    Welcome to this presentation. It shows the activities and documents of the different engineering disciplines (process, piping, civil etc.) for the engineering of a Process Plant. It covers the 2 common stages of engineering development: BASIC Engineering DETAIL Engineering

    . ( , , ..) . 2 - :

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    BASIC ENGINEERING

    Engineering/

    Documents for Inquiry / : Bill of Materials / specifications / /

    Documents submitted to client /

    Client /

    Approval/Comments /

    Process Design Package (PDP) /

    Vendors / Sub-Contractors /

    Quotations /

    Inquiries /

    Cost Estimate Department /

  • HERVE BARON

    2016 Herv Baron

    DETAIL ENGINEERING

    Engineering /

    Documents for Purchase / : bill of quantity & specification/ /

    Documents for Construction / : Construction drawings & specifications /

    Client /

    Design basis / : - Functional requirements /

    - Client specifications /

    - Design codes /

    Vendors /

    Documents submission /

    Comments /

    Approval/Comments /

    Documents submitted to client /

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING ORGANISATION

    Engineering /

    Instruments & Control

    Layout & Piping

    Process

    Electrical

    Equipment/Mechanical

    Civil

    Safety

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING DOCUMENT REGISTER

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING DOCUMENT REGISTER

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING DOCUMENT REGISTER

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING DOCUMENT REGISTER

  • HERVE BARON

    2016 Herv Baron

    LIST OF COMMON ENGINEERING DELIVERABLES (1/2) (1/2)

  • HERVE BARON

    2016 Herv Baron

    LIST OF COMMON ENGINEERING DELIVERABLES (2/2) (2/2)

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING DOCUMENT QUALITY REQUIREMENTS: CHECKING :

    Discipline self check

    Inter-Discipline Check (IDC) ()

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING DOCUMENT REVISION

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING MASTERS

  • HERVE BARON

    2016 Herv Baron

    ENGINEERING REVIEW ACTION ITEMS FOLLOW-UP

  • HERVE BARON

    2016 Herv Baron

    Key plan /

    Diagrams /

    Drawings /

  • HERVE BARON

    2016 Herv Baron

    18

    Plan view /

    Elevation view /

  • HERVE BARON

    2016 Herv Baron

    Section /

    Plan view /

  • HERVE BARON

    2016 Herv Baron

    GRID SYSTEM

  • HERVE BARON

    2016 Herv Baron

    GRID SYSTEM

  • HERVE BARON

    2016 Herv Baron

    DETAIL

  • HERVE BARON

    2016 Herv Baron

    DRAWINGS COMMON SIZES & SCALES

    Scale 1m =

    1/1000 1 mm

    1/500 2 mm

    1/250 4 mm

    1/100 1 cm

    1/50 2 cm

    1/33 3 cm

    A0 = 840x1188

    A1 = 594x840

    A2 = 420x594

    A4 = 210x297

    A3 = 297x420

  • HERVE BARON

    2016 Herv Baron

    SPECIFICATIONS /

  • HERVE BARON

    2016 Herv Baron

    BASIC ENGINEERING DESIGN DATA

    Process facilities / : Feedstock and products flow / Feedstock composition / Battery limit conditions / Equipment Spare / Performance / : Products specifications / Energy efficiency, emissions / , Utilities / : Electric power supply / Other utilities / Systems / : Process control / Fire/gas alarm / Public address, LAN, PABX / , LAN, PABX

    0 5

    10 15 20 25 30 35 40 45 50

    -85 -80 -75 -70 -65 -60 -55

    Pre

    ssu

    re (

    ba

    r) Infrastructure / :

    Administrative and technical buildings Control room / Access road / Site fencing, gates, check point / . , , - Design criteria / : % of over design / % Environment data / . : Min/max temperature / ./. Rain/snow fall / (/) Wind / Geological conditions / Applicable codes and standards / : International standards / Local rules /

    Pressure (bar)

    Hydrates Curve

    Phase Envelope

    Temperature (C)

    25

    20

    15

    10

    5

    0

    -5

    -10

    -15

    -20

    -25

    -30

    -35

    -40

    -45

    -50

    -55

    -60

    -65

    -70

    -75

    -80

    -85

    80

    75

    70

    65

    60

    55

    50

    45

    40

    35

    30

    25

    20

    15

    10

    5

    0

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (1/2) (1/2)

  • HERVE BARON

    2016 Herv Baron

    FUNCTIONAL REQUIREMENTS E.G. GAS COMPRESSOR STATION . .

    Gas composition / Performance /

  • HERVE BARON

    2016 Herv Baron

    PROCESS FLOW DIAGRAM (PFD)

  • HERVE BARON

    2016 Herv Baron

    PROCESS SIMULATIONS

  • HERVE BARON

    2016 Herv Baron

    PROCESS SCHEME OPTIMIZATION

    HP Separator / 500 psig

    5500 psig

    Emul. Treater / 50 psig 150 F

    3000 psig

    200 psig

    Degasser / 5 psig

    5 psig

    50 psig

    1200 psig Gas Injection /

    Oil Production /

    From Wells / 165 - 205 F

    500 psig

    HP Compression & TEG / TEG

    LP Compression /

    TEG

    Cooler /

    IP Compression /

  • HERVE BARON

    2016 Herv Baron

    EQUIPMENT LIST

  • HERVE BARON

    2016 Herv Baron

    HEAT & MATERIAL BALANCE

    Thermodynamic calculations /

  • HERVE BARON

    2016 Herv Baron

    PROCESS DATA SHEET

  • HERVE BARON

    2016 Herv Baron

    EQUIPMENT SIZING

  • HERVE BARON

    2016 Herv Baron

    FLUID LIST

  • HERVE BARON

    2016 Herv Baron

    PIPING & INSTRUMENTATION DIAGRAM (P&ID)

    Line List /

  • HERVE BARON

    2016 Herv Baron

    PIPING & INSTRUMENTATION DIAGRAM (P&ID)

  • HERVE BARON

    2016 Herv Baron

    P&IDS LEGEND & SYMBOLS -

  • HERVE BARON

    2016 Herv Baron

    LINE SIZING

  • HERVE BARON

    2016 Herv Baron

    PROCESS CAUSES & EFFECTS CHART -

  • HERVE BARON

    2016 Herv Baron

    PROCESS DESCRIPTION AND OPERATING PHILOSOPHY

  • HERVE BARON

    2016 Herv Baron

    ESD CAUSES & EFFECTS CHARTS -

  • HERVE BARON

    2016 Herv Baron

    ESD SIMPLIFIED DIAGRAM

  • HERVE BARON

    2016 Herv Baron

    FLARE STUDY

  • HERVE BARON

    2016 Herv Baron

    OPERATING MANUAL

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (1/2)

  • HERVE BARON

    2016 Herv Baron

    PROCESS EQUIPMENT LIST

  • HERVE BARON

    2016 Herv Baron

    ROTATING MACHINERY

  • HERVE BARON

    2016 Herv Baron

    PRESSURE VESSELS

  • HERVE BARON

    2016 Herv Baron

    HEAT EXCHANGERS

  • HERVE BARON

    2016 Herv Baron

    PACKAGES

  • HERVE BARON

    2016 Herv Baron

    DATA SHEET / SPECIFICATION /

  • HERVE BARON

    2016 Herv Baron

    PROCESS DATA SHEET / MECHANICAL DATA SHEET /

  • HERVE BARON

    2016 Herv Baron

    VESSEL GUIDE DRAWING

  • HERVE BARON

    2016 Herv Baron

    MATERIAL REQUISITION /

    Western Engineering Company MATERIAL REQUISITION /

    Russian Design Institute / TECHNICAL PART OF ORDER

  • HERVE BARON

    2016 Herv Baron

    VENDOR DESIGN

  • HERVE BARON

    2016 Herv Baron

    BID TECHNICAL EVALUATION

    Supplier 1 Supplier 2 Requirements

  • HERVE BARON

    2016 Herv Baron

    VENDOR DESIGN DEVELOPMENT

  • HERVE BARON

    2016 Herv Baron

    EQUIPMENT SUMMARY

  • HERVE BARON

    2016 Herv Baron

    Package / Centralized control /

  • HERVE BARON

    2016 Herv Baron

    Package / Local control /

  • HERVE BARON

    2016 Herv Baron

    THE WORK OF THE EQUIPMENT SPECIALIST

    Process design /

    PFDs / H&M balance

    Rotating equipment / Pressure vessels / Fired equipment / Heat exchangers / Packages etc. / ..

    Process data sheet /

    Equipment specification & Data Sheets /

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (2/2) (2/2)

  • HERVE BARON

    2016 Herv Baron

    HAZOP REVIEW / DEVIATION (HAZOP ) /

    Too much, too little, no , ,

    Flow, Pressure, Temperature / , ,

  • HERVE BARON

    2016 Herv Baron

    Too much, too little, no , ,

    Flow, Pressure, Temperature / , ,

    HAZOP REVIEW / DEVIATION (HAZOP ) /

  • HERVE BARON

    2016 Herv Baron

    HAZOP ACTION AND RESPONSE SHEET HAZOP

  • HERVE BARON

    2016 Herv Baron

    SAFETY OF LAYOUT

  • HERVE BARON

    2016 Herv Baron

    FIRE FIGHTING

  • HERVE BARON

    2016 Herv Baron

    FIRE FIGHTING

  • HERVE BARON

    2016 Herv Baron

    FIRE FIGHTING

    Nozzle Arrangement /

    Piping Arrangement /

    / :

    /

    /

  • HERVE BARON

    2016 Herv Baron

    FIRE WATER P&IDS

  • HERVE BARON

    2016 Herv Baron

    FIRE FIGHTING EQUIPMENT LOCATION DRAWING

  • HERVE BARON

    2016 Herv Baron

    PASSIVE FIRE PROTECTION

  • HERVE BARON

    2016 Herv Baron

    PASSIVE FIRE PROTECTION

  • HERVE BARON

    2016 Herv Baron

    FIRE & GAS DETECTION LAYOUTS

  • HERVE BARON

    2016 Herv Baron

    FIRE & GAS MATRIX

  • HERVE BARON

    2016 Herv Baron HAZARDOUS AREA CLASSIFICATION DRAWINGS

    Legend /

  • HERVE BARON

    2016 Herv Baron

    Case study: Gas leak from random piping component rupture Cause: installation error, corrosion, material defect Possible consequence: Dispersion without ignition / jet fire / flash fire / explosion Section considered: Compressor building

    QUANTITATIVE RISK ANALYSIS (QRA)

    : - : , , : / / / :

  • HERVE BARON

    2016 Herv Baron

    QUANTITATIVE RISK ANALYSIS (QRA)

    Step 1 / 1:

    Identification and characterisation of initiating events

    Gas leak inside compressor buidling due to component rupture Hole size (% of component section)

    5% 20% Full

    Frequency (event/year) 1,11E-01 5,06E-04 6,83E-05

    Outflow rate (kg/s) 5,7 90,8 2270,0

    risk components *failure rate (from statistics) /

  • HERVE BARON

    2016 Herv Baron

    QUANTITATIVE RISK ANALYSIS (QRA)

    Release Frequency Immediate ignition

    ESD & Fire Fighting

    Delayed Ignition

    Explosion/ Flash-fire

    Consequence Event Frequency (ev/y)

    0,998 Jet fire ESD & FF 7,779E-030,070

    0,002 Jet fire no ESD & FF 1,520E-05

    1,11E-01Release/yr

    0,949 Dispersion 9,827E-020,930

    0,120 Explosion 1,774E-050,028

    0,051 0,880 Flash fire 1,301E-04

    0,972 Dispersion 5,133E-03

    Yes Frequency (event/year)Jet fire ESD & FF 7,779E-03Jet fire no ESD & FF 1,520E-05Explosion 1,774E-05

    No Flash Fire 1,301E-04Dispersion 1,034E-01

    B04a/b/c/d 5%

    Probability of immediate ignition for 1-50 kg/s release rate is 7% (from statistical data).

    1-50 / 7% ( ).

    Gas detectors are provided inside the building, that activate isolation and depressurization. It is assumed that they operate 95% of the time.

    ; . , 95% .

    Probability of explosion vs flash fire (12%) depends on mass of gas and degree of confinement.

    (12%) .

    Probability of delayed ignition (2.8%) takes into account equipment explosion protection (Ex).

    (2,8%) .

    Step 2 / 2: Event tree analysis /

  • HERVE BARON

    2016 Herv Baron

    QUANTITATIVE RISK ANALYSIS (QRA)

    Step 3 / 3:

    Consequence evalutation /

    Overpresssure (bar) ()

    0.2 0.1 0.01

    Distance (m) / ()

    96 167 1270

    CONSEQUENCE CLASS /

    QUANTITATIVE CRITERIA /

    EFFECTS /

    MINOR / 0.1 bar locally (within 10m) / 0.1 ( 10 )

    No effect, no damage /

    SIGNIFICANT / 0.1 bar locally (within 50m) 0.1 ( 50 )

    Limited damage to plant and operators /

    SEVERE / 0.1 bar within plant 0.1

    Damage to plant and operators /

    MAJOR / 0.1 bar on populated areas 0.1

    Damage to plant, operators & public / , .

  • HERVE BARON

    2016 Herv Baron

    QUANTITATIVE RISK ANALYSIS (QRA)

    Unacceptable risk area Design change necessary

    As Low As Reasonably Practicable Plant Management measures

    Acceptable risk area

    1.0E-02

    1.0E-03

    1.0E-04 Unlikely 1.0E-05 Rare

    1.0E-06 Minor

    Significant

    Severe

    Major

    Final step / :

    Classification of risk /

  • HERVE BARON

    2016 Herv Baron

    QUANTITATIVE RISK ANALYSIS (QRA)

    Final step / :

    Classification of risk /

  • HERVE BARON

    2016 Herv Baron

    ENVIRONMENTAL IMPACT ASSESSMENT ()

    Ground Concentration of NOx (g/m3) / NOx (/3)

    Coordinates of sources / Sources definition /

  • HERVE BARON

    2016 Herv Baron

    NOISE STUDY

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (1/2) (1/2)

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    COMPLEMENTARY (SOIL) INVESTIGATIONS SPECIFICATION ()

    Basic Design / : Typical soil sections/domains and variability / ; Local geohazards if any (liquefiable, expansive or collapsible soils,

    underground cavities) / ,

    (, , );

    Geotechnical parameters for selection of suitable earthworks and foundations options /

    .

    detail design (complementary investigations) / ( ): To define the limits of geohazards areas, if any / ; To confirm the geotechnical parameters for Geotechnical Basis of Design / ,

    ; To precise soil conditions underneath specific critical structures / ,

    .

  • HERVE BARON

    2016 Herv Baron

    GRADING PLAN

    Native soil elevation /

    Required finish level /

  • HERVE BARON

    2016 Herv Baron

    EARTHWORKS DRAWINGS

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    VENDOR INFORMATION

  • HERVE BARON

    2016 Herv Baron

    (FOUNDATION) CALCULATION NOTES ()

  • HERVE BARON

    2016 Herv Baron

    FOUNDATION DRAWING: REINFORCEMENT . .

  • HERVE BARON

    2016 Herv Baron

    FOUNDATION DRAWING: FORMWORK . .

  • HERVE BARON

    2016 Herv Baron

    CIVIL WORKS SPECIFICATION /

  • HERVE BARON

    2016 Herv Baron

    STEEL STRUCTURES, PIPE RACKS ,

  • HERVE BARON

    2016 Herv Baron

    LOADING DATA

  • HERVE BARON

    2016 Herv Baron

    STRUCTURAL DESIGN

  • HERVE BARON

    2016 Herv Baron

    CALCULATIONS

  • HERVE BARON

    2016 Herv Baron

    STRUCTURAL DESIGN DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    SHOP DRAWINGS & FABRICATION . .

  • HERVE BARON

    2016 Herv Baron

    ERECTION DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    ARCHITECTURAL DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    Discip. DeliverableARCHITECTURAL doors and finishing schedules

    ARCHITECTURAL elevation views

    ARCHITECTURAL plan views

    ARCHITECTURAL section views

    ELECTRICAL cable sizing and schedule

    ELECTRICAL distribution board schedule

    ELECTRICAL distribution diagram

    ELECTRICAL grounding layout drawing

    ELECTRICAL illumination calculation note

    ELECTRICAL lighting equipment layout drawing

    ELECTRICAL socket layout drawing

    HVAC control logic diagram

    HVAC ductwork sizing

    HVAC equipment and ducts layour drawings

    HVAC equipment list

    HVAC equipment sizing

    HVAC air flow diagram

    PLUMBING water and sewage pipe sizing

    PLUMBING water and sewage pipes layout

    SAFETY fire alarm logic diagram

    SAFETY fire detection and alarm devices layout

    SAFETY fire fighting calculations

    SAFETY fire fighting equipment layout

    STRUCTURAL bill of material for concrete re-inforcement

    STRUCTURAL details drawings

    STRUCTURAL floor drawings

    STRUCTURAL foundation drawings

    STRUCTURAL structural design calculation note

    TELECOM public address and general alarm devices layout

    TELECOM telecom equiment layout

    BUILDING DETAIL DESIGN

    Sheet1

    Discip.Deliverable

    ARCHITECTURALdoors and finishing schedules

    ARCHITECTURALelevation views

    ARCHITECTURALplan views

    ARCHITECTURALsection views

    ELECTRICALcable sizing and schedule

    ELECTRICALdistribution board schedule

    ELECTRICALdistribution diagram

    ELECTRICALgrounding layout drawing

    ELECTRICALillumination calculation note

    ELECTRICALlighting equipment layout drawing

    ELECTRICALsocket layout drawing

    HVACcontrol logic diagram

    HVACductwork sizing

    HVACequipment and ducts layour drawings

    HVACequipment list

    HVACequipment sizing

    HVACair flow diagram

    PLUMBINGwater and sewage pipe sizing

    PLUMBINGwater and sewage pipes layout

    SAFETYfire alarm logic diagram

    SAFETYfire detection and alarm devices layout

    SAFETYfire fighting calculations

    SAFETYfire fighting equipment layout

    STRUCTURALbill of material for concrete re-inforcement

    STRUCTURALdetails drawings

    STRUCTURALfloor drawings

    STRUCTURALfoundation drawings

    STRUCTURALstructural design calculation note

    TELECOMpublic address and general alarm devices layout

    TELECOMtelecom equiment layout

  • HERVE BARON

    2016 Herv Baron

    BUILDING DETAIL DRAWING / TELECOM LAYOUT . .

  • HERVE BARON

    2016 Herv Baron

    HEATING, VENTILATION & AIR CONDITIONING (HVAC) , ()

  • HERVE BARON

    2016 Herv Baron

    CIVIL WORKS INSTALLATION DRAWINGS

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    STANDARD DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (1/2) (1/2)

  • HERVE BARON

    2016 Herv Baron

    PIPING DISCIPLINE

    PIPING DISCIPLINE

    PLANT LAYOUT

    PIPING INSTALLATION

    PIPING MATERIAL

    PIPING STRESS ANALYSIS

  • HERVE BARON

    2016 Herv Baron

    PLANT LAYOUT

  • HERVE BARON

    2016 Herv Baron

    ON-SHORE PLANT: INTER-UNIT SPACING RECOMMENDATIONS (AS PER GE GAP GUIDELINES .2.5.2) :

    ( 2.5.2 GE )

  • HERVE BARON

    2016 Herv Baron

    LAYOUT/PRINCIPLES .

  • HERVE BARON

    2016 Herv Baron

    LAYOUT/PRINCIPLES .

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    LAYOUT/PRINCIPLES .

  • HERVE BARON

    2016 Herv Baron

    LAYOUT PRINCIPLES: PROVISION FOR PIPING FLEXIBILITY . .

  • HERVE BARON

    2016 Herv Baron

    LAYOUT/VENDOR DRAWINGS . .

  • HERVE BARON

    2016 Herv Baron

    LAYOUT/CONSIDERATION FOR ALL NETWORKS

  • HERVE BARON

    2016 Herv Baron

    GENERAL PLOT PLAN

  • HERVE BARON

    2016 Herv Baron

    UNIT PLOT PLAN

  • HERVE BARON

    2016 Herv Baron

    3D MODELLING 3D

  • HERVE BARON

    2016 Herv Baron

    3D MODEL CLASH CHECK 3D

  • HERVE BARON

    2016 Herv Baron

    3D MODEL REVIEW 3D

  • HERVE BARON

    2016 Herv Baron

    PIPING DISCIPLINE

    PIPING DISCIPLINE

    PLANT LAYOUT

    PIPING INSTALLATION

    PIPING MATERIAL

    PIPING STRESS ANALYSIS

  • HERVE BARON

    2016 Herv Baron

    PIPING LAYOUT DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    PIPING ROUTING/PROVISION FOR FLEXIBILITY . .

  • HERVE BARON

    2016 Herv Baron

    PIPING ROUTING/ERGONOMICS . .

  • HERVE BARON

    2016 Herv Baron

    PIPING MODELLING IN 3D MODEL 3D

  • HERVE BARON

    2016 Herv Baron

    PIPING DRAWING EXTRACTION

  • HERVE BARON

    2016 Herv Baron

    ISOMETRIC DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    PIPING DESIGN ISO VS SHOP ISO ISO ISO

  • HERVE BARON

    2016 Herv Baron

    PIPING PRE-FABRICATION

  • HERVE BARON

    2016 Herv Baron

    POST WELD HEAT TREATMENT

  • HERVE BARON

    2016 Herv Baron

    PIPING INSPECTION AND TESTING

  • HERVE BARON

    2016 Herv Baron

    PIPING GENERAL ARRANGEMENT DRAWING

  • HERVE BARON

    2016 Herv Baron

    PIPING DISCIPLINE

    PIPING DISCIPLINE

    PLANT LAYOUT

    PIPING INSTALLATION

    PIPING MATERIAL

    PIPING STRESS ANALYSIS

  • HERVE BARON

    2016 Herv Baron

    PIPING STRESS ANALYSIS

  • HERVE BARON

    2016 Herv Baron

    PIPING STRESS ANALYSIS CALCULATION NOTE

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    PIPE SUPPORT DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    SPRING SUPPORTS

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    PIPING DISCIPLINE

    PIPING DISCIPLINE

    PLANT LAYOUT

    PIPING INSTALLATION

    PIPING MATERIAL

    PIPING STRESS ANALYSIS

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL: LINE PIPE, FITTINGS : ,

  • HERVE BARON

    2016 Herv Baron

    MATERIAL SELECTION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASSES

  • HERVE BARON

    2016 Herv Baron

    GENERAL PIPING SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL CLASS SPECIFICATION

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL TAKE-OFF

  • HERVE BARON

    2016 Herv Baron

    PIPING MATERIAL REQUISITION

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (2/2) (2/2)

  • HERVE BARON

    2016 Herv Baron

    PIPING & INSTRUMENTATION DIAGRAM (P&ID)

  • HERVE BARON

    2016 Herv Baron

  • HERVE BARON

    2016 Herv Baron

    INSTRUMENT LIST

  • HERVE BARON

    2016 Herv Baron

    INSTRUMENT DATA SHEET

  • HERVE BARON

    2016 Herv Baron

    PCS (PROCESS CONTROL SYSTEM) ( . )

  • HERVE BARON

    2016 Herv Baron

    SYSTEM ARCHITECTURE DRAWING

  • HERVE BARON

    2016 Herv Baron

    SYSTEM REQUISITION

  • HERVE BARON

    2016 Herv Baron

    CONTROL NARRATIVE

  • HERVE BARON

    2016 Herv Baron

    PROCESS AUTOMATION

  • HERVE BARON

    2016 Herv Baron

    MECHANICAL EQUIPMENT CONTROL

  • HERVE BARON

    2016 Herv Baron

    EMERGENCY SHUTDOWN (ESD) ( )

  • HERVE BARON

    2016 Herv Baron

    Package / Centralized control /

  • HERVE BARON

    2016 Herv Baron

    Package / Local control /

  • HERVE BARON

    2016 Herv Baron

    FIRE & GAS SYSTEM

  • HERVE BARON

    2016 Herv Baron

    FIELD INSTRUMENTATION

    Process line /

    PT JB / .

    Marshaling Cabinet

    DCS Cabinet

    Instrument room

    Control room

    VDU /

    CPU /

    LAN

    Secondary cable / Multi cable /

  • HERVE BARON

    2016 Herv Baron

    MAIN CABLE ROUTINGS AND JUNCTION BOX (JB) LOCATION DRAWING

    ()

  • HERVE BARON

    2016 Herv Baron

    INSTRUMENT LOCATION & SECONDARY CABLE ROUTING DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    TELECOMMUNICATION EQUIPMENT LAYOUT DRAWING

  • HERVE BARON

    2016 Herv Baron

    TYPICAL INSTALLATION DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    JUNCTION BOX WIRING

  • HERVE BARON

    2016 Herv Baron

    INSTRUMENT LOCATION & SECONDARY CABLE ROUTING DRAWINGS / CABLE LIST .

    .

  • HERVE BARON

    2016 Herv Baron

    ITEM QUANTITY DESIGNATION

    1 195 Gauge adapter x

    2 37 Block manifold 2 valves (Gas)

    3 23 Block manifold 5 valves (Gas)

    4 0 Ball valve 12mm

    5 300m Tubing 12mm OD x 1mm

    6 200 Reducer 12mm x

    7 50 Union tee 12 x 12 x 12mm

    8 50 Female connector 12mm x

    9 350 Male connector 12mm x

    10 9 Plug NPTF

    11 8 Plug NPTM

    INSTRUMENT BULK MATERIAL TAKE-OFF

  • HERVE BARON

    2016 Herv Baron

    EQUIPMENT LAYOUT DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    MIMIC DISPLAY DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    INSTRUMENT LOOP DIAGRAM

    FIELD

    JUNCTION BOX /

    FIELD DEVICE

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    COMMON ENGINEERING DELIVERABLES (2/2) (2/2)

  • HERVE BARON

    2016 Herv Baron

    ELECTRICAL CONSUMER LIST

  • HERVE BARON

    2016 Herv Baron

    ELECTRICAL POWER DISTRIBUTION

  • HERVE BARON

    2016 Herv Baron

    GENERAL ONE LINE DIAGRAM

  • HERVE BARON

    2016 Herv Baron

    Turbogenerator

    Switchgear

    Transformer

    EQUIPMENT SIZING

  • HERVE BARON

    2016 Herv Baron

    EQUIPMENT DATA SHEET

  • HERVE BARON

    2016 Herv Baron

    SWITCHBOARD SINGLE LINE DIAGRAM

  • HERVE BARON

    2016 Herv Baron

    SWITCHGEAR TYPICAL DIAGRAM

  • HERVE BARON

    2016 Herv Baron

    ELECTRICAL CONTROL SYSTEM

  • HERVE BARON

    2016 Herv Baron

    ELECTRICAL CONTROL SYSTEM

  • HERVE BARON

    2016 Herv Baron

    From emergency (diesel) generators / -

    From main power generators /

    To normal consumers e.g. pumps in process and utility units / . .,

    .

    To essential consummers e.g. fire water pump . .,

    .

    ELECTRICAL CONTROL SYSTEM

  • HERVE BARON

    2016 Herv Baron

    EQUIPMENT LAYOUT DRAWING

  • HERVE BARON

    2016 Herv Baron

    CABLE ROUTING DRAWINGS / CABLE LIST . .

  • HERVE BARON

    2016 Herv Baron

    TYPICAL INSTALLATION DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    BLOCK DIAGRAM

  • HERVE BARON

    2016 Herv Baron

    TROUBLE SHOOTING DIAGRAMS

  • HERVE BARON

    2016 Herv Baron

    LIGHTING LAYOUT DRAWINGS

  • HERVE BARON

    2016 Herv Baron

    8800

    8900

    9000

    9100

    9200

    9300

    9400

    9500

    9600

    9700

    9800

    9900

    10000

    0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0

    VOLTAGE OF MS-001 (STUDY1)Bus V

    oltage (Volt

    s)

    Time (Seconds)

    47.0

    47.5

    48.0

    48.5

    49.0

    49.5

    50.0

    0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0

    FREQUENCY OF MS-001 (STUDY1)

    Bus Freque

    ncy (Hz)

    Time (Seconds)

    CALCULATIONS

  • HERVE BARON

    2016 Herv Baron

    GENERAL / PROCESS / MECHANICAL / SAFETY & ENVIRONMENT / .

    CIVIL / PIPING LAYOUT & MATERIAL /

    INSTRUMENTATION / ELECTRICAL / SCHEDULE /

    PROCESS PLANT ENGINEERING DEVELOPMENT -

  • HERVE BARON

    2016 Herv Baron

    SCHEDULE /

  • HERVE BARON

    2016 Herv Baron

    SCHEDULE /

  • PROCESS PLANT ENGINEERING

    Good bye! !

    HERVE BARON

  • HERVE BARON

    2016 Herv Baron

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

    http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

    http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

    Diapositive numro 1Diapositive numro 2Diapositive numro 3Basic Engineering Detail Engineering Diapositive numro 6Diapositive numro 7Diapositive numro 8Diapositive numro 9Diapositive numro 10List of Common Engineering Deliverables (1/2) (1/2) List of Common Engineering Deliverables (2/2) (2/2) Engineering document quality requirements: checking : Engineering document revision Engineering MASTERs Engineering review action items follow-up Diapositive numro 17Diapositive numro 18Diapositive numro 19Grid system Grid system Detail Drawings common sizes & scales Specifications / Basic engineering design data Diapositive numro 26Diapositive numro 27Diapositive numro 28Diapositive numro 29Diapositive numro 30Process Scheme Optimization Diapositive numro 32Diapositive numro 33Diapositive numro 34Diapositive numro 35Diapositive numro 36Diapositive numro 37Diapositive numro 38Diapositive numro 39Diapositive numro 40Diapositive numro 41Diapositive numro 42Diapositive numro 43Diapositive numro 44Diapositive numro 45Diapositive numro 46Diapositive numro 47Diapositive numro 48Diapositive numro 49Diapositive numro 50Diapositive numro 51Diapositive numro 52Diapositive numro 53Diapositive numro 54Diapositive numro 55Diapositive numro 56Diapositive numro 57Diapositive numro 58Bid technical evaluation Vendor design development Equipment summary Diapositive numro 62Diapositive numro 63Diapositive numro 64Diapositive numro 65Diapositive numro 66HAZOP review / Deviation (HAZOP ) / Diapositive numro 68HAZOP action and response sheet HAZOPSafety of Layout Fire Fighting Fire Fighting Fire Fighting Fire Water P&IDs Diapositive numro 75Passive fire protection Passive fire protection Diapositive numro 78Diapositive numro 79Diapositive numro 80Diapositive numro 81Diapositive numro 82Diapositive numro 83Diapositive numro 84Diapositive numro 85Diapositive numro 86Environmental Impact Assessment ()Noise study Diapositive numro 89Diapositive numro 90Diapositive numro 91Diapositive numro 92Diapositive numro 93Earthworks drawings Diapositive numro 95Diapositive numro 96Diapositive numro 97Diapositive numro 98Diapositive numro 99Civil works specification / Diapositive numro 101Loading data Diapositive numro 103Diapositive numro 104Diapositive numro 105Diapositive numro 106Diapositive numro 107Diapositive numro 108Diapositive numro 109Diapositive numro 110Diapositive numro 111Diapositive numro 112Diapositive numro 113Diapositive numro 114Diapositive numro 115Diapositive numro 116Diapositive numro 117Diapositive numro 118Diapositive numro 119Diapositive numro 120Diapositive numro 121Diapositive numro 122Diapositive numro 123Diapositive numro 124Diapositive numro 125Diapositive numro 126Diapositive numro 127Diapositive numro 128Diapositive numro 129Diapositive numro 130Diapositive numro 131Diapositive numro 132Diapositive numro 133Diapositive numro 134Diapositive numro 135Diapositive numro 136Diapositive numro 137Diapositive numro 138Diapositive numro 139Diapositive numro 140Diapositive numro 141Diapositive numro 142Diapositive numro 143Diapositive numro 144Diapositive numro 145Diapositive numro 146Diapositive numro 147Diapositive numro 148Diapositive numro 149Diapositive numro 150Diapositive numro 151Diapositive numro 152Diapositive numro 153Diapositive numro 154Diapositive numro 155Diapositive numro 156Diapositive numro 157Diapositive numro 158Diapositive numro 159Diapositive numro 160Diapositive numro 161Diapositive numro 162Diapositive numro 163Diapositive numro 164Diapositive numro 165Diapositive numro 166Diapositive numro 167Diapositive numro 168Diapositive numro 169Diapositive numro 170Diapositive numro 171Diapositive numro 172Diapositive numro 173Diapositive numro 174Diapositive numro 175Diapositive numro 176Diapositive numro 177Diapositive numro 178Diapositive numro 179Diapositive numro 180Diapositive numro 181Diapositive numro 182Diapositive numro 183Diapositive numro 184Diapositive numro 185Diapositive numro 186Diapositive numro 187Diapositive numro 188Diapositive numro 189Diapositive numro 190Diapositive numro 191Diapositive numro 192Diapositive numro 193Diapositive numro 194Diapositive numro 195Diapositive numro 196Diapositive numro 197Diapositive numro 198Diapositive numro 199Diapositive numro 200Diapositive numro 201Diapositive numro 202Diapositive numro 203Diapositive numro 204Diapositive numro 205Diapositive numro 206Diapositive numro 207Diapositive numro 208Diapositive numro 209Diapositive numro 210Diapositive numro 211Diapositive numro 212Diapositive numro 213Diapositive numro 214The Oil & Gas Engineering Guide - 2nd edition