PERENCANAAN JALAN BARU UNTUK LALU LINTAS RENDAH1. RENCANAKANTebal perkerasan untuk jalan 2 jalur, data lalu lintas tahun 2014 seperti di bawah ini, dan umur rencana: 6 tahunJalan di buka tahun 2018 (i selama pelaksanaan= 4% per tahun) FR= 0,5 dan CBR tanah dasar = 9, 12
2. DATA DATAKendaraan ringan 2 ton..................................................................................14.253 kendaraanBus 10 ton............................................................................................................222 kendaraanTruk 2 as 8,3 ton..................................................................................................262 kendaraanLHR 2014= 14737 kendaraan/hari/2 jurusanPerkembangan lalu lintas (i).........................................................................untuk 6 tahun = 7%Bahan-bahan perkerasan: Lapen Mekanis Batu pecah (kelas A) CBR 100 Sirtu kelas B (kelas B) CBR 50
3. PENYELESAIANLHR pada tahun 2018 (awal umur rencana), dengan rumus: (1+i)nKendaraan ringan 2 ton..............................................................................16673,99 kendaraanBus 10 tahun.....................................................................................................259,7 kendaraanTruk 2 as 8,3 ton...............................................................................................306,5 kendaraan
LHR pada tahun ke-6 (akhir umur rencana), dengan rumus: (1+i)n6 TahunKendaraan ringan 2 ton..............................................................................25023,16 kendaraanBus 10 ton.......................................................................................................389,74 kendaraanTruk 2 as 8,3 ton.............................................................................................459,97 kendaraan
Menghitung angka ekuivalen (E) masing-masing kendaraan sebagai berikut:Kendaraan ringan 2 ton........................................................................0,0002+0,0002 = 0,0004Bus 10 ton.......................................................................................0,03406+0,44182 = 0,47588Truk 2 as 8,3 ton...........................................................................0,01568+0,2133 = 0,2289834
Menghitung LEPLEP =Kendaraan ringan 2 ton........................................................0,50 16673,990,0004=3,334798Bus 10 ton................................................................................... 0,50 2220,47588=52,82268Truk 2 as 8,3 ton.......................................................... 0,50 459,970,2289834=35,09170605 LEP = 91,24918405Menghitung LEA6 tahun:Kendaraan ringan 2 ton........................................................0,50 25023,160,0004=3,334798Bus 10 ton.............................................................................. 0,50 389,740,47588=52,82268Truk 2 as 8,3 ton.......................................................... 0,50 459,970,2289834=35,09170605 LEA6 = 150,4021149
Menghitung LETLET6 = (LEP + LEA6) =......................................... (91,24918405+150,4021149)=120,8256495
Menghitung LERLER6 = LET6 =......................................................................120,8256495 =74,4953897
Mencari ITPCBR tanah dasar= 9,17% ; DDT= 5,8 ; IP= 2 ; FR= 0,5 LER6 = 74,4953897...................................................................................ITP6= 5,3 (IP0 = 3,9-3,5)
Menetapkan tebal perkerasan Koefisien kekuatan relatif Lapen Mekanis, a1 = 0,30 Batu pecah (kelas A) CBR 100, a2 = 0,14 Sirtu kelas (kelas B) CBR 50, a3 = 0,12ITP= , a1 + a2 + a3 D3
Umur Rencana (UR) 6 Tahun5,3 = 0,30 D1 + 0,14 0,20 + 0,12 105,3 = 0,30 D1 + 2,8 + 1,25,3 = 0,30 D1 + 4D1 = D1 = 4,33Karena nilai D1 < tebal minimum, maka tebal minimum yaitu 5 cm
Susunan perkerasan: Lapen mekanis = 5 cm Batu pecah (kelas A) CBR 100 = 20 cm Sirtu kelas (kelas B) CBR 50 = 10 cm