PROJECT MANAGEMENT SYSTEM CONSISTS OF THE MAIN MODULE AND THE AUXILIARY MODULES
PROJECT MANAGEMENT SYSTEM SUPPORTS THE FOLLOWING PROCESSES:
• Planning and control of schedules
• Human resources management
• Input data management
• Project status management
• Registration and control of project executive documentation
• Task management
• E-mail exchange management
• Contractual arrangement
• Modifications management
• Claim management
PROJECT MANAGEMENT
For the need of project execution MTA Engineering has developed Project Management System. All the procedures
specified in the system have been implemented into the intranet platform. The application consists of modules whose
cooperation is ensured by a common database supplied with contract data.
Project Management System is a complex tool which facilitates project organization, supports the optimization of pro-
ject work by means of ready to use solutions database. Its main goal is to ensure the control of the overall design
process.
CONTACT:
MTA Engineering Sp. z o.o. ul. Poniatowskiego 14 PL 35-026 Rzeszów tel.: +48 17 850 59 20 fax: +48 17 854 81 09 email: [email protected] www.mta-online.net
TECHNICALDOCUMENTATION
3D MODELINGBE DATA MANAGEMENT
STATIC CALCULATIONOF CONNECTIONS
THE MAIN MODULES
THE AUXILIARY MODULES
INPUT DOCUMENTS SCHEDULE TASKSMANAGEMENT
TECHNICALARRANGEMENTS
CORRESPONDENCE VERIFICATION
MODIFICATIONSMANAGEMENT
ASSISTANTMATERIALS
STATISTICS
Static calculations of connections are done in accordance
with the procedures specified in the codes PN - EN 1993-
1-8, DIN 1880. Static calculation module is connected
with the main database gathering all contract informa-
tion. A large amount of connection types and their geo-
metrical variety allows for an optimal solution according
to the Client’s needs and requirements.
BE data management module is responsible for a struc-
ture design and the coordination of a designed object.
The object is represented in a 3D model. A unique feature
of this module management is a growing information
input about the object in real time. This feature enables
fast decision making process.
THE MAIN MODULES
BE DATA MANAGEMENT
STATIC CALCULATIONOF CONNECTIONS
THE MAIN MODULES
This module includes a registration of work on the con-
nection modeling. The module enables the export of con-
nections geometry to 3D programmes (Tekla, Bocad,
Aveva). The functions available in the module allow for
the generation of the module status information.3D MODELING
The module has the database with information regarding
project documentation status. It also has a system of con-
trolling mechanisms which ensure that only thoroughly
verified documentation is distributed. The appropriate
control reports are generated. The database includes the
following information:
revision number, position weight, holds, client approval,
dates of approval, drawing number, revision description,
dispatch list, date of dispatch.
TECHNICAL DOCUMENTATION
OUTPUT DATA AND MODULE FUNCTIONS:
• Full control of drawings
• Full control of revisions and holds
• Record of revisions with description, the revision
number, the date of introduction, the person respon-
sible for execution, the person ordering execution
• Record of items put on hold with description, the
date of holding, the person ordering execution, the
weight of held elements
• Record of items released for manufacturing with we-
ight and date of release
• Record of carried out and approved by design office
documentation, sent to the client for approval with
information about weight of elements
• Report of client approvals with approval dates and
weight of approved elements
• Reports in accordance with chosen filters
THE AUXILIARY MODULES
The module includes the project schedule in the form of
Gantt chart. An interactive connection of particular pro-
ject scopes with the common database enables to follow
project work progress in real time. In the module it is pos-
sible to divide each particular project into smaller scopes
of work.SCHEDULE
The module enables the registration of all contract docu-
ments in the Project Management System. A regular regi-
stration of all Client documents ensures the control of
documents’ revisions. Each member of any project team
has an access to the current revisions. INPUT DOCUMENTS
THE AUXILIARY MODULES
TASKS MANAGEMENT
The task management module is a significant tool of pro-
ject realization process. The module enables definition of
tasks in relation to category of works and the schedule.
Defined in this way tasks allow for full control of their exe-
cution status.
The module enables also a control of global human reso-
urces occupation. It gives a clear information about hu-
man resources division between projects and allows for
efficient management.
VERIFICATION
In the module there are verification reports for each pro-
ject stage. Included in the module control mechanisms
decrease significantly a risk of mistakes.
THE AUXILIARY MODULES
VARIOUS REPORTS ARE AVAILABLE: • Reports of open points
• Reports acc. to chosen filters: date, position, scope,
sub-scope, e-mail
TECHNICALARRANGEMENTS
All technical arrangements are registered in one place
which improves project communications. The system
enables automatic distribution of information regarding
current arrangements.
Module consists of mechanisms tracking the modification
and reports presenting status of modification completion
MODIFICATIONSMANAGEMENT
THE AUXILIARY MODULES
STATISTICS
The module enables tracking of Project Progress in the
scope of static calculations, modeling, documentation and
preparation of dispatch. The modules has also graphic
representation of project progress in the form of 3D
module.
The module consists of database with all automatic solu-
tions (macros) for static calculation of connections and
modeling split in element groups.
ASSISTANTMATERIALS