1

Click here to load reader

Site Visit to Central Wanchai Bypass 3.5.2014 Notice

Embed Size (px)

Citation preview

Page 1: Site Visit to Central Wanchai Bypass 3.5.2014 Notice

Room 1801-1804, China Merchants Building, 152 Connaught Road Central, Sheung Wan, Hong Kong 香港上環干諾道中 152 號招商局大廈 1801-1804 室

Tel: 2901 0848 / 2901 0898 Fax: 2501 0162 E-mail: [email protected] Website: www.aesnet.com.hk

To: AES Members

SiteSiteSiteSite Visit to Visit to Visit to Visit to CentralCentralCentralCentral ---- WanWanWanWan C C C Chai Bypasshai Bypasshai Bypasshai Bypass on on on on SaturdaySaturdaySaturdaySaturday,,,, 3 May 20143 May 20143 May 20143 May 2014

The Central - Wan Chai Bypass and Island Eastern Corridor Link under construction forms part of an east-west strategic route along the north shore of Hong Kong Island, which serves to alleviate the traffic congestion along the existing Gloucester Road - Harcourt Road - Connaught Road Central corridor. The Project includes construction of a 4.5 km long dual three-lane trunk road with a 3.7 km long tunnel, connecting the Rumsey Street Flyover at Central with the Island Eastern Corridor at North Point near City Garden. Our Association is organising a site visit to help our members understand the Project with close up explanation of construction details. Details of the visit are as follows.

Date: Saturday, 3 May 2014

Time: 8:45 a.m. - 11:00 a.m.

Assembly Place: Central Community Liaison Centre

Fee: Free of Charge (Members only) Attendance certificate will be provided after the visit. Bookings will be accepted on a first-come-first-served basis. For reservation, please complete and return the following reply slip to AES Secretariat, either by fax: 2501 0162 or email: [email protected] by Monday, 14 April 2014. For enquiries, please contact Ms Joyce Lee / Ms Shirley Tam at Tel: 2901 0848 / 2901 0898. AES Secretariat 26 March 2014

SiteSiteSiteSite Visit to Visit to Visit to Visit to CentralCentralCentralCentral ---- WanWanWanWan C C C Chai Bypasshai Bypasshai Bypasshai Bypass on Saturday, on Saturday, on Saturday, on Saturday, 3 May 20143 May 20143 May 20143 May 2014

REPLY SLIP (Please return by Monday, 14 April 2014)

Name (Ir/Prof/Dr/Mr/Ms): ____________________________________________________ Company: ______________________________________ Position:____________________ Tel: _______________ Mobile No.:______________ Email:__________________________ -------------------------------------------- ---------------------------------------- Signature Date