BIM & Asset Management at Denver Interna2onal Airport
Brendan Dillon, BIM Manager DENVER INTERNATIONAL AIRPORT September 13th, 2016
2
• Building InformaFon Modeling Or Building InformaFon
Management is about the flow of
informaFon about a facility/structure
• Most commonly thought of in terms of a Project, but also applicable to
ongoing programs • ExisFng CondiFons • Design • ConstrucFon / ConstrucFon Admin • Cx/AcFvaFon • Closeout • FM/O&M
BIM Overview
Existing BIM / Assets
Construction Model
Design Model
Project Start
Data Harvest
Cx / CxDMA
Accurate Living
Building Model
3
• BIM is all about the flow of informaFon for a project • ExisFng CondiFons • Design • ConstrucFon / ConstrucFon Admin • Cx/AcFvaFon • Closeout • FM/O&M
How BIM is o:en described
Existing BIM / Assets
Construction Model
Design Model
Project Start
Data Harvest
Cx / CxDMA
Accurate Living
Building Model
4
DSM – EDCI (Electronic Data Collec2on & Interchange)
5
• Base Revit Model supplied by DEN
• Floors, doors, walls, roofs
• Based on exisFng CAD
• Requires field verificaFon
• Used as linked background file (do not do design
within the DEN models
• Templates and Family Library supplied by DEN
• ExisFng CAD supplied by DEN
• Laser Scan may be requested
• DEN sets up Glue/Field Sites on DEN deployment
Exis2ng Condi2ons
ExisFng CondiFons
Design
ConstrucFon
ConstrucFon Admin
Commissioning
AcFvaFon
Closeout
FM/O&M
6
• Design • BIM Design model
• SpaFal CoordinaFon in BIM 360 Glue
• Model Reviews at kickoff/30/60/90/100
• Assets IdenFfied
• Preliminary Asset Data
Design Phase
ExisFng CondiFons
Design
ConstrucFon
ConstrucFon Admin
Commissioning
AcFvaFon
Closeout
FM/O&M
7
• ConstrucFon • ConstrucFon model
• Coordinated Clash DetecFon
• BIM 360 Field populated from Glue models
• Assets Tagged
• Asset Data checked and developed
Construc2on Phase
ExisFng CondiFons
Design
ConstrucFon
ConstrucFon Admin
Commissioning
AcFvaFon
Closeout
FM/O&M
8
• CxA • Commissioning, inspecFons & asset tagging
done with Field
• ConstrucFon
• Forma[ed O&Ms submi[ed to Design for
approval; to DEN as FYI
• Asset Data checked and developed
• DEN
• Field data exported to Revit via Glue
• Preliminary data load to MAXIMO
Commissioning
ExisFng CondiFons
Design
ConstrucFon
ConstrucFon Admin
Commissioning
AcFvaFon
Closeout
FM/O&M
9
• Final inspecFons done with Field
• Asset Data Finalized
• ConstrucFon
• Final Forma[ed O&Ms
• Asset Data Finalized
• DEN
• Final data load to MAXIMO
Ac2va2on
ExisFng CondiFons
Design
ConstrucFon
ConstrucFon Admin
Commissioning
AcFvaFon
Closeout
FM/O&M
10
• ConstrucFon • ConstrucFon model
• Coordinated Clash DetecFon
• BIM 360 Field populated from Glue models
• Assets Tagged
• Asset Data checked and developed
Construc2on Phase
ExisFng CondiFons
Design
ConstrucFon
ConstrucFon Admin
Commissioning
AcFvaFon
Closeout
FM/O&M
11
• Project opens
• ConstrucFon • As-‐Builts Delivered
• Design • Record Model delivered
Maximo connec2on via ModelStream
12
• Project opens
• ConstrucFon • As-‐Builts Delivered
• Design • Record Model delivered
So:ware Capabili2es
13
• DEN • Model updated by MAXIMO
• Model uFlized by Maintenance to locate assets
• Model Informs Future Projects
Facility Maintenance & Opera2on
14
• IniFal FuncFonality adjustments
• Risks of adopFng new soaware
• Model Viewer interacted with Beta tools
• Developer worked with DEN Maximo
support staff to add funcFonality
• DEN Maximo instances
• Maximo Upgrade
• Facility Gap
So:ware Experience
15
• Reference DSM EDCI for Design and ConstrucFon projects
• h[ps://business.flydenver.com/bizops/documents/denEDCIComplianceDSM.pdf
• Brendan Dillon, BIM Manager