  • 8/14/2019 Pozemni Stavby En

    1/6

    Ocenn Dopravn stavba roku 2007Nov tv na spolenosti

    Vizualizace

    Aspe

    Civil and Structural

    Schenker Liberec

    Design

    Valbek, spol. s r.o.

    Owner

    Schenker spol. s r.o.

    Start of construction

    August 2004

    Completion of construction

    March 2005

    Total Cost

    150 mil. CZK

    SchenkerIndustrial Zone

    Liberec South

  • 8/14/2019 Pozemni Stavby En

    2/6

    For the industrial area a new construcon of three separate

    buildings - administrave building and storage and transit halls wascompleted. To supplement the buildings all necessary supporngfacilies such as parking areas and access roads were constructed.Valbek provided all necessary design documentaons, permingand construcon support necessary for successful compleon.

    SchenkerIndustrial ZoneLiberec - South

  • 8/14/2019 Pozemni Stavby En

    3/6

    Ocenn Dopravn stavba roku 2007

    Nov tv na spolenosti

    Vizualizace

    Aspe

    Civil and Structural

    BentelerIndustrial zone

    Rumburk

    Benteler Rumburk

    Design

    Valbek, spol. s r.o.

    Owner

    Benteler Automotive R, k.s.

    Start of construction

    October 2004

    Completion of construction

    May 2005

    Cost

    340 mil. CZK

  • 8/14/2019 Pozemni Stavby En

    4/6

    New 4 stage assembly hall with adjoining two story administrave

    building was designed in the industrial zone. The structural design andlayout of the assembly hall allows for further expansion. To supplementthe industrial zone and new assembly all necessary supporngfacilies such as parking areas and access roads were constructed.Valbek provided all necessary design documentaons, permingand construcon support necessary for successful compleon.

    BentelerIndustrial zoneRumburk

  • 8/14/2019 Pozemni Stavby En

    5/6

    Ocenn Dopravn stavba roku 2007Nov tv na spolenostiVizualizaceAspe

    Ski area

    Jetd and Vesec

    Design and Renderings

    Valbek, spol. s r.o.

    Owner

    CITY OF LIBEREC

    Contractor

    For majority SS Liberec

    Start of construction

    September 2003

    Completion of construction

    2008

    Cost

    1,5 bil. CZK

    Ski areaJetd and Vesec

    Liberec

    Civil

    The rederings for FIS World Championship in Liberec 2009 incorpo-

    rated desired alternaves for design of the ski jumping hill and cross-

    country stadium in Vesec. As the design was underway the 3D models

    helped designers and the owner in decision-making process.

    In the recent years the owner had decided to complexly retrot theenre sporng area on the Jested Mountain. Aer the repairs of K120and K90 ski jumping hills in the years of 1997 and 1999, the ski slopeswere altered for higher capacity, lighng was installed throughout the

    whole area and the possibility of using snow-cannons was added. Aretenon pond was built in the lower part of the area in order to sup-

    ply the snow-cannons.

  • 8/14/2019 Pozemni Stavby En