimposed loads.
-All adjustable shoring should be locked in position when adjusted.
-Shoring should be so arranged that when it is being removed sufficient props can be
left in place to afford the support necessary to prevent danger.
Ana Latorre Health and safety
56
- Shoring should be adequately protected from damage from moving vehicles,
swinging loads, etc.
-Shoring should be left in place until the concrete has acquired sufficient strength to
support safely not only its own weight but also any imposed loads. It should not be
removed until authorisation has been given by a competent person.
-Shoring should be adequately braced or tied together to prevent deformation or
displacement.
-To prevent danger from falling parts when shuttering is being taken down, the
shuttering should as far as practicable be taken down whole, or else remaining parts
should be supported.
-Mechanical, hydraulic or pneumatic lifting appliances for handling forms should be
provided with automatic holding devices to prevent danger if the power of the lifting
mechanism fails.
-Vacuum-lifting appliances should only be applied to smooth, clean surfaces.
-Vacuum-lifting devices should be provided with an automatic cut-off to prevent loss
of suction in the event of a power or equipment failure.
D. Permanent facilities
Description and organization of the works
The permanent facilities can be subdivided in:
- Mechanical: elevators, electricity, plumbing, gas and special facilities
- Termomechanics: heating, air conditioning, ventilation.
The trust factor increases the number of accidents.
Detection of the most frequent risks
- Fall of personal to the same and different level
- Fallen of objects
- Cut for handling of manual tools
- Cut for handling of the guides and drivers
- Cut for the handling of foils
- Cut for the managing tools with edge
- Cut for the use of the glass fiber
- Risks that are detected during the connection tests and setting in service of the
installation. Being the most common: Electrocution or burns, for the bad protection of
electric boxes, for incorrect maneuvers in the lines, for use of tools without isolation,
for bridge of the protection mechanisms, for direct connections without pegs male-
female
- Trappings among heavy pieces
- The inherent ones to the use of the autogenous, electric welding, oxiacetilénic and
oxicut
Ana Latorre Health and safety
57
- Footfalls on sharp objects
- Burns
- Over efforts
- Direct and indirect electric contacts
- Explosion of the torch or of the deposit of liquefied gas
- Trappings between engagements and transmissions, during the setting operations to
point or assembly
- The inherent accidents to the auxiliary equipment to use
- Dermatosis for contacts with fibers
Personal protection
- Polyethylene helmet, during the displacements for the work and in places with risk of
fall of objects or of blows
- Insulating boots for electricity (in connecting works)
- Security boots (in wired)
- Insulating gloves
- Leather gloves
- Work clothes
- Security belt. Types TO, B and C
- Belt appropriate behaver-tools
- Insulating carpet
- Checkers of tension
- Insulating tools
For welding works:
- Welder's glasses
- Welder's helmet
- Hand or fixed welder's screen
- Leather gloves
- Rubber gloves or of PVC
- Leather wrists that cover the arms
- Leather leggings
- Leather apron
E.Installation of electricity
Description and organization of the works
The taking of earth will be carried out with cable. That specified in the
Electrotechnical regulation of low tension will be continued in any event.
Detection of the most frequent risks
Ana Latorre Health and safety
58
- Fallen to the same and different level
- Cut and blows for handling of manual tools
- Cut for handling of guides and drivers
- More common risks during the connection and setting in service of the installation
- Electrocution or burns for bad protection in electric boxes
- Electrocution or burns for incorrect maneuvers in the lines
- Electrocution of burns for use of tools without appropriate isolation
- Electrocution or burns for check of protection mechanisms
- Electrocution or burns for direct connections without pegs male-female
- Others
Basic norms of security
- The portable electric tools will have double isolation of security
- In any case the disconnection of the machine will be made throwing of the cable
- The security belts won't be used if they have deformed rings, or break points are
appreciated
- The embedded conductors will be located in horizontal or vertical address, avoiding
to cross the walls in diagonal
- The work place will be often ordered and cleaned in the phase of opening work and
closing of holes for facilities, to avoid the risks of footfalls or stumbles
- The illumination of the cuts won't be inferior to 100 lux measured to 2 meters of the
floor
- The illumination by means of portable ones will be made using tight lampboxes with
insulating handle fed to 24 volts
- Use of the pegs male-female
- The use of hand stairways or of scaffolds in places with fall risk from heightIt will be
forbiden in work, installing the appropriate protection of security
- The tools to use will be protected with normalized insulating material
- If a fire was originated in an installation in tension, they will come in the following
way:
1. The sources in tension will be disconnected
2. Extinguishers that have the indication of not using in presence of electric current
won't be used
3. Insulating gloves will be used to hold the extinguisher
4. The extinguisher will be at a minimum distance of 0.50 meters of the fire during its
use in facilities of low tension
Personal protection
- Security helmet
- Insulating boots for electricity (in connection works)
- Security boots (in wired)
Ana Latorre Health and safety
59
- Insulating gloves
- Work clothes
- Security belt
- Maneuver bench
- Insulating carpet for works in tension
- Checkers of tensión
- Belt behaver-tools appropriate
F. Installation of heating
Description and organization of the works
The conductions will be made of steel galvanized for the tracts in common elements
and of copper inside the housings. The elements of transmission of heat will be steel
radiators.
As it goes getting up the structure, the columns of the heating system will be mounted,
since they will reflect for the interior of walls and wrought.
The installation corresponding to the heating elements will settle at the end.
Detection of the most frequent risks
- Fall to the same and different level
- Fallen of height
- Trappings among heavy pieces
- Infrared and ultraviolet radiations generated during the welding
- Explosions, as well as burns and fires
- The inherent ones to the use of the autogenous welding
- Blows and courts for the handling of tools
- Footfalls on sharp objects
- Overefforts
- Others
Basic norms of security
- The plumbing facilities in height will be executed when the definitive protection are
lifted
- The pipe transport to the shoulder for a single man, will be carried out inclining the
load back, in such a way that the end that goes for before it overcomes man's height
Ana Latorre Health and safety
60
- If exists electric lines in work position, they will be left without service, and if this was
not possible it will be protected with insulating cases to avoid the direct contact
- They will recover the protection of the holes of the roofs once carried out the
plumbed, the operative who carries out the plumbed will use security belt
- During the settling of canalization, files and channels, they will be proven the
scaffolds daily
- The places where it is welded will be ventilated, the workers have to use mask,
besides the protection glasses against the radiations
- The work place will stay always clean of rubbles and cuttings, retiring periodically
those that take place and evacuating them to the rubbish storing
Personal protection
- Security helmet
- Leather gloves and security boots
- Leather apron (for weldings)
- Glasses against projections
- Glasses against the radiations
- Mask
- Work clothes
G.Work at height and roof work
Description and general provisions
1. Where necessary to guard against danger, or where the height of a structure or its
slope exceeds that prescribed by national laws or regulations, preventive measures
should be taken against the fall of workers and tools or other objects or materials.
2. Elevated workplaces, including roofs more than 2 m or as prescribed, above the
floor or ground should be protected on all open sides by guard-rails and toe boards
complying with the relevant national laws and regulations. Wherever guard-rails and
toe-boards cannot be provided, adequate safety harnesses should be provided and
used.
3. Elevated workplaces including roofs should be provided with safe means of access
and egress such as stairs, ramps or ladders complying with the relevant national laws
and regulations.
4. If guard-rails are not practicable, persons employed at elevated workplaces
including roofs from which they are liable to fall more than 2 m or as prescribed should
be protected by means of adequate safety nets or safety sheets or platforms, or be
secured by safety harnesses with lifelines securely attached.
Ana Latorre Health and safety
61
Preventive norms in the roof work
1. All roof-work operations should be pre-planned and properly supervised.
2. Roof work should only be undertaken by workers who are physically and
psychologically fit and have the necessary knowledge and experience for such work.
3. Work on roofs should not be carried on in weather conditions that threaten the
safety of workers.
4. Crawling boards, walkways and roof ladders should be securely fastened to a firm
structure.
5. Roofing brackets should fit the slope of the roof and be securely supported.
6. Where it is necessary for a person to kneel or crouch near the edge of the roof an
intermediate rail should be provided unless other precautions, such as the use of a
safety harness, are taken.
7. On a large roof where work does not have to be carried out at or near the edge, a
simple barrier consisting of crossed scaffold tubes supporting a tubing guardrail may
be provided. Such barriers should be positioned at least 2 m from the edge.
8. All covers for openings in roofs should be of substantial construction and be secured
in position.
9. Roofs with a pitch of more than 10 should be treated as sloping.
10. When work is being carried out on sloping roofs, sufficient and suitable crawling
boards or roof ladders should be provided and firmly secured in position as soon as is
practicable.
11. During extensive work on the roof, strong barriers or guard-rails and toe boards
should be provided to stop a person from falling off the roof.
12. Where workers are required to work on or near roofs or other places covered with
fragile material, through which they are liable to fall, they should be provided with
sufficient suitable roof ladders or crawling boards strong enough, when spanning
across the supports for the roof covering, to support those workers.
13. A minimum of two boards should be provided so that it is not necessary for a
person to stand on a fragile roof to move a board or a ladder, or for any other reason.
Ana Latorre Health and safety
62
14. Purlins or other intermediate supports for fragile roofing material should be
sufficiently close together to prevent danger.
15. Where a valley or parapet gutter of a fragile roof is used for access, protection
against falling through the fragile material should be provided by covering the adjacent
fragile material to a minimum distance of 1 m up the roof.
16. Buildings with fragile roofs should have a warning notice prominently displayed at
the approaches to the roof.
Personal protection:
- Polyethylene helmet
-Security footwear
-Security rubber boots.
-Leather impermeable gloves.
-Rubber gloves or P.V.C.
-Seat belt.
-Work clothing.
-Clothing for rainy weather.
In addition to handling hot bitumen and asphalt will be used:
-Leather boots.
- Leather Gaiters.
- Leather Aprons.
-Leather impermeable gloves.
Ana Latorre Health and safety
63
5. Auxiliary Equipment
A. Scaffolds
General provisions
1. Where work cannot safely be done on or from the ground or from part of a building
or other permanent structure, a safe and suitable scaffold should be provided and
maintained or other equally safe and suitable provision should be made.
2. Scaffolds should be provided with safe means of access, such as stairs, ladders or
ramps. Ladders should be secured against inadvertent movement.
3. All scaffolds and ladders should be constructed, erected and used in accordance
with national laws and regulations.
4. Every scaffold should be properly designed, constructed, erected and maintained so
as to prevent collapse or accidental displacement when properly used.
5. Every scaffold and part thereof should be:
a. designed so as to prevent hazards for workers during erection and dismantling;
b. designed so that guard rails and other protective devices, platforms, putlogs, rakers,
transoms, ladders, stairs or ramps can be easily put together;
c. of suitable and sound material and of adequate size and strength for the purpose for
which it is to be used and maintained in a proper condition.
6. The competent authority should establish and enforce laws, regulations or
standards covering detailed technical provisions for the design, construction, erection,
use, maintenance, dismantling and inspection of the different kinds of scaffolds and
ladders used in construction work.
Detection of the most frequent risks:
- Fallen at different level
- Fallen to the hole
- Fallen at the same level
- Throw out of plumb of the scaffold
- Contact with the electric power
- Throw out of plumb or fallen of objects (planks, tools, materials)
- Blows for objects or tools
- Trappings
- Those derived of the suffering of illnesses, not detected (epilepsy, vertigo, etc.)
Ana Latorre Health and safety
64
Basic norms of security
- The work platform, will only be loaded with the strictly necessary materials to assure
the continuity of the works, being distributed these evenly by the whole floor of the
platform
- During the assembly works and disassembly they will use belts of security associated
to anti-fall devices
- In any case the scaffolds will lean on supplementary elements formed by materials of
low resistance or stability
- The hoisted of the loads will be made using pulleys (when some general hoisted
equipment doesn't exist), they will be placed on the vertical element of anyone of the
supplements of height that it consists the scaffold
- Protection visors will be used, under the area of work of the scaffolds embedded to
the tubular structure, of rigid or elastic materials
- When one works on sidewalks in external walls, passing piazzas, that avoid the fall of
objects or materials on those who circulate below the same ones, will be placed
- The works will be prohibited in days of strong wind, or when the adverse
meteorological conditions advise this way it
- It will be forbidden to use scaffolds on the platforms of work of the tubular or hung
scaffolds
- The platform will have a minimum dimension of 60 cm, with nonskid floor, provided
of the following protection handrails:
o Front = 70 cm
o Later = 90 cm
o Of closing = 90 cm
- They will be formed by handrails, intermediate chart and baseboard of
20 cm.
- The materials will be distributed evenly on the work platforms, in prevention of
accidents for unnecessary overload
- It will be forbidden in this work to work on platforms located in levels below other
platforms in those that one is working, in prevention of accidents for fallen of objects
- Anybody won't jump or run on the scaffolds
- The scaffolds will be free of brashes
- Any class of materials won't be thrown from the scaffolds
- In the disassembly they won't allow to fall charts, railway ties or any other element of
the scaffold
- The minimum thickness of the planks which form the platform will be of
50 mm
- When the work platforms are to more than 2 meters high or facilitate an external fall
of more than 2 meters, they will be protected in all their contour with handrails, they
Ana Latorre Health and safety
65
will be of 90 cm of minimum height, they will have handrails, intermediate list and
baseboard
- The handrails will have a minimum resistance of group of 150 Kg/m
- The wood to use will be healthy, without defects neither knots visible, to avoid the
risks for break of the planks that form a work surface
Personal protection
If exists expressed approval of the Ministry of Work and Social Security, the garments
of personal protection to use in this work will be homologated.
Besides the obligatory personal protection garments to carry out the task specifies on
a scaffold they must use:
- Polyethylene helmet. Class N
- Security boots. Class III. Degree B
- Nonskid footwear
- Security belt. Class C. Type 2
- Work clothes
Inspection and maintenance
Scaffolds as prescribed by national laws or regulations should be inspected, and the
results recorded by a competent person:
a.before being taken into use;
b.at periodic intervals thereafter as prescribed for different types of scaffolds;
c.after any alteration, interruption in use, exposure to weather or seismic conditions or
any other occurrence likely to have affected their strength or stability.
Inspection by the competent person should more particularly ascertain that:
a.the scaffold is of suitable type and adequate for the job;
b.materials used in its construction are sound and of sufficient strength;
c.it is of sound construction and stable;
d. that the required safeguards are in position.
A scaffold should not be erected, substantially altered or dismantled except by or
under the supervision of a competent person.
Every scaffold should be maintained in good and proper condition, and every part
should be kept fixed or secured so that no part can be displaced in consequence of
normal use.
No scaffold should be partly dismantled and left so that it is capable of being used,
unless it continues to be safe for use.
Ana Latorre Health and safety
66
B. Transport, earth-moving and materials. Handling equipment
General provisions
All vehicles and earth-moving or materials-handling equipment should:
a. be of good design and construction taking into account as far as posible ergonomic
principles particularly with reference to the seat;
b.be maintained in good working order;
c. be properly used with due regard to safety and health;
d.be operated by workers who have received appropriate training in accordance with
national laws and regulations.
The drivers and operators of vehicles and earthmoving or materialshandling
equipment should be medically fit, trained and tested and of a prescribed minimum
age as required by national laws and regulations.
On all construction sites on which vehicles, earthmoving or materialshandling
equipment are used:
a.safe and suitable access ways should be provided for them;
b.traffic should be so organised and controlled as to secure their safe operation.
Adequate signalling or other control arrangements or devices should be provided to
guard against danger from the movement of vehicles and earth-moving or materials-
handling equipment. Special safety precautions should be taken for vehicles and
equipment when manoeuvring backwards.
The assistance of a trained and authorised signaller should be available when the view
of the driver or operator is restricted. The signalling code should be understood by all
involved.
When earth-moving or materials-handling equipment is required to operate in
dangerous proximity to live electrical conductors, adequate precautions should be
taken, such as isolating the electrical supply or erecting overhead barriers of a safe
height.
Preventive measures should be taken to avoid the fall of vehicles and earth-moving or
materials-handling equipment into excavations or into water.
Vehicles and earth-moving or materials-handling equipment should not travel on
bridges, viaducts, embankments, etc., unless it has been established that it is safe to
do so.
Ana Latorre Health and safety
67
Where appropriate, earth-moving or materials-handling equipment should be fitted
with structures designed to protect the operator from being crushed, should the
machine overturn, and from falling material.
All vehicles and earth-moving or materials-handling equipment should be provided
with a plate or the like indicating:
a.the gross laden weight;
b. the maximum axle weight or, in the case of caterpillar equipment, ground pressure;
c. the tare weight.
All vehicles and earth-moving or materials-handling equipment should be equipped
with:
a.an electrically operated acoustic signalling device;
b. searchlights for forward and backward movement;
c. power and hand brakes;
d. tail lights;
e. silencers;
f. a reversing alarm.
Operators of vehicles and earth-moving or materials-handling equipment should be
adequately protected against the weather or accidents due to impact, crushing or
contact with a moving load by a cab:
a.which is designed and constructed in accordance with ergonomic principles and
provides full protection from adverse weather conditions;
b. which is fully enclosed where dusty conditions are likely to be encountered;
c. which provides the driver with a clear and unrestricted view of the area of
operation;
d. which is equipped with a direction indicator and a rear-view mirror on both sides.
The cab of vehicles and earth-moving or materials-handling equipment should be kept
at least 1 m from a face being excavated.
When cranes and shovels are being moved, out of service, the boom should be in the
direction of travel and the scoop or bucket should be raised and without load, except
when travelling downhill.
On earth-moving and materials-handling equipment, motors, brakes, steering gear,
chassis, blades, blade-holders, tracks, wire ropes, sheaves, hydraulic mechanisms,
transmissions, bolts and other parts on which safety depends should be inspected
daily.
Vehicles and earth-moving or materials-handling equipment should not be left on a
slope with the engine running.
Ana Latorre Health and safety
68
Deck plates and steps of vehicles and equipment should be kept free from oil, grease,
mud or other slippery substances.
Detection of the most frequent risks
- Overturn of the machine.
- Accidents.
- Those derived of the maintenance operations (burns, etc.).
- Vibrations and noises.
- Environmental powder, blows and projections.
- Fallen when ascending or to get off the machine.
- Fallen at any level.
- Collide against other vehicles.
- Blows with parts motives of the machine, to be in their action radio
- Sinkings.
- Formation of aggressive atmospheres or you bother.
- Explosion and fires.
- Atrapamientos.
- Cut.
- Contacts with the electric power.
- The inherent ones to the own use place.
- The inherent ones to the own work to execute.
Basic norms of security
- The motors with transmission through axes and pulleys, will be endowed with
security chassis (lawn mowers, saw, compressors, etc.).
- The electric motors will be covered with security chassis eliminating of the direct
contact with the electric power. Is not allowed their operation without chassis or
important deteriorations of these.
- Is not allowed the manipulation of any component element of a machine worked by
means of electric power, being connected to the supply net.
- The irregular or damaged operation machines will be retired immediately for their
repair.
- The damaged machines that they cannot retire they will signal with warning posters
with the legend: "IT SCHEMES DAMAGED, NOT TO CONNECT"
- Is not allowed the manipulation and adjustment operations and arrangements of
machines to the personnel not specialized specifically in the machine repair object.
Ana Latorre Health and safety
69
- As additional caution to avoid the setting in service of damaged machines or of
irregular operation, the starters will be blocked, or in their case, the electric fuses will
be extracted.
- The same person that installs the sign of warning of damaged machine will be the one
in charge of retiring it, in prevention of connections or on in service outside of control.
- The authorized personnel will only be the one in charge of the use of a certain
machine or machinetool.
- The machines that are not of manual sustentation will always lean on even elements
and sign.
- The elevation or descent to machine of objects, will be made slowly, hoisting them in
vertical address.
- The hooks of it hangs of the apparatuses of hoisting they will be free of loads during
the descent phases.
- The loads of suspended transport will always be visible, with the purpose of avoiding
the accidents for lack of visibility of the trajectory of the load.
- The angles without vision of the load trajectory, will be replaced by means of
operatives that using Known signs replaces the vision of the one mentioned worker.
- Is not allowed the permanency or the work of operatives in areas under the
trajectory of suspended loads.
- The apparatuses of hoisting to use in this work, they will be equipped with
constrainer of journey of the car and of the hooks, and of load in tip for interference.
C. Plant, machinery, equipment and hand tools
General provisions
-Plant, machinery and equipment, including hand tools, both manual and power-
driven, should:
a.be of good design and construction, taking into account, as far as possible, health
and safety and ergonomic principles;
b. be maintained in good working order;
c.be used only for work for which they have been designed unless a use outside the
initial design purpose has been assessed by a competent person who has concluded
that such use is safe;
d.be operated only by workers who have been authorised and given appropriate
training;
e.be provided with protective guards, shields, or other devices as required by national
laws or regulations.
-Adequate instructions for safe use should be provided where appropriate by the
manufacturer or the employer, in a form understood by the user.
- As far as practicable, safe operating procedures should be established and used for all
plant, machinery and equipment.
Ana Latorre Health and safety
70
-Operators of plant, machinery and equipment should not be distracted while work is
in progress.
-Plant, machinery and equipment should be switched off when not in use and isolated
before any major adjustment, cleaning or maintenance is done.
-Where trailing cables or hose pipes are used they should be kept as short as
practicable and not allowed to create a safety hazard.
-All dangerous moving parts of machinery and equipment should be enclosed or
adequately guarded in accordance with national laws and regulations.
-Every power-driven machine and equipment should be provided with adequate
means, immediately accessible and readily identifiable to the operator, of stopping it
quickly and preventing it from being started again inadvertently.
-The machines or equipment should be so designed or fitted with a device that the
maximum safe speed, which should be indicated on it, is not exceeded. If the speed of
the machine is variable, it should only be possible to start it at the lowest speed
appropriate.
-Operators of plant, machinery, equipment and tools should be provided with personal
protective equipment including, where necessary, suitable hearing protection.
Hand tools
-Hand tools and implements should be tempered, dressed and repaired by competent
persons.
-The cutting edges of cutting tools should be kept sharp.
-Heads of hammers and other shock tools should be dressed or ground to a suitable
radius on the edge as soon as they begin to mushroom or crack.
-When not in use and while being carried or transported sharp tools should be kept in
sheaths, shields, chests or other suitable containers.
-Only insulated or non-conducting tools should be used on or near live electrical
installations if there is any risk of electrical shock.
-Only non-sparking tools should be used near or in the presence of flammable or
explosive dusts or vapours.
Pneumatic tools -Operating triggers on portable pneumatic tools should be:
a.so placed as to minimise the risk of accidental starting of the machine;
b.so arranged as to close the air inlet valve automatically when the pressure of the
operator's hand is removed.
-Hose and hose connections for compressed-air supply to portable pneumatic tools
should be:
a.designed for the pressure and service for which they are intended;
b.fastened securely to the pipe outlet and equipped with a safety chain, as
appropriate.
-Pneumatic shock tools should be equipped with safety clips or retainers to prevent
dies and tools from being accidentally expelled from the barrel.
Ana Latorre Health and safety
71
-Pneumatic tools should be disconnected from power and the pressure in hose lines
released before any adjustments or repairs are made.
Electrical tools
-Portable electrical tools should generally be used on reduced voltage to avoid as far as
possible the risk of a lethal shock.
-All electrical tools should be earthed, unless they are "all insulated" or
"double insulated" tools which do not require an earth. Earthing should be
incorporated in metallic cases, and as a safeguard against damaged cables where wires
enter the tool.
-All electrical tools should receive inspection and maintenance on a regular basis by a
competent electrician, and complete records kept.
Woodworking machines
-Shavings, sawdust, etc, should not be removed by hand from woodworking machines
or in their vicinity while the machines are working.
-Where provided, chip and sawdust extraction systems should be maintained in
efficient working order.
-Mechanical feeding devices should be used whenever practicable.
-All cutters and saw blades should be enclosed as far as practicable.
-Circular saws should be provided with strong, rigid and easily adjustable hood guards
for the saw blades and with riving knives of suitable design matched to the saw blade
in use. The width of the opening in the table for the saw blade should be as small as
practicable.
-Portable circular saws should be so designed that when the blade is running idle it is
automatically covered.
-On band saws all the blade, except the operating portion, should be enclosed. Band
wheels should be enclosed with stout guards.
-Band saws should be provided with automatic tension regulators.
-Planing machines should be provided with bridge guards covering the full length and
breadth of the cutting block and easily adjustable in both horizontal and vertical
directions.
-Thicknessing machines should be provided with sectional feed rollers or a kick-back
preventer which should be kept as free as possible.
-Woodworking machines should be properly spaced to avoid accidental injury when
handling large boards or long planks.
Engines
-Engines should:
Ana Latorre Health and safety
72
a.be constructed and installed so that they can be started safely and the máximum
safe speed cannot be exceeded;
b.have remote controls for limiting speed when necessary;
c.have devices to stop them from a safe place in an emergency.
-Internal combustion engines should not run for long periods in confined spaces unless
adequate exhaust ventilation is provided.
-When internal combustion engines are being fuelled:
a.the engine ignition should be shut off,
b.care should be taken to avoid spilling fuel;
c.no person should smoke or have an open light in the vicinity;
d.a fire extinguisher should be kept readily available.
-Secondary fuel reservoirs should be placed outside the engine room.
Concrete work equipment
-Concrete mixers should be protected by side railings to prevent workers from passing
under the skip while it is raised.
-Hoppers into which a person could fall, and revolving blades of trough or batch-type
mixers, should be adequately guarded by grating.
-In addition to the operating brake, skips of concrete mixers should be provided with a
device or devices by which they can be securely blocked when raised.
-While the drum of a concrete mixer is being cleaned, adequate precautions should be
taken to protect the workers inside by locking switches open, removing fuses or
otherwise cutting off the power.
-Concrete buckets for use with cranes and aerial cableways should be free as far as
practicable from projections from which accumulations of concrete could fall.
-Loaded concrete buckets should be guided into position by appropriate means.
-Concrete buckets positioned by crane or aerial cableways should be suspended by
safety hooks.
-When concrete is being tipped from buckets, workers should keep out of range of any
kick-back due to concrete sticking to the bucket.
-Concrete bucket towers and masts with pouring gutters or conveyor belts should:
a.be erected by competent persons;
b. be inspected daily.
-The winch for hoisting the bucket should be so placed that the operator can see the
filling, hoisting, emptying and lowering of the bucket. Where this is not practicable, a
banksman should direct the operator.
-If the winch operator cannot see the bucket, he should, where practicable, be
provided with an adequate means indicating its position.
-Guides for the bucket should be correctly aligned and so maintained as to prevent the
bucket from jamming in the tower.
-Scaffolding carrying a pipe for pumped concrete should be strong enough to support
the pipe when filled and all the workers who may be on the scaffold at the same time,
with a safety factor of at least 4.
-Pipes for carrying pumped concrete should:
Ana Latorre Health and safety
73
a.be securely anchored at the ends and at curves;
b. be provided near the top with air release valves;
c. be securely attached to the pump nozzle by a bolted collar or equivalent means.
Ana Latorre Budget
76
5 .1 Material requirement budget EUROS
1 Demolitions 50.000,00
1.1.- Complete demolition 50.000,00
2 Land preparation 29.376,82
2.1.- Excavation works 28.433,04
2.2.- Net of horizontal drainage 943,78
3 Foundation 230.158,50
3.1.- Remuneration 192.073,22
3.2.- Superficial 22.326,24
3.2.1.- Footings 22.326,24
3.3.- Stabilize 15.759,04
4 Structures 90.449,52
4.1.- Steel 26.215,76
4.2.- Concrete 64.233,76
4.2.1.- One-way spanning slab(Filligran) 64.233,76
5 Facades 177.551,48
5.1.- Closures 60.275,67
5.2.- Exterior woodwork 68.341,65
5.3.- Exterior´s tops 5.990,92
5.3.1.- Coping 5.990,92
5.4.- Glass 42.943,24
5.4.1.- Special: double glass with chamber 42.943,24
6 Partitions 23.129,50
6.1.- Interior doors 9.245,57
6.1.1.- Wood 9.245,57
6.2.- Helps 13.883,93
7 Installations 67.891,04
7.1.- Heating, ventilating air conditioning and hot water 22.014,38
7.1.1.- Boiler and thermal groups 13.583,79
7.1.2.- Systems of water channeling 4.901,92
7.1.3.- Transmitter by water for the air conditioning 2.980,50
7.1.4.- Mechanism of central control 548,17
7.2.- Electrical 19.538,51
7.3.- Plumbing 11.795,36
7.4.- Against fire 5.487,27
7.4.1.- Extinguishers 360,08
7.4.2.- Signs 73,80
7.4.3.- Emergency lights 189,00
7.4.4.- Alarm and detection 4.864,39
7.5.- Healthiness 7.671,82
7.6.- Security 1.383,70
7.6.1.- Burglar alarm 1.383,70
8 Insulation and waterproof 17.526,88
8.1.- Insulation 10.894,69
Ana Latorre Budget
77
8.2.- Waterproof 6.632,19
9 Roof 167.917,88
9.1.-Green roof 161.750.55
9.2.-PVC gutter 1.031.69
9.3.- White oak´s planks 3.207,60
9.4.-Metallic porch 1.928,04
10 Coatings 99.525,47
10.1.- Wall finishing 9.137,75
10.2.- Paintings in interior walls 9.761,08
10.3.- Floor and paving 59.352,58
10.4.- Suspended ceiling 21.274,06
11 Equipment 18.558,80
11.1.- Toilets 6.092,34
11.2.- Units of prefabricated wood houses for playground 7.550,00
11.3.- Kitchens/galleries 4.916,46
12 Interior urbanization of the plot 22.767,70
12.1.- Exterior illumination 5.632,68
12.2.- Gardening 11.011,00
12.3.- Exterior paving 2.346,30
12.4.- Installation´s distribution 38,32
12.5.- Urban furniture 3.739,40
13 Health and Safety 24.641,77
13.1.- Collective protection equipment 8.851,21
13.1.1.- Electrical protection 257,62
13.1.2.- Against fire protection 603,40
13.1.3.-Shelter and provisional ways 7.990,19
13.2.- Training 1.773,74
13.2.1.- Meetings 1.773,74
13.3.- Personal protection equipment 3.713,88
13.3.1.- For the head 50,40
13.3.2.- Against high falls 760,95
13.3.3.- For eyes and face 49,64
13.3.4.- For hands and arms 253,25
13.3.5.- For the ears 66,80
13.3.6.- For feet and legs 1.100,40
13.3.7.- For the body(protection dress) 1.328,44
13.3.8.- For the respiratory tracks 104,00
13.4.- Preventive medicine and firs aids 1.921,65
13.4.1.- Medical material 311,10
13.4.2.- Medical examination 1.610,55
13.5.- Provisional installations of health and hygiene 3.493,11
13.5.1.- Connection with the prefabricated site office 725,82
13.5.2.-Site office (rent/construction/adaptation) 329,89
13.5.3.- Furniture and equipment 1.110,20
Ana Latorre Budget
78
13.5.4.- Cleaning 1.327,20
13.6.- Signs and closure of the lot 4.888,18
13.6.1.- Markers 437,00
13.6.2.- Fence and access 4.279,93
13.6.3.- Different signs 171,25
14 Machinery 43.207,82
Total.........: 1.062.703,18
The material requirement budget is the amount of ONE MILLION SIXTY TWO
THOUSEN SEVEN HUNDRED THREE EUROS AND EIGHTEEN CENTS
Ana Latorre Budget
79
5.2 BUDGET FOR PROVISION OF THE CONTRACTED SERVICES CHAPTER 1: DEMOLITION 50.000,00 € / 525.000 SEK
CHAPTER 2: LAND PREPARATION 29.376,82 € / 308.456,61 SEK
CHAPTER 3: FOUNDATION 230.158,50 € / 2.416.664,25 SEK
CHAPTER 4: STRUCTURES 90.449,52 € / 949.719,96 SEK
CHAPTER 5: FACADES 177.551,48 € / 1.864.290,54 SEK
CHAPTER 6: PARTITIONS 23.129,50 € / 242.859,75 SEK
CHAPTER 7: INSTALLATIONS 67.891,04 € / 712.855,92 SEK
CHAPTER 8: INSULATION AND WATERPROOF 17.526,88 € / 184.032,24 SEK
CHAPTER 9: ROOF 167.917,88 € / 1.763.137,74 SEK
CHAPTER 10: COATINGS 99.525,47 € / 1.045.017,43 SEK
CHAPTER 11: EQUIPMENT 18.558,80 € / 194.867,4 SEK
CHAPTER 12: INTERIOR URBANIZATION OF THE PLOT 22.767,70 € / 239.060,85 SEK
CHAPTER 13: HEALTH AND SAFETY 24.641,77 € / 258.738.58 SEK
CHAPTER 14: MACHINERY 43.207,82 € / 453.682.11 SEK
MATERIAL REQUIREMENT BUDGET................................... 1.062.703,18 € / 11.158.383,39 SEK
+13% GENERAL COST 138.151,41 €/ 1.450.589,80 SEK
+6% INDUSTRIAL PROFIT 63.762,19 €/ 669.502,99 SEK
TOTAL 1.264.616,78 €/ 13.278.476,19 SEK
+16% VAT (TAX) 202.338,68 €/ 2.124.556,14 SEK
BUDGET FOR PROVISION OF THE CONTRACTED SERVICES…1.466.955,46 €/ 15.403.032,33 SEK
The budget for provision of the contracted services is the amount of ONE MILLION FOUR
HUNDRED SIXTYSIX THOUSEN NINE HUNDRED FIFTYFIVE EUROS ANS FOURTYSIX CENTS.
Ana Latorre Budget
80
5.3 BUDGET IN CHAPTERS
1.1.- Complete demolition
Total subchapter 1.1.-Complete demolition: 50.000,00
Total partial budget nº 1 Demolitions : 50.000,00
Partial budget nº 2 Land preparation
Nº Unit Description Measurement Cost Amount
81
2.1.- Land preparation
2.1.1 M² Clearing and cleaning the area, average depth of 25 cm, mechanical means.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Study of the possible existence of easements,
buried components, network service or any facilities that may be affected by the
works to start.
Includes: Rethinking. Removal of material for clearing.
Total m² ......: 3.400,000 1,93 6.562,00
2.1.2 M3 Excavation of land in casting, in middle ground, using mechanical means, including
transportation to dump surplus. Executed according to the technical guidance of
the NTE-ADV 2. Measured in natural profile.
Total M3 ......: 4.080,000 4,40 17.952,00
2.1.3 M2 Earthworks of land, using mechanical means, including extend from land
excavation. Executed according to the technical guidance of the NTE-ADE.
Total m2 ......: 1.184,000 3,31 3.919,04
Total subchapter 2.1.-Land preparation: 28.433,04
2.2.- Net of horizontal drainage
2.2.1 Un. Checked sump, the internal dimensions 51x51x65 cm, with prefabricated
reinforced concrete cap.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: Check that the location corresponds to the Project.
Includes: Rethinking the sump. Removal of loose soil from the bottom of the
excavation. Landfill compaction and formation of concrete floor. Formation of the
brick masonry, previously wetted, placed with mortar. Sump protection against the
beating and seals, especially during the filling and compacting. Removal of debris,
cleaning and removal of refuse to landfill.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Sealing.
Total Un. ......: 2,000 118,05 236,10
2.2.2 M Connection to the general drainage network of the municipality, smooth PVC
Series SN-4, annular rigid nominal 4 kN / m², 160 mm in diameter, by adhesive
bonding.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We find that the layout of the trenches
corresponds to the Project. The ground inside the trench, in addition to free water
should be clean of waste, loose or broken down and land vegetation. Rules of the
company that manages the municipal network.
Includes: redesign and layout of the plant and supply items. Rupture of the
pavement with a compressor. Removal of loose soil from the bottom of the
excavation. Presentation dry pipes and special parts. Discharge of the sand at the
bottom of the ditch. Placement of the collectors. Mounting the installation starting
from the end of header. Clean the areas to be joined. Junction boxes and with the
collector wells. Testing Service. Protection against knocks and set misuse.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: The network will
remain closed until placed in service, no problems in the circulation and have a
rapid evacuation.
Total m ......: 1,000 95,84 95,84
Partial budget nº 2 Land preparation
Nº Unit Description Measurement Cost Amount
82
2.2.3 M Collector buried in the foundation slab of smooth PVC Series SN-4, annular rigid
nominal 4 kN / m², 160 mm in diameter, with gasket.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of Project.
Includes: redesign and layout of the duct floor and slopes. Presentation dry pipes
and special parts. Mounting the installation starting from the end of header. Clean
the area to unite, placing the pieces together and fit. Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: The network will be
sufficient tight for avoid movements during subsequent concreting, will be closed
until placed in service, not present problems in the circulation and have a rapid
evacuation.
Criteria for measuring project length as horizontal projection as graphic Project.
Total m ......: 10,820 43,34 468,94
2.2.4 M Collector buried in the foundation slab of smooth PVC Series SN-4, annular rigid
nominal 4 kN / m², 100 mm in diameter, with gasket.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of Project.
Includes: redesign and layout of the duct floor and slopes. Presentation dry pipes
and special parts. Mounting the installation starting from the end of header. Clean
the area to unite, placing the pieces together and fit. Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: The network will be
sufficient tight for avoid movements during subsequent concreting, will be closed
until placed in service, not present problems in the circulation and have a rapid
evacuation.
Criteria for measuring project length as horizontal projection as graphic Project.
Total m ......: 4,570 31,27 142,90
Total subchapter 2.2.-Net of horizontal drainage: 943,78
Total partial budget nº 2 Land preparation: 29.376,82
Partial budget nº 3 Foundation
Nº Unit Description Measurement Cost Amount
83
3.1.- Remuneration
3.1.1 M3 Cleaning concrete H-20 N/mm2 in foundation elements, produced in central
cement CEM II / AV 42.5 R, plastic consistency and maximum aggregate diameter
of 45 mm, placed on work as EHE, chipped and smoothed surfaces. Measured
volume theory.
Total M3 ......: 118,400 109,34 12.945,86
3.1.2 M3 Gravel layer 20 cm thick over the entire surface of the foundation.
Total M3 ......: 1.184,000 125,74 148.935,36
3.1.3 M3 Flooring of concrete M-20 N/mm2 10 cm thick expanded polystyrene plachas
about 20 kg/m3 and 4 cm thick, mesh-sharing and paving gravel 15 cm,
constructed according NTE RSS-4. Measure the surface run.
Total M3 ......: 1.184,000 25,50 30.192,00
Total subchapter 3.1.- Remuneration: 192073,22
3.2.- Superficial
3.2.1.- Footings
3.2.1.1 M3 H-25 concrete pads in N/mm2 pillars, developed in central cement CEM II / AV
42.5 R, plastic consistency and maximum aggregate diameter of 45 mm, placed on
work as EHE, even with steel rebar Project B 400 S steel framework, vibration,
curing and shuttering if necessary. Measured the volume to full excavation theory.
Total M3 ......: 186,940 119,43 22.326.24
Total subchapter 3.2.1.-Footings: 22.326.24
Total subchapter 3.2.- Superficial: 22.326.24
3.3.- Stabilize
3.3.1 M2 Thermal insulation with extruded polystyrene plates of 20 cm thick and smooth
surface floors.
Total M2 ......: 1.184,000 13,31 15.759,04
Total subchapter 3.3.-Stabilize: 15.759,04
Total partial budget nº 3 Foundation: 230.158,50
Partial budget nº 4 Structures
Nº Unit Description Measurement Cost Amount
84
4.1.- Steel
4.1.1 Kg Steel S275JR media, hot-rolled profiles series IPN, IPE, UPN, HEA, HEB or HEM,
simple pieces, welded structure.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Approval by the Director of Implementation of the
Work Program for the assembly, based on project indicators and produced by the
assembler. Welders must be certified by an accredited and qualified in accordance
with the UNE-EN 287-1.
Includes: rethinking and marking lines on the anchor plates. Cleaning and
preparing the same. Placement and fixation of the bracket. Leveling and aplomb.
Implementation of the seams. Final verification of aplomb. Repair of surface
defects.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: surface finish suitable
for further processing of protection. Proper load transfer to the structure.
Criteria for measuring project: Nominal weight as measured by graphic Project.
Total kg ......: 9.327,880 1,61 15.017,89
4.1.2 Kg S275JR steel in beams, hot rolled profiles series IPN, IPE, UPN, HEA, HEB or HEM,
simple pieces, welded structure.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Approval by the Director of Implementation of the
Work Program for the assembly, based on project indicators and produced by the
assembler. Welders must be certified by an accredited and qualified in accordance
with the UNE-EN 287-1.
Include: redesign of the beam at its supports. Cleaning and preparing the plane of
the system. Placement and provisional fixation of the beam. Leveling and aplomb.
Implementation of the seams. Repair of surface defects.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: surface finish suitable
for further processing of protection. Proper load transfer to the structure.
Criteria for measuring project: Nominal weight as measured by graphic Project.
Total kg ......: 6.955,200 1,61 11.197,87
Total subcapítulo 4.1.- Acero: 26.215,76
4.2.-Prefabricated concrete
4.2.1.- One-way spanning slab
4.2.1.1 M² Filligran
Total m² ......: 914,620 70,23 64.233,76
Total subchapter 4.2.1.-One-way spanning slab: 64.233,76
Total subchapter 4.2.-Prefabricated concrete: 64.233,76
Total partial budget nº 4 Structures: 90.449,52
Partial budget nº 5 Facades
Nº Unit Description Measurement Cost Amount
85
5.1.- Closures
5.1.1 M2 M2 clear brick dimensions 25 * 18 * 12, made with cement mortar boards and M-
40 in sores and tendeles 1.2 cm.
Total M2 ......: 543,906 25,89 14.081,73
5.1.2 M2 Asphalt waterproofing sheet of elastomer bitumen (type LBM) of area not
protected by armor composed of fiberglass felt 60 g/m2 coated on both sides with
a mastic of bitumen and oxidized nonstick plastic film, with a weight 3 Kg/m2 half.
Meet the technical requirements of the NBE-QB 90.
Total M2 ......: 543,906 8,01 4.356,69
5.1.3 M2 Walls with oak plywood, wooden battens fixed on 50 * 40 mm anchor Vertical
stapled and recorded with cement mortar and sand for leveling and mark,
including gaskets, moldings and trim finishing. Measure the surface run.
Total M2 ......: 543,906 68,89 37.469,68
5.1.4 M2 Thermal insulation for walls with ventilated chamber, consisting of blankets of
glass wool water repellent, bonded with thermosetting resins, incorporated under
a veil of glass reinforced on one side, with a total thickness of 50 mm.
Total M2 ......: 543,906 8,03 4.367,57
Total subchapter 5.1.-Closures: 60.275,67
5.2.- Exterior woodwork
5.2.1 Un. Window sheet practicable vertical spindle higher fixed y155 * 115 cm total
external, made of aluminum with a minimum of 15 micron anodized in natural
color, even jonquil, pin fastening, hardware crash and safety, installation and
sealing of joints and internal paraments built as NTE-FCL 10.
Total Un. ......: 4,000 251,99 1.007,96
5.2.2 Un. Window of a practicable form of vertical axis and 80 * 115
cm of external action, made with aluminum anodized with a minimum of 15
microns in natural color, even jonquil, pin fastening, hardware crash and safety,
installation and sealing of joints and internal paraments built as NTE-FCL 3 .
Total Un.......: 14,000 239,36 3.351,04
5.2.3 Un. Double sheet wood door measures 180 * 240cm.
Total Un. ......: 7,000 283,43 1.984,01
5.2.4 Ml Balcony door 200 * 235 cm on two sheets practicables in wood for enamelling
sheet size 150 * 210 cm, with glass windows, hardware crash and safety aid
flashing and masonry, fully finished as NTE-FCM 8 and 9. Measure unit attached.
Total Ml ......: 388,800 148,89 57.888,43
5.2.5 Ud Armored door duplex comprising wooden pine treated, formed by twin pillars of
wood 14 cm wide, with wooden interior of the same quality, shielded on both
sides made of steel laminate 0 , 8 mm thick and finishing exterior wood board or as
smooth quarter, even locks up three points, reinforcing plate and cylinder, with
pivot hinges auction fully installed according NTE 8-PPM.
Total Un. ......: 1,000 485,00 485,00
5.2.6 Un. Single glazed glass door for lacquering, frame consisting of 70 * 22 sobrecerco of
70 * 22, flashings, sheet composed of standardized prefabricated perimeter frame
of wood reinforced with intermediate gap with molding and received jonquil, total
thickness 35 mm, edged with solid wood to two songs, including hanging
hardware, security, and knobs with slip and conviction, completely finished
according NTE-PPV 8.
Total Un. ......: 4,000 83,89 335,56
Partial budget nº 5 Facades
Nº Unit Description Measurement Cost Amount
86
5.2.7 Un. Wood door in one sheet with dimensions of 100x205 cm.
Total Un. ......: 13,000 253,05 3.289,65
Total subchapter 5.2.-Exterior woodwork: 68.341,65
5.3.- Exterior´s tops
5.3.1.- Coping
5.3.1.1 Ml Coping finishing wall, granite stone rate of 25/35 * 10 cm, seated with mortar
cement and sand 1:6, and even leveling.
Total Ml ......: 281,000 21,32 5.990,92
Total subchapter 5.3.1.-Coping: 5.990,92
Total subchapter 5.3.-Exterior´s tops: 5.990,92
5.4.- Glass
5.4.1.- Special: double glass with chamber
5.4.1.1 M² Double glazing with low emissivity thermal 8/20/12, continuous and sealed with
wedges.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The joinery shall be completely assembled and
attached to the element support.
Includes: Installation, footwear, assembly and adjustment in carpentry. Sealing
bottom of seal.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Sealing and correct
attachment of the glass sheet to rack.
Criterion Measurement Project Area to carpentry glazing as graphic
documentation of projects including stained glass on each sheet the size of the
frame.
Total m² ......: 461,656 93,02 42.943,24
Total subchapter 5.4.1.- Special: double glass with chamber: 42.943,24
Total subchapter 5.4.-Glass: 42.943,24
Total partial budget nº 5 Facades: 177.551,48
Partial budget nº 6 Partitions
Nº Unit Description Measurement Cost Amount
87
6.1.- Interior doors
6.1.1.- Wood
Un. Blind door with one sheet of 220x110x3, 5 cm, boards of direct glazed shop, pine
country model with molding line.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The dimensions of the hole and the fence and the
sense of openness, it was at the Project.
Includes: Installation of hanging. Placing the blade. Attaching hardware. Protecting
woodwork against knocks, splashes, etc..
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Strength of the whole.
Total Un. ......: 34,000 158,58 5.391,72
6.1.1.2 Un. Blind door with one sheet of 220x100x3, 5 cm, boards of direct glazed shop, pine
country model with molding line.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The dimensions of the hole and the fence and the
sense of openness, it was at the Project.
Includes: Installation of hanging.Placing the blade. Attaching hardware. Protecting
woodwork against knocks, splashes, etc..
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Strength of the whole.
Total Un. ......: 4,000 157,95 631,80
6.1.1.3 Un Blind door with two sheets 220x170x3, 5 cm, boards of direct glazed shop, pine
country model with molding line.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The dimensions of the hole and the fence and the
sense of openness, it was at the Project.
Includes: Installation of hanging Placing the blade .Attaching hardware. Protecting
woodwork against knocks, splashes, etc...
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Strength of the whole.
Total Un. ......: 13,000 247,85 3.222,05
Total subchapter 6.1.1.-Of wood: 9.245,57
Total subchapter 6.1.-Interior doors: 9.245,57
6.2.- Helps
6.2.1 M² Aid masonry for heating installation.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
trades to be engaged.
Includes: Job Opening. Paraments opening holes, walls, floors and slabs, for the
passage of facilities. Flowtubes placement. Placement and received cash for
embedded elements. Sealing holes and voids passage facilities.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 3,29 3.009,10
6.2.2 M² Aid masonry for installation of plumbing.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
Partial budget nº 6 Partitions
Nº Unit Description Measurement Cost Amount
88
trades to be engaged.
Includes: Job Opening. Paraments opening holes, walls, floors and slabs, for the
passage of facilities. Flowtubes placement. Placement and received cash for
embedded elements. Sealing holes and voids passage facilities.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 2,50 2.286,55
6.2.3 M² Aid masonry for installation of fire protection.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
trades to be engaged.
Includes: Job Opening Paraments opening holes, walls, floors and slabs, for the
passage of facilities. Flowtubes placement. Placement and received cash for
embedded elements. Sealing holes and voids passage facilities.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 0,21 192,07
6.2.4 M² Aid masonry for the installation of safety.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
trades to be engaged.
Includes: Job Opening. Paraments opening holes, walls, floors and slabs, for the
passage of facilities. Flowtubes placement. Placement and received cash for
embedded elements. Sealing holes and voids passage facilities.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 2,00 1.829,24
6.2.5 M² Aid masonry for electrical installation.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
trades to be engaged.
Includes: Job Opening. Paraments opening holes, walls, floors and slabs, for the
passage of facilities. Flowtubes placement. Placement and received cash for
embedded elements. Sealing holes and voids passage facilities.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 3,84 3.512,14
6.2.6 M² Aid masonry for the receipt of the interior woodwork.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
trades to be engaged.
Includes: Rethinking and training around the perimeter of the hole to
accommodate the fastening elements of the framework. Presentation, coined,
Partial budget nº 6 Partitions
Nº Unit Description Measurement Cost Amount
89
leveling and poise of the framework in the hole. Filled with mortar or screwing of
the fixation frame. Perimeter joint sealants.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 2,42 2.213,38
6.2.7 M² Aid masonry for the receipt of the exterior woodwork.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, will coordinate the various
trades to be engaged.
Includes: Rethinking and training around the perimeter of the hole to
accommodate the fastening elements of the framework. Presentation, coined,
leveling and poise of the framework in the hole. Filled with mortar or screwing of
the fixation frame. Perimeter joint sealants.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate completion
of the work unit.
Criteria for measuring project: surface, as measured by graphic Project.
Total m² ......: 914,620 0,92 841,45
Total subchapter 6.2.-Helps: 13.883,93
Total partial budget nº 6 Partitions : 23.129,50
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
90
7.1.- Heating, ventilating air conditioning and hot water
7.1.1.- Boiler and thermal groups
7.1.1.1 Un. Supply and installation of thermal, heating, dimensions 910x2005x1725 mm,
maximum working pressure 5 bar and equipment consists of: boiler body piece of
one sheet steel with a fireplace in excess, surround and control panel, modulating
burner for natural gas and propane gas and ramp. Even safety valve, bleed
connection chimney pipe galvanized single wall of 350 mm diameter and 0.5 mm
thick. Fully installed, wiring, tested and launched, without aid of masonry.
Includes: rethinking by staff. Placing and fixing the boiler, the burner and its
components. Connecting to the network elements. Redesign and implementation
of the connection to the chimney. Redesign and implementation of drainage.
Testing Service. Protection element against knocks and splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 13.583,79 13.583,79
Total subchapter7.1.1.-Boiler and Thermal groups: 13.583,79
7.1.2.- Systems of water channeling
7.1.2.1 M Supply and installation of water distribution piping hot climate, consisting of black
steel pipe with welded longitudinal electrical resistance of 15 mm in diameter,
placed on the inside surface of the building through insulated flexible mold
elastomeric foam. Even mounting elements, elbows, tees, sleeves and other
accessories necessary for operation. Fully assembled, connection and tested,
without aid of masonry.
Include: redesign of the pipe. Marking of the media.. Anchor the supports.
Placement and fixation of pipelines. Testing Service. Placing insulation. Protection
element against knocks and splashes.
Criteria for measuring project length depending graphic Project.
Total m ......: 25,820 20,68 533,96
7.1.2.2 M Supply and installation of water distribution piping hot climate, consisting of black
steel pipe with welded longitudinal electrical resistance of 20 mm in diameter,
placed on the inside surface of the building through insulated flexible mold
elastomeric foam. Even mounting elements, elbows, tees, sleeves and other
accessories necessary for operation. Fully assembled, connection and tested,
without aid of masonry.
Include: redesign of the pipe. Marking of the media. Anchor the supports.
Placement and fixation of pipelines. Testing Service. Placing insulation. Protection
element against knocks and splashes.
Criteria for measuring project length depending graphic Project.
Total m ......: 140,280 24,79 3.477,54
7.1.2.3 M Supply and installation of water distribution piping hot climate, consisting of black
steel pipe with welded longitudinal electrical resistance of 32 mm in diameter,
placed on the inside surface of the building through insulated mold Flexible
elastomeric foam. Even mounting elements, elbows, tees, sleeves and other
accessories necessary for operation. Fully assembled, connection and tested,
without aid of masonry.
Include: redesign of the pipe. Marking of the media. Anchor the supports.
Placement and fixation of pipelines. Testing Service. Placing insulation. Protection
element against knocks and splashes.
Criteria for measuring project length depending graphic Project.
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
91
Total m ......: 4,700 35,16 165,25
7.1.2.4 Un. Supply and installation of flush water distribution system for air conditioning
system consists of 2 m black steel tube welded longitudinal electrical resistance of
25 mm in diameter, placed superficially and shutoff valve. Even mounting
elements, elbows, tees, sleeves and other accessories necessary for operation.
Fully assembled and tested connections, without aid of masonry.
Include: redesign of the pipe. Marking of the media. Anchor the supports.
Placement and fixation of pipelines. Testing Service. Protection element against
knocks and splashes.
Criteria for measuring project length depending graphic Project.
Total Un. ......: 1,000 44,31 44,31
7.1.2.5 Un. Supply and installation of electrical centrifugal three speed, with a power of 0.11
kW, 1 male threaded mouths "of the pump height 130 mm, body with cast iron
impeller. Includes: rethinking. Connecting to the grid. Testing Service. Protection
element against knocks and splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 235,43 235,43
7.1.2.6 Un. Supply and installation of closed expansion tank with a capacity of 220 l, height
1075 mm, 550 mm in diameter, with screw 1 1 / 4 "in diameter and 10 bar
pressure, including pressure gauge p / w accessories for proper operation. Fully
assembled and tested connections, without aid of masonry.
Includes: rethinking. Connecting to the grid. Testing Service. Protection element
against knocks and splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 362,55 362,55
7.1.2.7 Un. Supply and installation of automatic air trap buoy and threaded 1 / 2 "diameter
brass cap and body, for a maximum working pressure of 6 bar and a maximum
temperature of 110 ° C, including assembly and other elements accessories
necessary for operation. Fully assembled and tested connections.
Includes: rethinking. Connections. Testing Service. Protection element against
knocks and splashes.
Criterion Measurement Project Unit projected as graphic Project..
Total Un. ......: 4,000 20,72 82,88
Total subchapter 7.1.2.- Systems of water channeling: 4.901,92
7.1.3.- Transmitter by water for the air conditioning
7.1.3.1 Un. Supply and installation of cast iron radiator, heat emission 267.2 kcal / h, according
to UNE-EN 442-1, for an average difference of 50 ° C between the radiator and the
atmosphere, consisting of 4 elements, 562 mm in height, with three columns,
installation of heating water with bitubo system. Even cock thermostatted, holder,
automatic trap, caps, cuts, joints, anchors, brackets, couplings for connection to
the distribution network, soffits and all those accessories necessary for operation.
Fully assembled and tested connections, without aid of masonry.
Includes: Checking facing termination of support. Redesign templates. Fixation by
facing anchoring elements. Location and setting of the units. Mounting accessories.
Connecting to the grid. Testing Service. Protection element against knocks and
splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 6,000 77,68 466,08
7.1.3.2 Un. Supply and installation of cast iron radiator, according to UNE-EN 442-1, for an
average difference of 50 ° C between the radiator and the atmosphere, consisting
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
92
of 9 elements, 562 mm in height, with three columns, installation of heating water
with bitubo system. Even cock thermostatted, holder, automatic trap, caps, cuts,
joints, anchors, brackets, couplings for connection to the distribution network,
soffits and all those accessories necessary for operation. Fully assembled and
tested connections, without aid of masonry.
Includes: Checking facing termination of support. Redesign templates. Fixation by
facing anchoring elements. Location and setting of the units. Mounting accessories.
Connecting to the grid. Testing Service. Protection element against knocks and
splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 18,000 139,69 2.514,42
Total subchapter 7.1.3.- Transmitter by water for the air conditioning: 2.980,50
7.1.4.- Mechanism of central control
7.1.4.1 Un. Supply and installation of centralized control of the heating installation to boiler
and radiator circuit comprising electronic central heating. Fully assembled,
connection and tested, without aid of masonry.
Includes: redesign, and fixing the network connection of the adjustment and
control. Testing Service. Cleaning and protection units.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 548,17 548,17
Total subchapter 7.1.4.- Mechanism of central control: 548,17
Total subchapter 7.1.- Heating, ventilating air conditioning and hot water: 22.014,38
7.2.- Electrical
7.2.1 Un. Kw recruitment processing costs with the Company for the supply to the building
from their distribution networks, including supply rights, engage in recruitment
and verification of insurance payment.
Total Un. ......: 1,000 43,05 43,05
7.2.2 Un. Network touchdown for concrete structure of the building with 90 m of bare
copper conductor 35 mm ² and 2 spades.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Contacts will be
adequately protected to ensure a steady and correct connection.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 616,90 616,90
7.2.3 Un. Touchdown independent deep rod method.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project.
Includes: rethinking. Excavation of the chest. Installing touchdown independent.
Placement of the chest. Connection to the network through a bridge of land for
verification. Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Contacts will be
adequately protected to ensure a steady and correct connection.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 199,32 199,32
7.2.4 Un. Network equalization in the bathroom.
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
93
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: rethinking. Connection of the electrode and the link line. Mounting point
earthing. Delineation of the main land. Subject. Delineation of ground derivations.
Connection of the referral. Connection to the mass of the network. Testing
Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Contacts will be
adequately protected to ensure a steady and correct connection.
Criterion Measurement Project Unit projected as graphic Project..
Total Un. ......: 6,000 34,84 209,04
7.2.5 Un. Box of protection and safe, installed inside the wall niche.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project area and
the location is completely finished. Will test the adequacy of existing rules of the
supplier.
Includes: rethinking the status of channels and anchorages of the box. Fixation.
Connections. Laying of pipes and special parts. Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units will be guaranteed
permanent access from the street, and security.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 412,44 412,44
7.2.6 Un. General protective box equipped with connection terminals.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project area and
the location is fully completed. Will test the adequacy of existing rules of the
supplier.
Included: rethinking the status of channels and anchorages of the box. Set
framework. Positioning the door. Connections. Laying of pipes and special parts.
Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units will be guaranteed
permanent access from the street, and security.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 4,000 333,02 1.332,08
7.2.7 M General line of supply consisting of buried cables with copper conductor unipolar,
under guard of polyethylene pipe, double wall, 75 mm in diameter.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units, accessible from
communal areas.
Criteria for measuring project length depending graphic Project.
Total m ......: 10,560 18,07 190,82
7.2.8 Un. Centralization of counters in cabinet formed by switch module 160 A of maneuver;
1 module muddy general, 1 safety fuse module, 1 module single phase, three
phase meters 1 module, service module overall sectioning; module clock rate
change to switch 1 module and mud protection, and output terminals connected to
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
94
ground.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project, the site is
complete with its auxiliaries, and their dimensions are correct. Will test the
adequacy of existing rules of the supplier.
Includes: rethinking. Leveling and clamping fittings and fixings. Connections. Laying
of pipes and special parts. Cabling. Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Record power
consumption of the subscriber.
Criterion Measurement Project Unit projected as graphic Project..
Total Un. ......: 1,000 826,12 826,12
7.2.9 M Shunt three-phase fixed at individual housing area, consisting of single-pole cables
with copper conductors.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units, accessible from
communal areas.
Criteria for measuring project length depending graphic Project.
Total m ......: 411,980 10,60 4.366,99
7.2.10 Un. Interior grid distribution of general services consisting of: GS; table side table side
lift; circuit wiring with low protective tube for feeding the following common uses:
lighting of staircases and common areas, emergency lighting of stairs and common
areas, door entry or video mail, storage, exterior lighting, other uses (type A);
mechanisms.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation. Minimum
separation of the pipeline with other facilities.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units, accessible from
communal areas.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 7.643,31 7.643,31
7.2.11 Un. Simple point of light installed copper cable, embedded in flexible PVC tube, box of
tools and aids masonry, implemented as Low Voltage Electrotechnical Regulations
and Instructions complementary techniques. Measure the finished unit.
Total Un. ......: 83,000 16,19 1.343,77
7.2.12 Un. Outlet 10/16 A with ground, installed copper cable rated minimum, embedded in
flexible PVC tube 16 mm in diameter, including mechanisms of top-quality link and
junction boxes, with aid masonry executed according NTE IEB-50 Low Voltage
Electrotechnical Regulations and Instructions complementary techniques. Measure
the finished unit.
Total Un. ......: 62,000 29,68 1.840,16
7.2.13 Un. Outlet 10/16 A with ground, installed copper cable section of 4 mm2 minimum
nominal, built-in flexible PVC tube 16 mm in diameter, including mechanisms of
top-quality link and junction boxes, with aid masonry executed according NTE IEB-
50 Low Voltage Electrotechnical Regulations and Instructions complementary
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
95
techniques. Measure the finished unit.
Total Un. ......: 10,000 32,61 326,10
7.2.14 Un. Outlet 10/16 A with ground, installed copper cable rated minimum section of 6
mm2, embedded in flexible PVC tube 16 mm in diameter, including mechanisms of
top-quality link and junction boxes, with aid masonry executed according NTE IEB-
50 Low Voltage Electrotechnical Regulations and Instructions complementary
techniques. Measure the finished unit.
Total Un. ......: 4,000 37,48 149,92
7.2.15 Un. Outlet 25 with ground, installed copper cable rated minimum section of 6 mm2,
embedded in flexible PVC tube 20 mm in diameter, including mechanisms of top
quality, junction boxes and liaison, aid masonry executed according NTE IEB-51
Low Voltage Electrotechnical Regulations and Instructions complementary
techniques. Measure the finished unit.
Total Un. ......: 1,000 38,49 38,49
Total subchapter 7.2.- Eléctrical: 19.538,51
7.3.- Plumbing
7.3.1 M Indoor plumbing, of polyethylene, 32 mm outer diameter, placed superficially
protected against condensation.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: Rethinking the route of the pipeline. Placement and fixation of tubes and
accessories. Placement of the protection of pipelines. Testing Service. Protection
element against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Pipes have closure
caps, placed at exit points of water, until receipt of the sanitary and taps.
Criterion Measurement Project Unit projected as graphic Project.
Total m ......: 4,700 12,17 57,20
7.3.2 M Indoor plumbing, of polyethylene (PEX), 20 mm outer diameter, placed superficially
protected against condensation.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: Rethinking the route of the pipeline. Placement and fixation of tubes and
accessories. Placement of the protection of pipelines. Testing Service. Protection
element against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Pipes have closure
caps, placed at exit points of water, until receipt of the sanitary and taps.
Criterion Measurement Project Unit projected as graphic Project.
Total m ......: 140,280 6,71 941,28
7.3.3 M Indoor plumbing, of polyethylene,15 mm outer diameter, placed superficially.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: Rethinking the route of the pipeline. Placement and fixation of tubes and
accessories. Testing Service. Protection element against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Pipes have closure
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
96
caps, placed at exit points of water, until receipt of the sanitary and taps.
Criterion Measurement Project Unit projected as graphic Project.
Total m ......: 56,740 2,74 155,47
7.3.4 Un. Supply of underground drinking water supply of 2 m long tube formed by high-
density polyethylene, 75 mm outer diameter.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We find that the layout of the trenches
corresponds to the Project. Will take into account the minimum separation of
supply to other facilities.
Includes: redesign and layout of the attack, coordinated with other facilities or
features that may have interference. Landfill and compacted concrete hearth in
training. Formation of the brick masonry, previously wetted, placed with cement
mortar. Discharge of the sand at the bottom of the ditch. Placement of the pipe.
Mounting the key cut. Implementation of the envelope stuffing. Protection against
knocks and set misuse. Joining the attack with the overall network of the
municipality. Testing Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Mechanical strength
and tightness.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 465,65 465,65
7.3.5 Un. Supply pipe drinking water from 8 m length of polyethylene (PEX), placed
superficially protected against condensation.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Include: layout and redesign. Attaching the hose to the ornament. Placement of
the protection of pipelines. Protection against knocks and set misuse. Testing
Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Mechanical strength
and tightness.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 350,78 350,78
7.3.6 Un. Sump, prefabricated polypropylene circular section, with top 18 cm in diameter
and stopcocks gate.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project area and
the location is completely finished.
Includes: Rethinking the chest. Removal of loose soil from the bottom of the
excavation. Landfill compaction and formation of concrete floor. Placement of
prefabricated chest. Formation of holes for passage of the tubes. Placement and
connection of the stopcock. Placement of the cover and accessories. Protection
against the chest beating and seals, especially during the filling and compacting.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Accessibility.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 34,72 34,72
7.3.7 Un. Preinstalling accountant water, placed in prefabricated closet, locked gate cut
overall.
Support preconditions: Before beginning the activities for the implementation
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
97
process, the following findings: The situation corresponds to the Project, the site is
complete with its auxiliaries, and their dimensions are correct.
Includes: rethinking. Placement and fixing of accessories and special parts. Testing
Service.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Sealing. Registration
of water use of the subscriber.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 748,24 748,24
7.3.8 Un. Pressure group, with 2 horizontal multistage centrifugal pumps with electronic
control.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project area and
the location is completely finished.
Includes: rethinking. Placement and fixation of the lobby. Placing and fixing pipes
and accessories. Testing Service. Protection until the completion of the works
against knocks, splashes, etc...
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Appropriate
regulation of pressure.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 3.520,30 3.520,30
7.3.9 Un. Cock brass seat, 1 / 2 "diameter pipe to put on polyethylene (PEX), threaded
through union.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We find that their situation reflects the Project and
that there is sufficient space for installation.
Includes: rethinking. Placement and fixation. Testing Service. Protection element
against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate grid.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 36,000 16,39 590,04
7.3.10 Un. Plumbing for a bathroom with envelope: toilet, double sink, shower, made of
polyethylene (PEX), for the network of hot and cold water.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: Rethinking the route of the pipeline and the status of the keys. Placement
and fixing of pipes and keys. Testing Service. Protection element against knocks
and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Pipes have closure
caps, placed at exit points of water, until receipt of the sanitary and taps.
Criterion Measurement Project Unit projected as graphic Project..
Total Un. ......: 8,000 440,99 3.527,92
7.3.11 Un. Indoor plumbing for the kitchen with envelope to: sink, and took a key step in
dishwashers made from polyethylene (PEX), for the network of hot and cold
water.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
98
the path of project, and that there is sufficient space for installation.
Includes: Rethinking the route of the pipeline and the status of the keys. Placement
and fixing of pipes and keys. Testing Service. Protection element against knocks
and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Pipes have closure
caps, placed at exit points of water, until receipt of the sanitary and taps.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 2,000 263,79 527,58
7.3.12 Un. . Indoor plumbing for toilet, made of polyethylene (PEX), for the network of hot
and cold water.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: Rethinking the route of the pipeline and the status of the keys. Placement
and fixing of pipes and keys. Testing Service. Protection element against knocks
and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Pipes have closure
caps, placed at exit points of water, until receipt of the sanitary and taps.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 3,000 292,06 876,18
Total subchapter 7.3.-Plumbing: 11.795,36
7.4.- Against fire
7.4.1.- Extinguishers
7.4.1.1 Un. Supply and placement of fire extinguisher ABC multipurpose dry chemical
antibrasa, pressure built for efficiency 113B-21A-C, 6 kg of extinguishing agent,
with pressure gauge and hose nozzle diffuser. Including support and mounting
accessories. Completely installed.
Includes: rethinking the status of the extinguisher. Placement and fixation of the
bracket. Placement of the extinguisher. Protection against knocks and set misuse.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 8,000 45,01 360,08
Total subchapter 7.4.1.- Extinguishers: 360,08
7.4.2.- Signs
7.4.2.1 Un. Supply and placement of plaque marking fire-fighting equipment, in polystyrene
photoluminescent of 210x210 mm.
Includes: rethinking. Placement and fixation elements by facing the anchorage.
Protection element against knocks and splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 8,000 6,15 49,20
7.4.2.2 Un. Supply and placement of plaque marking means of escape in polystyrene
photoluminescent of 210x210 mm.
Includes: rethinking. Placement and fixation elements by facing the anchorage.
Protection element against knocks and splashes.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 4,000 6,15 24,60
Total subchapter 7.4.2.- Signs: 73,80
7.4.3.- Emergency lights
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
99
7.4.3.1 Un. Supply and installation of emergency lighting, linear fluorescent tube. Even
accessories, anchoring and auxiliary material. Fully assembled, connection and
tested, without aid of masonry.
Installation:
- REBT. Regulation for Low Voltage Electro
Includes: rethinking. Fixation by facing anchoring elements. Placement. Protection
element against knocks and splashes. Testing Service.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 9,000 21,00 189,00
Total subchapter 7.4.3.- Emergency lights: 189,00
7.4.4.- Alarm and detection
7.4.4.1 Un. Supply and installation of fire detection system consisting of central automatic fire
detection with a maximum capacity of 2 areas of detection, ionic smoke detector,
optical smoke detector, alarm with 12 buttons light type and rearmable plastic cap
tilt pilot action with LED indicator for status on doors, 6 interior sirens optical signal
and noise, and external siren with visual and audible signal. Even pipes protection,
cabling inside and all accessories necessary for proper installation. Fully assembled
and tested connections, without aid of masonry.
Include: redesign of the pipeline and electrical elements of the installation. Laying
and fixing of the protective tube wiring. Assembly of the wiring. Mounting and
wiring of sensors, switches, etc.. Testing Service. Protection against the bumps and
misuse.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 2.755,01 2.755,01
7.4.4.2 Un. . Supply and installation of fire detection system for carbon monoxide (CO) with 2
zones for central modular detection with cockpit modules and two metal control
panel with 17 detectors based, status LED, semiconductor and microprocessor
technology, 8 bits. Even pipes protection, cabling inside and all accessories
necessary for proper installation. Fully assembled and tested connections, without
aid of masonry.
Include: redesign of the pipeline and electrical elements of the installation. Laying
and fixing of the protective tube wiring. Assembly of the wiring. Mounting and
wiring of sensors and center. Testing Service. Protection against the bumps and
misuse.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 2.109,38 2.109,38
Total subchapter 7.4.4.-Deraction and alarm: 4.864,39
Total subchapter 7.4.-Against fire: 5.487,27
7.5.- Healthiness
7.5.1 Un. Drainage of shower trays made up of PVC pipe of 32 mm outer diameter from the
apparatus to siphon the boat, including valves, connections, special joints, and
material aid small masonry, made according to ISS NTE-28. Measure the finished
unit.
Total Un. ......: 2,000 29,91 59,82
7.5.2 Un. Sink drain sinuses formed by two PVC tube 32 mm in outer diameter from the
apparatus to siphon the boat, including valves, connections, special joints, and
material aid small masonry, made according to ISS-22 NTE . Measure the finished
unit.
Total Un. ......: 6,000 36,06 216,36
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
100
7.5.3 Un. Sink drain trap with two breasts and PVC tube 40 mm outer diameter, installed
from the device, including valves, connections, special joints, and material aid small
masonry, executed according to NTE-25 ISS. Measure the finished unit.
Total Un. ......: 2,000 58,58 117,16
7.5.4 Un. Sink drain trap with PVC pipe and 40 mm outer diameter, installed from the device,
including valves, connections, special joints, and material aid small masonry.
Measure the finished unit.
Total Un. ......: 3,000 45,51 136,53
7.5.5 Un. Drain washer / dishwasher PVC tube 40 mm outer diameter, installed in the
making or referral, including connections, special joints, and material aid small
masonry. Measure the finished unit.
Total Un. ......: 5,000 8,61 43,05
7.5.6 M Descendant of smooth PVC, Series B (UNE-EN 1329-1) of 100 mm in diameter,
glued together.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: redesign and layout of the duct. Presentation dry pipes and special parts.
Marking the position of the braces. Fixing clamps. Mounting set, starting from the
top. Cleaning the area with glue, and gluing the pieces connect. Testing Service.
Protection against knocks and set misuse.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Sealing. Free
movement with respect to movements of the structure.
Criteria for measuring project length depending graphic Project.
Total m ......: 102,860 15,37 1.580,96
7.5.7 M Descendant circular copper Ø 80 mm and 0.60 mm thick.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: redesign and layout of the duct. Presentation dry pipes and special parts.
Marking the position of the braces. Fixing clamps. Mounting set, starting from the
top. Resolution of the seams between pieces. Protection against knocks and set
misuse.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Sealing. Free
movement with respect to movements of the structure.
Criteria for measuring project length depending graphic Project.
Total m ......: 47,800 24,83 1.186,87
7.5.8 Un. Interior net evacuation for bathroom manned for: toilet, double sink, shower, bath,
bidet, made with PVC pipe smooth, Series B (UNE-EN 1329-1) for the network of
drains.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: rethinking. Presentation of pipes and special parts. Splices. Fixations.
Testing Service. Protection against strokes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units will be caps on the
closing-off, pending receipt of medical devices. Mechanical strength and tightness.
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
101
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 6,000 478,29 2.869,74
7.5.9 Un. Evacuation to the internal network with allowance for kitchen: sink, and took a
sump in the dishwasher, made with PVC pipe smooth, Series B (UNE-EN 1329-1) for
the network of drains.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: rethinking. Presentation of pipes and special parts. Splices. Fixations.
Testing Service. Protection against strokes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units will be caps on the
closing-off, pending receipt of medical devices. Mechanical strength and tightness.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 2,000 168,68 337,36
7.5.10 Un. Interior net with kitchen evacuation envelope: making and cock for washing dishes,
made with PVC pipe smooth, Series B (UNE-EN 1329-1) for the network of drains.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: rethinking. Presentation of pipes and special parts. Splices. Fixations.
Testing Service. Protection against strokes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units will be caps on the
closing-off, pending receipt of medical devices. Mechanical strength and tightness.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 168,68 168,68
7.5.11 Un. PVC check valve 110 mm in diameter.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: Check that the location corresponds to the Project.
Includes: rethinking the location of the valve. Placement of the valve.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: The connection will
be closed until placed in service.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 121,43 121,43
7.5.12 Un. Hood with dimensions 218x127x304 mm, with a stretch to connect aluminum
tubing.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project.
Includes: Checking facing termination of support. Redesign templates. Fixation by
facing anchoring elements. Placement of the device. Connecting to the network.
Protection element against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units, and setting
appropriate position.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 86,44 86,44
7.5.13 Un. Sump of 51 * 51 cm with an average depth of 70 cm on concrete floor in central H-
20/P/25/I-IIa developed 10 cm thick, built of brick, including registration cap of
Partial budget nº 7 Installations
Nº Unit Description Measurement Cost Amount
102
reinforced concrete pipes and connections in and out. Executed according to NTE-
ISS.
Total Un. ......: 6,000 124,57 747,42
Total subchapter 7.5.-Healthiness: 7.671,82
7.6.- Security
7.6.1.- Burglar alarm
7.6.1.1 Un. Anti-theft protection system.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: will be checked for their status and correspond to
the path of project, and that there is sufficient space for installation.
Includes: redesign of the site. Redesign and layout of ductwork. Placement and
fixing of lines and boxes. Connecting pipes and fittings. Cabling. Placement of
sensors. Placement mechanisms. Testing Service. Protection against knocks and set
misuse.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units is correct operation.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 1.383,70 1.383,70
Total subchapter 7.6.1.-Burglar alarm: 1.383,70
Total subchapter 7.6.- Security: 1.383,70
Total partial budget nº 7 Installations : 67.891,04
Partial budget nº 8 Insulation and waterproof
Nº Unit Description Measurement Cost Amount
103
8.1.- Insulation
8.1.1 M Descendant of sound insulation of 100 mm in diameter, made with sound-
insulating elastomer-fiber of 18 mm thick.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: Check that the surface is dry and clean.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Stay in the insulating
layer in the space provided. Uniform protection of the entire surface.
Criteria for measuring project length depending graphic Project.
Total m ......: 64,240 11,43 734,26
8.1.2 M2 Insulation of the terraces on floors or under deck panels felt naked glass wool
bonded with thermosetting resins.
Total M2 ......: 914,620 6,04 5.524,30
8.1.3 M² Fire protection of the pillars with metal plates.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: Before starting work, verify that the structure is
completed, the deck and facade. The seating surface of the plates must be level
and the floor, if possible, placed and finished, except where the flooring can be
damaged during assembly work, in this case should be completed based seat. The
roofs of the work will be finished, being necessary to the lower surface is coated
forged if they are not going to make false ceilings. The facilities, both plumbing
and heating and electricity, must be taking the floor with waiting for further
distribution throughout the interior of the walls.
Total m² ......: 210,160 22,06 4.636,13
Total subchapter 8.1.-Insulation: 10.894,69
8.2.-Waterproof
8.2.1 M Sealing gasket structural dilatation of 25 mm wide vertical cladding in exterior
polyurethane sealant applied on a gun board and polyurethane sealant cord.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We comply with the manufacturer's specifications
for the handling and placement.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adherence to the
edges of the board and quality seal.
Criteria for measuring project length depending graphic Project.
Total m ......: 25,000 13,95 348,75
8.2.2 M2 Waterproofing sheets of asphalt, surface not protected. Meet the technical
requirements of the NBE-QB 90.
Total M2 ......: 914,620 6,87 6.283,44
Total subchapter 8.2.- Waterproof: 6.632,19
Total partial budget nº 8Insulation and waterproof: 17.526,88
Partial budget nº 9 Roof
Nº Unit Description Measurement Cost Amount
104
9.1.- Green roof
M2 Roof built on passable comprising water vapor barrier of 1.5 kg/m2 of oxiasfalto
pending lightening with concrete, protective layer of sand and cement mortar 1 cm
thick, ready to receive flooring final run as NTE-QAT 12.
Total M2 ......: 914,620 54,56 49.901,67
9.1.1 M2 Sand for building garden roof
Total M2 ......: 914,620 122,29 111.848,88
9.2.- PVC gutter
Ml PVC gutter circular section and diameter 110 mm, including components and
downspouts mouth of magnets.
Total Ml ......: 64,240 16,06 1.031,69
9.3.- White oak´s planks
9.3.1 M White oak´s planks
Total M ......: 194,400 16,50 3.207,60
Total subcapítulo 9.4.- Tablones de madera de roble blanco biselados: 3.207,60
9.4.- M2 Metal porch located on the terrace and entrance to prevent rainwater includes
transportation and placement
Total M2 ......: 49,260 39,14 1.928,04
Total partial budget nº 9 Roof: 167.917,88
Partial budget nº 10 Coatings
Nº Unit Description Measurement Cost Amount
105
10.1.- Wall finishings
10.1.1 M2 Tiled white tile 15 * 15 cm, placed with mortar cement and sand, without gaps left
even after grout joints with white cement paste and cleaning paraments, executed
according to RPA-NTE 3.
Total M2 ......: 69,520 35,38 2.459,62
10.1.2 M2 Stoneware tiles 20 * 20 cm, with cement mortar based, even after grout joints
with white cement paste and cleaning paraments, executed according to NTE RPA-
4.
Total M2 ......: 249,930 26,72 6.678,13
Total subchapter 10.1.-Wall finishing: 9.137,75
10.2.- Paintings in interior walls
10.2.1 M2 Tempera paint on smooth plaster or cement paraments formed by sanding and
cleaning paraments, skilled hand finishing bottom and conducted according NTE-
RPP-18. Measure the surface run.
Total M2 ......: 2.812,990 3,47 9.761,08
Total subchapter 10.2.-Paintings in interior walls: 9.761,08
10.3.- Floor and paving
10.3.1 M2 Parquet wooden splint American Oak 25 * 5 * 1 cm, pasted on with glue prior
paraments horizontal leveling and polishing paste with the same level even with
sanding and varnishing the hands of three abrasion-resistant coating secured by
certificate. Executed according to NTE-CSR.
Total M2 ......: 765,110 50,63 38.737,52
10.3.2 M2 Floor with pieces of ceramic 33 * 33 cm, set with cement mortar tail, even layer of
leveling sand and cement mortar and cleaning paraments built as NTE - RSB 8.
Measure the surface run.
Total M2 ......: 55,950 42,94 2.402,49
10.3.3 M2 Floor with pieces of ceramic 20 * 20 cm, set with cement mortar tail, even layer of
leveling sand and cement mortar and cleaning paraments built as NTE - RSB 8.
Measure the surface run.
Total M2 ......: 76,700 38,98 2.989,77
10.3.4 M Skirting of oak veneer plywood 6x1, 2 cm.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The paraments horizontal and vertical will be
completed and submitted a flat surface.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units, the flatness and
adhesion ornament.
Criteria for measuring project length depending graphic Project.
Total m ......: 508,950 3,99 2.030,71
10.3.5 M2 Floor tiles 33 * 33 cm, made up of cement mortar and sand and finish polished,
executed according to NTE RST-6. Measure the surface run.
Total M2 ......: 199,280 29,15 5.809,01
10.3.6 M² Base for floor with mortar 4 cm thick, placed directly on floor.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We find that the supporting surface has a flatness
and meets the appropriate resistance values taken into account in the scenario
calculation.
Includes: Preparation of the surface. Rethink and prepare together. Placement
Partial budget nº 10 Coatings
Nº Unit Description Measurement Cost Amount
106
levels. Pumping and mixing mortar. Implementation of the leveling bar. Cured.
Protection.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: The final area will
meet the requirements of flatness, surface finish and strength.
Criterion Measurement Project Area as measured by graphic Project.
Total m² ......: 1.097,040 6,73 7.383,08
Total subchapter 10.3.- Floor and paving 59.352,58
10.4.- Suspended ceiling
10.4.1 M2 Suspended ceiling plate lightened smooth plaster 1200 * 600 mm size, placed with
metal fasteners, court, final grading and pasta dough with plaster, paint ready
rebir built as NTE-RTC 14. Measure the surface run.
Total M2 ......: 914,620 23,26 21.274,06
Total subchapter 10.4.-Suspended ceilings: 21.274,06
Total partial budget nº 10 Coatings: 99.525,47
Partial budget nº 11 Equipment
Nº Unit Description Measurement Cost Amount
107
11.1.- Toilets
11.1.1 Un. Shower trays in china White vitreus, size 70 * 70 cm, including placement and
support of masonry. Measure the finished unit.
Total Un. ......: 2,000 83,31 166,62
11.1.2 Un. Team of top quality taps chrome stainless steel mixing bowl for a shower with
flexible diffuser of 1.50 m. Measure the finished unit.
Total Un. ......: 2,000 74,97 149,94
11.1.3 Un. Team to sink mixer taps, chrome plated brass top quality cross with chrome pipe
and central aerator, regulatory liaison and keys and automatic drain. Measure the
finished unit.
Total Un. ......: 18,000 73,60 1.324,80
11.1.4 Un. Toilet of White vitrified porcelain, formed by cup exit dual screws, seat and lid of
thermoset resins, including placement and support of masonry. Measure the
finished unit.
Total Un. ......: 15,000 160,04 2.400,60
11.1.5 Un. White vitreous china sink, made up of sink 450 * 340 mm, matching pedestal,
screws, anchors, stainless steel and integral overflow holes for taps hinted, even
aid and placement of masonry. Measure the finished unit.
Total Un. ......: 18,000 108,80 1.958,40
11.1.6 Un. Wall urinal in White vitreous china, including screws, manual cock and connection
and special pieces of masonry. Measure the finished unit.
Total Un. ......: 2,000 45,99 91,98
Total subchapter 11.1.-Toilets: 6.092,34
11.2.- Units of prefabricated wood houses for playground
Total subchapter 11.2.- Units of prefabricated wood houses for playground: 7.550,00
11.3.- Kitchens/galleries
11.3.1 Un. Sink mixer taps, stainless steel top quality, with chromed cross, aerator with swivel
spout top, link and connection. Measure the finished unit.
Total Un. ......: 1,000 84,24 84,24
11.3.2 Un. Sink drainer with two breasts on top quality stainless steel with matte finish, 1.20
* 0.5 m, with integral overflow, hinted holes for faucets and drain for 54 mm.
Measure the finished unit.
Total Un. ......: 1,000 140,90 140,90
11.3.3 Un. Taps for washing machine / dishwasher, chrome plated brass top quality, with
chrome crosshead even link and thread-making. Measure the finished unit.
Total Un. ......: 3,000 23,03 69,09
11.3.4 Un. Taps for laundry equipment consisting of two taps wall first quality chromed brass,
with chrome cross, including connection and adjustment.Measure the finished
unit.
Total Un. ......: 1,000 44,98 44,98
11.3.5 Un. Glass-ceramic plate.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project.
Includes: Checking facing termination of support. Redesign templates. Fixation by
facing anchoring elements. Placement of the device. Joint sealants. Connecting to
the network. Protection element against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
Partial budget nº 11 Equipment
Nº Unit Description Measurement Cost Amount
108
carrying forward the implementation of the remaining units: Suitable connection.
Criterion Measurement Project Unit projected as graphic Project.
Total Ud ......: 1,000 342,94 342,94
11.3.6 Un. Conventional oven.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project.
Includes: Checking facing termination of support. Redesign templates. Fixation by
facing anchoring elements. Placement of the device. Connecting to the network.
Protection element against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Suitable connection.
Criterion Measurement Project Unit projected as graphic Project..
Total Un. ......: 1,000 197,97 197,97
11.3.7 Un. Refurbishment of kitchen furniture with 5.25 m below low base and 3 m tall
furniture lacquer finish front with 18 mm thick, coated on both sides, front and all
four edges in textured lacquer, downside in white laminate.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project. The
vertical and horizontal parameters of the kitchen will be completed.
Includes: Checking facing termination of support. Redesign templates. Placement
of furniture and accessories. Set the ornament by anchoring elements. Remates.
Protection of furniture and fixtures against knocks and splashes.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate fixation.
Criterion Measurement Project Unit projected as graphic Project. No corners have
doubled in the measurement of the length of the furniture ups and downs.
Total Un. ......: 1,000 4.036,34 4.036,34
Total subchapter 11.3.-Kitchen/galleries: 4.916,46
Total partial budget nº 11 Equipment : 18.558,80
Partial budget nº 12 Interior urbanization of the plot
Nº Unit Description Measurement Cost Amount
109
12.1.- Exterior illumination
12.1.1 Un. Streetlamp with radially symmetrical light distribution, luminaire with cylindrical
diameter of 140 mm and 1400 mm highSupport preconditions: Before beginning
the activities for the implementation process, the following findings: The situation
corresponds to the Project.
Includes: Training for mass concrete foundation. Preparation of the surface.
Fixation of the spine. Placement of the lantern. Placement of the lamp and
accessories. Cleaning and protection against shock element, splashes, etc..
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate lighting
level and uniformity of it. Set to medium.
Criterion Measurement Project Unit projected as graphic Project.
Total Un ......: 3,000 1.877,56 5.632,68
Total subchapter 12.1.- Exterior illumination: 5.632,68
12.2.- Gardening
12.2.1 M² Sowing grass seed mixtures.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We can verify that the underground drainage is
sufficient and that the existing soil type is compatible with the requirements of the
species to spread.
Includes: Preparing the ground and paid in the background. Raked and remove all
material larger than 2 cm. Seed distribution. First irrigation.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units at the entrenched
field.
Criterion Measurement Project: Area measured in horizontal projection as graphic
Project.
Total m² ......: 1.300,000 8,47 11.011,00
Total subchapter 12.2.-Gardening: 11.011,00
12.3.- Exterior paving
12.3.1 M² Floor with concrete tile for exterior use on paved sidewalks.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: We find that there has been a study of the
characteristics of natural soil on which to act and has made withdrawals or
diversion of services, such as power lines and pipelines for water supply and
sewerage.
Includes: Rethinking the master levels through the laying of ropes. Spread and
compaction of the concrete base. Cleaning and wetting of the base. Spread layer of
sand-cement. Sprinkle with cement surface layer of mortar. Placement at the
laying of the tiles when wet. Training together. Fill joints. Cleaning. Protecting the
front element to transit, rain, frost and high temperatures.
Criterion Measurement Project: Area measured in horizontal projection as graphic
Project. Not taken into account retaceos as a factor for increasing the
measurement, given that the decomposition has been considered as the percent
of overall fractures.
Total m² ......: 90,000 26,07 2.346,30
Total subchapter 12.3.- Exterior paving: 2.346,30
12.4.- Installation´s distribution
12.4.1 Un. Sump of wiring, precast concrete, bottomless, registrability of internal measures
Partial budget nº 12 Interior urbanization of the plot
Nº Unit Description Measurement Cost Amount
110
30x30x30 cm, with frame of galvanized steel and reinforced concrete cap trimmed,
39,5 x38, 5 cm.
Support preconditions: Before beginning the activities for the implementation
process, the following checks: Check that the location corresponds to the Project.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 1,000 38,32 38,32
Total subchapter 12.4.- Installation´s distribution: 38,32
12.5.- Urban furniture
12.5.1 Un. Steel trash with vertical support, with key-type swingarm, circular mouth, 40 liters
of capacity.
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project area and
the location is completely finished.
Include: redesign of alignments and levels. Placement and fixation of parts.
Protection against shock, rain, frost and high temperatures.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 2,000 179,46 358,92
12.5.2 Un. Bank-cast arm with three places, of 1850x840 mm, attached to a support surface
(not included in this price).
Support preconditions: Before beginning the activities for the implementation
process, the following findings: The situation corresponds to the Project area and
the location is completely finished.
Include: redesign of alignments and levels. Placement and fixation of parts.
Protection against shock, rain, frost and high temperatures.
Conditions of completion: List of conditions that must be the unit of work for
carrying forward the implementation of the remaining units: Adequate fixation.
Good point.
Criterion Measurement Project Unit projected as graphic Project.
Total Un. ......: 4,000 433,31 1.733,24
12.5.3 Un. Slides, swings, seesaws and other recreational equipment
Total Un. ......: 6,000 274,54 1.647,24
Total subchapter 12.5.-Urban furniture: 3.739,40
Total partial budget nº 12Interior urbanization of the plot: 22.767,70
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
111
13.1.- Collective protection equipment
13.1.1.- Electrical protection
13.1.1.1 Un. Supply and placement of portable hand-held lamp, basket with protector and
handle insulator (repayable in 3 uses).
Includes: assembly, installation and testing.
Criterion Measurement Project Survey measured by length or Basic Study of
Safety and Health.
Total Un. ......: 10,000 5,16 51,60
13.1.1.2 Un. Supply and placement of picture control and protection works to a maximum
power of 25 kW (repayable in 4 uses).
Includes: Installation of the closet. Assembly, installation and testing.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 206,02 206,02
Total subchapter 13.1.1.-Electrical protection: 257,62
13.1.2.- Against fire protection
13.1.2.1 Un. Supply and placement of extinguisher ABC dry chemical, efficiency 34A/233B of 6
kg of extinguishing agent, a backing, a pressure gauge with diffuser nozzle and
verifiable, according to UNE 23110.
Includes: Location of fire extinguishers in facing. Placing and fixing brackets. Hang
the extinguishers. Assembly and installation.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 4,000 50,09 200,36
13.1.2.2 Un. Supply and placement of extinguisher CO2 dry ice, efficiency 89b, 5 kg of
extinguishing agent, model NC-5-P, with stand and nozzle with diffuser, according
to UNE 23110.
Includes: Location of fire extinguishers in facing. Placing and fixing brackets. Hang
the extinguishers. Assembly and installation.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un ......: 4,000 100,76 403,04
Total subchapter 13.1.2.- Against fire protection: 603,40
13.1.3.- Shelter and provisional ways
13.1.3.1 M Supply, erection and dismantling marquee perimeter protection built into the
roof .
m flight, consisting of metal modules of 2.0 m (redeemable in 20 uses), made up
of support jaw, and begun platform of pine boards comprising 20x3, 8 cm
together by nails (redeemable in 10 uses)..
Includes: assembly, installation and testing.
Criterion Measurement Project Survey measured by length or Basic Study of
Safety and Health.
Total m ......: 291,400 27,42 7.990,19
Total subchapter 13.1.3.- Shelter and provisional ways: 7.990,19
Total subchapter 13.1.- Collective protection equipment: 8.851,21
13.2.- Training
13.2.1.- Meetings
13.2.1.1 Un. Committee Meeting on Safety and Health at Work, considering a meeting of two
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
112
hours. The Committee shall consist of one qualified in health and safety level for
workers, two workers with the rank of 2nd officer, an assistant and a supervisor of
Health and Safety Officer with the rank of 1st.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 116,34 116,34
13.2.1.2 Un. Hours to talk training on Safety and Health at Work, carried out by qualified
technicians belonging to a consultancy firm in Security and Risk Prevention.
Includes: Part proportional loss of working hours for workers who attended the
talk, considering an average of six people.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 20,000 82,87 1.657,40
Total subchapter 13.2.1.-Meetings: 1.773,74
Total subchapter 13.2.-Training: 1.773,74
13.3.- Personal protection equipment
13.3.1.- For the head
13.3.1.1 Un. Provision of safety for the hull construction, with harness clamp. Approved and
marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 3,36 50,40
Total subchapter 13.3.1.-For the head: 50,40
13.3.2.- Against high falls
13.3.2.1 Un. Provision of safety belt with a suspension point mooring (repayable in 4 uses).
Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 16,11 80,55
13.3.2.2 Un. Equipment safety harness simple arresters with a lanyard built consisting of a
tubular elastic ribbon 1.5 m with shock impact on the end in carrying bag
(repayable in 4 uses. Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 19,11 95,55
13.3.2.3 Un. Arresters supply device for fastening a nylon rope, 16 mm (4 in depreciable uses).
Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 67,87 339,35
13.3.2.4 M Supply, erection and dismantling of the rope guide arresters high tenacity nylon
16 mm in diameter. Approved and marked with CE certificate.
Criterion Measurement Project Survey measured by length or Basic Study of
Safety and Health.
Total m ......: 50,000 4,91 245,50
Total subchapter 13.3.2.- Against high falls: 760,95
13.3.3.- For eyes and face
13.3.3.1 Un. Providing impact protection goggles (redeemable in 3 uses). Approved and
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
113
marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 10,000 4,16 41,60
13.3.3.2 Un. Provision of protective screen welders in thermoforming material, clamping a
hand (redeemable in 5 uses). Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 3,000 2,68 8,04
Total subchapter 13.3.3.- For eyes and face: 49,64
13.3.4.- For hands and arms
13.3.4.1 Un. Pair of rubber gloves, latex .Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 3,82 19,10
13.3.4.2 Un. Supply pair of gloves for general use of canvas and suede. Approved and marked
with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 3,12 46,80
13.3.4.3 Un. Supply pair of suede gloves lined welder for fireproofing, as RD 773/97. Approved
and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 3,000 9,73 29,19
13.3.4.4 Un. Provision of dielectric pair of gloves for electricians, insulating up to 5000 V,
according to RD 773/97. Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 3,000 52,72 158,16
Total subchapter 13.3.4.- For hands and arms: 253,25
13.3.5.- For the ears
13.3.5.1 Un. Provision of hearing protectors with a head harness and anatomic alignment with
the central cushion (repayable in 3 uses). Approved and marked with CE
certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 10,20 51,00
13.3.5.2 Un. Provision of anti-game silicone plugs. Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 10,000 1,58 15,80
Total subchapter 13.3.5.- For the ears: 66,80
13.3.6.- For feet and legs
13.3.6.1 Un. Supply of water boots without zipper. Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 31,69 475,35
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
114
13.3.6.2 Un. Supply of boots for electrical insulation, up to 5000 V. Approved and marked with
CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 41,67 625,05
Total subchapter 13.3.6.- For feet and legs: 1.100,40
13.3.7.- For the body(protection dress)
13.3.7.1 Un. Provision of a single work piece of polyester-cotton. Approved and marked with
CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 18,94 284,10
13.3.7.2 Un. Provision of protective apron welder in suede with buckle closure and side.
Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 2,000 17,72 35,44
13.3.7.3 Un. Supply belt bag with multiple compartments for tools. Approved and marked with
CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 25,26 378,90
13.3.7.4 Un. Provision of reflective bib butane or yellow color. Approved and marked with CE
certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 22,58 338,70
13.3.7.5 Un. Provision of protective belt with lumbar and abdominal support broad subject.
Approved and marked with CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 19,42 291,30
Total subchapter 13.3.7.- For the body(protection dress): 1.328,44
13.3.8.- For the respiratory tracks
13.3.8.1 Un. Supply of semi anti-mask, a filter (repayable in 3 uses). Approved and marked with
CE certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 10,000 9,36 93,60
13.3.8.2 Un. Supply of replacement filter semi-mask for anti-DR. Approved and marked with CE
certificate.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 10,000 1,04 10,40
Total subchapter 13.3.8.- For the respiratory tracks: 104,00
Total subchapter 13.3.- Personal protection equipment: 3.713,88
13.4.- Preventive medicine and firs aids
13.4.1.- Medical material
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
115
13.4.1.1 Un. Supply and placement of emergency kits for office work, with the minimum
required, installed in the locker room.
Includes: rethinking the layout and ornament. Placement and fixation with screws.
Protection against shock element. Assembly, installation and testing.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 103,98 103,98
13.4.1.2 Un. Provision of sanitary materials for the emergency kit placed in the locker room
during the course of the work.
Includes: Party Proportional means.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 2,000 103,56 207,12
Total subchapter 13.4.1.- Medical material: 311,10
13.4.2.- .- Medical examination
13.4.2.1 Un. Compulsory annual medical examination for workers.
Includes: Part proportional loss of working hours by the employee of the
company, due to displacement from the workplace to the Medical Center.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 15,000 107,37 1.610,55
Total subchapter 13.4.2.- .- Medical examination: 1.610,55
Total subchapter 13.4.- Preventive medicine and firs aids: 1.921,65
13.5.- Provisional installations of health and hygiene
13.5.1.- Connection with the prefabricated site office
13.5.1.1 Un. Connection to stand prefabricated plumbing works, including connection to the
general municipal network, to a maximum distance of 8 m.
Includes: manual excavation of trenches and cleaning up loose soil excavated from
the bottom. Redesign and layout of the pipe at the plant. Presentation of the dry
pipe and special parts. Discharge of the sand at the bottom of the ditch.
Placement of the polyethylene pipe 25 mm in diameter, high density and 15 kg /
cm ² with a maximum pressure of collar-making foundry. Mounting the installation
and connection to the general municipal network. Replacement of concrete
pavement with mass. Assembly, installation, testing and subsequent removal.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 107,66 107,66
13.5.1.2 Un. Connnection prefabricated house sanitation workers, including connection to the
general municipal network, to a maximum distance of 8 m.
Includes: manual excavation of trenches and cleaning up loose soil excavated from
the bottom. Redesign and layout of the duct floor and slopes. Presentation dry
pipes and special parts. Discharge of the sand at the bottom of the ditch.
Placement of the collectors who make up the onslaught. Mounting the installation
and connection to the general municipal network. Replacement of concrete
pavement with mass. Assembly, installation, testing and subsequent removal.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 434,10 434,10
13.5.1.3 Un. Provisional electricity connection prefabricated house work, including connecting
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
116
to the network of the supplier, up to a maximum distance of 50 m.
Include: redesign of the roof or wooden supports. Flattening and orientation of
the supports. Tended to the driver. Stretched between the supports of the
conductors. Stapling of the cable in the walls. Installation of junction boxes and
protection. Protection against moisture insulated conductor. Mounting the
installation and connection to the network of the supplier. Assembly, installation,
testing and subsequent removal.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 184,06 184,06
Total subchapter 13.5.1.- Connection with the prefabricated site office: 725,82
13.5.2.- Site office (rent/construction/adaptation)
13.5.2.1 Un. Monthly rental house for prefabricated toilets at work with Turkish plate, two
plates of shower and sink faucets.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 329,89 329,89
Total subchapter 13.5.2.- Site office (rent/construction/adaptation): 329,89
13.5.3.- Furniture and equipment
13.5.3.1 Un. Supply and laying of 10 individual lockers (redeemable in 3 uses), 10 perches, 2
benches for 5 persons (2 redeemable in use), mirror, 2 roll (redeemable in 3 uses),
2 soapers (redeemable in 3 uses) in booth dressing for work and / or toilets,
including assembly and installation.
Includes: placement and fixation of the elements. Protection against shock
element.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 1,000 1.110,20 1.110,20
Total subchapter 13.5.3.- Furniture and equipment: 1.110,20
13.5.4.- Cleaning
13.5.4.1 Un. Hours of cleaning and disinfection of the house or work in a swing made by
ordinary construction laborer. Includes: proportionally cleanup materials and
elements.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 60,000 22,12 1.327,20
Total subchapter 13.5.4.-Cleaning: 1.327,20
Total subchapter 13.5.- Provisional installations of health and hygiene: 3.493,11
13.6.- Signs and closure of the lot
13.6.1.- Markers
13.6.1.1 M Supply, placement and removal of tape two tone red / white plastic for buoyage
of 8 cm.
Includes: placement, installation and testing.
Criterion Measurement Project Survey measured by length or Basic Study of
Safety and Health.
Total m ......: 200,000 0,98 196,00
13.6.1.2 M Supply, placement and removal of banners for hanging signs, reflective, made of
plastic red / white, placed on supports in place. Includes: placement, installation
Partial budget nº 13 Health and safety
Nº Unit Description Measurement Cost Amount
117
and testing.
Criterion Measurement Project Survey measured by length or Basic Study of
Safety and Health.
Total m ......: 50,000 2,42 121,00
13.6.1.3 Un. Supply and placement of reflective cone to buoyage, unbreakable, 50 cm in height
(redeemable in 5 uses).
Includes: placement, installation and testing.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 30,000 4,00 120,00
Total subchapter 13.6.1.- Markers: 437,00
13.6.2.- Fence and access
13.6.2.1 M Supply, erection and dismantling of removable fence made of prefabricated racks
3.50 x2, 00 m in height. Include: redesign of the supports. Accessories included
fixing. Assembly and subsequent removal of access, fencing and accessories.
Criterion Measurement Project Survey measured by length or Basic Study of
Safety and Health.
Total m ......: 516,900 8,28 4.279,93
Total subchapter 13.6.2.- Fence and access: 4.279,93
13.6.3.- Different signs
13.6.3.1 Un. Supply, placement and removal of safety sign standard.
Include: redesign of the supports. Excavation and opening of the wells. Placement,
alignment and poise of the carriers. Concreting of the shaft. Assembly.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 13,14 65,70
13.6.3.2 Un. Supply, placement and removal of signs of risk standard of 30x30 cm.
Include: redesign of the supports. Excavation and opening of the wells. Placement,
alignment and poise of the carriers. Concreting of the shaft. Assembly.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 16,90 84,50
13.6.3.3 Un. Supply, placement and removal of plaque or signage information about risks of
PVC.
Include: redesign of the plates. Mechanical fixing to the bracket. Assembly.
Subsequent disassembly.
Criteria for measuring project unit designed as study or study Basic Occupational
Safety and Health.
Total Un. ......: 5,000 4,21 21,05
Total subchapter 13.6.3.- Different signs.: 171,25
Total subchapter 13.6.- Signs and closure of the lot: 4.888,18
Total partial budget nº 13Health and safety: 24.641,77
Partial budget nº 14 Machinery
Nº Unit Description Measurement Cost Amount
118
14.1 Un. Crane for construction
Total Un. ......: 1,000 21.480,65 21.480,65
14.2 Un. Bucket loader
Total Un. ......: 1,000 4.989,32 4.989,32
14.3 Un. Backhoe
Total Un. ......: 1,000 4.052,21 4.052,21
14.4 Un. Scaffolding
Total Un. ......: 1,000 3.798,64 3.798,64
14.5 Un. Concrete bomb
Total Un. ......: 1,000 8.887,00 8.887,00
Total partial budget nº 14 Machinery : 43.207,82
Ana Latorre Budget
119
Ana Latorre
As an extra part I am going to enclose a disabled study
in my stayed in Sweden I have realized that it’s a very important question to
attention.
Parking place:
Although we don’t have a specific parking place in our lot
one accessible space with dimensions of
least one parking for each 25.
It is necessary that these parking spaces are located as close as possible to the main
entrance, and preferably at the same level as this, so that access is not hampered with
stairs. It is desirable, if it´s possible, to
There should be ramps that will save the small slope of the sidewalk or walkway and
floor of the parking lot. These ramps should have a maximum gradient of 6%, a
minimum width of 100 cm, side with a height of 5 cm and anti
uniform.
Doors:
Thresholds should be at floor level, without obstacles
move one or 2 people with a dog must have a minimum width of 120 cm and interior
doors must have a minimum free width of 100 cm.
change anything because all the measures of the doors obey the regulation.
The color should contrast with the handle around the area.
we will place a sticker of contrasting color in the glass
cm.
A contrasting color on the floor also helps to direct the eyes towards the door.
To facilitate the identification of entry to people with visual impairments, the door or
frame must be contrasting colors to the wall.
DISABLED STUDY
Disabled study
121
xtra part I am going to enclose a disabled study realized in the building because
in my stayed in Sweden I have realized that it’s a very important question to
lthough we don’t have a specific parking place in our lot, in the street we will
one accessible space with dimensions of 500 x 380 cm. By regulation, be assigned at
least one parking for each 25. Appropriate sign will be placed to indicate the area
It is necessary that these parking spaces are located as close as possible to the main
entrance, and preferably at the same level as this, so that access is not hampered with
possible, to be protected from sun and rain.
There should be ramps that will save the small slope of the sidewalk or walkway and
floor of the parking lot. These ramps should have a maximum gradient of 6%, a
minimum width of 100 cm, side with a height of 5 cm and anti-skid surface, firm and
at floor level, without obstacles. The main entrance doors, to
move one or 2 people with a dog must have a minimum width of 120 cm and interior
doors must have a minimum free width of 100 cm. In our building we don´t need to
change anything because all the measures of the doors obey the regulation.
The color should contrast with the handle around the area. In the glass doors of inside
we will place a sticker of contrasting color in the glass at the chest height or every 120
A contrasting color on the floor also helps to direct the eyes towards the door.
To facilitate the identification of entry to people with visual impairments, the door or
frame must be contrasting colors to the wall.
Disabled study
realized in the building because
in my stayed in Sweden I have realized that it’s a very important question to pay
in the street we will provide
500 x 380 cm. By regulation, be assigned at
be placed to indicate the area
It is necessary that these parking spaces are located as close as possible to the main
entrance, and preferably at the same level as this, so that access is not hampered with
There should be ramps that will save the small slope of the sidewalk or walkway and
floor of the parking lot. These ramps should have a maximum gradient of 6%, a
skid surface, firm and
main entrance doors, to
move one or 2 people with a dog must have a minimum width of 120 cm and interior
our building we don´t need to
In the glass doors of inside
at the chest height or every 120
A contrasting color on the floor also helps to direct the eyes towards the door.
To facilitate the identification of entry to people with visual impairments, the door or
Ana Latorre Disabled study
122
Doors with door closers should be fitted with automatic door openers. Other doors can
sometimes also be too heavy for many people to open and should therefore be fitted
with automatic door openers. When designing doors with automatic door openers it is
important that the various component functions are located correctly (see above), that
operating buttons are contrast-marked, that areas where the door opens are marked
or, alternatively, that the door is fitted with safety sensors, and that account is taken
of similar considerations.
Ramps and elevator:
We don’t have stairs at the entrance and inside either so we don’t need elevator but in
the entrance for avoid the stair and for help we will make a ramp of 100 cm minimum
width and we will put two handrails one in the stair side at 90 cm for non disabled
people or people using cane and another in the ramp side at 75 cm for people with
wheelchairs.
Steps and walking areas:
Walking areas shall be designed so that people with limited mobility or orientation
capacity can move about on them and so that people in wheelchairs can also move
around without assistance.
Walking areas shall be level, firm and non-slip. There shall be special guide paths on
open surfaces.
Ana Latorre Disabled study
123
They have to be free from obstacles. Must have a minimum width of 180 cm, with a
banister located 90 cm from the floor, tactile strips of 20 cm on both sides of the
walking corridor floor.
Contrast and markings:
Important destinations, walking areas, stairs and ramps shall be easy to identify.
Stairs shall be supplied with contrast markings so that partially sighted people and
people with other orientation difficulties are able to discern the level difference.
Contrast in relation to the surroundings can, for instance, be achieved by inserting
material with a different structure and lightness in the ground surfacing, such as
clearly perceptible paving stones in asphalt surfaces.
Guide paths should provide both visual and tactile contrast in relation to their
surroundings.
Grass edges, walls, fences, edges and facades are natural boundaries that can
facilitate orientation for partially sighted people and people with other orientation
difficulties.
Walking areas with contrast marking should be designed so they do not result in a
risk of stumbling. A lightness contrast of at least of at least 0.40 according to the NCS
(Natural Color System) between the contrast marking and the surrounding ground
surfacing can greatly assist partially sighted people and people with other
orientation difficulties in discerning the marking.
Logical color systems facilitate orientation for people with intellectual disabilities or
other orientation difficulties. The markings should be made in a consistent way
throughout the area.
Bathrooms:
When a toilet is provided for the general public, at least one toilet shall be usable
by people with wheelchairs for restricted outdoor use.
Floors should be non-skid. At the urinals, toilets and showers, there should be support
bars and accessories for crutches and canes place.
Spaces reserved for persons with disabilities should be located where there are walls,
do not cancel the order setting the support bars.
Seats should be placed in thick W.C. there to match the height of a wheelchair; the
height is 52 cm above the floor level.
A toilet intended for people with wheelchairs for restricted outdoor use should be at
least 2.2 x 2.2 meters in size and have a free door passage dimension of at least 0.90
meters. There should be a turning zone directly alongside the toilet door.
-Washbasin:
There must be at least one barrier-free toilet in the low part, and with a height of 75
cm. To allow the approach to people in wheelchairs.
The faucets must be easy to open with the elbow or forearm, and its location should
be viewed from the front: hot water left and right for cold water.
Must have strong determination and support to bear the weight of people, if they have
Ana Latorre Disabled study
124
to rely on them.
The conditions of hot water must be protected, as the paraplegic has little feeling in his
legs and can cause burns.
The separation of the faucets should be 20 cm minimum.
You must install at least one mirror with a tilt of the top 10% in the sink and with a
dimension of 72 cm.
Switches:
Are required to have a kind of light signaling. Electrical contacts have to be polarized,
with live, neutral and earth physics.
The switches in general should not be placed within 50 cm from one corner; otherwise
their power will hinder a person in a wheelchair.
Signaling:
The necessary information signs shall be displayed to make it easier for people with
limited mobility and orientation capacity to use the space or the area. It must be
possible for people with impaired orientation capacity to discern and understand such
information signs.
Signs, symbols, maps or signage must be presented in different ways, like in high relief,
written in Braille, with sounds… Signs should be easy to understand and to read, have
tone contrast and be placed at an appropriate height to be read/heard both by people
in wheelchairs and by people with impaired vision who are standing. They should be
placed where they are expected and so that people can get right up to them. The text
size should be designed on the basis of the reading distance and the surface should not
cause reflection.
Tactile information that identifies each location must be located outside it, and its
location should always be constant.
In places where the signs and maps are protected by a glass, this should not be
reflective.
Directors- General signs:
The directory which is in the main entrances of the units must have letters and
graphics in high relief of contrasting color in the background.
Must be located with a metal plate engraved in Braille on the right side of the module
at a height with its center axis to 130 cm.
Emergency exits:
The accessible routes to emergency exits must be well indicated by the tactile,
auditory and bright warning systems.
The doors leading to risk areas should be locked, and open outward.
Signals emitting emergency doors in times of trouble should be standardized.