Sector Bridge Project Type Bridge Construction Project Title New Bridge Construction Project over the Kelani River Location Colombo, Sri Lanka Client Road Development Authority / JICA Project Period February 2013 – December 2013 New Bridge over the Kelani River Problems addressed by the Project Over 90% of freight transport is by road, so they are an essential transport infrastructure for the Democratic Socialist Republic of Sri Lanka. The existing New Kelani Bridge, which is 1,160 m long and 6 lanes, is located in the northern part of Colombo. The bridge is a key link for transportation as three arterial roads connect to it. Although three bridges including New Kelani Bridge are currently crossing the Kelani River, congestion has increased significantly in the past few years due to the rapid vehicle growth. It is severely affecting the economy of Sri Lanka. In addition, further traffic congestion is expected around the New Kelani Bridge, as a new expressway connecting the Bandaranaike International Airport is under construction and planned to open in 2014. The reduction of congestion in this area has become an urgent issue. In order to address above issues, the Government of Sri Lanka has decided to construct a new bridge as a part of expressway over the Kelani River with support of Japanese ODA Loan. Service Provided OC Global conducted the feasibility study on the project. The study commenced in February 2013 and was completed in December 2013. The feasibility of the project was confirmed in a series of studies including traffic demand forecast, preliminary design, construction planning, cost estimates, implementation planning, economic evaluation, environmental consideration, etc. Actual Project Works Main Bridge : L=380 m, 6-lane, Extra-dozed bridge Approach Bridge : L=625 m, 6-lane, PC box girder bridge L=815 m, 6-lane, Steel box girder bridge Interchange : 3 interchanges, direct ramps Junction : 1 junction, trumpet type Intersection : 2 intersection improvements Others : Soft soil treatment

Problems addressed by the Project - 株式会社 ... construction planning, cost estimates, implementation planning, economic evaluation, environmental consideration, etc. Actual Project

  • Upload
    lyxuyen

  • View
    216

  • Download
    3

Embed Size (px)

Citation preview

Sector Bridge

Project Type Bridge Construction

Project Title New Bridge Construction Project over the Kelani River

Location Colombo, Sri Lanka

Client Road Development Authority / JICA

Project Period February 2013 – December 2013

New Bridge over the Kelani River

Problems addressed by the Project

Over 90% of freight transport is by road, so they are an essential transport infrastructure for the Democratic Socialist Republic of Sri Lanka.

The existing New Kelani Bridge, which is 1,160 m long and 6 lanes, is located in the northern part of Colombo. The bridge is a key link for transportation as three arterial roads connect to it.

Although three bridges including New Kelani Bridge are currently crossing the Kelani River, congestion has increased significantly in the past few years due to the rapid vehicle growth. It is severely affecting the economy of Sri Lanka. In addition, further traffic congestion is expected around the New Kelani Bridge, as a new expressway connecting the Bandaranaike International Airport is under construction and planned to open in 2014. The reduction of congestion in this area has become an urgent issue.

In order to address above issues, the Government of Sri Lanka has decided to construct a new bridge as a part of expressway over the Kelani River with support of Japanese ODA Loan.

Service Provided

OC Global conducted the feasibility study on the project. The study commenced in February 2013 and was completed in December 2013.

The feasibility of the project was confirmed in a series of studies including traffic demand forecast, preliminary design, construction planning, cost estimates, implementation planning, economic evaluation, environmental consideration, etc.

Actual Project Works

Main Bridge : L=380 m, 6-lane, Extra-dozed bridge Approach Bridge : L=625 m, 6-lane, PC box girder bridge L=815 m, 6-lane, Steel box girder bridge Interchange : 3 interchanges, direct ramps Junction : 1 junction, trumpet type Intersection : 2 intersection improvements Others : Soft soil treatment