ESTRUCTURAS
DESCRIPCION SIMBOLO
MANO DE OBRA INC. LEYES SOCIALES J 47
AGREGADO GRUESO CP 5CEMENTO PORTLAND TIPO I 21
ACERO DE CONSTRUCCION CORRUGADO A 3
MAQUINARIA Y EQUIPO NACIONAL Q 48
MADERA NACIONAL PARA ENCONF. Y CARPINTERIA M 43
INDICE GENERAL DE PRECIOS AL CONSUMIEDOR GGU 39
Vo=193893.36Vr=Vo*(K reajustar)
Vr=193893.36*2.05120936= 397715.874
INDICEUNIFICADO
% Ir/Io
1 2 3 4=(3)*(2) 5 6=(5)*(2) 7=(4)/(6)
0.202 1 374.38 374.38 471.44 471.44 0.79412014
0.497 19.718 409.5 8074.521 434.36 8564.71048 0.942766370.497 55.734 389.45 21705.6063 457.84 25517.2546 0.85062467
0.497 24.547 654.59 16068.22073 438.01 10751.8315 1.4944636
0.092 1 318.76 318.76 325.69 325.69 0.9787221
0.118 1 460.79 460.79 619.56 619.56 0.74373749
0.091 1 333.83 333.83 384.88 384.88 0.86736126K reajuste
COEFICIENTE DEINCIDENCIA
IMPORTE EN EL MES DEVALORIZACION (Ir)
IMPORTE EN EL MES DEPRESUPUESTO (Io)
K
8=(1)*(7)
0.16041227
0.468554890.42276046
0.74274841
0.09004243
0.08776102
0.078929872.05120936