14
S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

Embed Size (px)

Citation preview

Page 1: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

S-2S MEMONew WC test

13 May 2015Toshiyuki Gogami

Page 3: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

Window cover

Page 4: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

PTM attachment with optical grease

Page 5: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

LED attachment on PMT

Page 6: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

Light shield check

Page 7: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

LED wiring

LED Signal

HV

Page 8: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

PMT signal check detecting LED light

LED ONLED OFF

Page 10: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

Started taking data on 2015/4/21

Page 11: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

Data phase

• Phase 1 (4/21 – 4/25); 作り立て• Phase 2 (5/11 – ); 作ってしばらく後

Page 13: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

One of the results for phase 1

At y = 0 cm, (PMT1, PMT2, Sum ) = (77.8±0.3, 99.0±0.4, 176.5±0.7)

蓋側(前回のミテーィングで話した不感領域がある方 )

Page 14: S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami

One of the results for phase 1

At y = 0 cm, (PMT1, PMT2, Sum ) = (77.8±0.3, 99.0±0.4, 176.5±0.7)

Analysis detail for phase 1

and results for phase 2 are coming soon !!!!!