RENCANA ANGGARAN BIAYA Program : Peningkatan Kapasitas Jalan Kegiatan : Pelebaran/Widening Pekerjaan : Peningkatan Kapasitas Jalan Muaro Kalaban - Sawah Lunto Sta 0+000 - 5+100 No Uraian Satuan Perkiraan Harga Kuantitas Satuan (Rupiah) a b c d e DIV. 1 UMUM 1.2 Mobilisasi dan Demobilisasi Ls 1.00 ### DIV. 2 PEKERJAAN DRAINASE 2.1 Galian Untuk Selokan Drainase dan Saluran Air 3,236.00 57,732.85 2.2 Pasangan Batu Dengan Mortar 2,143.85 624,212.85 2.3 21.00 981,654.61 DIV. 3 PEKERJAAN TANAH 3.1 (1) a Galian Biasa 2,040.00 48,429.36 3.1.(3) Galian Perkerasan Berasapal Tanpa Cold Milling Mac 0.40 267,751.00 3.2.(1) Timbunan biasa 538.52 49,886.09 DIV. 5 PERKERASAN BERBUTIR 5.1 (1) Lapis Pondasi Agregat Kelas A, 20 cm 2,040.00 561,056.14 DIV. 6 PERKERASAN ASPAL 6.1 (1) Lapis Resap Ikat Liter ### 9,081.67 6.1 (2) Lapis Resap Pengikat Liter 3,850.00 11,289.78 6.3 (3)a Laston Lapis Aus (AC-WC), (t = 5 Cm) 510.00 130,273.96 6.3 (4)b Laston Lapis Aus (AC-BC), (t = 5 Cm) 510.40 ### 6.3 (5)c Laston Lapis Antara (AC-BC) Pathcing 0.40 ### DIV. 7 STRUKTUR 7.9 (1) Beton K250 161.48 ### 7.9 (2) Beton K175 194.18 ### 7.9 (3)a Baja Tulangan U24 Polos Kg ### 16,989.28 7.9 (4)b Pasangan Batu 295.62 510,617.00 7.9 (5)c Pasangan Bronjong 237.50 483,038.00 7.9 (6)d Marka Jalan Termoplastik 1,721.25 95,945.00 (B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) (C) Jumlah Total Harga Pekerjaan = (A) + (B) (D) Pembulatan Terbilang Tujuh Milyar Lima Ratus Sembilan Puluh Tiga Juta Tiga Ratus Dua Puluh Dua Ribu Rupiah M 3 M 3 Gorong-gorong Pipa Beton Bertulang ø 70 - 100 cm M 1 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 2 (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

Rab Muara Kalaban Sawah Lumto

Embed Size (px)

DESCRIPTION

rab

Citation preview

RAB RENCANA ANGGARAN BIAYARENCANA ANGGARAN BIAYAProgram: Peningkatan Kapasitas JalanProgram: Peningkatan Kapasitas JalanKegiatan: Pelebaran/WideningKegiatan: Pelebaran/WideningPekerjaan: Peningkatan Kapasitas Jalan Muaro Kalaban - Sawah Lunto Sta 0+000 - 5+100Pekerjaan: Peningkatan Kapasitas Jalan Muaro Kalaban - Sawah Lunto Sta 0+000 - 5+100NoUraianSatuanPerkiraanHargaJumlahNoUraianSatuanPerkiraanHargaJumlahKuantitasSatuanHarga-HargaKuantitasSatuanHarga-Harga(Rupiah)(Rupiah)(Rupiah)(Rupiah)abcdef = (d x e)abcdef = (d x e)DIV. 1UMUMDIV. 1PERSIAPAN1.2Mobilisasi dan DemobilisasiLs1.0063,642,150.0063,642,150.001.2Mobilisasi dan DemobilisasiLs1.0049,920,000.0040,920,000.0058,142,150.001.11.3Direksi keet ( Base Camp)Ls1.0011,722,150.0011,722,150.005814215001.1DIV. 2PEKERJAAN DRAINASE1.4Fasilitas Direksi Teknis (Laboratorium)Ls1.005,500,000.005,500,000.005,814,215.001.12.1Galian Untuk Selokan Drainase dan Saluran AirM33,236.0057,732.85186,823,510.241.5Pembersihan lapanganM210,000.000.0063,956,365.002.2Pasangan Batu Dengan MortarM32,143.85624,212.851,338,218,719.112.3Gorong-gorong Pipa Beton Bertulang 70 - 100 cmM121.00981,654.6120,614,746.71DIV. 2PEKERJAAN DRAINASE10,656,500.00DIV. 3PEKERJAAN TANAH2.1Normalisasi Galian untuk Drainase SelokanM33,236.0057,732.85186,823,510.243.1 (1) aGalian BiasaM32,040.0048,429.3698,795,903.242.2Pasangan Batu Dengan Mortar (Dranase)M32,143.85624,212.851,338,218,719.1158,142,150.003.1.(3)Galian Perkerasan Berasapal Tanpa Cold Milling MachineM30.40267,751.00107,100.403.2.(1)Timbunan biasaM3538.5249,886.0926,864,681.15DIV. 3PEKERJAAN TANAH3.2.(1)Timbunan biasaM3538.5249,886.0926,864,681.15DIV. 5PERKERASAN BERBUTIR3.2 (1) aTimbunan di Belakang PasanganM30.00.00.05.1 (1)Lapis Pondasi Agregat Kelas A, 20 cmM32,040.00561,056.141,144,554,527.613.3Penyiapan Badan JalanM220,000.000.00.05.1 (1)Lapis Pondasi Agregat Kelas A, 15 cmM32,795.70561,056.141,568,544,653.35DIV. 6PERKERASAN ASPAL5.1 (1) aLapis Pondasi Bawah Sirtu Kelas C, 20 cmM33,902.700.00.06.1 (1)Lapis Resap IkatLiter12,240.009,081.67111,159,699.255.1 (1) bTimbunan Bahu Jalan dengan SirtuM31,862.590.00.06.1 (2)Lapis Resap PengikatLiter3,850.0011,289.7843,465,637.846.3 (3)aLaston Lapis Aus (AC-WC), (t = 5 Cm)M3510.00130,273.9666,439,721.726.3 (4)bLaston Lapis Aus (AC-BC), (t = 5 Cm)M3510.402,334,734.001,191,648,233.606.3 (5)cLaston Lapis Antara (AC-BC) PathcingM30.401,058,969.00423,587.60DIV. 6PERKERASAN ASPALDIV. 7STRUKTUR6.1 (1)Lapis Resap IkatM220,000.009,081.67181,633,495.507.9 (1)Beton K250M3161.481,624,252.46262,278,601.926.3 (5)aLaston Lapis Aus (AC-WC), (t = 4 Cm)M220,000.00130,273.962,605,479,282.957.9 (2)Beton K175M3194.181,356,379.87263,375,062.237.9 (3)aBaja Tulangan U24 PolosKg23,419.1216,989.28397,873,936.077.9 (4)bPasangan BatuM3295.62510,617.00150,947,065.697.9 (5)cPasangan BronjongM3237.50483,038.00114,721,525.007.9 (6)dMarka Jalan TermoplastikM21,721.2595,945.00165,145,331.250.00.0(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )5,647,099,740.62(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)564,709,974.06(C) Jumlah Total Harga Pekerjaan = (A) + (B)6,211,809,714.68(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )0.00(D) Pembulatan6,211,809,000.00(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)0.00(C) Jumlah Total Harga Pekerjaan = (A) + (B)0.00Terbilang :Tujuh Milyar Lima Ratus Sembilan Puluh Tiga Juta Tiga Ratus Dua Puluh Dua Ribu Rupiah(D) Pembulatan0.00Terbilang :Lima Milyar Delapan Ratus Sepuluh Juta Dua Ratus Enam Puluh Tujuh Ribu Rupiah

TSRENCANA ANGGARAN BIAYAProgram: Peningkatan Kapasitas JalanKegiatan: Pelebaran/WideningPekerjaan: Peningkatan Kapasitas Jalan Muaro Kalaban - Sawah Lunto Sta 0+000 - 5+100BobotWAKTU PELAKSANAANKETNoUraianSatuanPerkiraanHargaJumlahDurasi%KuantitasSatuanHarga-Harga(hari)HARI(Rupiah)(Rupiah)abcdef = (d x e)123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293100DIV. 1UMUM1.2MobilisasiLs1.0063,642,150.0063,642,150.0070.9600.1370.1370.1370.1370.1370.1370.137Mobi 1Demo 1Mobi 2Mobi 3Demo 2Demo 3Demo 4DIV. 2PEKERJAAN DRAINASE2.1Galian Untuk Selokan Drainase dan Saluran AirM33,236.0057,732.85186,823,510.24192.8180.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1480.1482.2Pasangan Batu Dengan MortarM32,143.85624,212.851,338,218,719.111320.1841.5541.5541.5541.5541.5541.5541.5541.5541.5541.5541.5541.5541.5542.3Gorong-gorong Pipa Beton Bertulang 70 - 100 cmM121.00981,654.6120,614,746.7140.3110.0740.0740.0740.074DIV. 3PEKERJAAN TANAH3.1 (1) aGalian BiasaM32,040.0048,429.3698,795,903.24101.4900.1490.1490.1490.1490.1490.1490.1490.1490.1490.1493.1.(3)Galian Perkerasan Berasapal Tanpa Cold Milling MachineM30.40267,751.00107,100.4010.0020.0023.2.(1)Timbunan biasaM3538.5249,886.0926,864,681.1550.4050.0810.0810.0810.0810.081DIV. 5PERKERASAN BERBUTIR5.1 (1)Lapis Pondasi Agregat Kelas A, 20 cmM32,040.00561,056.141,144,554,527.61817.2632.1602.1602.1602.1602.1602.1602.1602.16050DIV. 6PERKERASAN ASPAL6.1 (1)Lapis Resap PengikatLiter12,240.009,081.67111,159,699.2541.6770.4200.4200.4200.4206.1 (2)Lapis PerekatLiter3,850.0011,289.7843,465,637.8440.6560.1640.1640.1640.1646.3 (5)aLaston Lapis Aus (AC-WC), (t = 5 Cm)M210,200.00130,273.961,328,794,434.30420.0425.0155.0155.0155.0156.3 (6)aLaston Lapis Aus (AC-BC), (t = 5 Cm)M3510.002,334,734.001,190,714,340.00417.9604.4954.4954.4954.4956.3 (6)cLaston Lapis Antara (AC-BC) LevelingM30.401,058,969.00423,587.6010.0060.006DIV. 7STRUKTUR7.9 (1)Beton K250M3161.48567,420.8391,625,129.23141.3820.0990.0990.0990.0990.0990.0990.0990.0990.0990.0990.0990.0990.0990.0997.9 (2)Beton K175M3194.18800,605.00155,457,475.88172.3450.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1387.9 (3)aBaja Tulangan U24 PolosKg23,419.1216,989.28397,873,936.07196.0010.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3160.3167.9 (4)bPasangan BatuM3295.62510,617.00150,947,065.6962.2770.3800.3800.3800.3800.3800.3807.9 (5)cPasangan BronjongM3237.50483,038.00114,721,525.0061.7300.2890.2890.2890.2890.2890.2897.9 (6)dMarka Jalan Termoplastik1,721.2595,945.00165,145,331.2522.4911.2471.2470TOTAL6,629,949,5011481000.1370.1480.1480.1480.1480.1480.1480.1480.1481.7021.7021.7021.7021.7021.7021.7021.7021.7021.7021.7021.7771.7770.2230.2230.1490.1490.1490.1490.1510.1490.8330.6960.6960.6960.6960.6960.3160.3160.3160.3160.3160.3160.4150.4150.4150.4150.4150.4150.4150.0990.0990.0990.0990.2360.1800.1800.3700.3700.3702.4492.4492.4492.1602.1602.1602.1602.1600.1370.1374.9145.07810.09310.1005.1795.0151.5221.3850.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.1380.137TOTAL BOBOT RENCANA KUMULATIF0.1370.2850.4340.5820.7300.8791.0271.1751.3243.0264.7286.4318.1339.83511.53713.24014.94216.64418.34720.04921.82623.60323.82624.04924.19824.34724.49624.64524.79624.94525.77826.47427.17027.86628.56229.25729.57329.88930.20530.52130.83731.15331.56831.98332.39732.81233.22733.64234.05634.15534.25434.35234.45134.68734.86735.04735.41635.78636.15638.60541.05343.50245.66247.82249.98252.14254.30254.43954.57759.49164.56974.66284.76189.94094.95596.47797.86298.00098.13898.27698.41498.55298.69098.82898.96699.10499.24299.38099.51899.65699.79499.932100.000REALISASI BOBOTDEVIASI BOBOT

TS

NwpDemobilisasiAC - WC 1AC - WC 2AC - WC 3AC - WC 4MarkaDemobilisasi 4Demobilisasi 3Pas. Batu Mortar 1Pas. Batu Mortar 2Agregat Klas AAC - BC 1Tack Coat 1Tack Coat 2Tack Coat 3Tack Coat 3Gorong Gorong 4Timbunan APas. BatuMobilisasi 2mobilisasi 1G. Drainase 1G. Drainase 2Galian Biasa 1Timbunan BMobilisasi 3Prime Coat 1Prime Coat 2AC - BC 2AC - BC 3AC - BC 4Galian Biasa 2Baja Tulangan 1Baja Tulangan 2Prime Coat 3Prime Coat 4Dinding PenahanDinding PenahanPasangan BronjongTanah 1Tanah 2Demo 1

Finish9393929273757574747474737373737372727272727272727171717171717171707070706969686867675959595956565656375436533047303930304949242420209911002457181141166123910773811111111111111111121122530Galian Beraspal149491Patching177373Beton K1759292123567891011121615131419\181720212226252724232829323335373836343130394041

Div1ITEM PEMBAYARAN NO.: 1.2Analisa EI-12JENIS PEKERJAAN: MOBILISASI & DEMOBILISASIKOMPONEN: PERALATANLembar 1.2-2ANALISA HARGA LUMP SUM UNTUK MOBILISASIKODEHARGAJUMLAHNo.JENIS ALATALATSATUANVOL.SATUANHARGANOKOMPONENSATUANPERKIRAANHARGAJUMLAH(Rp.)(Rp.)PROYEK: Perencanaan Pembangunan Jalan KabupatenKUANTITASSATUANHARGANAMA PAKET: Perencanaan Pembangunan Jalan Kabupaten Ruas Jalan Timpeh Kampung - Marga Makmur(Rp)(Rp)1.ASPHALT MIXING PLANTE01Unit0.00.00.0PROP / KAB / KODYA: Sumatera Barat / Dharmasraya2.ASPHALT FINISHERE02Unit$1$2,000,000$2,000,000ITEM PEMBAYARAN NO.: 1.2PERKIRAAN VOL. PEK.:1.00ABAHANTRIPLEK3.ASPHALT SPRAYERE03Unit$1$300,000$300,000JENIS PEKERJAAN: Mobilisasi & DemobilisasiTOTAL HARGA (Rp.):63,642,150.00Triplek tebal 4 mm uk 1,2 x 2,40.35004500008,550,000.001.224.88194.BULLDOZER 100-150 HPE04Unit0.00.00.0SATUAN PEMBAYARAN: Lump Sump% THD. BIAYA PROYEK:1.13sengHL0.020039,000.00390,000.002.44105.COMPRESSOR 4000-6500 L\ME05Unit$1$500,000$500,000Kayu 5/70.0120775,000.00775,000.006.CONCRETE MIXER 0.3-0.6 M3E06Unit$1$300,000$300,000paku 30.020016,500.0016,500.007.CRANE 10-15 TONE07Unit0.00.00.0PERKIRAANHARGAJUMLAHpaku sengKg0.020025,000.0025,000.00SENG8.DUMP TRUCK 3-4 M3E08Unit$10$300,000$3,000,000NO.KOMPONENSATUANKUANTITASSATUANHARGAkayu kasau775,000.00775,000.000.94.59.DUMP TRUCKE09Unit0.00.00.0(Rp.)(Rp.)1.835.4910.EXCAVATOR 80-140 HPE10Unit$1$2,000,000$2,000,0009.9911.FLAT BED TRUCK 3-4 M3E11Unit0.00.00.012.GENERATOR SETE12Unit0.00.00.0A.BELI / SEWA TANAH1,550,000.0013.MOTOR GRADER >100 HPE13Unit$1$2,000,000$2,000,000UNTUK BASE CAMPm20.00.00.0BTENAGA77500014.TRACK LOADER 75-100 HPE14Unit0.00.00.0pekerja0.10006000060,000.0015.WHEEL LOADER 1.0-1.6 M3E15Unit$1$2,000,000$2,000,000JUMLAH0.00Kepala Tukang0.010065,000.0065,000.0016.THREE WHEEL ROLLER 6-8 TE16Unit0.00.00.012500017.TANDEM ROLLER 6-8 T.E17Unit$1$2,000,000$2,000,000B.TRANSPORTASI18.TIRE ROLLER 8-10 T.E18Unit$1$2,000,000$2,000,000PERALATANLs1.0037,200,000.0037,200,000.00CJUMLAH10,656,500.0019.VIBRATORY ROLLER 5-8 T.E19Unit$1$2,000,000$2,000,000(Sesuai Lampiran 1)20.CONCRETE VIBRATORE20Unit$1$200,000$200,000JUMLAH37,200,000.0021.STONE CRUSHERE21Unit0.00.00.022.WATER PUMP 70-100 mmE22Unit0.00.00.0CFASILITAS KONTRAKTOR23.WATER TANKER 3000-4500 L.E23Unit$1$300,000$300,0001Base Campm21.00$2,500,0002,500,000.0024.PEDESTRIAN ROLLERE24Unit0.00.00.02Kantorm21.0010,656,500.0010,656,500.0025.TAMPERE25Unit0.00.00.03Workshopm20.000.0026.JACK HAMMERE26Unit0.00.00.04Gudang dan Lain - Lainm21.00$2,500,0002,500,000.0027.FULVI MIXERE27Unit0.00.00.05Generator SetSet0.000.00.0028.CONCRETE PUMPE28Unit0.00.00.029.TRAILER 20 TONE29Unit0.00.00.0JUMLAH15,656,500.0030.PILE DRIVER + HAMMERE30Unit0.00.00.031.CRANE ON TRACK 35 TONE31Unit0.00.00.0DFASILITAS DIREKSI32.WELDING SETE32Unit0.00.00.0TEKNIS33.BORE PILE MACHINEE33Unit0.00.00.01.Kantorm20.000.000.0034.ASPHALT LIQUID MIXERE34Unit0.00.00.02.Bangunan laboratoriumm20.000.000.003Peralatan LaboratoriumUnit1.002,500,000.002,500,000.004Meubel dan Lain - LainUnit0.000.000.005Plank ProyekUnit1.002,500,000.002,500,000.00Total Harga$18,600,000JUMLAH5,000,000.00Harga Demobilisasi37,200,000EJUMLAH ( A + B + C + D )57,856,500.00FOVERHEAD & PROFIT10.0% x E5,785,650.00GHARGA SATUAN PEKERJAAN ( E + F )63,642,150.00Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.2Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPNyang dibayar dari kontrak) dan biaya-biaya lainnya.Analisano

Div2ITEM PEMBAYARAN NO.: 2.1Analisa EI-21Analisa EI-21JENIS PEKERJAAN: Galian Utk Drainase Selokan & Saluran AirSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANFORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUANNo.U R A I A NKODEKOEF.SATUANKETERANGANNo. PAKET KONTRAK: Peningkatan Pembangunan Jalan KabupatenI.ASUMSINAMA PAKET: Peningkatan Kapsitas Jalan Muaro Kalaban - Sawah Lunto$1Menggunakan alat berat (cara mekanik)PROP / KAB / KODYA: Sumatera Barat / Dharmasraya$2Lokasi pekerjaan : sepanjang jalanITEM PEMBAYARAN NO.: 2.1PERKIRAAN VOL. PEK.:3,236.00$3Kondisi Jalan : sedang / baikJENIS PEKERJAAN: Galian Utk Drainase Selokan & Saluran AirTOTAL HARGA (Rp.):186,823,510.24$4Jam kerja efektif per-hariTk7.00jam: M30% THD. BIAYA PROYEK:3.31$5Faktor pengembangan bahanFk1.20-PERKIRAANHARGAJUMLAHII.URUTAN KERJANO.KOMPONENSATUANKUANTITASSATUANHARGA$1Penggalian dilakukan dengan menggunakan Excavator(Rp.)(Rp.)$2Selanjutnya Excavator menuangkan material hasilgalian kedalam Dump Truck$3Dump Truck membuang material hasil galian keluarA.TENAGAlokasi jalan sejauhL10.00Km$4Sekelompok pekerja akan merapikan hasil galian1.Pekerja(L01)jam0.16598,571.431,421.972.Mandor(L03)jam0.041512,857.14533.24III.PEMAKAIAN BAHAN, ALAT DAN TENAGAJUMLAH HARGA TENAGA1,955.201.BAHANTidak ada bahan yang diperlukanB.BAHAN2.ALAT2.a.EXCAVATOR(E10)Kapasitas BucketV0.700M3Faktor BucketFb0.83-Faktor Efisiensi alatFa0.83-JUMLAH HARGA BAHAN0.00Waktu siklusTs1menit- Menggali / memuatT10.500menitC.PERALATAN- Lain-lainT20.500menitTs11.000menit1.Excavator(E10)jam0.0415331,084.3213,731.392.Dump Truck(E08)jam0.2136167,610.9735,797.82Kap. Prod. / jam =V x Fb x Fa x 60Q124.11M3 / jam3.Alat BantuLs1.00001,000.001,000.00Ts1 x FhKoefisien Alat / M3= 1 : Q1-0.0415JamJUMLAH HARGA PERALATAN50,529.212.b.DUMP TRUCK(E08)D.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )52,484.41Kapasitas bakV4.00M3E.OVERHEAD & PROFIT10.0% x D5,248.44Faktor efisiensi alatFa0.83-F.HARGA SATUAN PEKERJAAN ( D + E )57,732.85Kecepatan rata-rata bermuatanv140.00Km/JamNote: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranKecepatan rata-rata kosongv260.00Km/Jamberat untuk bahan-bahan.Waktu siklus :Ts22Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor- Waktu tempuh isi= (L : v1) x 60T115.00menitmata pembayaran.- Waktu tempuh kosong= (L : v2) x 60T210.00menit3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.- Muat= (V : Q1) x 60T39.95menit4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN- Lain-lainT40.50menityang dibayar dari kontrak) dan biaya-biaya lainnya.Ts235.45menitBerlanjut ke halaman berikutITEM PEMBAYARAN NO.: 2.1Analisa EI-21JENIS PEKERJAAN: Galian Utk Drainase Selokan & Saluran AirSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANLanjutanNo.U R A I A NKODEKOEF.SATUANKETERANGANKapasitas Produksi / Jam =V x Fa x 60Q24.68M3 / JamFk x Ts2Koefisien Alat / M3= 1 : Q2-0.2136Jam2.d.ALAT BANTUDiperlukan alat-alat bantu kecilLump Sump- Sekop100,000- Keranjang + Sapu55,0003.TENAGAProduksi menentukan : EXCAVATORQ124.11M3/JamProduksi Galian / hari = Tk x Q1Qt168.78M3Kebutuhan tenaga :- PekerjaP4.00orang- MandorM1.00orangKoefisien tenaga / M3 :- Pekerja= (Tk x P) : Qt(L01)0.1659Jam- Mandor= (Tk x M) : Qt(L03)0.0415Jam4.HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.5.ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :Rp.57,732.85/ M36.WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan :. . . . . . . . . . . .bulan7.VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan :3,236.00M3ITEM PEMBAYARAN NO.: 2.2Analisa EI-22Analisa EI-22JENIS PEKERJAAN: Pasangan Batu Dengan MortarSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANFORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUANNo.U R A I A NKODEKOEF.SATUANKETERANGANPROYEK: Peningkatan Pembangunan Jalan KabupatenNAMA PAKET: Peningkatan Kapsitas Jalan Muaro Kalaban - Sawah LuntoI.ASUMSIPROP / KAB / KODYA: Sumatera Barat / Dharmasraya$1Menggunakan buruh (cara manual)ITEM PEMBAYARAN NO.: 2.2PERKIRAAN VOL. PEK.:2,143.85$2Lokasi pekerjaan : sepanjang jalanJENIS PEKERJAAN: Pasangan Batu Dengan MortarTOTAL HARGA (Rp.):1,338,218,719.11$3Bahan dasar (batu, pasir dan semen) diterimaSATUAN PEMBAYARAN: M3% THD. BIAYA PROYEK:23.70seluruhnya di lokasi pekerjaan$4Jam kerja efektif per-hariTk7.00jamPERKIRAANHARGAJUMLAH$5Perbandingan Pasir & Semen: - Volume SemenSm25%NO.KOMPONENSATUANKUANTITASSATUANHARGA: - Volume PasirPs75%(Rp.)(Rp.)$6Perbandingan Batu & Mortar :- BatuBt60%- Mortar (campuran semen & pasir)Mr40%A.TENAGA$7Berat Jenis Bahan :- Pasangan Batu Dengan MortarD12.40ton/M31.Pekerja(L01)jam7.87508,571.4367,500.00- BatuD21.60ton/M32.Tukang(L02)jam2.625011,428.5730,000.00- Adukan (mortar)D31.80ton/M33.Mandor(L03)jam0.875012,857.1411,250.00- PasirD41.67ton/M3- Semen PortlandD51.44ton/M3JUMLAH HARGA TENAGA108,750.00$8Faktor kehilangan bahan :- BatuFh11.20-- Pasir / SemenFh21.05-B.BAHANII.URUTAN KERJA1.Batu(M02)M31.1158,500.00174,350.00$1Semen di tumpuk di gudang dekat lokasi pekerjaan2.Semen (PC)(M12)Kg2021,110.00224,220.00$2Untuk material batu dan pasir didatangkan dari AMP ke3.Pasir(M01)M30.4527132,200.0059,846.23lokasi pekerjaan$3Semen, pasir dan air dicampur dan diaduk menjadimortar dengan menggunakan alat bantu$4Batu dibersihkan dan dibasahi seluruh permukaannyasebelum dipasang$5Penyelesaian dan perapihan setelah pemasanganIII.PEMAKAIAN BAHAN, ALAT DAN TENAGAJUMLAH HARGA BAHAN458,416.231.BAHANC.PERALATAN1.a.Batu ----->{(Bt x D1 x 1 M3) : D2} x Fh1(M02)1.1M31.b.Semen ---->Sm x {(Mr x D1 x 1 M3} : D3} x Fh2(M12)0.1400M31.Alat BantuLs1.0000300.00300.00x {D5 x (1000)}(M12)202Kg1.c.Pasir ----->Ps x {(Mr x D1 x 1 M3) : D4} x Fh2(M01)0.4527M32.ALAT2.a.ALAT BANTUDiperlukan :- Sekop= 2 buah100,000.00JUMLAH HARGA PERALATAN300.00- Pacul= 2 buah60,000.00- Sendok Semen= 2 buah40,000.00D.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )567,466.23- Ember Cor= 4 buah30,000.00E.OVERHEAD & PROFIT10.0% x D56,746.62- Gerobak Dorong= 1 buah400,000.00F.HARGA SATUAN PEKERJAAN ( D + E )624,212.853.TENAGA630,000.00Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranProduksi Yang Menentukan : Tukang Batuberat untuk bahan-bahan.Produksi Pasangan Batu dengan Mortar 1 Grup dalam 1 hariQt8.00M32Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomorKebutuhan tenaga :- MandorM1.00orangmata pembayaran.- Tukang BatuTb3.00orang3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.- PekerjaP9.00orang4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPNBerlanjut ke halaman berikutyang dibayar dari kontrak) dan biaya-biaya lainnya.ITEM PEMBAYARAN NO.: 2.2Analisa EI-22JENIS PEKERJAAN: Pasangan Batu Dengan MortarSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANLanjutanNo.U R A I A NKODEKOEF.SATUANKETERANGANKoefisien Tenaga / M3 :- Mandor= (Tk x M) : Qt(L03)0.8750jam- Tukang= (Tk x Tb) : Qt(L02)2.6250jam- Pekerja= (Tk x P) : Qt(L01)7.8750jam4.HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.5.ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :Rp.624,212.85/ M36.WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan :. . . . . . . . . . . .bulan7.VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan :2,143.85M3ITEM PEMBAYARAN NO.: 2.3 (2)Analisa EI-232Analisa EI-232JENIS PEKERJAAN: Gorong2 Pipa Beton Bertulang,SATUAN PEMBAYARAN: M1 45 - Item3123>Item3214>Item3225>Item33KembaliBreakQuit$2Lokasi pekerjaan : sepanjang jalanJENIS PEKERJAAN: Galian biasaTOTAL HARGA (Rp.):98,795,903.24Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 311Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 312Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 321Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 322Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 33Kembali ke menu sebelumnyaMenghentikan pencetakan yang sedang berlangsung (printer non-laser)Batal/Selesai$3Kondisi Jalan : sedang / baikSATUAN PEMBAYARAN: M3% THD. BIAYA PROYEK:1.75{goto}311pk~{goto}312pk~{goto}321pk~{goto}322pk~{goto}33pk~{menubranch menud3}/pcq{menubranch menud3u}{quit}$4Jam kerja efektif per-hariTk7.00Jam{indicate CETAK URAIAN ITEM 311}{indicate CETAK URAIAN ITEM 312}{indicate CETAK URAIAN ITEM 321}{indicate CETAK URAIAN ITEM 322}{indicate CETAK URAIAN ITEM 33}$5Faktor pengembangan bahanFk1.20-{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}PERKIRAANHARGAJUMLAH:pilca:pilca:pilca:pilca:pilcaNO.KOMPONENSATUANKUANTITASSATUANHARGAtf{CE}tf{CE}tf{CE}tf{CE}tf{CE}II.URUTAN KERJA(Rp.)(Rp.)[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK$1Tanah yang dipotong umumnya berada disisi jalan3]~qqc3]~qqc3]~qqc3]~qqc3]~qqc$2Penggalian dilakukan dengan menggunakan Excavatori1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsq$3Selanjutnya Excavator menuangkan material hasilA.TENAGAsb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~galian kedalam Dump Trucke9{CE}e9{CE}e9{CE}e9{CE}e9{CE}$4Dump Truck membuang material hasil galian keluar1.Pekerja(L01)Jam0.19918,571.431,706.369999~s19999~s19999~s19999~s19999~s1lokasi jalan sejauhL10.00Km2.Mandor(L03)Jam0.033212,857.14426.59{CE}1~{CE}1~{CE}1~{CE}1~{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~wngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrIII.PEMAKAIAN BAHAN, ALAT DAN TENAGAJUMLAH HARGA TENAGA2,132.95crs{CE}crs{CE}crs{CE}crs{CE}crs{CE}311pk~g312pk~g321pk~g322pk~g33pk~g1.BAHANB.BAHAN{indicate}{indicate}{indicate}{indicate}{indicate}Tidak ada bahan yang diperlukan{branch \p}{branch \p}{branch \p}{branch \p}{branch \p}2.ALATJUMLAH HARGA BAHAN0.002.a.EXCAVATOR(E10)Kapasitas BucketV0.70M3Faktor BucketFb0.83-C.PERALATANFaktor Efisiensi alatFa0.83-1.Excavator(E10)Jam0.0332331,084.3210,985.11Waktu siklusTs1menit2.Dump Truck(E08)Jam0.1835167,610.9730,758.64- Menggali / memuatT10.50menit3.Alat BantuLs1.0000150.00150.00menud3f1>Item3112>Item3123>Item3214>Item3225>Item33KembaliBreakQuit- Lain-lainT20.30menitMencetak Formulir Standar Harga Satuan Pekerjaan ITEM 311Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 312Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 321Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 322Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 33Kembali ke menu sebelumnyaMenghentikan pencetakan yang sedang berlangsung (printer non-laser)Batal/SelesaiTs10.80menit{goto}311fa~{goto}312fa~{goto}321fa~{goto}322fa~{goto}33fa~{menubranch menud3}/pcq{menubranch menud3f}{quit}JUMLAH HARGA PERALATAN41,893.75{indicate CETAK FORMULIR ITEM 311}{indicate CETAK FORMULIR ITEM 312}{indicate CETAK FORMULIR ITEM 321}{indicate CETAK FORMULIR ITEM 322}{indicate CETAK FORMULIR ITEM 33}Kap. Prod. / jam =V x Fb x Fa x 60Q130.14M3/Jam{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}Ts1 x FhD.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )44,026.69:pilca:pilca:pilca:pilca:pilcaE.OVERHEAD & PROFIT10.0% x D4,402.67tf{CE}tf{CE}tf{CE}tf{CE}tf{CE}Koefisien Alat / M3= 1 : Q1(E10)0.0332JamF.HARGA SATUAN PEKERJAAN ( D + E )48,429.36[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WKNote: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran3]~qqc3]~qqc3]~qqc3]~qqc3]~qqcberat untuk bahan-bahan.i1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsq2Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomorsb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~2.b.DUMP TRUCK(E08)mata pembayaran.e9{CE}e9{CE}e9{CE}e9{CE}e9{CE}Kapasitas bakV4.00M33Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.9999~s19999~s19999~s19999~s19999~s1Faktor efisiensi alatFa0.83-4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN{CE}1~{CE}1~{CE}1~{CE}1~{CE}1~Kecepatan rata-rata bermuatanv150.00KM/Jamyang dibayar dari kontrak) dan biaya-biaya lainnya.c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~Kecepatan rata-rata kosongv260.00KM/JamwngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrWaktu siklusTs2menitcrs{CE}crs{CE}crs{CE}crs{CE}crs{CE}- Waktu tempuh isi= (L : v1) x 60T112.00menit311fa~g312fa~g321fa~g322fa~g33fa~g- Waktu tempuh kosong= (L : v2) x 60T210.00menit{indicate}{indicate}{indicate}{indicate}{indicate}- Muat= (V : Q1) x 60T37.96menit{branch \p}{branch \p}{branch \p}{branch \p}{branch \p}- Lain-lainT40.50menitTs230.46menitBerlanjut ke halaman berikutITEM PEMBAYARAN NO.: 3.1 (1)Analisa EI-311JENIS PEKERJAAN: Galian biasaSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANLanjutanNo.U R A I A NKODEKOEF.SATUANKETERANGAN\s{indicate SIMPAN}{paneloff}/wgpe{goto}L1~/fs{edit}~r{indicate}Kapasitas Produksi / Jam =V x Fa x 60Q25.45M3/JamutamaEditCetakSimpanIdentitasQuitFk x Ts2Melepaskan proteksi seluruh selMencetak URAIAN ANALISA dan FORMULIR STANDAR Harga SatuanMemproteksi dan menyimpan kembali seluruh isi worksheetMemasukkan identitas proyekBatal/Selesai/wgpd{branch \p}{branch \s}{getlabel "PROYEK : ",O8}{quit}{getlabel "PAKET : ",O9}Koefisien Alat / M3= 1 : Q2(E08)0.1835Jam\m{menubranch utama}{getlabel "NAMA KONTRAK : ",O10}{getlabel "PROVINSI : ",O11}{calc}2.d.ALAT BANTUDiperlukan alat-alat bantu kecilLump Sump- Sekop- Keranjang3.TENAGAProduksi menentukan : EXCAVATORQ130.14M3/JamProduksi Galian / hari = Tk x Q1Qt210.98M3Kebutuhan tenaga :- PekerjaP6.00orang- MandorM1.00orangKoefisien tenaga / M3 :- Pekerja= (Tk x P) : Qt(L01)0.1991Jam- Mandor= (Tk x M) : Qt(L03)0.0332Jam4.HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.5.ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :Rp.48,429.36/ M36.WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan :. . . . . . . . . . . .bulan7.VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan :2,040.00M3ITEM PEMBAYARAN NO.: 3.1 (1)aAnalisa EI-311Analisa EI-311\0{indicate SABAR YA}{paneloff}/fal{indicate}JENIS PEKERJAAN: Galian BiasaSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANFORMULIR STANDAR UNTUK\p{menubranch menud3}PEREKAMAN ANALISA MASING-MASING HARGA SATUANmenud3UraianFormBreakQuitNo.U R A I A NKODEKOEF.SATUANKETERANGANMencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien)Mencetak Formulir Standar Harga Satuan PekerjaanMenghentikan pencetakan yang sedang berlangsung (printer non-laser)Batal/SelesaiPROYEK: Perencanaan Pembangunan Jalan Kabupaten{menubranch menud3u}{menubranch menud3f}/pcq{branch \p}{quit}NAMA PAKET: Peningkatan Kapsitas Jalan Muaro Kalaban - Sawah LuntoI.ASUMSIPROP / KAB / KODYA: Sumatera Barat / Dharmasraya$1Menggunakan alat berat (cara mekanik)ITEM PEMBAYARAN NO.: 3.1 (1)aPERKIRAAN VOL. PEK.:2,040.00menud3u1>Item3112>Item3123>Item3214>Item3225>Item33KembaliBreakQuit$2Lokasi pekerjaan : sepanjang jalanJENIS PEKERJAAN: Galian BiasaTOTAL HARGA (Rp.):98,795,903.24Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 311Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 312Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 321Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 322Mencetak Uraian Analisa Harga Satuan (Perhitungan Koefisien) ITEM 33Kembali ke menu sebelumnyaMenghentikan pencetakan yang sedang berlangsung (printer non-laser)Batal/Selesai$3Kondisi Jalan : sedang / baikSATUAN PEMBAYARAN: M3% THD. BIAYA PROYEK:1.75{goto}311pk~{goto}312pk~{goto}321pk~{goto}322pk~{goto}33pk~{menubranch menud3}/pcq{menubranch menud3u}{quit}$4Jam kerja efektif per-hariTk7.00Jam{indicate CETAK URAIAN ITEM 311}{indicate CETAK URAIAN ITEM 312}{indicate CETAK URAIAN ITEM 321}{indicate CETAK URAIAN ITEM 322}{indicate CETAK URAIAN ITEM 33}$5Faktor pengembangan bahanFk1.20-{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}PERKIRAANHARGAJUMLAH:pilca:pilca:pilca:pilca:pilcaNO.KOMPONENSATUANKUANTITASSATUANHARGAtf{CE}tf{CE}tf{CE}tf{CE}tf{CE}II.URUTAN KERJA(Rp.)(Rp.)[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK$1Tanah yang dipotong umumnya berada disisi jalan3]~qqc3]~qqc3]~qqc3]~qqc3]~qqc$2Penggalian dilakukan dengan menggunakan Excavatori1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsq$3Selanjutnya Excavator menuangkan material hasilA.TENAGAsb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~galian kedalam Dump Trucke9{CE}e9{CE}e9{CE}e9{CE}e9{CE}$4Dump Truck membuang material hasil galian keluar1.Pekerja(L01)Jam0.12448,571.431,066.479999~s19999~s19999~s19999~s19999~s1lokasi jalan sejauhL10.00Km2.Mandor(L03)Jam0.062212,857.14799.86{CE}1~{CE}1~{CE}1~{CE}1~{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~wngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrIII.PEMAKAIAN BAHAN, ALAT DAN TENAGAJUMLAH HARGA TENAGA1,866.33crs{CE}crs{CE}crs{CE}crs{CE}crs{CE}311pk~g312pk~g321pk~g322pk~g33pk~g1.BAHANB.BAHAN{indicate}{indicate}{indicate}{indicate}{indicate}Tidak ada bahan yang diperlukan{branch \p}{branch \p}{branch \p}{branch \p}{branch \p}2.ALATJUMLAH HARGA BAHAN0.002.a.EXCAVATOR(E10)Kapasitas BucketV0.70M3Faktor BucketFb0.83-C.PERALATANFaktor Efisiensi alatFa0.83-1.Excavator(E10)Jam0.0622331,084.3220,597.08Waktu siklusTs1menit3.Alat BantuLs1.0000150.00150.00- Menggali / memuatT10.50menitmenud3f1>Item3112>Item3123>Item3214>Item3225>Item33KembaliBreakQuit- Lain-lainT21.00menitMencetak Formulir Standar Harga Satuan Pekerjaan ITEM 311Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 312Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 321Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 322Mencetak Formulir Standar Harga Satuan Pekerjaan ITEM 33Kembali ke menu sebelumnyaMenghentikan pencetakan yang sedang berlangsung (printer non-laser)Batal/SelesaiTs11.50menit{goto}311fa~{goto}312fa~{goto}321fa~{goto}322fa~{goto}33fa~{menubranch menud3}/pcq{menubranch menud3f}{quit}{indicate CETAK FORMULIR ITEM 311}{indicate CETAK FORMULIR ITEM 312}{indicate CETAK FORMULIR ITEM 321}{indicate CETAK FORMULIR ITEM 322}{indicate CETAK FORMULIR ITEM 33}Kap. Prod. / jam =V x Fb x Fa x 60Q116.07M3/Jam{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}{paneloff}{windowsoff}Ts1 x FhJUMLAH HARGA PERALATAN20,747.08:pilca:pilca:pilca:pilca:pilcatf{CE}tf{CE}tf{CE}tf{CE}tf{CE}Koefisien Alat / M3= 1 : Q1(E10)0.0622JamD.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )22,613.41[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WK[3-DIV3.WKE.OVERHEAD & PROFIT10.0% x D2,261.343]~qqc3]~qqc3]~qqc3]~qqc3]~qqcF.HARGA SATUAN PEKERJAAN ( D + E )24,874.75i1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsqi1oprfbsqNote: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuransb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~sb1{CE}1~berat untuk bahan-bahan.e9{CE}e9{CE}e9{CE}e9{CE}e9{CE}2Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor9999~s19999~s19999~s19999~s19999~s1mata pembayaran.{CE}1~{CE}1~{CE}1~{CE}1~{CE}1~3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~c1{CE}1~4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPNwngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqrwngnfnrqryang dibayar dari kontrak) dan biaya-biaya lainnya.crs{CE}crs{CE}crs{CE}crs{CE}crs{CE}311fa~g312fa~g321fa~g322fa~g33fa~g{indicate}{indicate}{indicate}{indicate}{indicate}{branch \p}{branch \p}{branch \p}{branch \p}{branch \p}Berlanjut ke halaman berikutITEM PEMBAYARAN NO.: 3.1 (1)aAnalisa EI-311JENIS PEKERJAAN: Galian BiasaSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANLanjutanNo.U R A I A NKODEKOEF.SATUANKETERANGAN\s{indicate SIMPAN}{paneloff}/wgpe{goto}L1~/fs{edit}~r{indicate}2.b.ALAT BANTUDiperlukan alat-alat bantu kecilLump Sump- Sekop- Keranjang3.TENAGAProduksi menentukan : EXCAVATORQ116.07M3/JamProduksi Galian / hari = Tk x Q1Qt112.52M3Kebutuhan tenaga :- PekerjaP2.00orang- MandorM1.00orangKoefisien tenaga / M3 :- Pekerja= (Tk x P) : Qt(L01)0.1244Jam- Mandor= (Tk x M) : Qt(L03)0.0622Jam4.HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.5.ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :Rp.24,874.75/ M36.WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan :. . . . . . . . . . . .bulan7.VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan :2,040.00M3ITEM PEMBAYARAN NO.: 3.1 (2)Analisa EI-312JENIS PEKERJAAN: Galian BatuSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANAnalisa EI-312FORMULIR STANDAR UNTUKNo.U R A I A NKODEKOEF.SATUANKETERANGANPEREKAMAN ANALISA MASING-MASING HARGA SATUANI.ASUMSINo. PAKET KONTRAK: Perencanaan Pembangunan Jalan Kabupaten$1Pekerjaan dilakukan secara manualNAMA PAKET: Peningkatan Kapsitas Jalan Muaro Kalaban - Sawah Lunto$2Lokasi pekerjaan : sepanjang jalanPROP / KAB / KODYA: Sumatera Barat / Dharmasraya$3Kondisi Jalan : sedang / baikITEM PEMBAYARAN NO.: 3.1 (2)PERKIRAAN VOL. PEK.:$4Jam kerja efektif per-hariTk7.00JamJENIS PEKERJAAN: Galian BatuTOTAL HARGA (Rp.):$5Faktor pengembangan bahanFk1.20-SATUAN PEMBAYARAN: M3% THD. BIAYA PROYEK:II.URUTAN KERJAPERKIRAANHARGAJUMLAH$1Batu yg dipotong umumnya berada disisi jalanNO.KOMPONENSATUANKUANTITASSATUANHARGA$2Penggalian dilakukan dengan Excavator, Compresor(Rp.)(Rp.)dan Jack Hammer, dimuat ke dlm Truk dengan Loader.$3Dump Truck membuang material hasil galian keluarlokasi jalan sejauh :L1.00KmA.TENAGA1.Pekerja(L01)Jam0.25008,571.432,142.862.Mandor(L03)Jam0.125012,857.141,607.14III.PEMAKAIAN BAHAN, ALAT DAN TENAGA1.BAHANJUMLAH HARGA TENAGA3,750.00Tidak ada bahan yang diperlukanB.BAHAN2.ALAT2.a.COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER(E05/26/10/15)Produksi per jamQ18.00M3 / JamJUMLAH HARGA BAHAN0.00Koefisien Alat / m3= 1 : Q1(E05/26)0.1250JamC.PERALATAN1.Compressor(E05)Jam0.1250106,074.9913,259.372.b.DUMP TRUCK(E08)2.Jack Hammer(E26)Jam0.125036,414.894,551.86Kapasitas bakV4.00M33.Wheel Loader(E15)Jam0.1250240,261.3030,032.66Faktor efisiensi alatFa0.83-4.Excavator(E10)Jam0.1250331,084.3241,385.54Kecepatan rata-rata bermuatanv150.00KM/Jam5Dump Truck(E08)Jam0.2060167,610.9734,531.90Kecepatan rata-rata kosongv260.00KM/JamAlat bantuLs1.00001,000.001,000.00Waktu siklusTs1menit- Waktu tempuh isi= (L : v1) x 60T11.20menit- Waktu tempuh kosong= (L : v2) x 60T21.00menit- Muat= (V : Q1) x 60T330.00menitJUMLAH HARGA PERALATAN124,761.34- Lain-lainT42.00menitTs134.20menitD.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )128,511.34E.OVERHEAD & PROFIT10.0% x D12,851.13F.HARGA SATUAN PEKERJAAN ( D + E )141,362.47Kapasitas Produksi / Jam =V x Fa x 60Q24.85M3 / JamNote: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranFk x Ts1berat untuk bahan-bahan.2Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.Koefisien Alat / m3= 1 : Q2(E08)0.2060Jam3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPNyang dibayar dari kontrak) dan biaya-biaya lainnya.Berlanjut ke halaman berikutITEM PEMBAYARAN NO.: 3.1 (2)Analisa EI-312JENIS PEKERJAAN: Galian BatuSATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUANLanjutanNo.U R A I A NKODEKOEF.SATUANKETERANGAN2.d.ALAT BANTUDiperlukan alat-alat bantu kecilLump Sump- Pahat / Tatah= 2 buah- Palu Besar= 2 buah3.TENAGAProduksi menentukan : JACK HAMMERQ18.00M3/JamProduksi Galian / hari = Tk x Q1Qt56.00M3Kebutuhan tenaga :- PekerjaP2.00orang- MandorM1.00orangKoefisien tenaga / M3 :- Pekerja= (Tk x P) : Qt(L01)0.2500Jam- Mandor= (Tk x M) : Qt(L03)0.1250Jam4.HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.5.ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :Rp.141,362.47/ M36.WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan :. . . . . . . . . . . .bulan7.VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan :0.00M3ITEM PEMBAYARAN NO.: 3.1 (3)Analisa EI-313JENIS PEKERJAAN: Galian Struktur Kedalaman 100 HPE13135.0--875,000,000336,693.54Alat baru01002.Faktor Angsuran Modal =i x (1 + i)^A'D0.19925-4.BULLDOZER 100-150 HPE04155.00.7M3810,000,0005.02,000.0810,000,00081,000,0000.29128106,172.85810.00106,982.850.12500.0100170,593.000.00000.000.125050,625.0010,714.297,142.86239,075.14346,058.00Alat baru14.TRACK LOADER 75-100 HPE1470.00.8M3567,000,000205,224.64Alat baru-1110(1 + i)^A' - 15.COMPRESSOR 4000-6500 L\ME0560.0--114,000,0005.02,000.0114,000,00011,400,0000.2912814,942.85114.0015,056.850.12500.010066,036.000.00000.000.12507,125.0010,714.297,142.8691,018.14106,074.99Alat baru15.WHEEL LOADER 1.0-1.6 M3E1596.01.5M3600,000,000240,261.30Alat baru-21233,036,3643.Biaya Pasti per Jam :6.CONCRETE MIXER 0.3-0.6 M3E0620.0500.0Liter65,000,0002.02,000.019,500,0006,500,0000.607293,947.3819.503,966.880.15000.015027,918.000.00000.000.15001,462.5010,714.297,142.8647,237.6451,204.53Usia 2 th.16.THREE WHEEL ROLLER 6-8 TE1655.08.0Ton300,000,000136,763.42Alat baru-31399,109,091a. Biaya Pengembalian Modal =( B' - C ) x DE217,224.60Rupiah7.CRANE 10-15 TONE07150.025.0Ton1,044,000,0005.02,000.01,044,000,000104,400,0000.29128136,845.011,044.00137,889.010.12500.0100165,090.000.00000.000.125065,250.0010,714.297,142.86248,197.14386,086.15Alat baru17.TANDEM ROLLER 6-8 T.E1782.08.1Ton575,000,000219,988.46Alat baru-414198,218,182W'7DUMP TRUCK 3-4 M3E08100.06.0Ton204,000,0005.02,000.0204,000,00020,400,0000.2912826,739.83204.0026,943.830.12500.0100110,060.000.00000.000.125012,750.0010,714.297,142.86140,667.14167,610.97Alat baru18.TIRE ROLLER 8-10 T.E18100.59.0Ton750,000,000290,615.44Alat baru55558DUMP TRUCKE09125.06.0Ton342,000,0005.02,000.0342,000,00034,200,0000.2912844,828.54342.0045,170.540.12500.0100137,575.000.00000.000.125021,375.0010,714.297,142.86176,807.14221,977.68Alat baru19.VIBRATORY ROLLER 5-8 T.E1982.07.1Ton581,000,000234,730.73Alat baruKondisi AlatUmur >10 th.b. Asuransi, dll =0.002x B'F2,422.67Rupiah9EXCAVATOR 80-140 HPE10133.00.7M3750,000,0005.02,000.0850,000,00075,000,0000.29128112,872.37850.00113,722.370.12500.0100146,379.800.00000.000.125053,125.0010,714.297,142.86217,361.94331,084.32Alat baru20.CONCRETE VIBRATORE205.5--8,000,00027,397.52Alat baruNilai B' dariA>15th ?W'11.FLAT BED TRUCK 3-4 M3E11190.010.0M3170,000,0005.02,000.0170,000,00017,000,0000.2912822,283.19170.0022,453.190.12500.0100209,114.000.00000.000.125010,625.0010,714.297,142.86237,596.14260,049.33Alat baru21.STONE CRUSHERE21220.050.0T/Jam1,020,000,000465,601.15Alat baruDepresiasiA>15th ?10GENERATOR SETE12180.0135.0KVA225,000,0005.02,000.0225,000,00022,500,0000.2912829,492.46225.0029,717.460.12500.0100198,108.000.00000.000.125014,062.5010,714.297,142.86230,027.64259,745.10Alat baru22.WATER PUMP 70-100 mmE226.0--7,500,00026,986.60Alat baruBiaya Pasti per Jam =( E + F )G219,647.27Rupiah11MOTOR GRADER >100 HPE13135.0--875,000,0005.02,000.0875,000,00087,500,0000.29128114,692.90875.00115,567.900.12500.0100148,581.000.00000.000.125054,687.5010,714.297,142.86221,125.64336,693.54Alat baru23.WATER TANKER 3000-4500 L.E23100.04,000.0Liter150,000,000157,103.78Alat baruE0260800,000,00014.TRACK LOADER 75-100 HPE1470.00.8M3567,000,0005.02,000.0567,000,00056,700,0000.2912874,321.00567.0074,888.000.12500.010077,042.000.00000.000.125035,437.5010,714.297,142.86130,336.64205,224.64Alat baru24.PEDESTRIAN ROLLERE248.8835.00Ton180,000,00066,772.01Alat baru51571,428,571C.BIAYA OPERASI PER JAM KERJA12WHEEL LOADER 1.0-1.6 M3E1596.01.5M3600,000,0005.02,000.0600,000,00060,000,0000.2912878,646.56600.0079,246.560.12500.0100105,657.600.00000.000.125037,500.0010,714.297,142.86161,014.74240,261.30Alat baru25.STAMPERE254.7121.00Ton17,50023,037.59Alat baru42380,952,38116.THREE WHEEL ROLLER 6-8 TE1655.08.0Ton300,000,0005.02,000.0300,000,00030,000,0000.2912839,323.28300.0039,623.280.12500.010060,533.000.00000.000.125018,750.0010,714.297,142.8697,140.14136,763.42Alat baru26.JACK HAMMERE263.0--35,000,00036,414.89Alat baru33228,571,4291.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH1248,944.50Rupiah13TANDEM ROLLER 6-8 T.E1782.08.1Ton575,000,0005.02,000.0575,000,00057,500,0000.2912875,369.62575.0075,944.620.12500.010090,249.200.00000.000.125035,937.5010,714.297,142.86144,043.84219,988.46Alat baru27.FULVI MIXERE27345.0--900,000,000572,683.98Alat baru24114,285,714Bahan Bakar Pemanasan Material= 12 x 0.7Cp x MsH23,414,096.00RupiahKhusus AMP14TIRE ROLLER 8-10 T.E18100.59.0Ton750,000,0005.01,800.0750,000,00075,000,0000.29128109,231.33833.33110,064.660.12500.0100110,610.300.00000.000.125052,083.3310,714.297,142.86180,550.78290,615.44Alat baru28.CONCRETE PUMPE28100.08.00M3112,500,000148,079.49Alat baru1538,095,23815VIBRATORY ROLLER 5-8 T.E1982.07.1Ton581,000,0004.02,000.0581,000,00058,100,0000.3432089,730.89581.0090,311.890.12500.010090,249.200.00000.000.125036,312.5010,714.297,142.86144,418.84234,730.73Alat baru29.TRAILER 20 TONE29175.020.00Ton339,000,000271,218.02Alat baru0602.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI73,617.60Rupiah20.CONCRETE VIBRATORE205.5--8,000,0004.01,000.08,000,000800,0000.343202,471.0716.002,487.070.12500.01006,053.300.00000.000.12501,000.0010,714.297,142.8624,910.4427,397.52Alat baru30.PILE DRIVER + HAMMERE3025.02.50Ton129,000,00070,472.65Alat baru-17016STONE CRUSHERE21220.050.0T/Jam1,020,000,0005.02,000.01,020,000,000102,000,0000.29128133,699.151,020.00134,719.150.12500.0100242,132.000.00000.000.125063,750.0010,714.2914,285.71330,882.00465,601.15Alat baru31.CRANE ON TRACK 35 TONE31125.035.00Ton850,000,000307,769.88Alat baru-2838,095,2383.Perawatan dan =(12,5 % - 17,5 %) x B'K151,416.67Rupiah22.WATER PUMP 70-100 mmE226.0--7,500,0002.02,000.07,500,000750,0000.607292,049.607.502,057.100.12500.01006,603.600.00000.000.1250468.7510,714.297,142.8624,929.4926,986.60Alat baru32.WELDING SETE3240.0250.00Amp27,000,00067,134.74Alat baru-39114,285,714perbaikanW'17WATER TANKER 3000-4500 L.E23100.04,000.0Liter150,000,0005.02,000.0150,000,00015,000,0000.2912819,661.64150.0019,811.640.12500.0100110,060.000.00000.000.12509,375.0010,714.297,142.86137,292.14157,103.78Alat baru33.BORE PILE MACHINEE33150.02,000Meter4,992,000,0001,077,617.74Alat baru-410228,571,4294.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah24.PEDESTRIAN ROLLERE248.8835.0Ton180,000,0004.02,000.0180,000,00018,000,0000.3432027,799.59180.0027,979.590.12500.01009,685.280.00000.000.125011,250.0010,714.297,142.8638,792.4266,772.01Alat baru34.ASPHALT LIQUID MIXERE3440.020,000.00Liter15,000,00065,150.28Alat baru-511380,952,3815.Pembantu Operator= ( 3 Orang / Jam ) x U2M27,857.14Rupiah18STAMPERE254.7121.0Ton17,5004.01,000.017,5001,7500.343205.410.045.440.12500.01005,172.820.00000.000.12502.1910,714.297,142.8623,032.1523,037.59Alat baru35.TRAILLER 15 TONE35160.015.00Ton318,000,000257,456.09Alat baru-612571,428,57126.JACK HAMMERE263.0--35,000,0004.01,000.035,000,0003,500,0000.3432010,810.9570.0010,880.950.12500.01003,301.800.00000.000.12504,375.0010,714.297,142.8625,533.9436,414.89Alat baru36.COLD MILLING (WINGET)E36125.0--2,520,000,000658,663.02Alat baru-713800,000,000Biaya Operasi per Jam =(H+I+K+L+M)P3,928,074.77Rupiah27.FULVI MIXERE27345.0--900,000,0005.02,000.0900,000,00090,000,0000.29128117,969.84900.00118,869.840.12500.0100379,707.000.00000.000.125056,250.0010,714.297,142.86453,814.14572,683.98Alat baru37.ROCK DRILL BREAKERE373.0--300,000,00081,067.38Alat baru-8141,066,666,66728.CONCRETE PUMPE28100.08.00M3112,500,0006.02,000.0112,500,00011,250,0000.2571613,018.60112.5013,131.100.12500.0100110,060.000.12507,031.2510,714.297,142.86134,948.39148,079.49Alat baru21> 15th ?D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )T4,147,722.03Rupiah29.TRAILER 20 TONE29175.020.00Ton339,000,0006.02,000.0339,000,00033,900,0000.2571639,229.38339.0039,568.380.12500.0100192,605.000.125021,187.5010,714.297,142.86231,649.64271,218.02Alat baruKondisi AlatUmur >10 th.30PILE DRIVER + HAMMERE3025.02.50Ton129,000,0005.02,000.0129,000,00012,900,0000.2912816,909.01129.0017,038.010.12500.010027,515.000.12508,062.5010,714.297,142.8653,434.6470,472.65Alat baruNilai B' dariA>15th ?31.CRANE ON TRACK 35 TONE31125.035.00Ton850,000,0006.02,000.0850,000,00085,000,0000.2571698,362.74850.0099,212.740.12500.0100137,575.000.125053,125.0010,714.297,142.86208,557.14307,769.88Alat baruDepresiasiA>15th ?E.LAIN - LAIN32.WELDING SETE3240.0250.00Amp27,000,0005.02,000.027,000,0002,700,0000.291283,539.1027.003,566.100.12500.010044,024.000.12501,687.5010,714.297,142.8663,568.6467,134.74Alat baru1.Tingkat Suku Bungai15.00% / Tahun33.BORE PILE MACHINEE33150.02,000.0Meter4,992,000,0006.02,000.04,992,000,000499,200,0000.25716577,678.604,992.00582,670.600.12500.0100165,090.000.1250312,000.0010,714.297,142.86494,947.141,077,617.74Alat baruE0350130,000,0002.Upah Operator / SopirU112,142.86Rp./Jam34.ASPHALT LIQUID MIXERE3440.020,000.0Liter15,000,0004.02,000.015,000,0001,500,0000.343202,316.6315.002,331.630.12500.010044,024.000.1250937.5010,714.297,142.8662,818.6465,150.28Alat baru4186,666,6673.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam35.TRAILLER 15 TONE35160.015.0Ton318,000,00010.01,500.0318,000,00031,800,0000.1917136,578.94424.0037,002.940.12500.0100176,096.000.125026,500.0010,714.297,142.86220,453.14257,456.09Alat baru3252,000,0004.Bahan Bakar BensinMb5,833.80Liter36.COLD MILLING (WINGET)E36125.0--2,520,000,00010.01,500.02,520,000,000252,000,0000.19171289,870.873,360.00293,230.870.12500.0100137,575.000.1250210,000.0010,714.297,142.86365,432.14658,663.02Alat baru2326,000,0005.Bahan Bakar SolarMs6,774.00Liter37.ROCK DRILL BREAKERE373.0--300,000,00010.01,500.0300,000,00030,000,0000.1917134,508.44400.0034,908.440.12500.01003,301.800.125025,000.0010,714.297,142.8646,158.9481,067.38Alat baru6.Minyak PelumasMp25,040.00LiterKETERANGAN :1.Tingkat Suku Bunga=14.00% per-tahun7.PPN diperhitungkan pada lembar Rekapitulasi2.Upah Operator / Sopir / Mekanik=10,714Rupiah per-orang/jam148,666,667Biaya Pekerjaan3.Upah Pembantu Operator/Sopir/Mekanik=7,143Rupiah per-orang/jam0504.Harga Bahan Bakar Bensin=4,500Rupiah per-liter-1605.Harga Bahan Bakar Solar=6,800Rupiah per-liter-278,666,667URAIAN ANALISA ALAT6.Minyak Pelumas=25,060Rupiah per-liter-3826,000,0007.Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan-4952,000,0008.Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)-51086,666,667No.U R A I A NKODEKOEF.SATUANKET.-611130,000,000-712182,000,000-813242,666,667A.URAIAN PERALATAN-914312,000,0001.Jenis PeralatanASPHALT FINISHERE0215> 15th ?2.TenagaPw72.4HPKondisi AlatUmur >10 th.3.KapasitasCp10.0TonNilai B' dariA>15th ?4.Alat Baru :a. Umur EkonomisA6.0TahunDepresiasiA>15th ?b. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB800,000,000RupiahE0450810,000,0005.Alat Yang Dipakai :a. Umur EkonomisA'6.0TahunAlat baruALAT BANTU41540,000,000b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baru32324,000,000c. Harga Alat (*)B'800,000,000RupiahAlat baruAlat bantuUnitHarga/UnitTotal23162,000,000Gerobak24000008000001454,000,000B.BIAYA PASTI PER JAM KERJAPacul330000900000501.Nilai Sisa Alat= 10 % x BC80,000,000RupiahSendok Semen22500050000-160Ember41000040000-2754,000,0002.Faktor Angsuran Modal =i x (1 + i)^A'D0.26424-Tang22000040000-38162,000,000(1 + i)^A' - 1Pemotong kawat22000040000-49324,000,0003.Biaya Pasti per Jam :Palu pemecah batu23500070000-510540,000,000a. Biaya Pengembalian Modal =( B' - C ) x DE95,125.29RupiahSekop3110000330000-611810,000,000W'Keranjang + Sapu12500025000-7121,134,000,000Pahat21500030000-8131,512,000,000b. Asuransi, dll =0.002x B'F800.00RupiahRambu22000040000-9141,944,000,000W'155500015> 15th ?Kondisi AlatUmur >10 th.Biaya Pasti per Jam =( E + F )G95,925.29RupiahNilai B' dariA>15th ?DepresiasiA>15th ?C.BIAYA OPERASI PER JAM KERJAE0550114,000,0001.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH61,304.70Rupiah4176,000,0003245,600,0002.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI18,128.96Rupiah2322,800,000147,600,0003.Perawatan dan(12,5 % - 17,5 %) x B'K50,000.00Rupiah050perbaikan =W'-160-277,600,0004.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah-3822,800,0005.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah-4945,600,000-51076,000,000Biaya Operasi per Jam =(H+I+K+L+M)P150,862.23Rupiah-611114,000,000-712159,600,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S246,787.52Rupiah-813212,800,000-914273,600,00015> 15th ?E.LAIN - LAINKondisi AlatUmur >10 th.1.Tingkat Suku Bungai15.00% / TahunNilai B' dariA>15th ?2.Upah Operator / SopirU112,142.86Rp./JamDepresiasiA>15th ?3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80LiterE064065,000,0005.Bahan Bakar SolarMs6,774.00Liter3139,000,0006.Minyak PelumasMp25,040.00Liter2219,500,0007.PPN diperhitungkan pada lembar Rekapitulasi136,500,000Biaya Pekerjaan040-150-266,500,000URAIAN ANALISA ALAT-3719,500,000-4839,000,000-5965,000,000No.U R A I A NKODEKOEF.SATUANKET.-61097,500,000-711136,500,000-812182,000,000A.URAIAN PERALATAN-913234,000,0001.Jenis PeralatanASPHALT SPRAYERE03-1014292,500,0002.TenagaPw4.0HP10> 15th ?3.KapasitasCp850.0LiterKondisi AlatUmur >10 th.4.Alat Baru :a. Umur EkonomisA5.0TahunNilai B' dariA>15th ?b. Jam Kerja Dalam 1 TahunW2,000.0JamDepresiasiA>15th ?c. Harga AlatB130,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baruE07501,044,000,000b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baru41696,000,000c. Harga Alat (*)B'130,000,000RupiahAlat baru32417,600,00023208,800,000B.BIAYA PASTI PER JAM KERJA1469,600,0001.Nilai Sisa Alat= 10 % x BC13,000,000Rupiah050-1602.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832--2769,600,000(1 + i)^A' - 1-38208,800,0003.Biaya Pasti per Jam :-49417,600,000a. Biaya Pengembalian Modal =( B' - C ) x DE17,451.46Rupiah-510696,000,000W'-6111,044,000,000-7121,461,600,000b. Asuransi, dll =0.002x B'F130.00Rupiah-8131,948,800,000W'-9142,505,600,00015> 15th ?Biaya Pasti per Jam =( E + F )G17,581.46RupiahKondisi AlatUmur >10 th.Nilai B' dariA>15th ?C.BIAYA OPERASI PER JAM KERJADepresiasiA>15th ?1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH3,387.00RupiahE0850204,000,00041136,000,0002.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI1,001.60Rupiah3281,600,0002340,800,0003.Perawatan dan(12,5 % - 17,5 %) x B'K8,125.00Rupiah1413,600,000perbaikan =W'050-1604.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah-2713,600,0005.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah-3840,800,000-4981,600,000Biaya Operasi per Jam =(H+I+K+L+M)P33,942.17Rupiah-510136,000,000-611204,000,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S51,523.63Rupiah-712285,600,000-813380,800,000-914489,600,000E.LAIN - LAIN15> 15th ?1.Tingkat Suku Bungai15.00% / TahunKondisi AlatUmur >10 th.2.Upah Operator / SopirU112,142.86Rp./JamNilai B' dariA>15th ?3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./JamDepresiasiA>15th ?4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00LiterE0950342,000,0006.Minyak PelumasMp25,040.00Liter41228,000,0007.PPN diperhitungkan pada lembar Rekapitulasi32136,800,000Biaya Pekerjaan2368,400,0001422,800,000050URAIAN ANALISA ALAT-160-2722,800,000-3868,400,000No.U R A I A NKODEKOEF.SATUANKET.-49136,800,000-510228,000,000-611342,000,000A.URAIAN PERALATAN-712478,800,0001.Jenis PeralatanBULLDOZER 100-150 HPE04-813638,400,0002.TenagaPw155.0HP-914820,800,0003.KapasitasCp--15> 15th ?4.Alat Baru :a. Umur EkonomisA5.0TahunKondisi AlatUmur >10 th.b. Jam Kerja Dalam 1 TahunW2,000.0JamNilai B' dariA>15th ?c. Harga AlatB810,000,000RupiahDepresiasiA>15th ?5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruE1050850,000,000c. Harga Alat (*)B'810,000,000RupiahAlat baru41566,666,66732340,000,000B.BIAYA PASTI PER JAM KERJA23170,000,0001.Nilai Sisa Alat= 10 % x BC81,000,000Rupiah1456,666,6670502.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832--160(1 + i)^A' - 1-2756,666,6673.Biaya Pasti per Jam :-38170,000,000a. Biaya Pengembalian Modal =( B' - C ) x DE108,736.02Rupiah-49340,000,000W'-510566,666,667-611850,000,000b. Asuransi, dll =0.002x B'F810.00Rupiah-7121,190,000,000W'-8131,586,666,667-9142,040,000,000Biaya Pasti per Jam =( E + F )G109,546.02Rupiah15> 15th ?Kondisi AlatUmur >10 th.C.BIAYA OPERASI PER JAM KERJANilai B' dariA>15th ?DepresiasiA>15th ?1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH131,246.25RupiahE1150170,000,0002.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI38,812.00Rupiah41113,333,3333268,000,0003.Perawatan dan(12,5 % - 17,5 %) x B'K50,625.00Rupiah2334,000,000perbaikan =W'1411,333,3330504.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah-1605.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah-2711,333,333-3834,000,000Biaya Operasi per Jam =(H+I+K+L+M)P242,111.82Rupiah-4968,000,000-510113,333,333D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S351,657.84Rupiah-611170,000,000-712238,000,000-813317,333,333E.LAIN - LAIN-914408,000,0001.Tingkat Suku Bungai15.00% / Tahun15> 15th ?2.Upah Operator / SopirU112,142.86Rp./JamKondisi AlatUmur >10 th.3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./JamNilai B' dariA>15th ?4.Bahan Bakar BensinMb5,833.80LiterDepresiasiA>15th ?5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00LiterE1250225,000,0007.PPN diperhitungkan pada lembar Rekapitulasi41150,000,000Biaya Pekerjaan3290,000,0002345,000,0001415,000,000URAIAN ANALISA ALAT050-160-2715,000,000No.U R A I A NKODEKOEF.SATUANKET.-3845,000,000-4990,000,000-510150,000,000A.URAIAN PERALATAN-611225,000,0001.Jenis PeralatanCOMPRESSOR 4000-6500 L\ME05-712315,000,0002.TenagaPw60.0HP-813420,000,0003.KapasitasCp---914540,000,0004.Alat Baru :a. Umur EkonomisA5.0Tahun15> 15th ?b. Jam Kerja Dalam 1 TahunW2,000.0JamKondisi AlatUmur >10 th.c. Harga AlatB114,000,000RupiahNilai B' dariA>15th ?5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baruDepresiasiA>15th ?b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'114,000,000RupiahAlat baruE1350875,000,00041583,333,333B.BIAYA PASTI PER JAM KERJA32350,000,0001.Nilai Sisa Alat= 10 % x BC11,400,000Rupiah23175,000,0001458,333,3332.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-050(1 + i)^A' - 1-1603.Biaya Pasti per Jam :-2758,333,333a. Biaya Pengembalian Modal =( B' - C ) x DE15,303.59Rupiah-38175,000,000W'-49350,000,000-510583,333,333b. Asuransi, dll =0.002x B'F114.00Rupiah-611875,000,000W'-7121,225,000,000-8131,633,333,333Biaya Pasti per Jam =( E + F )G15,417.59Rupiah-9142,100,000,00015> 15th ?C.BIAYA OPERASI PER JAM KERJAKondisi AlatUmur >10 th.Nilai B' dariA>15th ?1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH50,805.00RupiahDepresiasiA>15th ?2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI15,024.00RupiahE1450567,000,00041378,000,0003.Perawatan dan(12,5 % - 17,5 %) x B'K7,125.00Rupiah32226,800,000perbaikan =W'23113,400,0001437,800,0004.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah0505.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah-160-2737,800,000Biaya Operasi per Jam =(H+I+K+L+M)P94,382.57Rupiah-38113,400,000-49226,800,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S109,800.16Rupiah-510378,000,000-611567,000,000-712793,800,000E.LAIN - LAIN-8131,058,400,0001.Tingkat Suku Bungai15.00% / Tahun-9141,360,800,0002.Upah Operator / SopirU112,142.86Rp./Jam15> 15th ?3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./JamKondisi AlatUmur >10 th.4.Bahan Bakar BensinMb5,833.80LiterNilai B' dariA>15th ?5.Bahan Bakar SolarMs6,774.00LiterDepresiasiA>15th ?6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiE1550600,000,000Biaya Pekerjaan41400,000,00032240,000,00023120,000,000URAIAN ANALISA ALAT1440,000,000050-160No.U R A I A NKODEKOEF.SATUANKET.-2740,000,000-38120,000,000-49240,000,000A.URAIAN PERALATAN-510400,000,0001.Jenis PeralatanCONCRETE MIXER 0.3-0.6 M3E06-611600,000,0002.TenagaPw20.0HP-712840,000,0003.KapasitasCp500.0Liter-8131,120,000,0004.Alat Baru :a. Umur EkonomisA4.0Tahun-9141,440,000,000b. Jam Kerja Dalam 1 TahunW2,000.0Jam15> 15th ?c. Harga AlatB65,000,000RupiahKondisi AlatUmur >10 th.5.Alat Yang Dipakai :a. Umur EkonomisA'2.0TahunUsia 2 th.Nilai B' dariA>15th ?b. Jam Kerja Dalam 1 TahunW'2,000.0JamUsia 2 th.DepresiasiA>15th ?c. Harga Alat (*)B'19,500,000RupiahUsia 2 th.E1650300,000,000B.BIAYA PASTI PER JAM KERJA41200,000,0001.Nilai Sisa Alat= 10 % x BC6,500,000Rupiah32120,000,0002360,000,0002.Faktor Angsuran Modal =i x (1 + i)^A'D0.61512-1420,000,000(1 + i)^A' - 10503.Biaya Pasti per Jam :-160a. Biaya Pengembalian Modal =( B' - C ) x DE3,998.26Rupiah-2720,000,000W'-3860,000,000-49120,000,000b. Asuransi, dll =0.002x B'F19.50Rupiah-510200,000,000W'-611300,000,000-712420,000,000Biaya Pasti per Jam =( E + F )G4,017.76Rupiah-813560,000,000-914720,000,000C.BIAYA OPERASI PER JAM KERJA15> 15th ?Kondisi AlatUmur >10 th.1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH20,322.00RupiahNilai B' dariA>15th ?DepresiasiA>15th ?2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI7,512.00RupiahE1750575,000,0003.Perawatan dan(12,5 % - 17,5 %) x B'K1,462.50Rupiah41383,333,333perbaikan =W'32230,000,00023115,000,0004.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah1438,333,3335.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah050-160Biaya Operasi per Jam =(H+I+K+L+M)P50,725.07Rupiah-2738,333,333-38115,000,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S54,742.83Rupiah-49230,000,000-510383,333,333-611575,000,000E.LAIN - LAIN-712805,000,0001.Tingkat Suku Bungai15.00% / Tahun-8131,073,333,3332.Upah Operator / SopirU112,142.86Rp./Jam-9141,380,000,0003.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam15> 15th ?4.Bahan Bakar BensinMb5,833.80LiterKondisi AlatUmur >10 th.5.Bahan Bakar SolarMs6,774.00LiterNilai B' dariA>15th ?6.Minyak PelumasMp25,040.00LiterDepresiasiA>15th ?7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanE1850750,000,00041500,000,00032300,000,000URAIAN ANALISA ALAT23150,000,0001450,000,000050No.U R A I A NKODEKOEF.SATUANKET.-160-2750,000,000-38150,000,000A.URAIAN PERALATAN-49300,000,0001.Jenis PeralatanCRANE 10-15 TONE07-510500,000,0002.TenagaPw150.0HP-611750,000,0003.KapasitasCp25.0Ton-7121,050,000,0004.Alat Baru :a. Umur EkonomisA5.0Tahun-8131,400,000,000b. Jam Kerja Dalam 1 TahunW2,000.0Jam-9141,800,000,000c. Harga AlatB1,044,000,000Rupiah15> 15th ?5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baruKondisi AlatUmur >10 th.b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruNilai B' dariA>15th ?c. Harga Alat (*)B'1,044,000,000RupiahAlat baruDepresiasiA>15th ?B.BIAYA PASTI PER JAM KERJAE1940581,000,0001.Nilai Sisa Alat= 10 % x BC104,400,000Rupiah31348,600,00022174,300,0002.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-1358,100,000(1 + i)^A' - 10403.Biaya Pasti per Jam :-150a. Biaya Pengembalian Modal =( B' - C ) x DE140,148.65Rupiah-2658,100,000W'-37174,300,000-48348,600,000b. Asuransi, dll =0.002x B'F1,044.00Rupiah-59581,000,000W'-610871,500,000-7111,220,100,000Biaya Pasti per Jam =( E + F )G141,192.65Rupiah-8121,626,800,000-9132,091,600,000C.BIAYA OPERASI PER JAM KERJA-10142,614,500,00010> 15th ?1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH127,012.50RupiahKondisi AlatUmur >10 th.Nilai B' dariA>15th ?2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI37,560.00RupiahDepresiasiA>15th ?3.Perawatan dan(12,5 % - 17,5 %) x B'K65,250.00RupiahE20408,000,000perbaikan =W'314,800,000222,400,0004.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah13800,0005.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah040-150Biaya Operasi per Jam =(H+I+K+L+M)P251,251.07Rupiah-26800,000-372,400,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S392,443.72Rupiah-484,800,000-598,000,000-61012,000,000E.LAIN - LAIN-71116,800,0001.Tingkat Suku Bungai15.00% / Tahun-81222,400,0002.Upah Operator / SopirU112,142.86Rp./Jam-91328,800,0003.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam-101436,000,0004.Bahan Bakar BensinMb5,833.80Liter10> 15th ?5.Bahan Bakar SolarMs6,774.00LiterKondisi AlatUmur >10 th.6.Minyak PelumasMp25,040.00LiterNilai B' dariA>15th ?7.PPN diperhitungkan pada lembar RekapitulasiDepresiasiA>15th ?Biaya PekerjaanE21501,020,000,00041680,000,000URAIAN ANALISA ALAT32408,000,00023204,000,0001468,000,000No.U R A I A NKODEKOEF.SATUANKET.050-160-2768,000,000A.URAIAN PERALATAN-38204,000,0001.Jenis PeralatanDUMP TRUCK 3-4 M3E08-49408,000,0002.TenagaPw100.0HP-510680,000,0003.KapasitasCp6.0Ton-6111,020,000,0004.Alat Baru :a. Umur EkonomisA5.0Tahun-7121,428,000,000b. Jam Kerja Dalam 1 TahunW2,000.0Jam-8131,904,000,000c. Harga AlatB204,000,000Rupiah-9142,448,000,0005.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru15> 15th ?b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruKondisi AlatUmur >10 th.c. Harga Alat (*)B'204,000,000RupiahAlat baruNilai B' dariA>15th ?DepresiasiA>15th ?B.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC20,400,000RupiahE22207,500,000112,500,0002.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-020(1 + i)^A' - 1-1303.Biaya Pasti per Jam :-242,500,000a. Biaya Pengembalian Modal =( B' - C ) x DE27,385.37Rupiah-357,500,000W'-4615,000,000-5725,000,000b. Asuransi, dll =0.002x B'F204.00Rupiah-6837,500,000W'-7952,500,000-81070,000,000Biaya Pasti per Jam =( E + F )G27,589.37Rupiah-91190,000,000-1012112,500,000C.BIAYA OPERASI PER JAM KERJA-1113137,500,000-1214165,000,0001.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH84,675.00Rupiah3> 15th ?Kondisi AlatUmur >10 th.2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI25,040.00RupiahNilai B' dariA>15th ?DepresiasiA>15th ?3.Perawatan dan(12,5 % - 17,5 %) x B'K12,750.00Rupiahperbaikan =W'E2350150,000,00041100,000,0004.Operator= ( 1 Orang / Jam ) x U1L9,285.71Rupiah3260,000,0005.Pembantu Operator= ( 1 Orang / Jam ) x U2M8,571.43Rupiah2330,000,0001410,000,000Biaya Operasi per Jam =(H+I+K+L+M)P140,322.14Rupiah050-160D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S167,911.51Rupiah-2710,000,000-3830,000,000-4960,000,000E.LAIN - LAIN-510100,000,0001.Tingkat Suku Bungai15.00% / Tahun-611150,000,0002.Upah Operator / Sopir / MekanikU19,285.71Rp./Jam-712210,000,0003.Upah Pembantu Operator / Pmb.Sopir / Pmb.MekanikU28,571.43Rp./Jam-813280,000,0004.Bahan Bakar BensinMb5,833.80Liter-914360,000,0005.Bahan Bakar SolarMs6,774.00Liter15> 15th ?6.Minyak PelumasMp25,040.00LiterKondisi AlatUmur >10 th.7.PPN diperhitungkan pada lembar RekapitulasiNilai B' dariA>15th ?Biaya PekerjaanDepresiasiA>15th ?E244018,500,000URAIAN ANALISA ALAT3111,100,000225,550,000131,850,000No.U R A I A NKODEKOEF.SATUANKET.040-150-261,850,000A.URAIAN PERALATAN-375,550,0001.Jenis PeralatanDUMP TRUCKE09-4811,100,0002.TenagaPw125.0HP-5918,500,0003.KapasitasCp8.0Ton-61027,750,0004.Alat Baru :a. Umur EkonomisA5.0Tahun-71138,850,000b. Jam Kerja Dalam 1 TahunW2,000.0Jam-81251,800,000c. Harga AlatB342,000,000Rupiah-91366,600,0005.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru-101483,250,000b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baru10> 15th ?c. Harga Alat (*)B'342,000,000RupiahAlat baruKondisi AlatUmur >10 th.Nilai B' dariA>15th ?B.BIAYA PASTI PER JAM KERJADepresiasiA>15th ?1.Nilai Sisa Alat= 10 % x BC34,200,000RupiahE25403,000,0002.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-311,800,000(1 + i)^A' - 122900,0003.Biaya Pasti per Jam :13300,000a. Biaya Pengembalian Modal =( B' - C ) x DE45,910.76Rupiah040W'-150-26300,000b. Asuransi, dll =0.002x B'F342.00Rupiah-37900,000W'-481,800,000-593,000,000Biaya Pasti per Jam =( E + F )G46,252.76Rupiah-6104,500,000-7116,300,000C.BIAYA OPERASI PER JAM KERJA-8128,400,000-91310,800,0001.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH105,843.75Rupiah-101413,500,00010> 15th ?2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI31,300.00RupiahKondisi AlatUmur >10 th.Nilai B' dariA>15th ?3.Perawatan dan(12,5 % - 17,5 %) x B'K21,375.00RupiahDepresiasiA>15th ?perbaikan =W'E26403,500,0004.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah312,100,0005.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah221,050,00013350,000Biaya Operasi per Jam =(H+I+K+L+M)P179,947.32Rupiah040-150D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S226,200.08Rupiah-26350,000-371,050,000-482,100,000E.LAIN - LAIN-593,500,0001.Tingkat Suku Bungai15.00% / Tahun-6105,250,0002.Upah Operator / Sopir / MekanikU112,142.86Rp./Jam-7117,350,0003.Upah Pembantu Operator / Pmb.Sopir / Pmb.MekanikU29,285.71Rp./Jam-8129,800,0004.Bahan Bakar BensinMb5,833.80Liter-91312,600,0005.Bahan Bakar SolarMs6,774.00Liter-101415,750,0006.Minyak PelumasMp25,040.00Liter10> 15th ?7.PPN diperhitungkan pada lembar RekapitulasiKondisi AlatUmur >10 th.Biaya PekerjaanNilai B' dariA>15th ?DepresiasiA>15th ?URAIAN ANALISA ALATE275046,000,0004130,666,6673218,400,000No.U R A I A NKODEKOEF.SATUANKET.239,200,000143,066,667050A.URAIAN PERALATAN-1601.Jenis PeralatanEXCAVATOR 80-140 HPE10-273,066,6672.TenagaPw133.0HP-389,200,0003.KapasitasCp0.7M3-4918,400,0004.Alat Baru :a. Umur EkonomisA5.0Tahun-51030,666,667b. Jam Kerja Dalam 1 TahunW2,000.0Jam-61146,000,000c. Harga AlatB850,000,000Rupiah-71264,400,0005.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru-81385,866,667b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baru-914110,400,000c. Harga Alat (*)B'850,000,000RupiahAlat baru15> 15th ?Kondisi AlatUmur >10 th.B.BIAYA PASTI PER JAM KERJANilai B' dariA>15th ?1.Nilai Sisa Alat= 10 % x BC85,000,000RupiahDepresiasiA>15th ?2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-E285046,000,000(1 + i)^A' - 14130,666,6673.Biaya Pasti per Jam :3218,400,000a. Biaya Pengembalian Modal =( B' - C ) x DE114,105.70Rupiah239,200,000W'143,066,667050b. Asuransi, dll =0.002x B'F850.00Rupiah-160W'-273,066,667-389,200,000Biaya Pasti per Jam =( E + F )G114,955.70Rupiah-4918,400,000-51030,666,667C.BIAYA OPERASI PER JAM KERJA-61146,000,000-71264,400,0001.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH112,617.75Rupiah-81385,866,667-914110,400,0002.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI33,303.20Rupiah15> 15th ?Kondisi AlatUmur >10 th.3.Perawatan dan(12,5 % - 17,5 %) x B'K53,125.00RupiahNilai B' dariA>15th ?perbaikan =W'DepresiasiA>15th ?4.Operator= ( 1 Orang / Jam ) x U1L12,142.86RupiahE295046,000,0005.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71Rupiah4130,666,6673218,400,000Biaya Operasi per Jam =(H+I+K+L+M)P220,474.52Rupiah239,200,000143,066,667D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S335,430.22Rupiah050-160-273,066,667E.LAIN - LAIN-389,200,0001.Tingkat Suku Bungai15.00% / Tahun-4918,400,0002.Upah Operator / SopirU112,142.86Rp./Jam-51030,666,6673.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam-61146,000,0004.Bahan Bakar BensinMb5,833.80Liter-71264,400,0005.Bahan Bakar SolarMs6,774.00Liter-81385,866,6676.Minyak PelumasMp25,040.00Liter-914110,400,0007.PPN diperhitungkan pada lembar Rekapitulasi15> 15th ?Biaya PekerjaanKondisi AlatUmur >10 th.Nilai B' dariA>15th ?DepresiasiA>15th ?URAIAN ANALISA ALATE305046,000,0004130,666,667No.U R A I A NKODEKOEF.SATUANKET.3218,400,000239,200,000143,066,667A.URAIAN PERALATAN0501.Jenis PeralatanFLAT BED TRUCK 3-4 M3E11-1602.TenagaPw190.0HP-273,066,6673.KapasitasCp10.0M3-389,200,0004.Alat Baru :a. Umur EkonomisA5.0Tahun-4918,400,000b. Jam Kerja Dalam 1 TahunW2,000.0Jam-51030,666,667c. Harga AlatB170,000,000Rupiah-61146,000,0005.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru-71264,400,000b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baru-81385,866,667c. Harga Alat (*)B'170,000,000RupiahAlat baru-914110,400,00015> 15th ?B.BIAYA PASTI PER JAM KERJAKondisi AlatUmur >10 th.1.Nilai Sisa Alat= 10 % x BC17,000,000RupiahNilai B' dariA>15th ?DepresiasiA>15th ?2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 1315046,000,0003.Biaya Pasti per Jam :4130,666,667a. Biaya Pengembalian Modal =( B' - C ) x DE22,821.14Rupiah3218,400,000W'239,200,000143,066,667b. Asuransi, dll =0.002x B'F170.00Rupiah050W'-160-273,066,667Biaya Pasti per Jam =( E + F )G22,991.14Rupiah-389,200,000-4918,400,000C.BIAYA OPERASI PER JAM KERJA-51030,666,667-61146,000,0001.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH160,882.50Rupiah-71264,400,000-81385,866,6672.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI47,576.00Rupiah-914110,400,00015> 15th ?3.Perawatan dan(12,5 % - 17,5 %) x B'K10,625.00RupiahKondisi AlatUmur >10 th.perbaikan =W'Nilai B' dariA>15th ?DepresiasiA>15th ?4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahE325046,000,0004130,666,667Biaya Operasi per Jam =(H+I+K+L+M)P240,512.07Rupiah3218,400,000239,200,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S263,503.21Rupiah143,066,667050-160E.LAIN - LAIN-273,066,6671.Tingkat Suku Bungai15.00% / Tahun-389,200,0002.Upah Operator / SopirU112,142.86Rp./Jam-4918,400,0003.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam-51030,666,6674.Bahan Bakar BensinMb5,833.80Liter-61146,000,0005.Bahan Bakar SolarMs6,774.00Liter-71264,400,0006.Minyak PelumasMp25,040.00Liter-81385,866,6677.PPN diperhitungkan pada lembar Rekapitulasi-914110,400,000Biaya Pekerjaan15> 15th ?Kondisi AlatUmur >10 th.Nilai B' dariA>15th ?URAIAN ANALISA ALATDepresiasiA>15th ?E335046,000,000No.U R A I A NKODEKOEF.SATUANKET.4130,666,6673218,400,000239,200,000A.URAIAN PERALATAN143,066,6671.Jenis PeralatanGENERATOR SETE120502.TenagaPw180.0HP-1603.KapasitasCp135.0KVA-273,066,6674.Alat Baru :a. Umur EkonomisA5.0Tahun-389,200,000b. Jam Kerja Dalam 1 TahunW2,000.0Jam-4918,400,000c. Harga AlatB225,000,000Rupiah-51030,666,6675.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru-61146,000,000b. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baru-71264,400,000c. Harga Alat (*)B'225,000,000RupiahAlat baru-81385,866,667-914110,400,000B.BIAYA PASTI PER JAM KERJA15> 15th ?1.Nilai Sisa Alat= 10 % x BC22,500,000RupiahKondisi AlatUmur >10 th.Nilai B' dariA>15th ?2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-DepresiasiA>15th ?(1 + i)^A' - 13.Biaya Pasti per Jam :1Usia 1 th.a. Biaya Pengembalian Modal =( B' - C ) x DE30,204.45Rupiah2Usia 2 th.W'3Usia 3 th.4Usia 4 th.b. Asuransi, dll =0.002x B'F225.00Rupiah5Usia 5 th.W'6Usia 6 th.7Usia 7 th.Biaya Pasti per Jam =( E + F )G30,429.45Rupiah8Usia 8 th.9Usia 9 th.C.BIAYA OPERASI PER JAM KERJA10Usia 10 th.1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH152,415.00Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI45,072.00Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K14,062.50Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P232,978.07RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S263,407.52RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanMOTOR GRADER >100 HPE132.TenagaPw135.0HP3.KapasitasCp--4.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB875,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'875,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC87,500,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE117,461.75RupiahW'b. Asuransi, dll =0.002x B'F875.00RupiahW'Biaya Pasti per Jam =( E + F )G118,336.75RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH114,311.25Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI33,804.00Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K54,687.50Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P224,231.32RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S342,568.07RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanTRACK LOADER 75-100 HPE142.TenagaPw70.0HP3.KapasitasCp0.8M34.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB567,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'567,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC56,700,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE76,115.21RupiahW'b. Asuransi, dll =0.002x B'F567.00RupiahW'Biaya Pasti per Jam =( E + F )G76,682.21RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH59,272.50Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI17,528.00Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K35,437.50Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P133,666.57RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S210,348.78RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanWHEEL LOADER 1.0-1.6 M3E152.TenagaPw96.0HP3.KapasitasCp1.5M34.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB600,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'600,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC60,000,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE80,545.20RupiahW'b. Asuransi, dll =0.002x B'F600.00RupiahW'Biaya Pasti per Jam =( E + F )G81,145.20RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH81,288.00Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI24,038.40Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K37,500.00Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P164,254.97RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S245,400.17RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanTHREE WHEEL ROLLER 6-8 TE162.TenagaPw55.0HP3.KapasitasCp8.0Ton4.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB300,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'300,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC30,000,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE40,272.60RupiahW'b. Asuransi, dll =0.002x B'F300.00RupiahW'Biaya Pasti per Jam =( E + F )G40,572.60RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH46,571.25Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI13,772.00Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K18,750.00Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P100,521.82RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S141,094.42RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanTANDEM ROLLER 6-8 T.E172.TenagaPw82.0HP3.KapasitasCp8.1Ton4.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB575,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'575,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC57,500,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE77,189.15RupiahW'b. Asuransi, dll =0.002x B'F575.00RupiahW'Biaya Pasti per Jam =( E + F )G77,764.15RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH69,433.50Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI20,532.80Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K35,937.50Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P147,332.37RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S225,096.52RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanTIRE ROLLER 8-10 T.E182.TenagaPw100.5HP3.KapasitasCp9.0Ton4.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW1,800.0Jamc. Harga AlatB750,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'1,800.0JamAlat baruc. Harga Alat (*)B'750,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC75,000,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE111,868.33RupiahW'b. Asuransi, dll =0.002x B'F833.33RupiahW'Biaya Pasti per Jam =( E + F )G112,701.67RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH85,098.38Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI25,165.20Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K52,083.33Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P183,775.48RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S296,477.15RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanVIBRATORY ROLLER 5-8 T.E192.TenagaPw82.0HP3.KapasitasCp7.1Ton4.Alat Baru :a. Umur EkonomisA4.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB581,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'4.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'581,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJARFH1.Nilai Sisa Alat= 10 % x BC58,100,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.35027-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE91,576.88RupiahW'b. Asuransi, dll =0.002x B'F581.00RupiahW'Biaya Pasti per Jam =( E + F )G92,157.88RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH69,433.50Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI20,532.80Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K36,312.50Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P147,707.37RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S239,865.25RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanCONCRETE VIBRATORE202.TenagaPw5.5HP3.KapasitasCp--4.Alat Baru :a. Umur EkonomisA4.0Tahunb. Jam Kerja Dalam 1 TahunW1,000.0Jamc. Harga AlatB8,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'4.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'1,000.0JamAlat baruc. Harga Alat (*)B'8,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC800,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.35027-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE2,521.91RupiahW'b. Asuransi, dll =0.002x B'F16.00RupiahW'Biaya Pasti per Jam =( E + F )G2,537.91RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH4,657.13Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI1,377.20Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K1,000.00Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P28,462.90RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S31,000.81RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanSTONE CRUSHERE212.TenagaPw220.0HP3.KapasitasCp50.0T/Jam4.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB1,020,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'1,020,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC102,000,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE136,926.84RupiahW'b. Asuransi, dll =0.002x B'F1,020.00RupiahW'Biaya Pasti per Jam =( E + F )G137,946.84RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH186,285.00Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI55,088.00Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K63,750.00Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 2 Orang / Jam ) x U2M18,571.43RupiahBiaya Operasi per Jam =(H+I+K+L+M)P335,837.29RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S473,784.12RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanWATER PUMP 70-100 mmE222.TenagaPw6.0HP3.KapasitasCp--4.Alat Baru :a. Umur EkonomisA2.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB7,500,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'2.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'7,500,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC750,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.61512-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE2,076.02RupiahW'b. Asuransi, dll =0.002x B'F7.50RupiahW'Biaya Pasti per Jam =( E + F )G2,083.52RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH5,080.50Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI1,502.40Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K468.75Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P28,480.22RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S30,563.74RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanWATER TANKER 3000-4500 L.E232.TenagaPw100.0HP3.KapasitasCp4,000.0Liter4.Alat Baru :a. Umur EkonomisA5.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB150,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat barub. Jam Kerja Dalam 1 TahunW'2,000.0JamAlat baruc. Harga Alat (*)B'150,000,000RupiahAlat baruB.BIAYA PASTI PER JAM KERJA1.Nilai Sisa Alat= 10 % x BC15,000,000Rupiah2.Faktor Angsuran Modal =i x (1 + i)^A'D0.29832-(1 + i)^A' - 13.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE20,136.30RupiahW'b. Asuransi, dll =0.002x B'F150.00RupiahW'Biaya Pasti per Jam =( E + F )G20,286.30RupiahC.BIAYA OPERASI PER JAM KERJA1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x MsH84,675.00Rupiah2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI25,040.00Rupiah3.Perawatan dan(12,5 % - 17,5 %) x B'K9,375.00Rupiahperbaikan =W'4.Operator= ( 1 Orang / Jam ) x U1L12,142.86Rupiah5.Pembantu Operator= ( 1 Orang / Jam ) x U2M9,285.71RupiahBiaya Operasi per Jam =(H+I+K+L+M)P140,518.57RupiahD.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S160,804.87RupiahE.LAIN - LAIN1.Tingkat Suku Bungai15.00% / Tahun2.Upah Operator / SopirU112,142.86Rp./Jam3.Upah Pembantu Operator / Pmb.SopirU29,285.71Rp./Jam4.Bahan Bakar BensinMb5,833.80Liter5.Bahan Bakar SolarMs6,774.00Liter6.Minyak PelumasMp25,040.00Liter7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanURAIAN ANALISA ALATNo.U R A I A NKODEKOEF.SATUANKET.A.URAIAN PERALATAN1.Jenis PeralatanPEDESTRIAN ROLLERE242.TenagaPw8.8HP3.KapasitasCp835.000Ton4.Alat Baru :a. Umur EkonomisA4.0Tahunb. Jam Kerja Dalam 1 TahunW2,000.0Jamc. Harga AlatB180,000,000Rupiah5.Alat Yang Dipakai :a. Umur EkonomisA'4.0TahunAlat barub. Jam K