Project Management System MTA Engineering Ltd.

PROJECT MANAGEMENT SYSTEM CONSISTS OF THE MAIN MODULE AND THE AUXILIARY MODULES

PROJECT MANAGEMENT SYSTEM SUPPORTS THE FOLLOWING PROCESSES:

• Planning and control of schedules

• Human resources management

• Input data management

• Project status management

• Registration and control of project executive documentation

• Task management

• E-mail exchange management

• Contractual arrangement

• Modifications management

• Claim management

PROJECT MANAGEMENT

For the need of project execution MTA Engineering has developed Project Management System. All the procedures

specified in the system have been implemented into the intranet platform. The application consists of modules whose

cooperation is ensured by a common database supplied with contract data.

Project Management System is a complex tool which facilitates project organization, supports the optimization of pro-

ject work by means of ready to use solutions database. Its main goal is to ensure the control of the overall design

process.

CONTACT:

MTA Engineering Sp. z o.o. ul. Poniatowskiego 14 PL 35-026 Rzeszów tel.: +48 17 850 59 20 fax: +48 17 854 81 09 email: [email protected] www.mta-online.net

TECHNICALDOCUMENTATION

3D MODELINGBE DATA MANAGEMENT

STATIC CALCULATIONOF CONNECTIONS

THE MAIN MODULES

THE AUXILIARY MODULES

INPUT DOCUMENTS SCHEDULE TASKSMANAGEMENT

TECHNICALARRANGEMENTS

CORRESPONDENCE VERIFICATION

MODIFICATIONSMANAGEMENT

ASSISTANTMATERIALS

STATISTICS

Static calculations of connections are done in accordance

with the procedures specified in the codes PN - EN 1993-

1-8, DIN 1880. Static calculation module is connected

with the main database gathering all contract informa-

tion. A large amount of connection types and their geo-

metrical variety allows for an optimal solution according

to the Client’s needs and requirements.

BE data management module is responsible for a struc-

ture design and the coordination of a designed object.

The object is represented in a 3D model. A unique feature

of this module management is a growing information

input about the object in real time. This feature enables

fast decision making process.

THE MAIN MODULES

BE DATA MANAGEMENT

STATIC CALCULATIONOF CONNECTIONS

THE MAIN MODULES

Static calculation of connections

Object representation in a 3D model

THE MAIN MODULES

This module includes a registration of work on the con-

nection modeling. The module enables the export of con-

nections geometry to 3D programmes (Tekla, Bocad,

Aveva). The functions available in the module allow for

the generation of the module status information.3D MODELING

The module has the database with information regarding

project documentation status. It also has a system of con-

trolling mechanisms which ensure that only thoroughly

verified documentation is distributed. The appropriate

control reports are generated. The database includes the

following information:

revision number, position weight, holds, client approval,

dates of approval, drawing number, revision description,

dispatch list, date of dispatch.

TECHNICAL DOCUMENTATION

OUTPUT DATA AND MODULE FUNCTIONS:

• Full control of drawings

• Full control of revisions and holds

• Record of revisions with description, the revision

number, the date of introduction, the person respon-

sible for execution, the person ordering execution

• Record of items put on hold with description, the

date of holding, the person ordering execution, the

weight of held elements

• Record of items released for manufacturing with we-

ight and date of release

• Record of carried out and approved by design office

documentation, sent to the client for approval with

information about weight of elements

• Report of client approvals with approval dates and

weight of approved elements

• Reports in accordance with chosen filters

THE MAIN MODULES

Project documentation

Modeling 3D - database

THE AUXILIARY MODULES

The module includes the project schedule in the form of

Gantt chart. An interactive connection of particular pro-

ject scopes with the common database enables to follow

project work progress in real time. In the module it is pos-

sible to divide each particular project into smaller scopes

of work.SCHEDULE

The module enables the registration of all contract docu-

ments in the Project Management System. A regular regi-

stration of all Client documents ensures the control of

documents’ revisions. Each member of any project team

has an access to the current revisions. INPUT DOCUMENTS

THE AUXILIARY MODULES

Project schedule and work progress

Input documentation

THE AUXILIARY MODULES

TASKS MANAGEMENT

The task management module is a significant tool of pro-

ject realization process. The module enables definition of

tasks in relation to category of works and the schedule.

Defined in this way tasks allow for full control of their exe-

cution status.

The module enables also a control of global human reso-

urces occupation. It gives a clear information about hu-

man resources division between projects and allows for

efficient management.

VERIFICATION

In the module there are verification reports for each pro-

ject stage. Included in the module control mechanisms

decrease significantly a risk of mistakes.

THE AUXILIARY MODULES

Verification reports

Human resources and task management, work progress

THE AUXILIARY MODULES

VARIOUS REPORTS ARE AVAILABLE: • Reports of open points

• Reports acc. to chosen filters: date, position, scope,

sub-scope, e-mail

TECHNICALARRANGEMENTS

All technical arrangements are registered in one place

which improves project communications. The system

enables automatic distribution of information regarding

current arrangements.

Module consists of mechanisms tracking the modification

and reports presenting status of modification completion

MODIFICATIONSMANAGEMENT

THE AUXILIARY MODULES

List of open points

Modification management

THE AUXILIARY MODULES

STATISTICS

The module enables tracking of Project Progress in the

scope of static calculations, modeling, documentation and

preparation of dispatch. The modules has also graphic

representation of project progress in the form of 3D

module.

The module consists of database with all automatic solu-

tions (macros) for static calculation of connections and

modeling split in element groups.

ASSISTANTMATERIALS

THE AUXILIARY MODULES

Project status

for change for modeling ready

Base of connections types